# Industrial stormwater permit requirements, topic by topic

> Inspections, sampling, report dates, exceedances, no exposure and SWPPP duties, compared across the permits StormDue has checked, with sections.

Canonical page: https://stormdue.com/guides

Each guide takes one kind of duty and lines up what every checked permit says about it, with the deadline and the section it comes from. 4 permits, 111 duties.

[Get my permit calendar](https://stormdue.com/lookup) [Find my state's permit](https://stormdue.com/states)

The guides compare permits. The lookup gives you your own dates. Free, no account.

## Pick a topic

- ### Inspection requirements
  Monthly, quarterly and yearly checks, and what to record.
- ### Sampling and qualifying storms
  Which storm counts, how many samples, and the windows.
- ### Report due dates
  Annual reports, DMRs and where each one is filed.
- ### Exceedance response
  Level 1, 2 and 3 steps and their deadlines.
- ### No exposure certification
  The eleven questions and how often to renew.
- ### SWPPP, training and records
  Revision deadlines, training and record keeping.

## How many duties each guide covers, by permit

**Duties per guide and permit**

| Guide | [California Industrial General Permit (IGP)](https://stormdue.com/permits/us-ca-igp) | [Texas MSGP](https://stormdue.com/permits/us-tx-txr050000) | [Washington ISGP](https://stormdue.com/permits/us-wa-isgp) | [EPA 2021 MSGP](https://stormdue.com/permits/us-epa-msgp-2021) |
| --- | --- | --- | --- | --- |
| [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements) | 3 | 3 | 4 | 5 |
| [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements) | 3 | 4 | 4 | 10 |
| [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates) | 8 | 4 | 2 | 5 |
| [Exceedance response](https://stormdue.com/guides/benchmark-exceedance-response) | 7 | 1 | 3 | 3 |
| [No exposure certification](https://stormdue.com/guides/no-exposure-certification) | 4 | 1 | 1 | 1 |
| [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements) | 15 | 9 | 5 | 6 |

Rules last checked: California Industrial General Permit (IGP) November 25, 2026; Texas MSGP November 25, 2026; Washington ISGP November 25, 2026; EPA 2021 MSGP November 26, 2026. Other states show their permit facts and a waitlist until their rules are checked: see [every state](https://stormdue.com/states) and [how we check the rules](https://stormdue.com/about-the-rules).

## Your own dates, not a comparison

Pick your state and coverage and get each duty's next date with the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.
