# Louisiana MSGP due dates and duties

Every duty in the LPDES Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activities, with when it is due and the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup?state=LA)

Free, no account. Your own dates in a minute.

- 80duties, each cited
- 9on a schedule
- 71when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

**Notes on the permit's status and renewal**

The cover page (a scanned image) says the permit and authorization to discharge were effective October 27, 2021 and expire five years from the effective date, and that a modification issued March 31, 2022 took effect April 1, 2022; the PDF read is that modified version ("Modified Page n of 128"). LDEQ's general permits page lists LAR050000 as issued 10/27/21 and expiring 10/26/26. No draft reissuance, public notice or extension was found on LDEQ's public notice search or the web on November 27, 2026; the only LAR050000 notice listed is the 2021 reissuance draft. Part 1.12 of the permit says that if it expires before it is reissued, LDEQ will administratively extend it for permittees covered before the expiration until they obtain coverage under a reissued permit. StormDue found no LDEQ notice confirming the extension, and the permit does not say whether a facility not covered by October 26, 2026 can still obtain coverage (open question q1).

## What does full permit coverage require?

Permit coverage by Notice of Intent (Form MSGP-G); authorization begins 30 days after LDEQ receives a complete NOI unless LDEQ says otherwise (Part 1.8).

- Every quarter 3
- Every year 2
- One time 2
- When something happens 17
- Ongoing 4
- Only if... 50

### Every quarter  3 duties

#### Do a visual assessment of a storm water sample from each outfall once a quarter

By the end of each calendar quarter.

Each quarter, collect a storm water sample from each outfall within the first 30 minutes of a discharge (or as soon as practicable after), at least 72 hours after the previous discharge, and examine it in a clear container for color, odor, clarity, solids, foam and oil sheen. Keep the record with the SWPPP.

- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 3.2.5. Check your copy of the permit.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.5, page 26**

> "The permittee must collect and conduct a visual assessment of a storm water sample from each outfall once per quarter for the entire permit term."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=27)

#### Inspect exposed areas and controls once each calendar quarter

By the end of each calendar quarter.

Qualified personnel, with at least one pollution prevention team member, inspect every area where industrial materials or activities are exposed to storm water and every control measure, at least once each calendar quarter while the facility operates, and document the findings.

- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 5.1, page 54**

> "Routine facility inspections must be conducted at least quarterly (i.e., once each calendar quarter)"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=55)

#### Benchmark monitoring: quarterly in 2022 and 2024 only

No set date. The permit sets benchmark monitoring only in calendar years 2022 and 2024 (Part 3.2.3.1); both have passed. Quarterly sampling continues only after a four-quarter average above a benchmark (the corrective action monitoring duty).

Facilities in a sub-sector with benchmark values in Table 3 sampled each outfall once a quarter in permit years 2 and 4, calendar years 2022 and 2024, and reported each year's results by January 28 of the next year. Both years have passed and the permit sets no later monitoring year. Hardness-dependent metal benchmarks come from Table 4.

- **Does not apply if:** the facility is inactive and unstaffed.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3.1, page 25**

> "Benchmark monitoring shall be conducted quarterly in years 2 and 4 of the permit, years 2022 and 2024, respectively."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

### Every year  2 duties

#### Do at least one routine inspection each calendar year while storm water is discharging

By December 31 each year.

At least once each calendar year, one of the routine inspections is done during a period when a storm water discharge is occurring.

- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 5.1, page 54**

> "at least once each calendar year, during a period when a storm water discharge is occurring."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=55)

#### Do the annual comprehensive site inspection once each calendar year

By December 31 each year.

Qualified personnel, with at least one team member, inspect every area affected by the permit, review the year's monitoring data, check the control measures and record the findings with a signed statement, once in each calendar year. It continues while coverage is administratively continued.

- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 5.2, page 54**

> "Annual, as defined in this Part, means once during each calendar year beginning with the year the facility is authorized to discharge under this permit."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=55)

### One time  2 duties

#### Covered before October 26, 2026: coverage continues until a reissued permit, then follow its steps

No set date. No reissued permit has been issued. The steps and dates will come from the new permit when LDEQ gives notice of it (Part 1.12).

The permit expired October 26, 2026. For facilities covered before then, LDEQ extends it until they obtain coverage under a reissued permit. When LDEQ gives notice of a reissued or replacement permit, follow that permit's steps to keep authorization to discharge.

- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 1.12, page 17**

> "Should this permit expire before it is reissued, this Office will administratively extend the permit to discharge, for permittees that were covered prior to the expiration, until such time that coverage under a reissued permit is obtained."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=18)

#### Write the SWPPP before submitting the NOI

No set date. Before the NOI is submitted (Part 4.2.a); the permit sets no other date.

Prepare a Storm Water Pollution Prevention Plan under good engineering practices before the NOI. It names the pollution prevention team, maps the site, lists pollutant sources, spills and non-storm water discharges, describes the control measures, schedules and monitoring and inspection procedures, and carries the sector-specific items of Part 6 and a copy of the permit.

- **Does not apply if:** your coverage was granted together with another LPDES permit.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 4.2.a, page 46**

> "New dischargers shall develop a SWPPP in compliance with this permit prior to submittal of the NOI."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=47)

### When something happens  17 duties

#### After a four-quarter average above a benchmark: fix controls and keep sampling quarterly

By the end of each calendar quarter.

If the average of four quarterly results for a parameter exceeds its benchmark, review the control measures and either make the needed changes and keep monitoring quarterly until four consecutive quarters average at or below the benchmark, or tell LDEQ in the next benchmark report that no further reductions are achievable and document why.

- **When:** the four-quarter benchmark average is exceeded.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.3, page 29**

> "make the necessary modifications and continue quarterly monitoring until 4 consecutive quarters of monitoring for which the average concentration of the pollutant does not exceed the benchmark have been completed"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=30)

#### Report corrective action benchmark results by the 28th of the month after each quarter

By April 28 (Q1), July 28 (Q2), October 28 (Q3) and January 28 (Q4).

Submit the DMR for each quarter of corrective action benchmark monitoring in NetDMR by the 28th day of the month after the quarter (April 28, July 28, October 28, January 28). Table 5 instead lets the year's results go in one package by January 28; the pack shows the earlier reading.

- **When:** the four-quarter benchmark average is exceeded.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 5.5. Check your copy of the permit.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 5.5, page 57**

> "DMRs shall be electronically submitted in accordance with LAC 33:I.2101.A and B no later than the 28th day of the month following the reporting period."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=58)

#### Covered together with another LPDES permit: write the SWPPP within 60 days

Within 60 days after you receive coverage.

A facility granted MSGP coverage at the same time as another LPDES permit (for example the Light Commercial General Permit) for its other discharges develops the SWPPP within 60 days of receiving coverage.

- **When:** your coverage was granted together with another LPDES permit.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 4.2.c, page 46**

> "shall develop a SWPPP in compliance with this permit within 60 days of receiving coverage."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=47)

#### Document a corrective action condition within 24 hours, and the action within 14 days

Within 24 hours after you discover the condition.

When an unauthorized release, controls too weak for water quality standards, an effluent limit exceedance, an inspection finding or another Part 4.5 or 4.6 condition is found, document the condition, the problem and the date within 24 hours. Within 14 days document the corrective action taken or planned (or why none is needed), any SWPPP change and the start and finish dates.

Further steps with their own deadlines:

- **Document the corrective action and SWPPP changes.** Within 14 days after you discover the condition. [Section 4.8, page 53](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=54)
  > "Within 14 days of discovery of any condition listed in Parts 4.5 and 4.6, the permittee must document the following information:"

- **When:** you discover a corrective action condition.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 4.8, page 53**

> "Within 24 hours of discovery of any condition listed in Parts 4.5 and 4.6, the permittee must document the following information:"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=54)

#### Give notice at least 10 days before an anticipated bypass

At least 10 days before the bypass.

If the permittee knows in advance that a treatment facility must be bypassed, submit prior notice to LDEQ's Water Permits Division, if possible at least 10 days before the bypass.

- **When:** a bypass is expected.

- You send it to the agency (LDEQ Office of Environmental Services, Water Permits Division).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section Part 8, B.4.c, page 110**

> "it shall submit prior notice to the Office of Environmental Services, Water Permits Division, if possible at least 10 days before the date of the bypass."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=111)

#### If the non-storm water certification cannot be made: notify LDEQ 180 days after the NOI

Within 180 days after you submit the NOI.

The SWPPP must include a signed certification that every outfall was tested or evaluated for non-storm water and that unauthorized discharges were eliminated. If it is not provided, notify LDEQ 180 days after submitting the NOI, explain why, and keep a copy in the SWPPP.

- **When:** the non-stormwater certification was not provided.

- You send it to the agency (LDEQ Office of Environmental Services).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 4.3.9, page 51**

> "If the certification required (testing and/or evaluation for non-storm water discharges) is not provided, LDEQ must be notified 180 days after submitting the NOI for this permit"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=52)

#### Name change without an ownership change: submit a Notification of Change (NOC-1)

No set date. The permit sets no deadline for the NOC-1.

A company or facility name change that is not due to an ownership change is reported on a completed Notification of Change Form (NOC-1).

- **When:** the name changes without a change of ownership.

- You send it to the agency (LDEQ (Form NOC-1)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 1.10, page 17**

> "Facilities that undergo a company or facility name change not due to an ownership change must submit a completed Notification of Change Form (NOC-1)"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=18)

#### New owner or operator: submit an NOI 30 days before taking operational control

At least 30 days before you take operational control.

Coverage does not transfer. A new owner or operator files its own NOI before taking over the facility; the previous permittee files a Notice of Termination at the same time or after. Table 2 sets 30 days before taking operational control; Part 1.10 says at least 2 days. The pack dates the earlier, 30 days.

- **When:** the owner or operator changes.

- You send it to the agency (LDEQ Office of Environmental Services, Water Permits Division (Form MSGP-G)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 2.1, Table 2, page 18**

> "New owner/operators of existing discharges Thirty (30) days prior to taking operational control of the facility."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=19)

#### Noncompliance that may endanger health or the environment: report orally within 24 hours

Within 24 hours after you become aware of the circumstances.

Report orally any noncompliance that may endanger human health or the environment within 24 hours of becoming aware of it, including an unanticipated bypass or upset that exceeds an effluent limit. Send a written submission within five days.

Further steps with their own deadlines:

- **Send the written submission.** Within 5 days after you become aware of the circumstances. [Section Part 8, D.6.e, page 119](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=120)
  > "A written submission shall also be provided within five days of the time the permittee becomes aware of the circumstances."

- **When:** noncompliance that needs a 24-hour report happens.

- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section Part 8, D.6.e, page 119**

> "Any information shall be provided orally within 24 hours from the time the permittee becomes aware of the circumstances."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=120)

#### Report a reportable-quantity spill to the National Response Center as soon as known

When you learn of the discharge.

When a leak, spill or release of oil or a hazardous substance at or above a reportable quantity occurs in 24 hours, notify the National Response Center at (800) 424-8802 as soon as the permittee knows of it, and keep contact information where it is easy to reach.

- **When:** a release of a reportable quantity happens.

- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.1.4, page 23**

> "the permittee must notify the National Response Center (NRC) at (800) 424-8802"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=24)

#### Report other noncompliance with the next monitoring report

No set date. With the next monitoring report; the permit sets no separate date.

Report every instance of noncompliance not reported under the other Part 8 reporting rules when monitoring reports are submitted, with the same information as a 24-hour written submission.

- **When:** any other noncompliance happens.

- You file it in the agency's system (With the DMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section Part 8, D.7, page 120**

> "The permittee shall report all instances of noncompliance not reported under Section D.4, 5, and 6, at the time monitoring reports are submitted."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=121)

#### Sample as LDEQ directs in a written monitoring notice

No set date. The schedule is the one in LDEQ's notice.

LDEQ may send any facility a written notice requiring sampling for specific parameters. The notice sets the parameters, frequency, period, sample type and reporting.

- **When:** LDEQ gives you written notice to monitor.

- You file it in the agency's system (NetDMR, or as the notice says).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.6, page 27**

> "The LDEQ may provide written notice to any facility ... requiring discharge sampling for specific parameter(s)."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=28)

#### Send a signed copy of the NOI to the MS4 operator by the NOI deadline

At least 30 days before operations with industrial stormwater discharge start.

A facility whose industrial storm water enters a regulated MS4, or an MS4 designated by LDEQ, sends the MS4 operator a signed copy of the NOI by the same deadline as the NOI.

- **When:** the facility discharges to a regulated MS4; a new discharge is not yet covered.

- You send a copy to the operator of your storm sewer system (MS4).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 2.5. Check your copy of the permit.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 2.5, page 21**

> "In accordance with the deadlines listed in Table 2, a signed copy of the NOI must be submitted to the MS4 operator by facilities that have storm water discharges associated with industrial activity entering a regulated MS4"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=22)

#### Submit a Notice of Termination within 30 days when coverage should end

Within 30 days after a condition for ending coverage is met.

Submit a complete Notice of Termination (Form MSGP-T) within 30 days after a new owner or operator takes responsibility, operations stop and no industrial storm water remains, Sector G, H or J termination requirements are met, or individual or alternative general permit coverage is obtained for all discharges. Authorization ends at midnight on the day the NOT is signed and mailed.

- **When:** a condition for ending coverage is met.

- You send it to the agency (LDEQ Office of Environmental Services, Water Permits Division (Form MSGP-T)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 1.9, page 16**

> "The NOT is valid if it is submitted within thirty (30) days after one or more of the following conditions have been met:"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=17)

#### Submit the Notice of Intent 30 days before operations with industrial storm water begin

At least 30 days before operations with industrial stormwater discharge start.

A new facility submits a complete NOI (Form MSGP-G) to LDEQ, with the SWPPP already written, at least 30 days before it starts operating with discharges of storm water associated with industrial activity. Authorization begins 30 days after LDEQ receives a complete NOI unless LDEQ says otherwise.

- **When:** a new discharge is not yet covered.

- You send it to the agency (LDEQ Office of Environmental Services, Water Permits Division (Form MSGP-G)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 2.1, Table 2, page 18**

> "Thirty (30) days prior to commencing operation of the facility with discharges of storm water associated with industrial activity."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=19)

#### Unauthorized discharge above a reportable quantity: notify DPS within 24 hours

Within 24 hours after you learn of the discharge.

For an unauthorized discharge that exceeds a reportable quantity but causes no emergency, notify the DPS hotline, (225) 925-6595, within 24 hours after learning of it, and send a written report within seven calendar days after the notification.

Further steps with their own deadlines:

- **Send the written report.** Within 7 days after the notification. [Section Part 8, D.6.d, page 118](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=119)
  > "in accordance with LAC 33:I.3925 within seven calendar days after the notification required by D.6.a or 6.b"

- **When:** an unauthorized discharge above a reportable quantity happens.

- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section Part 8, D.6.b, page 117**

> "the discharger shall promptly notify DPS by telephone at (225) 925-6595 (collect calls accepted 24 hours a day) within 24 hours after learning of the discharge."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=118)

#### Unauthorized discharge causing an emergency: call the hotline within one hour

Within 1 hour after you learn of the discharge.

For an unauthorized discharge that causes an emergency condition, notify the Department of Public Safety 24-hour Louisiana Emergency Hazardous Materials Hotline, (225) 925-6595, at once and no later than one hour after learning of it, whatever the amount. Send a written report within seven calendar days.

Further steps with their own deadlines:

- **Send the written report.** Within 7 days after the notification. [Section Part 8, D.6.a, page 117](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=118)
  > "A written report shall be provided within seven calendar days after the notification."

- **When:** an unauthorized discharge causes an emergency.

- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section Part 8, D.6.a, page 117**

> "but in no case later than one hour after learning of the discharge."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=118)

### Ongoing  4 duties

#### Keep runoff within Louisiana's limits for TOC, oil and grease, and pH

No set date. Standing limit; no sampling schedule unless Table 3 or LDEQ requires one.

Any runoff leaving the site above 50 mg/L total organic carbon or 15 mg/L oil and grease, or with a pH below 6.0 or above 9.0, is a violation. Regular monitoring for these is required only where Table 3 says so; the SWPPP must be built to meet them.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.1, page 25**

> "Any runoff leaving the permitted site exceeding 50 mg/L Total Organic Carbon (TOC), 15 mg/l Oil and Grease, or having a pH less than 6.0 or greater than 9.0 standard units shall be a violation of this permit."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Keep the current SWPPP at the facility and show it on request

No set date. Standing duty while covered.

Keep a copy of the current SWPPP, with a copy of the permit language, at the facility from the start of coverage until coverage ends, and make it immediately available to LDEQ, a local agency, the MS4 operator or federal wildlife agencies at an inspection or on request.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 4.4, page 52**

> "The permittee must retain a copy of the current SWPPP required by this permit at the facility, and it must be made immediately available to the LDEQ"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=53)

#### Keep the SWPPP, reports and NOI records for 3 years after coverage ends

No set date. Standing duty; the retention periods are counted from the end of coverage and from each sample.

Keep copies of the SWPPP, every report the permit requires and the records used for the NOI for at least three years after coverage expires or is terminated, and monitoring records for at least three years from the sample or measurement. LDEQ may extend these periods.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 5.4.1, page 56**

> "for a period of at least three years from the date that the facility's coverage under this permit expires or is terminated."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=57)

#### Train employees who work in exposed areas or carry out the permit

No set date. The permit sets no frequency for the general training; EPA's recommendation of at least annually is not a permit requirement. Sectors G, J and P have their own yearly training duties.

Train everyone who works where industrial materials or activities are exposed to storm water or who carries out the permit (inspectors, maintenance staff, the pollution prevention team) on the SWPPP, spill response, housekeeping, maintenance, material management, emergency procedures, control measures and the monitoring, inspection and reporting duties. Keep a training schedule in the SWPPP.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.1.8, page 24**

> "All employees who work in areas where industrial materials or activities are exposed to storm water ... must be trained."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=25)

### Only if...  50 duties

These apply only in the situation named on each one. Answer the questions to sort them.

#### Sector E: sweep or vacuum exposed paved areas at least once a week

By the end of each week.

Where cement, aggregate, fly ash or settled dust are handled or processed and may reach storm water, sweep or vacuum (or use an equivalent measure) at least once a week, and keep these fine solids in enclosed silos, hoppers or buildings or under cover where practicable.

- **Only if:** your permit sector is E.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.E.2, page 60**

> "It must be performed at least once a week in areas where cement, aggregate, fly ash, or settled dust are handled or processed, and may be discharged in storm water"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=61)

#### Sector I drilling and sand or shale mining areas: inspect erosion controls every 7 days

By the end of each week.

Inspect all erosion and sedimentation controls every 7 days, or instead every 14 calendar days and within 24 hours of a storm of 0.25 inches or more. The pack shows the 7-day schedule.

- **Only if:** your permit sector is I.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.I.3, page 65**

> "Inspect all erosion and sedimentation control measures either: 1) every 7 days; or 2) once every 14 calendar days and within 24 hours of a storm event of 0.25 inches or greater."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=66)

#### Sector L operating landfills, open dumps and land application sites: inspect at least once every 7 days

By the end of each week.

Inspect operating landfills, open dumps and land application sites at least once every 7 days, focusing on areas not yet finally stabilized, active land application areas, exposed storage, controls, leachate systems and truck entrances and exits.

- **Only if:** your permit sector is L.
- **Does not apply if:** the site is an inactive landfill, open dump or land application site; the landfill is stabilized or land application is complete.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.L.6.1, page 68**

> "Inspect operating landfills, open dumps, and land application sites at least once every 7 days."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=69)

#### Sector A wood preserving: inspect processing, transport and treated wood storage areas monthly

By the end of each month.

If wood surface protection or preservation is done, inspect the processing and transport areas and treated wood storage areas each month for treatment chemicals reaching unprotected soil or areas that contact storm water.

- **Only if:** your permit sector is A; the facility does wood surface protection or preservation.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.A.5, page 59**

> "inspect the processing and transport areas and treated wood storage areas monthly"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=60)

#### Sector AA blasting and painting: clean storm water conveyances of blasting debris and paint chips monthly

By the end of each month.

Where blasting or painting is done, clean storm water conveyances of abrasive blasting debris and paint chips at least once a month.

- **Only if:** your permit sector is AA; blasting or painting is done at the facility.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.AA.3.3, page 92**

> "6.AA.3.3 Blasting and Painting Area ... At least once per month, clean storm water conveyances of deposits of abrasive blasting debris and paint chips."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=93)

#### Sector AB blasting and painting: clean storm water conveyances of blasting debris and paint chips monthly

By the end of each month.

Where blasting or painting is done, clean storm water conveyances of abrasive blasting debris and paint chips at least once a month.

- **Only if:** your permit sector is AB; blasting or painting is done at the facility.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.AB.2.1, page 93**

> "At least once per month, clean storm water conveyances of deposits of abrasive blasting debris and paint chips."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=94)

#### Sector G active metal mining sites: inspect at least monthly

By the end of each month.

Inspect active metal mining sites at least once a month.

- **Only if:** your permit sector is G.
- **Does not apply if:** the site is a temporarily inactive mining site.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.G.8, page 62**

> "Inspect active mining sites at least monthly; and inspect temporarily inactive sites at least quarterly unless adverse weather conditions make the site inaccessible."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=63)

#### Sector J sites discharging to outstanding or sediment- or nitrogen-impaired waters: inspect monthly

By the end of each month.

Mineral mining sites that discharge to designated outstanding natural resource waters or to sediment- or nitrogen-impaired waters inspect at least once a month.

- **Only if:** your permit sector is J; the facility discharges to an outstanding natural resource water or a water impaired for sediment or nitrogen.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.J.6, page 67**

> "Monthly inspections must be conducted at sites which discharge to designated outstanding natural resource waters or sediment- or nitrogen-impaired waters."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=68)

#### Sector L stabilized sites and completed land application areas: inspect at least monthly

By the end of each month.

For stabilized landfill sites and areas where land application has been completed, inspect at least once a month.

- **Only if:** your permit sector is L; the landfill is stabilized or land application is complete.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.L.6.1, page 68**

> "For stabilized sites and areas where land application has been completed, conduct inspections at least once every month."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=69)

#### Sector O steam electric: inspect coal handling, fueling, storage and ash areas monthly

By the end of each month.

Each month, inspect coal handling areas, loading and unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas, areas next to disposal ponds and landfills, maintenance areas, liquid storage tanks and material storage areas.

- **Only if:** your permit sector is O.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.O.3, page 75**

> "Inspect the following areas monthly: coal handling areas, loading or unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=76)

#### Sector Q blasting and painting: clean storm water conveyances of blasting debris and paint chips monthly

By the end of each month.

Where blasting or painting is done, clean storm water conveyances of abrasive blasting debris and paint chips at least once a month.

- **Only if:** your permit sector is Q; blasting or painting is done at the facility.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.Q.3.2, page 78**

> "At least once per month, clean storm water conveyances of deposits of abrasive blasting debris and paint chips."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=79)

#### Sector S blasting and painting: clean storm water conveyances of blasting debris and paint chips monthly

By the end of each month.

Where aircraft blasting or painting is done, clean storm water conveyances of abrasive blasting debris and paint chips at least once a month.

- **Only if:** your permit sector is S; blasting or painting is done at the facility.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.S.4.9, page 85**

> "At least once per month, clean storm water conveyances of deposits of abrasive blasting debris and paint chips."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=86)

#### Sector V textiles and leather: inspect transfer lines, spill prevention and housekeeping monthly

By the end of each month.

At least once a month, inspect transfer and transmission lines, spill prevention, housekeeping, management of process waste products and all structural and non-structural practices.

- **Only if:** your permit sector is V.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.V.4, page 88**

> "Inspect, at least monthly, the following activities and areas (at a minimum): transfer and transmission lines, spill prevention, good house-keeping practices"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=89)

#### Facilities with an effluent guideline in Table 3: sample each outfall once each calendar year

By December 31 each year.

Facilities subject to an effluent limitation guideline in Table 3 (Sector A wet decking, C phosphate fertilizer, D asphalt emulsion, E cement material storage, J mine dewatering, K and L landfills, O coal piles, S airfield urea deicing) sample every outfall for each limited parameter once each calendar year. A result above a limit is a permit violation.

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs).

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.2, page 25**

> "Permittees subject to one of the Effluent Limitation Guidelines identified in Table 3 must conduct monitoring at all outfalls for each parameter on an annual basis (January 1 to December 31), for the entire term of the permit."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector G temporarily inactive metal mining sites: inspect at least quarterly

By the end of each calendar quarter.

Inspect temporarily inactive metal mining sites at least once each calendar quarter unless adverse weather makes the site inaccessible.

- **Only if:** your permit sector is G; the site is a temporarily inactive mining site.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 6.G.8. Check your copy of the permit.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.G.8, page 62**

> "Inspect active mining sites at least monthly; and inspect temporarily inactive sites at least quarterly unless adverse weather conditions make the site inaccessible."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=63)

#### Sector H coal mining: inspect active mining areas quarterly with the SMCRA inspections

By the end of each calendar quarter.

Inspect active coal mining-related areas covered by the permit each quarter, at the same time as the SMCRA inspections, and keep the SMCRA authority's records. Areas in the exploration and construction phase are excluded.

- **Only if:** your permit sector is H.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 6.H.6. Check your copy of the permit.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.H.6, page 64**

> "perform quarterly inspections of active mining areas covered by this permit corresponding with the inspections as performed by SMCRA inspectors"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=65)

#### Sector J mineral mining: inspect at least quarterly

By the end of each calendar quarter.

Inspect the site at least once each calendar quarter unless adverse weather makes it inaccessible, except areas in the exploration and construction phase.

- **Only if:** your permit sector is J.
- **Does not apply if:** the facility discharges to an outstanding natural resource water or a water impaired for sediment or nitrogen.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 6.J.6. Check your copy of the permit.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.J.6, page 67**

> "conduct inspections at least quarterly unless adverse weather conditions make the site inaccessible."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=68)

#### Sector L inactive landfills, open dumps and land application sites: inspect at least quarterly

By the end of each calendar quarter.

Qualified personnel inspect inactive landfills, open dumps and land application sites at least once each calendar quarter: stabilization and erosion controls, leachate systems and closed land application areas.

- **Only if:** your permit sector is L; the site is an inactive landfill, open dump or land application site.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 6.L.6.2. Check your copy of the permit.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.L.6.2, page 68**

> "Inspect inactive landfills, open dumps, and land application sites at least quarterly."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=69)

#### Sector M salvage yards: inspect fluid-holding equipment and storage areas quarterly

By the end of each calendar quarter.

Each quarter, inspect all equipment containing oily parts, hydraulic or other fluids or mercury switches, and all vessels and areas where hazardous materials and automotive fluids are stored, for signs of leakage. Inspect arriving vehicles for leaks immediately or as soon as practicable.

- **Only if:** your permit sector is M.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 6.M.6. Check your copy of the permit.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.M.6, page 69**

> "Inspect the following quarterly for signs of leakage:"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=70)

#### Report effluent limit monitoring by January 28 for the previous calendar year

By January 28, for the calendar year before.

Submit the year's effluent limit results, including follow-up samples, on one DMR in NetDMR by January 28 of the following year. Report the highest value from any outfall.

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs).

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 5.5, Table 5, page 58**

> "Submit results, including follow-up samples, by January 28th for the preceding calendar year."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=59)

#### Send signed copies of DMRs to the MS4 operator by the Table 5 dates

By January 28, for the calendar year before.

A facility with at least one industrial storm water discharge into a regulated MS4 sends signed copies of its DMRs to the MS4 operator by the same dates as the DMRs (January 28 for the previous year's effluent limit results).

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs); the facility discharges to a regulated MS4.

- You send a copy to the operator of your storm sewer system (MS4).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 5.5.1. Check your copy of the permit.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 5.5.1, page 58**

> "the permittee must submit signed copies of the DMRs to the MS4 operator in accordance with the dates provided above in Table 5."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=59)

#### After an effluent limit exceedance: start corrective action within 30 days

Within 30 days after an effluent limit is exceeded.

If a result exceeds an effluent limit, review the control measures and start any needed corrective action within 30 days, document it in the SWPPP, and take a follow-up sample at that outfall within 30 days after the corrective action (or at the next qualifying runoff event). Keep sampling quarterly until the discharge meets the limit, and report every exceedance to LDEQ's Enforcement Division.

Further steps with their own deadlines:

- **Take the follow-up sample.** Within 30 days after the corrective action is in place. [Section 3.5, page 30](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=31)
  > "must be conducted within 30 calendar days (or during the next qualifying runoff event, should none occur within 30 days) of implementing corrective action(s) taken."

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs); an effluent limit is exceeded.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.5, page 30**

> "If an exceedance of an effluent limitation occurs, the permittee must review the control measures and initiate any required corrective action within 30 days."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=31)

#### Discharging to an impaired water or one with a TMDL: address it in the SWPPP

No set date. Standing SWPPP requirement; the permit sets no date.

If the first water body the facility discharges to is impaired (Category 5 on the latest EPA-approved Integrated Report), the SWPPP must document how the controls minimize the pollutants of concern. If a TMDL applies, meet its monitoring, requirements, assumptions and any waste load allocation.

- **Only if:** your stormwater reaches an impaired water body.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 1.7.8.a, page 14**

> "then the SWPPP must address the impairments."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=15)

#### Oil and gas facility after a reportable release: submit an NOI within 14 days

Within 14 days after you learn of the release.

An oil and gas field facility normally exempt from storm water permitting that has a discharge of a reportable quantity of oil or a hazardous substance submits an NOI within 14 calendar days after learning of the release, and prepares and puts in place the SWPPP within 60 days.

Further steps with their own deadlines:

- **Prepare and implement the SWPPP.** Within 60 days after you learn of the release. [Section 2.1.2, page 18](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=19)
  > "Within 60 calendar days after learning of the release they shall also prepare and implement the SWPPP as required in Part 4"

- **Only if:** your permit sector is I; a reportable quantity release happens at an exempt oil and gas facility.

- You send it to the agency (LDEQ Office of Environmental Services, Water Permits Division (Form MSGP-G)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 2.1.2, page 18**

> "shall submit an NOI for permit coverage within 14 calendar days after learning of the release."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=19)

#### Sector A: benchmark values for timber products (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector A sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is A.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector AA: benchmark values for fabricated metal products (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector AA sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is AA.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector B: benchmark values for paper and allied products (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector B sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is B.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector C: benchmark values for chemical and allied products (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector C sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is C.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector D: benchmark values for asphalt paving and roofing materials and lubricants (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector D sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is D.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector E: benchmark values for glass, clay, cement, concrete and gypsum products (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector E sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is E.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector F: benchmark values for primary metals (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector F sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is F.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector G active and temporarily inactive sites: train employees at least annually

Within 1 year after the last training.

Conduct employee training at least once a year at active and temporarily inactive metal mining sites and document it in the SWPPP. The pack counts twelve months from the last training.

- **Only if:** your permit sector is G.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 6.G.3. Check your copy of the permit.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.G.3, page 61**

> "Document in the SWPPP all employee training(s) which must be conducted at least annually at active and temporarily inactive sites."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=62)

#### Sector G: benchmark values for metal mining (G1 and G2) (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector G sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is G.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector G3: report-only monitoring parameters for other metal ore mines (Table 3)

No set date. Report-only parameters for the benchmark monitoring years (2022 and 2024, Part 3.2.3.1); see the benchmark monitoring duty.

Tungsten, nickel, vanadium, aluminum, mercury, iron, platinum, titanium, molybdenum, uranium and radium ore mines report values for the parameters Table 3 lists; there is no benchmark value.

- **Only if:** your permit sector is G.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector H: benchmark values for coal mines and coal mining-related facilities (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector H sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is H.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector I: begin vegetative practices within 14 days after the last activity in a disturbed area

Within 14 days after the last activity in the area.

Unless covered by the construction general permit, begin appropriate vegetative practices (seeding, mulching, sod, buffer strips) on all disturbed areas of well drilling and sand or shale mining sites within 14 days after the last activity in that area, and document them in the SWPPP.

- **Only if:** your permit sector is I; the last activity in a disturbed area happens.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.I.4.2, page 66**

> "Begin implementing appropriate vegetative practices on all disturbed areas within 14 days following the last activity in that area."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=67)

#### Sector I: benchmark values for oil and gas extraction (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector I sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is I.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector J active and temporarily inactive sites: train employees at least annually

Within 1 year after the last training.

Conduct employee training at least once a year at active and temporarily inactive mineral mining sites and document it in the SWPPP. The pack counts twelve months from the last training.

- **Only if:** your permit sector is J.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 6.J.4. Check your copy of the permit.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.J.4, page 66**

> "Conduct employee training at least annually at active and temporarily inactive sites."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=67)

#### Sector J: benchmark values for non-metallic mineral mining and dressing (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector J sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is J.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector K: benchmark values for hazardous waste treatment, storage or disposal facilities (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector K sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is K.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector L: benchmark values for landfills and land application sites (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector L sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is L.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector M: benchmark values for automobile salvage yards (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector M sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is M.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector N: benchmark values for scrap recycling and waste recycling facilities (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector N sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is N.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector P land transportation: train personnel at least once a year

Within 1 year after the last training.

Train personnel at least once a year on used oil and spent solvent management, fueling, housekeeping, painting and used battery management, as applicable. The pack counts twelve months from the last training.

- **Only if:** your permit sector is P.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 6.P.3. Check your copy of the permit.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.P.3, page 76**

> "Train personnel at least once a year and address the following activities, as applicable:"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=77)

#### Sector Q: benchmark values for water transportation (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector Q sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is Q.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector R: benchmark values for ship and boat building and repair yards (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector R sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is R.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector S airports: inspect at least monthly while deicing occurs

No set date. The deicing season is set by each facility (6.S.4.8), so no calendar dates are computed.

During the facility's deicing season, inspect at least monthly when deicing occurs, extending the monthly inspections to every month deicing chemicals may be used, and do the annual comprehensive inspection while deicing occurs.

- **Only if:** your permit sector is S; it is the deicing season.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 6.S.6, page 85**

> "At a minimum conduct facility inspections at least monthly when deicing occurs during the deicing season"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=86)

#### Sector S: benchmark values for air transportation (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector S sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is S.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector U: benchmark values for food and kindred products (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector U sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is U.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

#### Sector Y: benchmark values for rubber, miscellaneous plastic products and miscellaneous manufacturing (Table 3)

No set date. These are the values a four-quarter average is compared with. Benchmark monitoring was set for 2022 and 2024 (Part 3.2.3.1); see the benchmark monitoring duty.

Benchmark values from Table 3 for Sector Y sub-sectors. The average of four quarterly samples is compared with each value; a benchmark exceedance is not a permit violation but triggers a review of the control measures.

- **Only if:** your permit sector is Y.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 3.2.3, page 25**

> "All facilities with sector-specific benchmark monitoring concentration values are required to conduct monitoring and sampling of storm water at each outfall as specified in Table 3"

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=26)

## What does no-exposure certification require?

Conditional no exposure exclusion (Form NOEXP, Part 1.11), effective for five years from submittal while the no exposure condition lasts.

- Every few years 1
- One time 1

### Every few years  1 duty

#### No Exposure: submit the certification again every 5 years

Within 5 years after you submitted your last no exposure certification.

The exclusion stays in effect for five years from submittal while the no exposure condition lasts. Submit a new certification at least once every five years to stay excluded.

- You send it to the agency (LDEQ (Form NOEXP)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 1.11, page 17**

> "Facilities that satisfy the condition of no exposure criteria must submit an accurately completed no exposure certification form to the LDEQ once every 5 years to be excluded from coverage by the current MSGP."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=18)

### One time  1 duty

#### No Exposure: submit the No Exposure Certification (Form NOEXP)

No set date. The permit sets no date for the first certification.

A facility eligible for the MSGP with no exposure of industrial materials and operations to storm water may submit a complete No Exposure Certification to LDEQ instead of obtaining coverage. The exclusion is facility-wide, not by outfall, and no NOT is needed.

- You send it to the agency (LDEQ (Form NOEXP)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: LPDES Multi-Sector General Permit LAR050000 (October 2021, modified April 1, 2022), with Addenda A to G, section 1.11, page 17**

> "may submit a complete and accurate No Exposure Certification form (Form NOEXP) to the LDEQ to obtain exclusion from this general permit."

[Open the permit at this section](https://www.deq.louisiana.gov/assets/docs/Permits/LAR050000.pdf#page=18)

## Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

## Louisiana MSGP duties, topic by topic

How the Louisiana MSGP compares with the other checked permits on each kind of duty, in the permit's own words with the section for each:

- [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements#permit-us-la-lar050000)
- [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements#permit-us-la-lar050000)
- [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates#permit-us-la-lar050000)
- [No-exposure certification](https://stormdue.com/guides/no-exposure-certification#permit-us-la-lar050000)
- [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements#permit-us-la-lar050000)

- [Every state's permit](https://stormdue.com/states)
- [How we check permit rules](https://stormdue.com/about-the-rules)
- [Deadline calculator](https://stormdue.com/tools/deadline-calculator)
- [Benchmark comparison](https://stormdue.com/tools/benchmark-comparison)
- [More free tools](https://stormdue.com/tools)
- [Duties compared across permits](https://stormdue.com/guides)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.