# SMARTS annual report: how to submit and verify it

> Finish your SMARTS annual report with steps to check account access, prepare answers, complete certification, and save proof of submission.

Canonical page: https://stormdue.com/blog/smarts-annual-report

November 26, 2026

[Get my permit calendar](https://stormdue.com/lookup)

Free, no account: your permit's recurring duties with due dates and the permit section for each.

A saved SMARTS annual report still needs certification and submission. For California industrial facilities filing under the Industrial General Permit (IGP), Order 2014-0057-DWQ as amended, Section XVI.A requires both actions through the Stormwater Multiple Application and Report Tracking System (SMARTS). This article follows the filing process, from account access to proof of submission. [Read the permit, Section XVI](https://www.waterboards.ca.gov/water_issues/programs/stormwater/docs/industrial/2014indgenpermit/order.pdf).

Keep your facility identifier, reporting period, source records, and authorized signer together before you start. Treat preparation, review, and submission as separate work assignments, even if you handle them yourself.

## Follow the annual report filing checklist

Use this sequence alongside the Water Boards’ [official annual report help guide](https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/industrial/docs/annual_report_smarts_helpguide.pdf).

- Open **File Reports**, then **Annual Reports**.
- Select the correct Report ID and reporting period.
- Complete the questions and add necessary attachments.
- Open **Certify** and select **Perform Completion Check**.
- Have the authorized signer review and certify the report.
- Confirm **Submitted** status and save the report and confirmation.

For the reporting deadline itself, use the [annual report due-date reference](https://stormdue.com/guides/stormwater-annual-report-due-dates). The steps below focus on getting the correct report through SMARTS.

## Check access before preparing the report

Account registration and facility access are separate. The Water Boards’ linking guide explains that a Legally Responsible Person (LRP) can link users to organization and facility records. A Duly Authorized Representative (DAR) has certification rights. A Data Entry Person (DEP) can enter and save information but cannot certify it. [See the managing and linking users guide](https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/general/docs/linking_users_help_guide.pdf).

Before assembling a long draft, ask the intended signer to log in under their own account. Have them check that the facility is visible. This gives you a chance to resolve an access problem before the report is waiting for a signature.

If the facility is missing, ask the LRP to check **Account Management**, then **Manage Linked Users**. The linking guide notes that duplicate organization records can have different facility identifiers associated with them. Check the actual facility record rather than relying on the organization name alone.

The signer also needs an Electronic Authorization form on file. The Water Boards require the original signed form and send an email after processing it. The form explains that the account represents the signer’s electronic signature and that account details must remain private. [Follow the Electronic Authorization guide](https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/general/docs/eauth_help_guide.pdf).

Use separate accounts for the preparer and signer. Arrange a review session if the signer needs help locating the draft. Don’t solve an access problem by passing around the signer’s password.

## Assemble a review packet for your answers

For California IGP facilities subject to annual reporting, Section XVI.B requires the checklist, explanations for unmet requirements, identification of Storm Water Pollution Prevention Plan (SWPPP) revisions by page or section, and annual evaluation dates. Use those requirements as the starting point for your review packet. [See Section XVI.B](https://www.waterboards.ca.gov/water_issues/programs/stormwater/docs/industrial/2014indgenpermit/order.pdf).

Create a working folder for the report you’re preparing. Put the records you expect to consult there, along with a short list of unresolved questions. Keep working notes separate from documents intended for upload.

For each draft answer, record where you found the supporting information. A useful working note has the question label, proposed answer, source filename, and anything the signer needs to review. This is an internal preparation aid, not an additional agency form.

For example, beside an evaluation-date answer, write the filename of the signed evaluation record. Beside an explanation, identify the record that supports the description. That lets the reviewer check the answer without searching through an entire shared drive.

If inspection records need sorting before you can answer, use the [industrial stormwater inspection checklist](https://stormdue.com/blog/industrial-stormwater-inspection-checklist) as a reference for organizing them.

Don’t copy last year’s answers as your starting assumption. Use the previous report to locate familiar records, then draft from the period you’re reporting.

## Open the correct facility and reporting period

Before editing, compare the report’s facility details against your own facility file. Check the name, address, identifier, and reporting period together. The official guide shows these fields in the annual report list. [See the annual report selection screens](https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/industrial/docs/annual_report_smarts_helpguide.pdf).

Make this a deliberate stop in your process. Write the selected Report ID in your working notes, then use that same identifier in the review handoff.

For a manager overseeing several locations, put the street address at the top of the working packet. Company names can look similar across records. Give the reviewer enough information to distinguish the facility without opening every attachment.

If you’re unsure which record belongs to your facility, resolve that question before entering answers. Send the help desk the facility details and explain what you see. Don’t begin a replacement application merely to get past a missing report.

## Write answers the signer can verify

Draft explanations in plain language. Describe what happened during the reporting period, what the available records establish, and what remains unresolved. Section XVI.B requires explanations for unmet requirements identified in the checklist. [Read the annual report requirements](https://www.waterboards.ca.gov/water_issues/programs/stormwater/docs/industrial/2014indgenpermit/order.pdf).

Avoid explanations such as “handled by consultant” or “see files.” Those phrases give your signer little to review. Identify the activity, describe the issue, and point to the relevant record.

For example, if you cannot locate a record, don’t rewrite that uncertainty as proof that the activity occurred. Ask the person responsible for the activity to supply the record or clarify what happened. Keep that question open in your working notes until you can support the answer.

If an explanation discusses later corrective work, separate that work from what happened during the reporting period. Don’t let a recent repair obscure the original condition you’re describing.

Use a brief internal review note beside any answer that needs judgment. State the question you need resolved and who will resolve it. The signer should receive a clear decision to review, rather than an unexplained blank or a confident guess.

## Check attachments before the signer reviews them

SMARTS provides an **Upload Attachment** control. The official guide directs users to confirm uploaded files appear in the attachment list and to remove an incorrect attachment. [See the attachment instructions](https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/industrial/docs/annual_report_smarts_helpguide.pdf).

Prepare the intended upload files in a separate folder. Give each a descriptive filename that identifies the facility, reporting period, and document purpose. Open each file before uploading it. Check that it is readable and contains the intended version.

As a final review habit, open the attachment from the report itself. Compare it with your upload folder. Look for an old draft, a similarly named file from another location, or a document with missing pages.

Keep your internal comments out of the upload folder unless you deliberately intend to submit them. A folder full of drafts makes the final review harder than it needs to be.

## Hand off the report for certification

The California IGP’s Section XXI.K allows the LRP or designated DAR to certify reports. A DEP does not have certification rights. [See the permit’s electronic signature requirements](https://www.waterboards.ca.gov/water_issues/programs/stormwater/docs/industrial/2014indgenpermit/order.pdf) and the [user-role guide](https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/general/docs/linking_users_help_guide.pdf).

Send the signer a short handoff message with the facility address, Report ID, reporting period, and location of the review packet. Identify unresolved issues explicitly. Ask the signer to review the answers and attachments before taking the certification action.

The official guide describes certification through **Documents Ready for Certification** or the report’s **Certify** tab. The signer accepts the certification statement, answers the security prompts, enters their account password, and submits. [Follow the certification instructions](https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/industrial/docs/annual_report_smarts_helpguide.pdf).

Agree in advance who will save the final report. That small assignment removes ambiguity after the signer finishes.

## Verify the filing and save the final record

After submission, match the final report to your working packet. Check that you have the intended facility, reporting period, answers, and attachments. Save the submission confirmation beside the final report, separate from the draft.

For California IGP records, Section XXI.J.4 requires retention for at least five years, with paper or electronic copies available for Water Board staff review at the facility during scheduled operating hours. [See the permit’s records provision](https://www.waterboards.ca.gov/water_issues/programs/stormwater/docs/industrial/2014indgenpermit/order.pdf).

Make the immediate next step a file check. Ask someone who did not prepare the report to locate the final report and confirmation using your folder names alone. If they open a draft first, rename or move the drafts. Keep a short note identifying who submitted the report and where the final record lives.

## FAQ

### Can my consultant submit the SMARTS annual report?

A consultant acting as a DEP can prepare and save the report. Certification requires an eligible LRP or DAR. The Water Boards’ linking guide states that a DAR role may not be delegated to a third party. [Check the role restrictions](https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/general/docs/linking_users_help_guide.pdf).

### Why can’t the signer complete certification?

Check their role, facility linkage, and Electronic Authorization status. The authorization guide explains that certification access follows receipt and processing of the signed form. [Review the authorization instructions](https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/general/docs/eauth_help_guide.pdf).

### Can I correct an annual report after submitting it?

The LRP or DAR can use **Remand** when available, make corrections, and recertify. Availability is limited by reporting year and due date. Contact the Regional Water Board for older reports. [See the correction instructions](https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/industrial/docs/annual_report_smarts_helpguide.pdf).

### Where do I get help with a SMARTS error?

Use **Report a SMARTS Issue** on the [official SMARTS resources page](https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/). Include the facility identifier, Report ID, screen name, and error text. Exclude passwords and security answers.

## Related on StormDue

- [Report due dates, permit by permit](https://stormdue.com/guides/stormwater-annual-report-due-dates): what each checked permit says, with the section for each duty.
- [Permit lookup](https://stormdue.com/lookup): your permit's recurring duties and due dates, free and without an account.
- [Free tools](https://stormdue.com/tools): check your industry, a lab result or your next deadlines against your permit.
- [More posts on the blog](https://stormdue.com/blog).

[Get my permit calendar](https://stormdue.com/lookup) [Find my state's permit](https://stormdue.com/states)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.