# Maryland General Permit 20-SW-A Due Dates and Duties

> Every recurring duty in the Maryland General Permit 20-SW-A with its due date rule and permit section, checked November 26, 2026. Get your own dates free.

Canonical page: https://stormdue.com/permits/us-md-20swa

[States](https://stormdue.com/states) / [Maryland](https://stormdue.com/states/md)

# Maryland General Permit 20-SW-A due dates and duties

Every duty in the General Permit for Discharges from Stormwater Associated with Industrial Activities, with when it is due and the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup?state=MD)

Free, no account. Your own dates in a minute.

- 71duties, each cited
- 8on a schedule
- 63when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

Today

February 1, 2023 January 31, 2028

**Notes on the permit's status and renewal**

The 20-SW permit was issued November 8, 2022 and took effect February 1, 2023; it expires January 31, 2028 (cover page). After a limited remand from the Circuit Court for Baltimore County, MDE amended three parts and renumbered the state permit 20-SW-A, modified February 7, 2025: Part I.F (no exposure certifications follow 40 CFR 122.26(g) and must state site size, EJScore and flood elevation), Part V.A.2.b (facilities in a census tract with an EJScore of 0.76 or more must send MDE their yearly evaluation report) and two cross references in Part III.C. This pack reads the modified text; the appendices are the 2022 files, which MDE did not reissue. The page headers of the modified permit still print "20SW" and the appendices print "20-SW". MDE's permit page and a web search on November 26, 2026 show no later modification, extension or draft replacement. The NPDES number prints as MDR0000 on the cover and MDR00 in the page headers. Facility registration numbers start with 20SR.

## What does full permit coverage require?

Coverage by Notice of Intent, fee and SWPPP; discharge is authorized only after MDE approves the registration in writing.

- Every quarter 3
- Every year 2
- One time 2
- When something happens 25
- Ongoing 3
- Only if... 34
- Where the permit is unclear 1

### Every quarter  3 duties

#### Inspect containers that could spill or leak every quarter

By the end of each calendar quarter.

Each quarter, inspect containers that are susceptible to spills or leaks, such as used oil, to confirm the containment has no leaks or cracks, plugs are in place and valves work.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section III.B.1.b.iv. Check your copy of the permit.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section III.B.1.b.iv, page 18**

> "Quarterly inspection procedures for containers that are susceptible to spillage or leakage (e.g., used oil) to ensure the containment structures have no leaks/cracks, and that the outlets are properly sealed."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=20)

#### Quarterly visual check of a stormwater sample from each outfall

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins.

Once each calendar quarter, collect a stormwater sample from each outfall within the first 30 minutes of a discharge, look at it for color, clarity, sheen, odor, solids and foam, and fill in the permit's Quarterly Visual Monitoring Form. Starts with the first full quarter after MDE confirms coverage.

- If the facility is inactive and unstaffed: not required.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.A.3, page 39**

> "You are required to begin visual inspections in the first full quarter after you have been notified that you are covered by this permit. ... Once each quarter, you must collect a stormwater sample from each outfall"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=41)

#### Routine facility inspection at least once per quarter

By the end of each calendar quarter.

At least once per quarter, qualified personnel with at least one pollution prevention team member assess the site and whether the SWPPP is working, and record it on a signed checklist. At least one inspection each calendar year must take place while stormwater is discharging.

- If the facility is inactive and unstaffed: not required.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section V.A.1. Check your copy of the permit.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.A.1, page 38**

> "At least once per quarter, you must conduct a site assessment that will review the effectiveness of the SWPPP."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=40)

### Every year  2 duties

#### Train employees at least once every calendar year

By December 31 each year.

Train every employee who works where industrial materials or activities are exposed to stormwater or who carries out permit duties, including the pollution prevention team, at least once per calendar year, and more often if turnover is high. Keep records with dates.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section III.C.5.a.iv, page 25**

> "All training must be held at least once per calendar year (or more often if employee turnover is high)."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=27)

#### Comprehensive site compliance evaluation once a year

Within 1 year after the last comprehensive site compliance evaluation.

Once a year, qualified personnel evaluate every area where industrial materials or activities are exposed to stormwater, the outfalls, the control measures, the year's training, inspections, maintenance and monitoring results, and write a signed report. Update the SWPPP where the evaluation shows a need.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section V.A.2. Check your copy of the permit.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.A.2, page 38**

> "You must conduct a comprehensive site compliance evaluation once a year."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=40)

### One time  2 duties

#### Submit the Continuation of Registration statement at least 60 days before the permit expires

By December 2, 2027.

To keep coverage if MDE administratively extends the permit after it expires on January 31, 2028, submit a Continuation of Registration statement at least 60 days before that date. Late statements are not accepted.

- You send it to the agency (MDE Wastewater Permits Program, 1800 Washington Blvd, Ste 455, Baltimore, MD 21230).
- Keep the records 3 years.
- Signed or certified by a responsible official per 20sw II.C.2.

Inferred from section I.H. Check your copy of the permit.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section I.H, page 5**

> "You must submit a Continuation of Registration statement at least 60 days before the expiration of the 20-SW."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=7)

#### Pay the permit fee with the Notice of Intent

No set date. Paid with the NOI. The permit does not state the due date of later annual fee payments.

The initial permit fee is sent to MDE with the NOI, in the amount in effect when payment is due. If the check fails, proper payment is due within 30 calendar days or coverage is void from the outset.

Further steps with their own deadlines:

- **Make good a failed NOI fee payment.** Within 30 days after the payment failed. [Section II.A.2.c, page 7](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=9)
  > "you will have 30 calendar days from the date the payment fails to make proper payment, including any interest and other charges."

- You send it to the agency (Maryland Department of the Environment, P.O. Box 2057, Baltimore, MD 21203-2057).
- Keep the records 3 years.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section II.A.2.a, page 6**

> "You must submit the initial permit fee to the Department with the NOI form for the fee in effect at the time that the payment is due"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=8)

### When something happens  25 duties

#### Chesapeake Bay restoration by trading: email the yearly evaluation report by December 1

By December 1 each year.

In every year the facility uses credits to meet the restoration requirement, email MDE a scanned copy of the Comprehensive Site Compliance Evaluation report, including the status of its trades, by December 1.

- **When:** the Chesapeake Bay restoration requirements apply to the facility; the restoration requirement is met by trading credits.

- You send it to the agency (swppp.permit@maryland.gov).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: 20-SW Appendix G, Reporting and Verification Requirements for Trading, section Appendix G, Satisfying Restoration Requirements via a Trade, item 3, page 2**

> "by December 1 of every year that they used credits to satisfy the restoration requirement."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixG.pdf#page=2)

#### Facilities generating marketable credits: email the yearly evaluation report by December 1

By December 1 each year.

While a practice at the facility generates marketable nutrient credits, email MDE a scanned copy of the Comprehensive Site Compliance Evaluation report by December 1 of each year, and have the credits verified at least every 3 years.

- **When:** the facility generates marketable nutrient credits.

- You send it to the agency (swppp.permit@maryland.gov).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: 20-SW Appendix G, Reporting and Verification Requirements for Trading, section Appendix G, Facilities Generating a Marketable Credit, item 5, page 1**

> "by December 1 of every year that the BMP generates credit."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixG.pdf#page=1)

#### Salt terminals with uncovered piles between April and September: monitor and report runoff

By the end of each calendar quarter.

Salt terminals whose piles are not covered between April and September sample the runoff at the storm drain inlets for flow, chloride, free amenable cyanide and iron and report the results each quarter for as long as the permit lasts.

- **When:** the facility is a salt terminal with piles uncovered between April and September.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from Appendix D, AD.d.4 and Table AD.d-1. Check your copy of the permit.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, AD.d.4 and Table AD.d-1, page 63**

> "When piles are not covered between April and September, and therefore exposed to stormwater, quarterly monitoring and reporting is required."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=63)

#### Report quarterly monitoring results in NetDMR within 28 days after each quarter

By April 28 (Q1), July 28 (Q2), October 28 (Q3) and January 28 (Q4).

Facilities that must monitor report each quarter's measurements in NetDMR no later than 28 days after the monitoring period ends: by April 28, July 28, October 28 and January 28.

- **When:** monitoring and reporting are required that quarter.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.B.4.c, page 43**

> "you must report the quarterly measurements no later than 28 days following the Monitoring Period"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=45)

#### Chesapeake Bay restoration by trading: acquire the verified credits by the end of March

By March 31, for the calendar year before.

A facility that meets the restoration requirement by trading completes the acquisition of verified credits no later than the end of March following the calendar year the credits apply to.

- **When:** the Chesapeake Bay restoration requirements apply to the facility; the restoration requirement is met by trading credits.

- You file it in the agency's system (Maryland Water Quality Trading Registry).
- Keep the records 3 years.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section III.A.1.d.iii, page 13**

> "complete the acquisition of verified credits no later than 3 months (end of March) following the end of the calendar year in which the credits are applicable."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=15)

#### After a spill of oil or a hazardous substance: call at once, write within 10 working days

Within 10 working days after you learn of the incident.

If oil or a hazardous substance is spilled or discharged, call MDE's Emergency Response Division at (866) 633-4686 and the National Response Center at (800) 424-8802 as soon as you know of it, send MDE a written description within 10 working days, and update the SWPPP within 14 calendar days.

Further steps with their own deadlines:

- **Update the SWPPP after the spill.** Within 14 days after you learn of the incident. [Section V.D.2.b.iii, page 47](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=49)
  > "Modify the SWPPP within 14 calendar days of knowledge of the incident"

- **When:** oil or a hazardous substance is spilled or discharged.

- You send it to the agency (MDE (written description); MDE Emergency Response Division and the National Response Center by phone).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.D.2.b.ii, page 47**

> "Submit to the Department a written description within 10 working days of knowledge of the incident"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=49)

#### Apply under the new general permit once MDE issues it

No set date. The deadline will be set by the replacement permit, which MDE has not issued yet.

To keep discharging after this permit's expiration date, apply for and obtain authorization as the replacement permit requires. MDE has not issued a replacement.

- **When:** a new general permit is issued.

- You file it in the agency's system (MDE Environmental Service Center (online NOI) or the paper NOI form).
- Keep the records 3 years.
- Signed or certified by a responsible official per 20sw II.C.2.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section I.I, page 5**

> "you must apply for and obtain authorization as required by the new permit once the Department issues it."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=7)

#### Chemical additives for sediment control: get approval for cationic additives at least 7 days before use

At least 7 days before you first use the cationic additive.

A facility that uses polymers or flocculants for sediment control uses only additives MDE has approved. Cationic additives need MDE's written approval, requested at least 7 days before use. For anionic additives MDE is told no later than 7 days after use begins. Switching to another pre-approved additive is reported within 30 days of starting it.

Further steps with their own deadlines:

- **Tell MDE about an anionic additive.** Within 7 days after you first use the anionic additive. [Section Appendix D, L.5.4, page 21](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=21)
  > "For anionic the notice to the Department must occur no later than a week (7 days) after you begin using a product."
- **Report a change to another pre-approved additive.** Within 30 days after you first use the new additive. [Section Appendix D, L.5.4, page 20](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=20)
  > "you shall provide notification to the Industrial Stormwater Permits Division of the Department within 30 days of commencing the use of the new pre-approved additive."

- **When:** chemical additives are used for sediment control.

- You send it to the agency (MDE Industrial Stormwater Permits Division).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, L.5.4, page 21**

> "You must notify and receive written approval from the Department's Industrial Stormwater Permits Division of the Department at least 7 days prior to using cationic chemical additives"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=21)

#### Chesapeake Bay restoration by trading: register each trade with MDE within 15 days

Within 15 days after the trade.

Notify MDE of each trade by filing the form MDE provides within 15 days after the trade, then add the registration number to the SWPPP with an explanation of how the trade meets the restoration requirement.

- **When:** the Chesapeake Bay restoration requirements apply to the facility; the restoration requirement is met by trading credits.

- You send it to the agency (MDE, on the trade registration form MDE provides).
- Keep the records 3 years.

**Source: 20-SW Appendix G, Reporting and Verification Requirements for Trading, section Appendix G, Satisfying Restoration Requirements via a Trade, item 2, page 2**

> "The permittee must notify the Department about each trade they are involved in by filing a form provided by the Department within 15 days after the trade"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixG.pdf#page=2)

#### Chesapeake Bay restoration: get a written professional certification when the measures are in place

No set date. When the measures have been implemented; the permit gives no number of days. The measures themselves have the four-year deadline.

When the selected practices are implemented, obtain a written certification from a Professional Engineer, a Certified Professional in Storm Water Quality, a Registered Architect or a Landscape Architect who has visited the facility, and keep it with the SWPPP.

- **When:** the Chesapeake Bay restoration requirements apply to the facility; restoration measures are fully in place.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by pe cpswq registered architect or landscape architect.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section III.A.3.a, page 14**

> "you shall obtain written certification by either a Professional Engineer (PE), a Certified Professional in Storm Water Quality (CPSWQ), a Registered Architect, or a Landscape Architect."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=16)

#### Chesapeake Bay restoration: keep maintaining the practices every year

No set date. Standing yearly duty; the permit sets no date.

After certifying, or after the certification deadline has passed, keep maintaining the structural practices and keep performing the non-structural ones, such as street sweeping or trading, every year while the permit is in effect or extended, and record it in the SWPPP.

- **When:** the Chesapeake Bay restoration requirements apply to the facility.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section III.A.4.a, page 15**

> "you must continue to maintain structural practices, and/or continue to perform any non-structural requirements (such as street sweeping or trading), yearly as required by this permit"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=17)

#### Chesapeake Bay restoration: put the nutrient control measures in place within four years of filing the NOI

Within 4 years after your notice of intent was filed.

Facilities newly subject to the Chesapeake Bay restoration requirements restore 20 percent of their untreated impervious surface, or put equivalent nutrient controls in place, within four years from the date the NOI is filed. The requirements apply when the facility is in the Chesapeake Bay watershed, is 5 acres or larger, lies partly in a Phase I or Phase II MS4 jurisdiction, and is not owned by or leased from an MS4 permittee.

- **When:** the Chesapeake Bay restoration requirements apply to the facility; the facility was not subject to the restoration requirements under the previous permit.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section III.A.1.e, page 13**

> "must implement control measures within four (4) years from the date an NOI is filed."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=15)

#### Chesapeake Bay restoration: send the updated SWPPP and the Nutrient Reduction Progress Report within four years of filing the NOI

Within 4 years after your notice of intent was filed.

Facilities subject to the Chesapeake Bay restoration requirements send MDE an updated SWPPP and the completed Nutrient Reduction Progress Report form within four years from the date they file an NOI.

- **When:** the Chesapeake Bay restoration requirements apply to the facility.

- You send it to the agency (MDE Industrial Stormwater Permits Division, 1800 Washington Blvd, Ste 455, Baltimore, MD 21230).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section III.A.3.b, page 14**

> "send both documents to the Department within four (4) years from the date you file an NOI."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=16)

#### Fix conditions that need corrective action within 14 days (45 at most)

Within 14 days after you discover the condition (up to 45 days where the permit allows more time).

After an unauthorized release, a limit violation, controls that are missing, inadequate or poorly maintained, or a visual sample showing pollution: take all reasonable steps the same day, then finish the fix before the next storm if possible and within 14 calendar days of discovery. If that is infeasible, record why and finish within 45 days; going past 45 days needs notice to MDE's Compliance Program.

Further steps with their own deadlines:

- **Update the SWPPP after the corrective action.** Within 14 days after the corrective action work is finished. [Section IV.A.2.b, page 29](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=31)
  > "you must modify your SWPPP accordingly within 14 calendar days of completing corrective action work."

- **When:** a corrective action condition happens.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section IV.A.2.b, page 28**

> "within no more than 14 calendar days from the time of discovery that the condition in IV.A.1 is not met."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=30)

#### Get NetDMR access within six months of authorization

No set date. Apply within one month of being registered and complete access within six months of authorization. The dates depend on the day MDE registered the facility.

Facilities that must report monitoring results apply for NetDMR access within one month of being registered and finish the training and test submission within six months of authorization.

- **When:** monitoring and reporting are required that quarter.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.B.4.a, page 43**

> "You must complete all requirements to gain access to NetDMR within six (6) months of authorization under this permit, including applying for access within one (1) month of being registered."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=45)

#### Give MDE written notice of planned changes to the facility as soon as possible

No set date. As soon as possible; the permit gives no number of days.

Give written notice of planned physical alterations or additions that could make the facility a new source, significantly change the pollutants discharged, or lead to noncompliance.

- **When:** a physical alteration or addition is planned.

- You send it to the agency (MDE Wastewater Permits Program, 1800 Washington Blvd, Ste 455, Baltimore, MD 21230).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section II.F.1, page 10**

> "give written notice to Department's Water Permits Program as soon as possible of any planned physical alterations or additions to the permitted facility."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=12)

#### NetDMR opt-out: ask MDE in writing at least 60 days before NetDMR use would start

At least 60 days before you would have to start using NetDMR.

A facility that cannot use NetDMR sends MDE a written opt-out request at least 60 days before the date it would have to start using it. An approval lasts twelve months and must be renewed.

- **When:** the facility cannot use NetDMR.

- You send it to the agency (MDE Water and Science Administration, Compliance Program).
- Keep the records 3 years.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.B.4.b, page 43**

> "Opt-out requests must be submitted in writing to the Department for written approval at least sixty (60) days prior to the date you would be required under this permit to begin using NetDMR."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=45)

#### New owner or operator: send the transfer request at least 30 days before the transfer

At least 30 days before the transfer.

When ownership or operation of a covered facility changes, the transfer request goes to MDE at least 30 days before the date of the transfer, with a written agreement naming the transfer date and the new permittee's confirmation of the NOI information and the SWPPP.

- **When:** the owner or operator changes.

- You send it to the agency (MDE Wastewater Permits Program, 1800 Washington Blvd, Ste 455, Baltimore, MD 21230).
- Keep the records 3 years.
- Signed or certified by a responsible official per 20sw II.C.2.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section II.B, page 8**

> "A minimum of 30 days prior to date that the transfer will take place to the new owner/operator."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=10)

#### Public works and highway maintenance sites: benchmark values for runoff from street sweeping or inlet cleaning debris

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for public works and highway maintenance facilities (Sector AD.a) whose stored street sweeping or storm drain inlet cleaning debris is left uncovered.

- **When:** the site is a public works or highway site with uncovered street sweeping or inlet cleaning debris.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, AD.a.3, Table 1, page 61**

> "Subsector AD.a1 Benchmarks required for stormwater that has come into contact with street"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=61)

#### Record the condition within 24 hours and the response within 14 days

Within 1 day after you become aware of the condition.

Document a corrective action condition or an AIM triggering event within 24 hours of becoming aware of it, and within 14 days of discovery document what was done or will be done, with dates. Keep both with the SWPPP and summarize them in the yearly evaluation report.

Further steps with their own deadlines:

- **Document the corrective actions or AIM responses.** Within 14 days after you discover the condition. [Section IV.C.2, page 37](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=39)
  > "within 14 days from the time of discovery of any of those conditions/triggering events."

- **When:** a corrective action condition happens, or an AIM triggering event happens.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section IV.C.1, page 37**

> "You must document the existence of any of the conditions listed in Parts IV.A.1, IV.B.1.a, IV.B.2.a, and/or IV.B.3.a within 24 hours of becoming aware of such condition."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=39)

#### Report noncompliance that may endanger health or the environment within 24 hours

Within 1 day after you become aware of the circumstances.

Report orally to MDE's Water and Science Administration Compliance Program within 24 hours of becoming aware of any noncompliance that may endanger health or the environment, and follow up in writing within five days.

Further steps with their own deadlines:

- **Written follow-up.** Within 5 days after you become aware of the circumstances. [Section V.D.1.b, page 47](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=49)
  > "A written submission must also be provided within five days of the time you become aware of the circumstances."

- **When:** noncompliance that may endanger health or the environment happens.

- You send it to the agency (MDE Water and Science Administration, Compliance Program).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.D.1, page 46**

> "You must report any noncompliance which may endanger health or the environment to WSA Compliance within 24 hours."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=48)

#### Submit a Notice of Termination within 30 days when coverage should end

Within 30 days after a condition for ending coverage is met.

Send a complete Notice of Termination within 30 days after operations have permanently ceased with no further exposure, the operation moves, a new owner or operator takes over, or all discharges are covered by another permit. The permit applies until MDE acknowledges it.

- **When:** a condition for ending coverage is met.

- You send it to the agency (MDE Wastewater Permits Program, 1800 Washington Blvd, Ste 455, Baltimore, MD 21230).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section II.F.2.b, page 10**

> "You must submit a Notice of Termination within 30 days after one or more of the following conditions have been met:"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=12)

#### Submit the Notice of Intent, SWPPP and fee at least 60 days before a new discharge starts

At least 60 days before you start discharging.

New dischargers and new sources send MDE a complete Notice of Intent with the permit fee and an electronic copy of the SWPPP at least 60 days before the discharge begins. Discharge is allowed only after MDE approves the registration in writing.

- **When:** the facility is a new discharger or new source.

- You file it in the agency's system (MDE Environmental Service Center (online NOI) or the paper NOI form).
- Keep the records 3 years.
- Signed or certified by a responsible official per 20sw II.C.2.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section II.B, page 8**

> "A minimum of 60 days prior to commencing discharge."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=10)

#### Tell MDE in writing at once if the site becomes inactive

No set date. Immediately; the permit gives no number of days.

If the site becomes inactive during the permit term, contact MDE immediately and give, in writing, the date of inactivity, the facility contact phone number and where the SWPPP and records are kept. Seasonal closures do not count.

- **When:** the site becomes inactive.

- You send it to the agency (MDE Wastewater Permits Program, 1800 Washington Blvd, Ste 455, Baltimore, MD 21230).
- Keep the records 3 years.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section III.C.8, page 27**

> "If during the term of this permit, your site becomes inactive, you must contact the Department immediately and provide, in writing, the date of inactivity"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=29)

#### Tell the MS4 owner or operator that you are covered

No set date. The permit sets no date for this notice.

If stormwater from the facility enters a municipal separate storm sewer system, notify its owner or operator that you are authorized under this permit, and send it the reports this permit requires you to send MDE.

- **When:** the facility discharges into an MS4.

- You send a copy to the operator of your storm sewer system (MS4).
- Keep the records 3 years.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section II.E, page 9**

> "you must notify the MS4 owner/operator that you are authorized to discharge under this permit."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=11)

### Ongoing  3 duties

#### Keep monitoring records and reports for at least 3 years

No set date. Standing duty; the permit sets no date.

Keep all monitoring information, calibration and maintenance records, copies of every report the permit requires and the data used for the application for at least 3 years from the date of the sample, measurement, report or application. MDE may ask for longer.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.E, page 47**

> "for a period of at least 3 years from the date of the sample, measurement, report or application."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=49)

#### Keep the SWPPP up to date and at the facility

No set date. Standing duty; changes after a corrective action follow the corrective action deadlines.

Keep the Stormwater Pollution Prevention Plan current throughout coverage, including changes learned from major storms, and keep a signed copy immediately available at the facility with the inspection, monitoring, training and maintenance records.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section III.C, page 21**

> "Facilities must keep their SWPPP up-to-date throughout their permit coverage"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=23)

#### Post and maintain a sign of permit coverage

No set date. Standing duty; the permit sets no date.

Post a sign or other notice of permit coverage at a safe, publicly accessible place near the facility, readable from a public right-of-way, with the permit number, MDE's wastewater permits portal address and a contact name and phone number. Keep it legible and correct.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section II.G, page 10**

> "You must post a sign or other notice of your permit coverage at a safe, publicly accessible location in close proximity to your facility and at potentially impacted public access areas."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=12)

### Only if...  34 duties

These apply only in the situation named on each one. Answer the questions to sort them.

#### Sector E: sweep paved areas at least once a week where cement, aggregate or dust is handled

By the end of each week.

Glass, clay, cement, concrete and gypsum facilities sweep, or use an equivalent measure on, paved areas exposed to stormwater at the frequency stated in the SWPPP, and at least once a week where cement, aggregate, kiln dust, fly ash or settled dust is handled or processed.

- **Only if:** your permit sector is E; the facility handles cement, aggregate, kiln dust, fly ash or settled dust.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, E.2.1, page 9**

> "it must be performed at least once a week if cement, aggregate, kiln dust, fly ash, or settled dust are being handled or processed."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=9)

#### Sector A wood surface protection or preserving: inspect treatment areas monthly

By the end of each month.

Timber products facilities that do wood surface protection or preservation inspect the processing areas, transport areas and treated wood storage areas every month for treatment chemicals reaching unprotected soil or areas that contact stormwater.

- **Only if:** your permit sector is A; the facility does wood surface protection or preservation.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, A.5, page 3**

> "inspect processing areas, transport areas, and treated wood storage areas monthly"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=3)

#### Sector O: inspect the listed areas monthly

By the end of each month.

Steam electric generating facilities inspect every month the coal handling areas, loading and unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas, areas next to disposal ponds and landfills, maintenance areas, liquid storage tanks and material storage areas.

- **Only if:** your permit sector is O.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, O.6.1, page 32**

> "As part of your inspection, inspect the following areas monthly: coal handling areas, loading or unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=32)

#### Sector S: monthly inspections during the deicing season

By the end of each month.

Airports and air transportation facilities inspect at least monthly during the deicing season, and in any other month when deicing chemicals may be used.

- **Only if:** your permit sector is S; it is the deicing season.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, S.5.1, page 43**

> "At a minimum conduct routine facility inspections at least monthly during the deicing season (e.g., October through April for most mid-latitude airports)."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=43)

#### Sector S: record the deicing chemicals used each month

By the end of each month.

Facilities that use deicing chemicals keep a record of the types used, with their safety data sheets, and the monthly quantities, measured or estimated. Tenants give the record to the airport authority.

- **Only if:** your permit sector is S; deicing chemicals are used.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, S.4.2, page 43**

> "you must maintain a record of the types (including the Material Safety Data Sheets [MSDS]) used and the monthly quantities"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=43)

#### Sector V: inspect the listed areas at least monthly

By the end of each month.

Textile mills, apparel and fabric product facilities inspect at least monthly the transfer and transmission lines, spill prevention, good housekeeping, management of process waste products and all structural and nonstructural management practices.

- **Only if:** your permit sector is V.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, V.5, page 50**

> "Inspect, at least monthly, the following activities and areas (at a minimum): transfer and transmission lines, spill prevention, good housekeeping practices, management of process waste products"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=50)

#### Sector L inactive landfills and land application sites: inspect at least quarterly

By the end of each calendar quarter.

Qualified personnel inspect inactive landfills and land application sites at least quarterly: stabilization and structural erosion controls, leachate collection and treatment systems, and all closed land application areas.

- **Only if:** your permit sector is L, or the site is an inactive landfill assigned to Sector AD.e; the site is an inactive landfill or land application site.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred from Appendix D, L.7.2. Check your copy of the permit.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, L.7.2, page 22**

> "Inspect inactive landfills and land application sites at least quarterly."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=22)

#### Sector M: inspect for leaks every quarter

By the end of each calendar quarter.

Automobile salvage yards inspect each quarter for signs of leakage all equipment that contains oily parts, hydraulic fluid or other fluids or mercury switches, and all vessels and areas where hazardous materials and automotive fluids are stored. Arriving vehicles are inspected for leaks at once.

- **Only if:** your permit sector is M.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from Appendix D, M.4. Check your copy of the permit.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, M.4, page 24**

> "Inspect quarterly for signs of leakage all equipment containing oily parts, hydraulic fluids, any other types of fluids, or mercury switches."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=24)

#### AIM Level 1: review the controls at once and make changes within 14 days (45 at most)

Within 14 days after the sample that caused the AIM trigger was taken (up to 45 days where the permit allows more time).

In the first year of benchmark monitoring, if a parameter's annual average is over the benchmark, or one sample is over four times the benchmark: review the control measures immediately, make any needed changes within 14 days of the triggering event (45 days if 14 is infeasible and documented), and keep monitoring quarterly into the next year.

- **Only if:** a parameter is at AIM level 1.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section IV.B.1.c. Check your copy of the permit.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section IV.B.1.c, page 30**

> "you must implement those actions or modifications within 14 days of the occurrence of the triggering event under Part IV.B.1.a, unless doing so within 14 days is infeasible."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=32)

#### AIM Level 2: install structural or treatment controls within 30 days (90 at most)

Within 30 days after the sample that caused the AIM trigger was taken (up to 90 days where the permit allows more time).

In the second year of benchmark monitoring, if the second annual average is over the benchmark, or one sample is over four times the benchmark: install structural source controls or treatment controls, with a professional engineer, stormwater professional or geologist assisting, within 30 days of the triggering event (up to 90 days if 30 is infeasible and documented), and keep monitoring quarterly into the next year.

- **Only if:** a parameter is at AIM level 2.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by professional engineer stormwater professional or geologist.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section IV.B.2.c. Check your copy of the permit.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section IV.B.2.c, page 31**

> "You must install the appropriate structural source and/or treatment control measures within 30 days of the occurrence of the triggering event under Part IV.B.2.a."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=33)

#### AIM Level 3: action plan by a professional and controls within 90 days (120 at most)

Within 90 days after the sample that caused the AIM trigger was taken (up to 120 days where the permit allows more time).

In the third or a later year of benchmark monitoring, if the annual average is again over the benchmark, or one sample is over four times the benchmark: have a professional engineer, stormwater professional or geologist prepare an action plan for MDE, and install the structural or treatment controls within 90 days of the triggering event (30 more days if infeasible and documented). Quarterly monitoring continues.

Further steps with their own deadlines:

- **Select the professional and prepare the action plan.** The permit gives the timing in words, quoted below. [Section IV.B.3.b.i, page 32](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=34)
  > "You may take up to 30 days to select the professional, and an additional 30 days to prepare the action plan for the Department, which must include milestone dates"

- **Only if:** a parameter is at AIM level 3.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by professional engineer stormwater professional or geologist.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section IV.B.3.c. Check your copy of the permit.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section IV.B.3.c, page 33**

> "You must install the appropriate structural source and/or treatment control measures within 90 days of the occurrence of the triggering event under Part IV.B.3.a."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=35)

#### Quarterly benchmark monitoring for four full quarters after registration

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins. Only in coverage years 1, counted from when your coverage began.

Facilities in a sector with benchmarks sample each outfall once per quarter for four full quarters, starting with the first full monitoring period after registering. If a parameter's average is at or below its benchmark, ask MDE to confirm that monitoring for it can stop. If the average is above, or one sample is more than four times the benchmark, the Additional Implementation Measures apply and quarterly monitoring continues.

- **Only if:** your permit subsector is A1, A2, A3, A4, B1, C1, C2, C3, C4, D1, E1, E2, F1, F2, F3, F4, I1, K1, L1, L2, N1, Q1, R1, S1, U1, U2, Y1, or your permit sector is M, AA, or the site is a public works or highway site with uncovered street sweeping or inlet cleaning debris.
- **Does not apply if:** the facility is inactive and unstaffed.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.B.2, page 40**

> "You must conduct benchmark monitoring quarterly for four (4) full quarters, starting the first full monitoring period (found in Part V.C.7) that occurs, after registering under this permit."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=42)

#### Sector A: benchmark values for timber products

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for general sawmills and planing mills (A1), wood preserving (A2), log storage and handling (A3) and special product sawmills and other wood products (A4).

- **Only if:** your permit sector is A.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, A.6, Tables A-1 to A-4, page 3**

> "Table A-1 - Subsector A1 Benchmarks (General Sawmills and Planing Mills for SIC 2421)"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=3)

#### Sector AA: benchmark values for fabricated metal products

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for fabricated metal products, metal coating and engraving, jewelry, silverware and plated ware.

- **Only if:** your permit sector is AA.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, AA.5, Table AA-1, page 58**

> "Table AA-1 - Sector AA Benchmarks (Fabricated Metal Products, Fabricated Metal Coating and Engraving, and"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=58)

#### Sector B: benchmark value for paperboard mills

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentration for paperboard mills (B1, SIC 2631).

- **Only if:** your permit sector is B.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, B.2, Table B-1, page 5**

> "Table B-1 - Subsector B1 Benchmarks (Paperboard Mills for SIC Code 2631)"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=5)

#### Sector C: benchmark values for chemicals and allied products

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for agricultural chemicals (C1), industrial inorganic chemicals (C2), soaps, detergents, cosmetics and perfumes (C3) and plastics, synthetics and resins (C4).

- **Only if:** your permit sector is C.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, C.3, Tables C-1 to C-4, page 6**

> "Table C-1 - Subsector C1 Benchmarks (Agricultural Chemicals for SIC 2873-2879)"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=6)

#### Sector D: benchmark value for asphalt paving and roofing materials

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentration for asphalt paving and roofing materials (D1, SIC 2951 and 2952).

- **Only if:** your permit sector is D.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, D.3, Table D-1, page 8**

> "Table D-1 Subsector D1 Benchmarks (Asphalt Paving and Roofing Materials SIC 2951, 2952)"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=8)

#### Sector E: benchmark values for clay, concrete and gypsum products

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for clay product manufacturers (E1) and concrete and gypsum product manufacturers (E2).

- **Only if:** your permit sector is E.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, E.4, Tables E-1 and E-2, page 9**

> "Table E-1 Subsector E1 Benchmarks (Clay Product Manufacturers SIC 3251-3259, 3261-3269)"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=9)

#### Sector F: benchmark values for nonferrous foundries

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for nonferrous foundries (F4, SIC 3363-3369).

- **Only if:** your permit sector is F.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, F.5, Table F-4, page 12**

> "Table F-4 - Subsector F4 Benchmarks (Nonferrous Foundries (SIC 3363-3369)"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=12)

#### Sector F: benchmark values for steel works, foundries and nonferrous rolling

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for steel works, blast furnaces and rolling and finishing mills (F1), iron and steel foundries (F2) and rolling, drawing and extruding of nonferrous metals (F3).

- **Only if:** your permit sector is F.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, F.5, Tables F-1 to F-3, page 11**

> "Table F-1 - Subsector F1 Benchmarks (Steel Works, Blast Furnaces, and Rolling and Finishing Mills"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=11)

#### Sector I: benchmark values for oil and gas extraction

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for crude petroleum and natural gas, natural gas liquids and oil and gas field services (I1).

- **Only if:** your permit sector is I.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, I.6, Table I-1, page 15**

> "Table I-1 - Subsector I1 Benchmarks (Crude Petroleum and Natural Gas; Natural Gas Liquids; Oil and Gas Field"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=15)

#### Sector I: inspect erosion and sediment controls every 7 days

Within 7 days after the last inspection of erosion and sedimentation controls.

Oil and gas extraction facilities inspect all erosion and sedimentation control measures every 7 days.

- **Only if:** your permit sector is I.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, I.5, page 15**

> "All erosion and sedimentation control measures must be inspected every 7 days."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=15)

#### Sector K: benchmark values for hazardous waste treatment, storage or disposal

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for hazardous waste treatment, storage or disposal facilities (K1), for discharges not subject to the federal landfill effluent limits.

- **Only if:** your permit sector is K.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, K.5, Table K-1, page 17**

> "Table K-1 - Subsector K1 Benchmarks"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=17)

#### Sector L operating landfills and land application sites: inspect at least once every 7 days

Within 7 days after the last inspection of the site.

Operating landfills and land application sites are inspected at least once every 7 days. Stabilized sites and areas where land application is finished are inspected at least once every month.

- **Only if:** your permit sector is L, or the site is an inactive landfill assigned to Sector AD.e; the site is an operating landfill or land application site.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, L.7.1, page 21**

> "inspect operating landfills and land application sites at least once every 7 days."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=21)

#### Sector L: benchmark values for landfills and land application sites

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for landfills and land application sites (L1) and for those other than municipal solid waste landfill areas closed under 40 CFR 258.60 (L2).

- **Only if:** your permit sector is L.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, L.9, Tables L-1 and L-2, page 22**

> "Table L-1 - Subsector L1 Benchmarks - Landfills and Land Application Sites"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=22)

#### Sector M: benchmark values for automobile salvage yards

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for automobile salvage yards (SIC 5015).

- **Only if:** your permit sector is M.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, M.5, Table M-1, page 25**

> "Table M-1 - Sector M Benchmarks (Automobile Salvage Yards)"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=25)

#### Sector N: benchmark values for scrap and waste recycling

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for scrap recycling and waste recycling facilities other than source-separated recycling (N1, SIC 5093).

- **Only if:** your permit sector is N.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, N.6, Table N-1, page 29**

> "Table N-1 - Subsector N1 Benchmarks (Scrap Recycling and Waste Recycling Facilities except Source-Separated"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=29)

#### Sector Q: benchmark values for water transportation

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for water transportation facilities (Q1).

- **Only if:** your permit sector is Q.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, Q.6, Table Q-1, page 36**

> "Table Q-1 - Subsector Q1 Benchmarks (Water Transportation Facilities SIC 4412-4499)"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=36)

#### Sector R: benchmark values for ship and boat building or repair yards

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for ship and boat building or repairing yards (R1, SIC 3731 and 3732).

- **Only if:** your permit sector is R.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, R.6, Table R-1, page 39**

> "Table R-1 - Subsector R1 Benchmarks (Ship and Boat Building or Repairing Yards for SIC 3731, 3732)"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=39)

#### Sector S: benchmark values for airports with heavy deicer use

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for airports that use more than 100,000 gallons of glycol-based deicing fluid or 100 tons or more of urea a year, for the outfalls that collect runoff from deicing areas.

- **Only if:** your permit sector is S.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, S.6, Table S-1, page 43**

> "Table S-1 - Subsector S1 Benchmarks (Airports using more than 100,000 gallons of deicing glycols based fluids"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=43)

#### Sector U: benchmark values for grain mill and fats and oils products

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for grain mill products (U1) and fats and oils products (U2).

- **Only if:** your permit sector is U.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, U.6, Tables U-1 and U-2, page 47**

> "Table U-1 - Subsector U1. Grain Mill Products (SIC 2041-2048)"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=47)

#### Sector Y: benchmark values for rubber products

No set date. These are the values a sample is compared with. The sampling schedule is in the quarterly benchmark monitoring duty.

Benchmark concentrations for tires and inner tubes, rubber and plastics footwear, gaskets, hoses and belting and fabricated rubber products (Y1).

- **Only if:** your permit sector is Y.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: 20-SW Appendix D, Sector-Specific Requirements for Industrial Activity, section Appendix D, Y.4, Table Y-1, page 53**

> "Table Y-1 - Subsector Y1 Benchmarks (Tires and Inner Tubes, Rubber and Plastics Footwear, Gaskets, Packing"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-Final-AppendixD.pdf#page=53)

#### Send a receiving water hardness value with the first benchmark report

No set date. Sent with the first benchmark discharge monitoring report.

A facility with hardness-dependent metal benchmarks that plans to adjust them for the hardness of its receiving water sends MDE a representative hardness value with its first benchmark discharge monitoring report.

- **Only if:** your permit subsector is A1, A2, A3, A4, B1, C1, C2, C3, C4, D1, E1, E2, F1, F2, F3, F4, I1, K1, L1, L2, N1, Q1, R1, S1, U1, U2, Y1, or your permit sector is M, AA, or the site is a public works or highway site with uncovered street sweeping or inlet cleaning debris; a benchmark is adjusted for the receiving water's hardness.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.B.1, page 40**

> "you are required to submit to the Department with your first benchmark discharge monitoring report (Part V.B.4) a hardness value, established consistent with the procedures in Appendix C"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=42)

#### Yearly monitoring for discharges to impaired waters without a TMDL

Once each year of your coverage, counted from when it began.

If the first water the discharge reaches is impaired and has no approved TMDL, sample each discharge point once per year for the pollutants of concern, beginning in the first full quarter after discharge authorization. Monitoring for a pollutant can stop after three consecutive years without detecting it.

- **Only if:** your stormwater reaches an impaired water body.
- **Does not apply if:** the facility is inactive and unstaffed.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section V.B.3.a. Check your copy of the permit.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.B.3.a, page 41**

> "Beginning in the first full quarter following your date of discharge authorization, you must monitor for pollutants of concern once per year at each discharge point"

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=43)

### Where the permit is unclear  1 duty

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

#### Facilities in a census tract with an EJScore of 0.76 or more: send MDE the yearly evaluation report

No set date. Part V.A.2.b requires a facility whose EJScore is 0.76 or more to submit its annual Comprehensive Site Compliance Evaluation to MDE, but gives no date. By what date each year must the report reach MDE, and does the first one cover the year the modification took effect (2025)?

If the facility's census tract has an EJScore of 0.76 or higher (shown on the NOI and on MDE's authorization letter), the annual Comprehensive Site Compliance Evaluation report is sent to MDE through NetDMR, by email, or through MDE's online NOI system once it exists. The permit gives no date for sending it.

- **When:** the facility is in a census tract with an EJ score of 0.76 or more.

- You file it in the agency's system (NetDMR, email to MDE, or MDE's online NOI system when established).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Discharge Permit No. 20-SW-A (NPDES MDR0000), as modified February 7, 2025, section V.A.2.b, page 39**

> "If your EJScore is >= 0.76, then you must submit your annual Comprehensive Site Compliance Evaluation using NetDMR, emailed to the Department, or submitted through an eNOI system when established by the Department."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SWA%20Permit%20-%20Final%20Modified%20Feb%207%202025.pdf#page=41)

## What does no-exposure certification require?

No exposure exclusion: the operator certifies on MDE's No Exposure Certification form that no industrial materials or activities are exposed to rain, snow, snowmelt or runoff, and submits the form again at least once every five years.

### Every few years  1 duty

#### No exposure facilities: submit the certification again at least once every five years

Within 5 years after you submitted your last no exposure certification.

A facility excluded from the permit because nothing industrial is exposed to stormwater submits MDE's No Exposure Certification form again at least once every five years, and keeps the no exposure condition in between.

- You send it to the agency (MDE Wastewater Permits Program, 1800 Washington Blvd, Ste 455, Baltimore, MD 21230).
- Signed or certified by a responsible official per 20sw II.C.2.

Inferred from No Exposure Certification form, Obtaining and Maintaining the No Exposure Exclusion. Check your copy of the permit.

**Source: MDE No Exposure Certification form for exclusion from the 20-SW permit, section No Exposure Certification form, Obtaining and Maintaining the No Exposure Exclusion, page 1**

> "This certification is only applicable in jurisdictions where MDE is the NPDES permitting authority and must be re-submitted at least once every five years."

[Open the permit at this section](https://mde.maryland.gov/programs/permits/WaterManagementPermits/Documents/GDP%20Stormwater/20SW/20SW-NEC-Form.pdf#page=1)

## Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

## General Permit 20-SW-A duties, topic by topic

How the General Permit 20-SW-A compares with the other checked permits on each kind of duty, in the permit's own words with the section for each:

- [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements#permit-us-md-20swa)
- [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements#permit-us-md-20swa)
- [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates#permit-us-md-20swa)
- [Exceedance response](https://stormdue.com/guides/benchmark-exceedance-response#permit-us-md-20swa)
- [No-exposure certification](https://stormdue.com/guides/no-exposure-certification#permit-us-md-20swa)
- [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements#permit-us-md-20swa)

- [Every state's permit](https://stormdue.com/states)
- [How we check permit rules](https://stormdue.com/about-the-rules)
- [Deadline calculator](https://stormdue.com/tools/deadline-calculator)
- [Benchmark comparison](https://stormdue.com/tools/benchmark-comparison)
- [More free tools](https://stormdue.com/tools)
- [Duties compared across permits](https://stormdue.com/guides)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.