# Mississippi Industrial Stormwater General Permit MSR00...

> Every duty in the Mississippi Industrial Stormwater General Permit MSR00 (formerly the Baseline Stormwater General Permit), with due dates. Get your...

Canonical page: https://stormdue.com/permits/us-ms-msr00

[States](https://stormdue.com/states) / [Mississippi](https://stormdue.com/states/ms)

# Mississippi Industrial Stormwater General Permit MSR00 (formerly the Baseline Stormwater General Permit) due dates and duties

Every duty in the Industrial Storm Water General Permit for Industrial Activities, with when it is due and the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup?state=MS)

Free, no account. Your own dates in a minute.

- 45duties, each cited
- 9on a schedule
- 36when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

**Notes on the permit's status and renewal**

Cover page: "Issued: December 10, 2020", "Expires: November 30, 2025", "Permit No. MSR00". MDEQ's industrial stormwater page, read November 28, 2026, says MDEQ is working to reissue the permit, that it will be administratively continued until reissued, and asks coverage holders not to send renewal forms until the Letter of Instruction arrives. MDEQ's memorandum of October 29, 2025 (Admin-Cont-Notice.pdf, a scanned page with no text layer) says the Department "will administratively continue the 2020 permit until the new permit has been reissued" (ACT16 T-22). No draft, public notice or modification of the permit was found on November 28, 2026. Mining, ready-mix concrete, hot mix asphalt, construction and landfills not covered by ACT6 use other general permits (ACT2 T-4(1)(A)), as do facilities with stormwater effluent guidelines (cement, feedlots, fertilizer, petroleum refining, phosphate, coal mining, mineral mining, ore mining, paving and roofing materials). The permit has no sectors and no benchmarks; sampling applies only to coal piles, Section 313 releases and impaired water monitoring MDEQ requires. No permit fee is in this pack. The table of contents and some cross-references are out of step with the conditions (ACT10 R-1 points to ACT6 T-6 for the weekly inspection, which is T-5; ACT10 R-2 points to ACT15 T-9 and T-10 for signatures, which are in ACT16).

## What does full permit coverage require?

Coverage under MSR00: an ISNOI with the SWPPP, maps and site drawing at least 60 days before the regulated activity starts; discharge is allowed only after MDEQ's written approval of coverage.

- Every month 2
- Every year 2
- Every few years 1
- One time 2
- When something happens 28
- Ongoing 4
- Only if... 3

### Every month  2 duties

#### Complete the monthly spill and leak log

By the end of each month.

Record spills and leaks of toxic or hazardous pollutants on the Monthly Spill and Leak Log Sheet (or an equivalent form), one form for every month of coverage, checking the box and signing it when no spills happened. File it with the SWPPP.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from ACT5 T-3. Check your copy of the permit.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT5 T-3, page 11**

> "A separate form shall be completed for each month that the facility is covered under this general permit."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=17)

#### Inspect the site every month

By the end of each month.

A person listed in the Employee Training Log visually inspects all areas that contribute industrial stormwater at least once a month, checking discharges for color, cloudiness, solids, foam, odor and oil sheen, and records it on the Industrial Stormwater Monthly Inspection Report Form (or an equivalent).

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT10 R-1, page 25**

> "Routine visual site inspections shall be performed at a minimum of once per month to ensure the effectiveness of the SWPPP's design and implementation by an authorized authority listed in the Employee Training Log."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=31)

### Every year  2 duties

#### Complete the annual comprehensive SWPPP evaluation by December 31

By December 31 each year.

Evaluate the SWPPP's effectiveness and accuracy by December 31 each calendar year, record it on the signed Annual Comprehensive SWPPP Evaluation Form (or an equivalent) filed with the SWPPP, and send MDEQ any SWPPP amended as a result.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT10 R-2, page 25**

> "Coverage recipients shall conduct a comprehensive evaluation of the facility's SWPPP by December 31st of each calendar year."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=31)

#### Give refresher training by December 31

By December 31 each year.

Everyone responsible for carrying out the permit receives refresher training by December 31 each calendar year.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT14 S-2, page 32**

> "All employees responsible for implementing and/or complying with the requirements of this permit shall receive refresher training by December 31st of each calendar year."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=38)

### Every few years  1 duty

#### Certify the non-stormwater discharge evaluation every five years

Within 5 years after the last certification.

Evaluate stormwater discharges for non-allowable non-stormwater discharges (for example by visual inspection, plant schematic review or dye testing) and certify it at least every five years, recording methods, dates, observation points and results. File the certification with the SWPPP.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT5 T-7, page 13**

> "The coverage recipient shall certify at least every five (5) years that stormwater discharges have been evaluated for the presence of non-allowable, non-stormwater discharges."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=19)

### One time  2 duties

#### Apply for recoverage when MDEQ reissues the permit

No set date. No date until MDEQ reissues the permit and sends the Letter of Instruction (ACT3 S-3, ACT16 T-22); MDEQ asks that no renewal forms be sent before then.

When MDEQ reissues the Industrial Stormwater General Permit, follow its Letter of Instruction to get coverage under the new permit. Coverage under the old permit ends six months after reissuance unless a complete Recoverage Form has been received.

- You file it in the agency's system (MDEQ's electronic general permit submittal portal (noi_esubmittals), with the paper form mailed to the Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225).
- Keep the records 3 years.
- Signed or certified by a responsible official per msr00 act16 t9.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT3 S-3, page 7**

> "Once the Industrial Stormwater General Permit is reissued, MDEQ will provide a Letter of Instruction to active coverage recipients, outlining the process for obtaining coverage under the reissued permit."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=13)

#### Train responsible staff within 12 months of coverage

Within 1 year after your coverage was issued.

Give initial training to everyone responsible for carrying out the permit within twelve months after coverage or recoverage is issued.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT14 S-2, page 32**

> "Initial training for all personnel that are responsible for implementing and/or complying with the requirements of this permit shall be performed within twelve (12) months of issuance of coverage or recoverage under this permit."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=38)

### When something happens  28 duties

#### Coal piles: sample the runoff once a year

By December 31 each year.

A facility with coal piles takes a grab sample of its stormwater discharge once each calendar year (January to December) for total suspended solids (annual maximum 50 mg/L), pH, total copper and total zinc, at the nearest accessible point after final treatment and before the receiving stream.

- **When:** the facility has coal piles.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT11 L-1, page 28**

> "Stormwater discharges associated with industrial activity from facilities with coal piles shall be limited and monitored as specified below:"

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=34)

#### Submit the annual DMR in NetDMR by January 28

By January 28, for the calendar year before.

A facility that samples under ACT11 (coal piles, impaired water monitoring MDEQ has required, or Section 313 release sampling) submits its Discharge Monitoring Report electronically in NetDMR by January 28 of the following year.

- **When:** the facility has coal piles, or MDEQ requires monitoring because the receiving water has a TMDL wasteload allocation for a parameter present at the facility, or an EPA Form R, or the information for a Form A, indicates a release of a Section 313 water priority chemical to stormwater.

- You file it in the agency's system (NetDMR (EPA), through a CDX account).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT11 S-3, page 29**

> "DMRs must be submitted annually electronically using the NetDMR system by January 28th the following year."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=35)

#### Amend the SWPPP after a change and send it to MDEQ within 30 days

Within 30 days after the SWPPP amendment.

Amend the SWPPP whenever design, construction, operation or maintenance changes, or the SWPPP proves ineffective, and submit the amended SWPPP to MDEQ within 30 days of the amendment.

- **When:** a change in design, construction, operation or maintenance affects the SWPPP, or the SWPPP proves ineffective.

- You send it to the agency (MDEQ, Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225 (ACT4 T-2)).
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT9 S-1, page 24**

> "The coverage recipient shall submit it to the MDEQ within 30 days of amendment."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=30)

#### Ask MDEQ to approve a transfer at least 30 days before an ownership change

At least 30 days before the change of ownership.

Coverage moves to a new owner only after notice to and approval by the Permit Board. Submit the transfer request form at least 30 days before a planned change of ownership.

- **When:** the ownership of the facility is changing.

- You file it in the agency's system (MDEQ's electronic general permit submittal portal (noi_esubmittals), with the paper form mailed to the Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225).
- Keep the records 3 years.
- Signed or certified by a responsible official per msr00 act16 t9.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT4 S-3, page 8**

> "The coverage recipient must notify the Permit Board by submittal of an appropriate form at least 30 days before: ... (3) Any planned changes of ownership"

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=14)

#### Fix problems found in an inspection within 7 days

Within 7 days after the inspection.

Correct poorly functioning controls or BMPs, problem discharges and other deficiencies found in an inspection as soon as possible and within 7 days, unless unsafe weather prevents it. Correct a deficiency that would harm the environment immediately.

- **When:** an inspection finds a deficiency in controls, BMPs or discharges.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT10 R-1, page 25**

> "shall be corrected as soon as possible, but not to exceed 7 days of the inspection unless prevented by unsafe weather conditions"

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=31)

#### Fix the SWPPP within 30 days of an MDEQ notice

Within 30 days after the Executive Director's notice.

If the Executive Director notifies you that the SWPPP does not meet the minimum requirements, amend it and certify in writing to the Executive Director that the changes were made, within 30 days unless the notice says otherwise.

- **When:** the Executive Director notifies you that the SWPPP does not meet the minimum requirements.

- You send it to the agency (MDEQ, Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225 (ACT4 T-2)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT9 S-1, page 24**

> "Unless otherwise provided, the coverage recipient shall have 30 days to make the requested changes."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=30)

#### Give 10 days notice of planned noncompliance

At least 10 days before the planned noncompliance.

Give MDEQ at least 10 days advance notice, if possible, before any planned noncompliance with the permit.

- **When:** noncompliance with the permit is planned.

- You send it to the agency (MDEQ, attention Chief, Environmental Compliance and Enforcement Division, P.O. Box 2261, Jackson MS 39225 (ACT16 T-18)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT16 T-18, page 40**

> "The coverage recipient shall give at least 10 days advance notice, if possible, before any planned noncompliance with permit requirements."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=46)

#### Give the Permit Board information it asks for

No set date. Within a reasonable time (ACT16 T-4); no number of days.

Furnish the Permit Board, within a reasonable time, any information it requests to decide on the coverage or check compliance, and copies of required records on request.

- **When:** the Permit Board asks for information or records.

- You send it to the agency (MDEQ, Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225 (ACT4 T-2)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT16 T-4, page 35**

> "The coverage recipient shall furnish to the Permit Board, within a reasonable time, any relevant information which the Permit Board may request"

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=41)

#### Give the SWPPP to the MS4 when asked

No set date. On request (ACT9 S-2(2)); no number of days.

When stormwater discharges into a municipal separate storm sewer system (MS4), make the SWPPP available to the local authority on request.

- **When:** the MS4 operator asks for the SWPPP.

- You send a copy to the operator of your storm sewer system (MS4).
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT9 S-2, page 24**

> "When stormwater discharges into a Municipal Separate Storm Sewer System (MS4), the coverage recipient shall make the SWPPP available to the local authority upon request."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=30)

#### Notify MDEQ at least 30 days before a planned change

At least 30 days before the planned change.

Submit the modification form to the Permit Board at least 30 days before a planned process change that may affect stormwater quality, a change in the facility's footprint, or a change in any information given in the ISNOI.

- **When:** a change in processes, the facility footprint or ISNOI information is planned.

- You file it in the agency's system (MDEQ's electronic general permit submittal portal (noi_esubmittals), with the paper form mailed to the Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225).
- Keep the records 3 years.
- Signed or certified by a responsible official per msr00 act16 t9.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT4 S-3, page 8**

> "The coverage recipient must notify the Permit Board by submittal of an appropriate form at least 30 days before:"

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=14)

#### Prepare the SWPPP and send it with the ISNOI

No set date. With the ISNOI (ACT4 S-2); the ISNOI itself is due at least 60 days before the regulated activity starts.

Prepare a Stormwater Pollution Prevention Plan (SWPPP) meeting ACT5 and submit it with the Industrial Stormwater Notice of Intent (ISNOI), together with a USGS quad map reaching at least half a mile beyond the property and a detailed scaled site drawing.

- **When:** a new facility is seeking coverage.

- You file it in the agency's system (MDEQ's electronic general permit submittal portal (noi_esubmittals), with the paper form mailed to the Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225).
- Keep the records 3 years.
- Signed or certified by a responsible official per msr00 act16 t9.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT4 S-2, page 8**

> "Submittals required with a completed ISNOI include: (1) A Stormwater Pollution Prevention Plan (SWPPP) prepared in accordance with ACT5 of this permit,"

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=14)

#### Record a jar test when inspecting during or after a storm

No set date. During the storm inspection (ACT10 R-1); no separate date.

When an inspection is made during or after a storm, collect a sample at each outfall in a clean, clear jar, examine it in good light, trace any pollution found upstream and fix it, and record the results on the Monthly Visual Jar Test Inspection Form (or an equivalent).

- **When:** an inspection is made during or after a storm.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT10 R-1, page 25**

> "The results of all jar test inspections shall be documented on the Monthly Visual Jar Test Inspection Form"

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=31)

#### Record the details of each sampled storm

No set date. With each sample (ACT11 L-1(3)); no separate date.

For each sampled storm, record the date and duration, the rainfall, the time since the end of the previous measurable storm (over 0.1 inch) and an estimate of the total discharge, and keep it with the SWPPP.

- **When:** the facility has coal piles.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT11 L-1, page 28**

> "The following records of sampled storm events must also be documented and maintained with the SWPPP:"

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=34)

#### Report noncompliance that may endanger health or the environment within 24 hours

Within 24 hours after you become aware of unanticipated noncompliance that may endanger health or the environment.

Tell MDEQ orally within 24 hours of becoming aware of unanticipated noncompliance that may endanger health or the environment, and send a written report within five working days.

Further steps with their own deadlines:

- **Send the written report within five working days.** Within 5 working days after you become aware of unanticipated noncompliance that may endanger health or the environment. [Section ACT16 T-18, page 40](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=46)
  > "A written report shall be provided to the MDEQ within five (5) working days of the time he or she becomes aware of the circumstances leading to the unanticipated noncompliance."

- **When:** you become aware of unanticipated noncompliance that may endanger health or the environment.

- You send it to the agency (MDEQ, attention Chief, Environmental Compliance and Enforcement Division, P.O. Box 2261, Jackson MS 39225 (ACT16 T-18)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT16 T-18, page 40**

> "The coverage recipient shall notify the MDEQ orally within 24 hours from the time he or she becomes aware of unanticipated noncompliance, which may endanger health or the environment."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=46)

#### Report other noncompliance within 30 days after the month ends

Within 30 days after the end of the month in which the noncompliance happened.

Report every other instance of noncompliance to MDEQ within 30 days from the end of the month in which it happened, with its cause, dates and times and the steps taken.

- **When:** noncompliance happens that the 24-hour report does not cover.

- You send it to the agency (MDEQ, attention Chief, Environmental Compliance and Enforcement Division, P.O. Box 2261, Jackson MS 39225 (ACT16 T-18)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT16 T-18, page 40**

> "The coverage recipient shall report all instances of noncompliance not reported under paragraph (2) above, within 30 days from the end of the month in which the noncompliance occurs."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=46)

#### Report releases that threaten water quality or cause a sheen

No set date. The permit gives no time limit (ACT16 T-15); report as soon as the release is known.

Report a release of hazardous substances, oil, pollutants or contaminants that threatens water quality standards or causes a film, sheen or discoloration of state waters to the Mississippi Emergency Management Agency, (601) 933-6362 or (800) 222-6362, or the National Response Center, (800) 424-8802.

- **When:** a release threatens water quality standards or causes a film, sheen or discoloration of state waters.

- You send it to the agency (Mississippi Emergency Management Agency (601) 933-6362 or (800) 222-6362, or the National Response Center (800) 424-8802, by phone).
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT16 T-15, page 39**

> "Releases into the environment of hazardous substances, oil, and pollutants or contaminants, which pose a threat to applicable water quality standards or causes a film, sheen or discoloration of waters of the State, shall be reported to the:"

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=45)

#### Rubbish sites: contain a sediment basin breach within 24 hours

Within 24 hours after an inspection finds an unanticipated breach of a sediment basin or pond.

After an inspection finds an unanticipated breach of a sediment basin or pond, take temporary containment measures within 24 hours, and permanent corrective measures within five days; if that cannot be done in time, contact MDEQ.

Further steps with their own deadlines:

- **Put permanent corrective measures in place within five days.** Within 5 days after the inspection. [Section ACT6 T-5, page 18](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=24)
  > "Permanent corrective measures shall be implemented within five (5) days of the inspection"

- **When:** the facility is a "rubbish site accepting Industrial Waste"; an inspection finds an unanticipated breach of a sediment basin or pond.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT6 T-5, page 18**

> "In the event of an unanticipated breach of a sediment basin/pond temporary containment measures shall be taken within 24 hours after the inspection."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=24)

#### Rubbish sites: fix erosion and sediment control problems within 24 hours

Within 24 hours after an inspection at the rubbish site finds a deficiency in erosion or sediment controls or discharges.

At a rubbish site accepting industrial waste, correct poorly functioning erosion or sediment controls, problem discharges and other deficiencies found in an inspection as soon as possible and within 24 hours, unless unsafe weather documented on the inspection form prevents it.

- **When:** the facility is a "rubbish site accepting Industrial Waste"; an inspection at the rubbish site finds a deficiency in erosion or sediment controls or discharges.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT6 T-5, page 17**

> "shall be corrected as soon as possible, but not to exceed 24 hours of the inspection unless prevented by unsafe weather conditions as documented on the inspection form."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=23)

#### Rubbish sites: inspect unstabilized areas weekly and after discharging rain

Within 7 days after the last inspection.

A rubbish site accepting industrial waste inspects all controls and outfalls after every rain that produces a discharge and at least weekly for all areas not stabilized; stabilized areas may be inspected monthly.

- **When:** the facility is a "rubbish site accepting Industrial Waste".

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT6 T-5, page 17**

> "Procedures shall provide that al controls and outfalls/discharge points are inspected after rain events that produce a discharge and at least weekly for all areas not stabilized."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=23)

#### Sample after a Section 313 water priority chemical release to stormwater

No set date. As close to the time of the release as practicable (ACT11 S-2(2)); no number of days.

When an EPA Form R, or the information gathered for a Form A, indicates a release of a Section 313 water priority chemical to stormwater, sample for pH, total suspended solids and each such chemical as close to the time of the release as practicable, recording the storm's date, duration, rainfall, the time since the last measurable storm and the estimated discharge.

- **When:** an EPA Form R, or the information for a Form A, indicates a release of a Section 313 water priority chemical to stormwater.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT11 S-2, page 27**

> "Frequency of Monitoring. Sampling shall be conducted as close to the time of the release as practicable."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=33)

#### Section 313 facilities: inspect for leaks at the intervals in the plan

No set date. At the intervals the SWPPP specifies (ACT8 T-4(8)); the permit sets none.

A facility subject to SARA Title III Section 313 inspects all areas at the intervals set in its plan for leaks or conditions that could release water priority chemicals, takes corrective action immediately (or shuts the unit down) when a leak could cause a significant release, and promptly removes contaminated soil and debris.

- **When:** the facility is subject to SARA Title III, Section 313.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT8 T-4, page 22**

> "Inspection intervals shall be specified in the plan and shall be based on design and operational experience."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=28)

#### Section 313 facilities: train employees and contractors at least once a year

Within 1 year after the last Section 313 training.

A facility subject to SARA Title III Section 313 trains employees and contractor personnel at least annually on pollution control laws, the SWPPP and the facility's features for preventing releases of Section 313 water priority chemicals.

- **When:** the facility is subject to SARA Title III, Section 313.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT8 T-4, page 22**

> "Training shall be conducted at least annually on pollution control laws and regulations, the stormwater pollution prevention plan and the particular features of the facility"

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=28)

#### Send a new authorization when the signing representative changes

No set date. Before or with the next report the new representative signs (ACT16 T-11).

If a duly authorized representative's authorization is no longer accurate, submit a new authorization to the Permit Board before or together with any report signed by the new representative.

- **When:** the authorization of the duly authorized representative is no longer accurate.

- You send it to the agency (MDEQ, Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225 (ACT4 T-2)).
- Keep the records 3 years.
- Signed or certified by a responsible official per msr00 act16 t9.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT16 T-11, page 37**

> "a new authorization satisfying the requirements of T-9 and T-10 above must be submitted to the Permit Board prior to or together with any reports, information or applications signed by the representative."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=43)

#### Send new stormwater sampling data to MDEQ within 90 days

Within 90 days after a stormwater sample is taken.

Submit any new stormwater sampling data to MDEQ within 90 days of sampling.

- **When:** the facility samples stormwater.

- You send it to the agency (MDEQ, Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225 (ACT4 T-2)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT9 S-1, page 24**

> "Submit any new stormwater sampling data within 90 days of sampling."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=30)

#### Submit a closure plan 30 days before closing or certifying no exposure

At least 30 days before the closure or the end of coverage.

Before permanently stopping the regulated activity, leaving the premises, or ending coverage to certify no exposure, submit a closure plan to MDEQ at least 30 days ahead, covering removal of equipment and materials, the no exposure steps, and final stabilization of the site.

- **When:** you want to end permit coverage, stop the regulated activity or leave the premises.

- You send it to the agency (MDEQ, Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225 (ACT4 T-2)).
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT15 S-1, page 34**

> "a closure plan shall be submitted to the MDEQ no later than 30 days prior to doing so."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=40)

#### Submit the ISNOI at least 60 days before the regulated activity starts

At least 60 days before the regulated industrial activity starts.

Submit the Industrial Stormwater Notice of Intent (ISNOI) at least 60 days before the regulated industrial activity starts. Stormwater may be discharged only after MDEQ staff send written notice that coverage is approved.

- **When:** a new facility is seeking coverage.

- You file it in the agency's system (MDEQ's electronic general permit submittal portal (noi_esubmittals), with the paper form mailed to the Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225).
- Keep the records 3 years.
- Signed or certified by a responsible official per msr00 act16 t9.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT4 S-1, page 8**

> "should submit an ISNOI Form at least 60 days prior to the commencement of the regulated industrial activity."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=14)

#### Submit the Request for Termination

No set date. The permit sets no date (ACT15 S-2); the closure plan is due 30 days before closing.

A facility that is out of business, no longer an industrial activity, or wants to certify no exposure submits the Request for Termination form. The permit binds it until MDEQ issues written termination.

- **When:** you want to end permit coverage, stop the regulated activity or leave the premises.

- You file it in the agency's system (MDEQ's electronic general permit submittal portal (noi_esubmittals), with the paper form mailed to the Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225).
- Keep the records 3 years.
- Signed or certified by a responsible official per msr00 act16 t9.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT15 S-2, page 34**

> "The coverage recipient is bound by the conditions of this permit until MDEQ issues a written termination of coverage."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=40)

#### Train new staff before they take on permit duties

No set date. Before the employee performs the duties (ACT14 S-2).

Newly hired employees responsible for the permit get initial training before performing those duties.

- **When:** a newly hired employee takes on permit duties.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT14 S-2, page 32**

> "Newly hired employees responsible for implementing and/or complying with the requirements of this permit shall receive initial training prior to performing such responsibilities."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=38)

### Ongoing  4 duties

#### Carry out the SWPPP and keep a copy at the site

No set date. Standing duty from the start of the regulated activity (ACT9 S-1(1), (2)).

Implement the SWPPP from the start of the regulated activity and keep a copy at the permitted site, available to MDEQ inspectors during an on-site inspection.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT9 S-1, page 24**

> "Implement the SWPPP and retain a copy of the SWPPP at the permitted site. Failure to implement the SWPPP is a violation of permit requirements."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=30)

#### Keep permit records for three years

No set date. Standing duty (ACT13 T-1).

Keep all records, reports and information required by the permit on site with the SWPPP for at least three years from the date they were made.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT13 T-1, page 31**

> "All records, reports and information resulting from activities required by this permit shall be retained by the coverage recipient, on-site with the SWPPP, for a minimum of at least three years from the date of generation."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=37)

#### Provide secondary containment for large fuel and chemical containers

No set date. Standing duty (ACT5 T-7(5)(F), (G); ACT16 T-24).

Provide secondary containment around any single fuel or chemical container over 660 gallons, or any group of containers with above ground bulk storage over 1,320 gallons, and for raw material stockpiles where needed to keep material out of state waters.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT5 T-7, page 13**

> "Provide secondary containment around any on-site single fuel or chemical container with a capacity greater than 660 gallons or any combination of containers which has an above ground bulk storage capacity of more than 1,320 gallons"

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=19)

#### Record all training on the Employee Training Log

No set date. Standing duty (ACT14 S-1).

Document all permit training on the Employee Training Log Form (or an equivalent) with each employee's name, worker identification number, date, contents, whether initial or refresher, and signature. Keep it with the SWPPP.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT14 S-1, page 32**

> "Personnel training conducted to meet the requirements of this ACT shall be documented."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=38)

### Only if...  3 duties

These apply only in the situation named on each one. Answer the questions to sort them.

#### Salvage yards: inspect unstabilized areas weekly and after discharging rain

Within 7 days after the last inspection.

An automobile salvage yard inspects all controls and outfalls after every rain that produces a discharge and at least weekly for all areas not stabilized (permanent vegetation, gravel, limestone or impervious cover); stabilized areas may be inspected monthly.

- **Only if:** your SIC code starts with 5015, or the facility dismantles used automobiles to sell parts or distributes used automobile parts.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT7 T-3, page 20**

> "Procedures shall provide that all controls and outfalls/discharge points are inspected after rain events that produce a discharge and at least weekly for all areas not stabilized."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=26)

#### Salvage yards: log and fix spills or leaks within 14 days

Within 14 days after a spill or leak is found.

At an automobile salvage yard, record any spill or leak on the Monthly Spill and Leak Log Sheet and correct it within 14 days, or as soon as possible if it immediately threatens stormwater.

- **Only if:** your SIC code starts with 5015, or the facility dismantles used automobiles to sell parts or distributes used automobile parts; a spill or leak is found.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT7 T-3, page 20**

> "Any spill or leaks should be documented on the Monthly Spill and Leak Log Sheet required by ACT 5 T-3 and corrected within 14 days"

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=26)

#### Sample at least quarterly when MDEQ requires impaired water monitoring

Within 89 days after the last sample.

A facility discharging to a 303(d) listed water with a TMDL wasteload allocation, where MDEQ believes the parameter is present and not controlled consistent with the TMDL, samples at least quarterly following the permit's sample type and representative discharge rules.

- **Only if:** your stormwater reaches an impaired water body; MDEQ requires monitoring because the receiving water has a TMDL wasteload allocation for a parameter present at the facility.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

Inferred from ACT11 S-1. Check your copy of the permit.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT11 S-1, page 27**

> "If required, sampling shall be conducted at least quarterly and according to T-1 and T-2 of this ACT."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=33)

## What does no-exposure certification require?

Exclusion for no exposure: a No Exposure Certification, resubmitted every five years.

- Every few years 1
- One time 1
- When something happens 1

### Every few years  1 duty

#### Resubmit the No Exposure Certification every five years

Within 5 years after the last certification.

Resubmit the No Exposure Certification form every five years.

- You file it in the agency's system (MDEQ's electronic general permit submittal portal (noi_esubmittals), with the paper form mailed to the Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225).
- Keep the records 3 years.
- Signed or certified by a responsible official per msr00 act16 t9.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT2 T-6, page 5**

> "This certification form must be resubmitted every five (5) years."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=11)

### One time  1 duty

#### Submit the No Exposure Certification

No set date. The permit sets no date (ACT2 T-6).

A facility whose industrial materials and activities are all sheltered from rain and runoff may submit the No Exposure Certification form instead of getting coverage.

- You file it in the agency's system (MDEQ's electronic general permit submittal portal (noi_esubmittals), with the paper form mailed to the Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225).
- Keep the records 3 years.
- Signed or certified by a responsible official per msr00 act16 t9.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT2 T-6, page 5**

> "To qualify for this exclusion, a No Exposure Certification Form (Industrial Stormwater Forms Package) must be submitted."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=11)

### When something happens  1 duty

#### New owner: submit a new No Exposure Certification

No set date. When ownership changes (ACT2 T-6); the permit gives no number of days.

The No Exposure Certification cannot be transferred. When ownership changes, the new owner submits a new certification.

- **When:** the ownership of the facility is changing.

- You file it in the agency's system (MDEQ's electronic general permit submittal portal (noi_esubmittals), with the paper form mailed to the Chief, Environmental Permits Division, P.O. Box 2261, Jackson MS 39225).
- Keep the records 3 years.
- Signed or certified by a responsible official per msr00 act16 t9.

**Source: Industrial Storm Water General Permit for Industrial Activities, Permit No. MSR00 (cover, contents and printed pages 1 to 46; 52 PDF pages), section ACT2 T-6, page 5**

> "The No Exposure Certification is non-transferable. In the event that ownership changes, the new owner must submit a new certification."

[Open the permit at this section](https://www.mdeq.ms.gov/wp-content/uploads/2020/12/Industrial-Stormwater-General-Permit-Final.pdf#page=11)

## Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

## Mississippi Industrial Stormwater General Permit MSR00 (formerly the Baseline Stormwater General Permit) duties, topic by topic

How the Mississippi Industrial Stormwater General Permit MSR00 (formerly the Baseline Stormwater General Permit) compares with the other checked permits on each kind of duty, in the permit's own words with the section for each:

- [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements#permit-us-ms-msr00)
- [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements#permit-us-ms-msr00)
- [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates#permit-us-ms-msr00)
- [No-exposure certification](https://stormdue.com/guides/no-exposure-certification#permit-us-ms-msr00)
- [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements#permit-us-ms-msr00)

- [Every state's permit](https://stormdue.com/states)
- [How we check permit rules](https://stormdue.com/about-the-rules)
- [Deadline calculator](https://stormdue.com/tools/deadline-calculator)
- [Benchmark comparison](https://stormdue.com/tools/benchmark-comparison)
- [More free tools](https://stormdue.com/tools)
- [Duties compared across permits](https://stormdue.com/guides)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.