# North Carolina NCG02 Mining Activities General Permit...

> Every recurring duty in the North Carolina NCG02 Mining Activities General Permit with its due date rule and permit section. Get your own dates free.

Canonical page: https://stormdue.com/permits/us-nc-ncg02

[States](https://stormdue.com/states) / [North Carolina](https://stormdue.com/states/nc)

# North Carolina NCG02 Mining Activities General Permit due dates and duties

Every duty in the General Permit No. NCG020000 to discharge stormwater, mine dewatering, and process wastewater under the National Pollutant Discharge Elimination System: Active and Inactive Mining Sites, with when it is due and the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup?state=NC&pack=us-nc-ncg02)

Free, no account. Your own dates in a minute.

- 65duties, each cited
- 11on a schedule
- 54when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

Today

July 1, 2025 June 30, 2030

**Notes on the permit's status and renewal**

Cover page: "The General Permit shall become effective on July 1, 2025" and expires at midnight on June 30, 2030, signed June 26, 2025. NC DEQ's general industrial permits page, read November 28, 2026, lists "NCG020000: Mining Activities, Effective 7-1-2025, Expires 6-30-2030" and says COCs that owed no fees were renewed automatically. No modification, amendment or draft renewal was found on that page or the stormwater public notices page on November 28, 2026. North Carolina has no catch-all industrial permit: each industry has its own NCG general permit, and NCG02 is the largest by active COCs (426 of 4,648 active rows in DEQ's permit list of November 2, 2026). The permit covers stormwater from nonmetallic mineral mining and quarrying (and lithium, per the cover page) and the wastewater it designates (mine dewatering, process wastewater, commingled water and recycle system overflows); peat, coal, coal ash, other metal mining, oil and gas, and DOT borrow pits are excluded. In-stream mining uses the NPDES wastewater permit NCG520000. No permit fee amount is in this pack.

## What does full permit coverage require?

Coverage under NCG020000: a Notice of Intent and a Certificate of Coverage (COC) before any discharge. North Carolina's No Exposure Certification is a separate exclusion not covered by this pack.

- Every month 1
- Every quarter 3
- Every year 6
- One time 1
- When something happens 51
- Ongoing 3

### Every month  1 duty

#### Record monthly new motor and hydraulic oil use

By the end of each month.

Track and record the average monthly use of new motor and hydraulic oil for vehicle maintenance, which decides whether non-polar oil and grease is sampled.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section F-1(b), page 16**

> "The average monthly usage of new motor and hydraulic oil used for vehicle maintenance at the facility shall be tracked and recorded."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=21)

### Every quarter  3 duties

#### Inspect industrial areas each calendar quarter

By the end of each calendar quarter.

Under the preventative maintenance and good housekeeping program, inspect material storage and handling, disposal, process, loading and unloading areas, haul roads and vehicle maintenance areas at least once each calendar quarter, and keep a record.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section B-12(a), page 7**

> "Inspections shall occur at a minimum on a quarterly schedule (January-March, April-June, July-September, October-December)."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=12)

#### Sample every stormwater outfall each calendar quarter

By the end of each calendar quarter; at least 30 days apart.

Take grab samples at each stormwater outfall (or ROS outfall) in each calendar quarter, at least 30 days apart, for TSS, settleable solids and turbidity, plus non-polar oil and grease where more than 55 gallons of new motor or hydraulic oil a month is used, and record the rainfall. Compare the results with the Table 2 benchmarks.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- The permit says this is done by an accredited laboratory.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section F-1(d), page 16**

> "Samples shall be collected from four separate monitoring periods per year unless the facility is in Tier Two or Tier Three status."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=21)

#### Visual inspection of each outfall with every analytical sample

By the end of each calendar quarter.

At each stormwater outfall, record color, odor, clarity, floating and suspended solids, foam, oil sheen, deposition and erosion at the outfall and other signs of pollution on DEMLR's Qualitative Monitoring Report form, at the same time as the analytical monitoring.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section E-1, page 15**

> "Visual inspections shall be performed concurrent with required analytical monitoring."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=20)

### Every year  6 duties

#### Evaluate every outfall for non-stormwater discharges once a year

Within 1 year after the last outfall evaluation.

Each year, evaluate all stormwater outfalls for non-stormwater discharges. Record the evaluation, dated and signed, in the SWPPP; if a non-stormwater discharge is found that is not otherwise permitted, take corrective action and keep a signed certification with the SWPPP.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from B-5. Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section B-5, page 4**

> "On an annual basis, the permittee shall evaluate all stormwater outfalls for the presence of non-stormwater discharges."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=9)

#### Review and update the BMP Summary once a year

Within 1 year after the last BMP Summary review.

Review and update the SWPPP's Best Management Practice Summary every year.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-7. Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section B-7, page 5**

> "The BMP Summary shall be reviewed and updated annually."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=10)

#### Review and update the whole SWPPP once a year

Within 1 year after the last SWPPP review.

Review and update all of the SWPPP every year, including a comparison of the past year's results with the benchmarks and the tier status on DEMLR's Annual Summary DMR form (kept in the SWPPP, not sent unless requested), and of past and expected wastewater flow rates.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-16. Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section B-16, page 8**

> "All aspects of the SWPPP shall be reviewed and updated on an annual basis."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=13)

#### Train employees once a year

Within 1 year after the last training.

Provide stormwater training every year to personnel whose work could contaminate stormwater, documented with the date, signature and printed name of each employee trained.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-13. Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section B-13, page 7**

> "Employee training shall be developed and provided on an annual basis for facility personnel responsible for operations that have the potential to contaminate stormwater runoff."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=12)

#### Update the list of significant spills once a year

Within 1 year after the last spill list update.

Update every year the SWPPP list of significant spills or leaks in the previous three years and the corrective actions taken (or a note that none happened).

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-10(f). Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section B-10(f), page 6**

> "A list of significant spills or leaks of pollutants that have occurred during the previous three (3) years ... This list shall be updated on annual basis."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=11)

#### Update the solvent inventory once a year

Within 1 year after the last solvent inventory update.

Keep the Solvent Management Plan's quantified inventory of solvents on site in the previous three years updated every year. If no solvents are stored or used on site, certify that in the SWPPP instead.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-11(a). Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section B-11(a), page 7**

> "an annually updated and quantified inventory of solvents present on site during the previous three years"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=12)

### One time  1 duty

#### Register for eDMR within 30 days of the COC

Within 30 days after the Certificate of Coverage is issued.

Register for the Stormwater eDMR system within 30 days of the date the Certificate of Coverage is issued, unless the Director says otherwise.

- You file it in the agency's system (NC DEQ Stormwater eDMR (deq.nc.gov/SW-eDMR)).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section I-1, page 32**

> "permittees are required to register for eDMR within 30 days of the Certificate of Coverage issuance date."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=37)

### When something happens  51 duties

#### After a turbidity standard exceedance: monitor upstream and downstream each quarter

By the end of each calendar quarter.

Any exceedance of the instream turbidity standard requires effluent, upstream and downstream turbidity monitoring with each quarterly wastewater sample.

- **When:** the COC authorizes wastewater discharges (mine dewatering, process wastewater, commingled water or recycle system overflows); the instream turbidity standard has been exceeded.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- The permit says this is done by an accredited laboratory.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section H-2(g), page 27**

> "Any exceedance of the in-stream water quality standard for turbidity shall require effluent, upstream and downstream monitoring for turbidity concurrent with quarterly monitoring"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=32)

#### Sample wastewater discharges each calendar quarter

By the end of each calendar quarter.

Take grab samples at each authorized wastewater outfall (mine dewatering, process wastewater, commingled stormwater and wastewater, recycle system overflows) each calendar quarter for pH, TSS and turbidity, plus settleable solids, fecal coliform or enterococcus for the receiving water classes listed, and meet the Table 8 limits.

- **When:** the COC authorizes wastewater discharges (mine dewatering, process wastewater, commingled water or recycle system overflows).

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- The permit says this is done by an accredited laboratory.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section H-1(a), page 27**

> "Wastewater discharges shall be monitored on a quarterly schedule. Sampling shall be performed in each of the four quarterly monitoring periods:"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=32)

#### No stormwater discharge all quarter: report it within 30 days

By April 30 (Q1), July 30 (Q2), October 30 (Q3) and January 30 (Q4).

If an outfall had no discharge from any measurable storm in the whole monitoring period, report "No Discharge" on the DMR, note it in the SWPPP and submit the DMR within 30 days after the period ends.

- **When:** an outfall had no discharge from any measurable storm in the quarter.

- You file it in the agency's system (NC DEQ Stormwater eDMR (deq.nc.gov/SW-eDMR); before registration, scanned DMRs through the DMR upload form and signed originals mailed to the Regional Office).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section F-6(e), page 20**

> "Submit the DMR within 30 days after the end of the monitoring period."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=25)

#### No wastewater discharge all quarter: record it within 30 days

By April 30 (Q1), July 30 (Q2), October 30 (Q3) and January 30 (Q4).

If no wastewater discharge happens in a sampling period, record "No Flow" or "No Discharge" in the monitoring records within 30 days after the period ends, and report "No Discharge" on the DMR (I-5).

- **When:** the COC authorizes wastewater discharges (mine dewatering, process wastewater, commingled water or recycle system overflows); there was no wastewater discharge in the quarter.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section H-1(b), page 27**

> "If no discharge occurs during the sampling period, the permittee shall record "No Flow" or "No Discharge" within 30 days of the end of the sampling period"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=32)

#### Apply for an individual permit 180 days before the permit expires if DEMLR finds TMDL reasonable potential

By January 1, 2030.

If DEMLR determines in writing that the discharges have reasonable potential to cause water quality standard violations under a TMDL, apply for an individual permit 180 days before this General Permit expires.

- **When:** DEMLR determines in writing that the discharges have reasonable potential to violate water quality standards under a TMDL.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official per ncg02 k1a.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section Part A, page 1**

> "If DEMLR determines that discharges have reasonable potential to cause water quality standard violations, the facility shall apply for an individual permit 180 days prior to the expiration date of this General Permit."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=6)

#### Ask DEMLR to reissue representative outfall status 30 days before the permit expires

By May 31, 2030.

To keep representative outfall status (ROS), send DEMLR's Central Office a written request for reissuance within thirty days before this General Permit expires. Tell DEMLR of any site change that affects ROS.

- **When:** DEMLR has granted representative outfall status.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from B-14. Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section B-14, page 8**

> "The permittee must request reissuance of ROS by submitting a written request to DEMLR's Central Office within thirty (30) days prior to the expiration of this General Permit to maintain ROS."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=13)

#### Dormant mine: ask DEMLR to reissue dormant status 30 days before the permit expires

By May 31, 2030.

To keep dormant status, send DEMLR's Central Office a written request for reissuance within thirty days before this General Permit expires.

- **When:** DEMLR has granted dormant status in writing.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from D-3. Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section D-3, page 13**

> "The permittee must request reissuance of Dormant Status in writing by submitting a written request to DEMLR's Central Office within thirty (30) days prior to the expiration of this General Permit to maintain Dormant Status."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=18)

#### Amend the SWPPP when a change affects the discharge

No set date. When the change happens (B-16); the permit sets no number of days.

Amend the SWPPP whenever a change in design, construction, operation, site drainage, maintenance or physical features may significantly affect the potential discharge of pollutants.

- **When:** a change in design, operation, drainage, maintenance or site features may affect the discharge of pollutants.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section B-16, page 8**

> "The permittee shall amend the SWPPP whenever there is a change in design, construction, operation, site drainage, maintenance, or configuration of the physical features"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=13)

#### Apply for an individual permit if DEMLR does not renew this permit

No set date. When DEMLR says (L-12).

No NOI or renewal request is needed at reissuance unless DEMLR asks. If DEMLR decides not to renew this General Permit, it will tell permittees to apply for individual permits.

- **When:** DEMLR decides not to renew this general permit.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official per ncg02 k1a.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section L-12, page 44**

> "If DEMLR chooses not to renew this General Permit, the permittee will be notified to submit an application for an individual permit"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=49)

#### Ask for a COC change before discharging to a water not on the COC

No set date. Before the discharge starts (I-7).

Before discharging from a new stormwater outfall to a waterbody not listed on the current COC, ask DEMLR to modify the COC.

- **When:** a new stormwater outfall to a waterbody not on the COC is planned.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section I-7, page 33**

> "The permittee shall request a modification to the COC from DEMLR prior to discharging to a new stormwater discharge outfall (SDO) to a waterbody that is not listed on the most current COC."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=38)

#### Ask for an electronic reporting waiver 60 days before reporting starts

At least 60 days before the date electronic reporting must begin.

A facility that cannot use eDMR (demonstrated hardship, or an area where under 10 percent of households have broadband) asks DEMLR in writing for a temporary waiver at least sixty days before it must start submitting data. A waiver lasts at most five years.

- **When:** you need a waiver from electronic reporting.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section K-11, page 39**

> "Requests for temporary electronic reporting waivers must be submitted in writing to DEMLR for written approval at least sixty (60) days prior to the date the facility would be required under this permit to begin submitting monitoring data"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=44)

#### Check stored stormwater before a maintenance drawdown

No set date. Before the release (C-6).

A treatment facility may be drawn down only for essential maintenance, from the surface or after sampling (taken no more than 14 calendar days before) shows the discharge will not exceed benchmarks. Check the water for color, foam, odor and sheens before release and document it.

- **When:** a stormwater or wastewater treatment facility is drawn down for maintenance.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section C-6, page 11**

> "Permittees shall evaluate any accumulated stormwater for color, foam, odor and visible sheens prior to release and document such evaluation."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=16)

#### Clay, feldspar ore and lithium ore mines: added stormwater parameters

No set date. Applies to every quarterly stormwater sample (nc-ncg02.baseline-sampling).

Clay mines, feldspar ore mines and lithium ore mines also sample the Table 3 parameters for their mine type with each quarterly stormwater sample. An exceedance of any Table 3 benchmark starts a tiered response for all parameters.

- **When:** the facility is a clay mine, feldspar ore mine or lithium ore mine.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- The permit says this is done by an accredited laboratory.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section F-3, page 17**

> "Clay Mines, Feldspar Ore Mines, and Lithium Ore Mines shall monitor all of the parameters listed in Table 2 and, in addition, shall monitor the parameters listed in Table 3."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=22)

#### Clay, feldspar ore and lithium ore mines: added wastewater limits

No set date. Applies to every quarterly wastewater sample (nc-ncg02.wastewater-sampling).

Wastewater from clay, feldspar ore and lithium ore mines must meet Table 9 as well as Table 8; take grab samples for the listed parameters each quarter, and report chromium and gamma/beta results even where no saltwater limit applies.

- **When:** the COC authorizes wastewater discharges (mine dewatering, process wastewater, commingled water or recycle system overflows); the facility is a clay mine, feldspar ore mine or lithium ore mine.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- The permit says this is done by an accredited laboratory.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section H-3, page 29**

> "Wastewater discharges from Clay Mines, Feldspar Ore Mines and Lithium Ore Mines shall not exceed the effluent limitations provided in both Table 8 and Table 9."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=34)

#### Clean out stormwater control measures at half their sediment capacity

No set date. When the condition is reached (C-2); no number of days.

Clean out a stormwater control measure when its sediment storage reaches 50 percent of the design volume, or when visible sedimentation is leaving the property.

- **When:** a stormwater control measure reaches 50 percent of its sediment capacity, or visible sediment leaves the property.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section C-2, page 10**

> "When applicable, SCMs must be cleaned out when sediment storage capacity equals or exceeds 50 percent of the design sediment volume or if visible sedimentation is leaving the property."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=15)

#### Complete corrective actions as soon as possible

No set date. As soon as possible (C-5); no number of days.

Take corrective action when a self-inspection shows the need, a facility performs poorly or creates nuisance conditions, and complete it as soon as possible considering weather and site conditions.

- **When:** a self-inspection shows corrective action is needed, or a facility performs poorly or creates a nuisance.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section C-5, page 10**

> "Corrective actions shall be completed as soon as possible considering adverse weather and site conditions."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=15)

#### Contact DEMLR before mining changes that affect the discharges

No set date. Before the change (Part A).

If mining activities expand or change after the COC is issued so that the types of discharges are affected, contact DEMLR first to find out whether the COC must be modified, and contact DEMLR if the Mining Permit must be modified.

- **When:** mining activities expand or change so that the types of discharges are affected.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section Part A, page 2**

> "If mining activities expand or change after issuance of the COC such that the types of discharges are affected, the permittee must first contact DEMLR to determine if modifications to the COC are necessary."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=7)

#### Correct wrong or missing information promptly

No set date. Promptly (K-10).

On learning that the NOI or a report left out relevant facts or gave incorrect information, promptly submit the facts or corrections.

- **When:** you find that the NOI or a report left out facts or was wrong.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section K-10, page 39**

> "Where the permittee becomes aware that it failed to submit any relevant facts in a Notice of Intent ... it shall promptly submit such facts or information"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=44)

#### Dormant mine: inspect the site and revise the SWPPP once a year

Within 1 year after the last dormant site inspection.

A dormant mine inspects the site each year and revises the SWPPP to match.

- **When:** DEMLR has granted dormant status in writing.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from D-6. Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section D-6, page 14**

> "The permittee shall conduct an annual inspection of the site and revise the SWPPP accordingly."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=19)

#### Dormant mine: notify DEMLR 30 days before mining starts again

At least 30 days before mining restarts.

A mine with dormant status notifies DEMLR in writing within thirty days before reactivating or starting mining activity.

- **When:** DEMLR has granted dormant status in writing.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from D-1(g). Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section D-1(g), page 13**

> "The permittee notifies DEMLR in writing within thirty (30) days prior to reactivating and/or commencing mining activity at the facility."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=18)

#### Dormant mine: recertify dormant status once a year

Within 1 year after the last Dormant Status Certification.

Each year complete the Dormant Status Certification Form, certifying the site is still temporarily inactive and stabilized with permanent vegetation, and keep it with the SWPPP.

- **When:** DEMLR has granted dormant status in writing.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from D-3. Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section D-3, page 13**

> "The permittee shall self-recertify that Dormant Status conditions are being maintained annually by completing a Dormant Status Certification Form"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=18)

#### Existing facility newly covered: SWPPP within 6 months of coverage

Within 181 days after the Certificate of Coverage takes effect.

An existing facility covered for the first time develops and implements the SWPPP within 6 months of the effective date of its COC, and has secondary containment (B-9) in place within 12 months.

Further steps with their own deadlines:

- **Secondary containment in place within 12 months.** Within 365 days after the Certificate of Coverage takes effect. [Section L-1(a), page 41](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=46)
  > "Secondary containment, as specified in Part B-9 of this General Permit, shall be accomplished within 12 months of the effective date of the issuance of the Certificate of Coverage."

- **When:** an existing facility is covered for the first time.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from section L-1(a). Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section L-1(a), page 41**

> "The Stormwater Pollution Prevention Plan shall be developed and implemented within 6 months of the effective date of the Certificate of Coverage"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=46)

#### Fix problems found by visual monitoring within 60 days

Within 60 days after the visual monitoring.

If visual monitoring shows the SWPPP or BMPs are not working or stormwater is contaminated, investigate the causes, evaluate corrective actions and carry out the feasible ones within sixty days, unless the Regional Engineer approves otherwise. Keep a written record in the SWPPP.

- **When:** visual monitoring shows the SWPPP or BMPs are not working, or stormwater is contaminated.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section E-2, page 15**

> "then the permittee shall investigate potential causes, evaluate the feasibility of corrective actions, and implement those feasible corrective actions within sixty (60) days."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=20)

#### Get a Certificate of Coverage before any discharge

No set date. Before any discharge (Part A); DEMLR inspects the site before coverage.

File a Notice of Intent (NOI) with DEMLR and pay the applicable fees. The NOI must be submitted and a Certificate of Coverage (COC) issued before any point source discharge of stormwater associated with industrial activity.

- **When:** a new facility is seeking coverage.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official per ncg02 k1a.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section Part A, page 1**

> "The NOI shall be submitted and a Certificate of Coverage (COC) issued prior to any discharge of stormwater associated with industrial activity"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=6)

#### Get the Director's approval before a transfer

No set date. Before the transfer (K-4).

Coverage cannot be transferred to anyone without prior written notice to and approval from the Director.

- **When:** the permit is to be transferred to a new owner or operator.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section K-4, page 37**

> "This General Permit is not transferable to any person without prior written notice to and approval from the Director in accordance with 40 CFR 122.61."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=42)

#### Give DEMLR requested information within a reasonable time

No set date. Within a reasonable time (L-8).

Furnish, within a reasonable time, any information the Permit Issuing Authority asks for, and copies of records this permit requires.

- **When:** DEMLR asks for information or records.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section L-8, page 43**

> "The permittee shall furnish to the Permit Issuing Authority, within a reasonable time, any information which the Permit Issuing Authority may request"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=48)

#### Inspect BMPs at least every 7 calendar days

Within 7 days after the last BMP inspection.

Inspect BMPs at least once every seven calendar days, unless the site has dormant status. Keep a signed written record of results, dates and repairs for each BMP, and document any visible off-site sedimentation and the steps taken.

- **Does not apply if:** DEMLR has granted dormant status in writing.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section B-8, page 5**

> "BMPs shall be inspected by or under the direction of the permittee at least once every seven (7) calendar days, unless the site has dormant status."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=10)

#### Mine dewatering near wetlands: get a Pumping Operation and Monitoring Plan approved

No set date. With the NOI, and approved before mine dewatering is discharged (G-2(b)).

If mine dewatering could drain wetlands or other surface waters, submit a Pumping Operation and Monitoring (POM) Plan with the NOI and get DEMLR's written approval before discharging mine dewatering water; then carry out the plan.

- **When:** mine dewatering could drain wetlands or other surface waters.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section G-2(b), page 25**

> "The POM shall be submitted with the NOI for DEMLR's review and approval. Written Division approval of the POM is required prior to the discharge of mine dewatering."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=30)

#### New facility: SWPPP and secondary containment before discharges begin

No set date. Before discharges from the industrial activity begin (L-1(b)).

A new facility develops and implements the SWPPP, and puts secondary containment in place, before discharges from the industrial activity begin.

- **When:** a new facility is seeking coverage.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section L-1(b), page 41**

> "The Stormwater Pollution Prevention Plan shall be developed and implemented prior to the beginning of discharges from the operation of the industrial activity"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=46)

#### Pay the annual fee within 30 days of the bill

Within 30 days after you are billed.

Pay the annual permit fee within 30 days after DEMLR bills it. Late payment may lead DEMLR to revoke coverage.

- **When:** DEMLR bills the annual fee.

- You send it to the agency (DEMLR, as the bill directs).
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section K-12, page 39**

> "The permittee must pay the annual fee within 30 (thirty) days after being billed by DEMLR."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=44)

#### Phosphate and industrial sand mines: added stormwater parameters

No set date. Applies to every quarterly stormwater sample (nc-ncg02.baseline-sampling).

Phosphate and industrial sand mines also sample the Table 4 parameters for their mine type with each quarterly stormwater sample. An exceedance of any Table 4 benchmark starts a tiered response for all parameters.

- **When:** the facility is a phosphate mine or industrial sand mine.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- The permit says this is done by an accredited laboratory.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section F-4, page 18**

> "Phosphate and Industrial Sand Mines shall monitor all of the parameters listed in Table 2 and, in addition, shall monitor the parameters listed in Table 4."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=23)

#### Phosphate and industrial sand mines: added wastewater limits

No set date. Applies to every quarterly wastewater sample (nc-ncg02.wastewater-sampling).

Wastewater from phosphate and industrial sand mines must meet Table 10 as well as Table 8; take grab samples for the listed parameters each quarter.

- **When:** the COC authorizes wastewater discharges (mine dewatering, process wastewater, commingled water or recycle system overflows); the facility is a phosphate mine or industrial sand mine.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- The permit says this is done by an accredited laboratory.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section H-4, page 29**

> "Wastewater discharges from Phosphate and Industrial Sand Mines shall not exceed the effluent limitations provide in both Table 8 and Table 10."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=34)

#### Record every release from secondary containment

No set date. At each release (B-9).

Before releasing stormwater from a secondary containment system, look at it for color, foam, outfall staining, sheens and dry weather flow, release only uncontaminated water, and record who observed it, a description of the water and the date and time. Keep these records five years.

- **When:** the facility has secondary containment.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section B-9(e), page 6**

> "Records on every release from a secondary containment system that include: the individual making the observation, a description of the accumulated stormwater, and the date and time of the release."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=11)

#### Record the daily wastewater flow rate

No set date. Every day there is a discharge (H-2(h)).

Record the daily wastewater flow rate with a continuous flow measurement instrument, or calculate it from pump curves and pump logs.

- **When:** the COC authorizes wastewater discharges (mine dewatering, process wastewater, commingled water or recycle system overflows).

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section H-2(h), page 27**

> "Daily flow rate shall be recorded by a continuous flow measurement instrument."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=32)

#### Record the details of every sample

No set date. With each sample (F-11).

For each sample or measurement record the date, place and time, who sampled, the analysis dates, who analyzed, the methods and the results.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section F-11, page 24**

> "For each measurement or sample taken pursuant to the requirements of this general permit, the permittee shall record the following information"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=29)

#### Renewed coverage: new SWPPP elements within 6 months of July 1, 2025

By December 31, 2025.

A facility renewed under this permit develops and implements the SWPPP elements new in this renewal within 6 months of the permit taking effect on July 1, 2025. Everything else applies as soon as the COC is issued.

- **When:** the facility was covered under the previous NCG02 permit and renewed.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from section L-1(c). Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section L-1(c), page 41**

> "New elements of the Stormwater Pollution Prevention Plan for this permit renewal shall be developed and implemented within 6 months of the effective date of this General Permit"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=46)

#### Report a hazardous substance release over a reportable quantity within 24 hours

Within 24 hours after you discover the release.

Notify DEMLR's Regional Office orally or electronically within 24 hours of discovering a release of hazardous substances over the reportable quantities under Section 311 of the Clean Water Act, with the date, time, nature, volume and location.

- **When:** hazardous substances are released over a Clean Water Act Section 311 reportable quantity.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section Part J, Table 11, page 34**

> "Releases of hazardous substances ... in excess of reportable quantities"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=39)

#### Report a reportable oil spill within 24 hours

Within 24 hours after you discover the oil spill.

Notify DEMLR's Regional Office orally or electronically within 24 hours of discovering an oil spill of 25 gallons or more, one under 25 gallons not cleaned up within 24 hours, one that causes a sheen on surface waters, or one within 100 feet of surface waters, with the date, time, nature, volume and location.

- **When:** an oil spill of 25 gallons or more, one not cleaned up in 24 hours, one causing a sheen, or one within 100 feet of surface waters happens.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section Part J, Table 11, page 34**

> "Oil spills if they are: ... 25 gallons or more,"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=39)

#### Report an anticipated bypass at least 10 days before

At least 10 days before the anticipated bypass.

Send DEMLR's Regional Office a written report at least ten days before an anticipated bypass of stormwater or wastewater treatment, with the expected quantity, quality and effect.

- **When:** you know in advance that a bypass of a treatment facility is needed.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section C-9 Table 1, page 12**

> "Written report at least ten days prior to the anticipated bypass."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=17)

#### Report an unanticipated bypass or upset within 24 hours

Within 24 hours after an unanticipated bypass or upset happens.

Notify DEMLR's Regional Office orally or electronically within 24 hours of an unanticipated bypass or upset, and send a written report with the quantity, quality and effect within 7 calendar days.

Further steps with their own deadlines:

- **Written report within 7 calendar days.** Within 7 days after an unanticipated bypass or upset happens. [Section C-9 Table 1, page 12](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=17)
  > "Written report within 7 calendar days of the event."

- **When:** an unanticipated bypass or upset happens.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from C-9 Table 1. Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section C-9 Table 1, page 12**

> "Oral or electronic notification within 24 hours of the event,"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=17)

#### Report noncompliance that may endanger health or the environment within 24 hours

Within 24 hours after you discover the noncompliance.

Notify DEMLR's Regional Office orally or electronically within 24 hours of discovering noncompliance that may endanger health or the environment, and send a report within 7 calendar days with its causes, exact dates and times, expected duration and the steps taken to stop it recurring.

Further steps with their own deadlines:

- **Written report within 7 calendar days.** Within 7 days after you discover the noncompliance. [Section Part J, Table 11, page 35](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=40)
  > "ii. Within 7 calendar days, a report that contains a ... description of the noncompliance, and its causes"

- **When:** noncompliance happens that may endanger health or the environment.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section Part J, Table 11, page 35**

> "Noncompliance with the ... conditions of this permit that may ... endanger health or the"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=40)

#### Report visible sediment in a stream or wetland within 24 hours

Within 24 hours after you discover the sediment deposition.

If discharges deposit visible sediment in a stream or wetland, notify DEMLR's Regional Office orally or electronically within 24 hours of discovery and send a report within 7 calendar days describing the sediment and the actions taken.

Further steps with their own deadlines:

- **Report within 7 calendar days.** Within 7 days after you discover the sediment deposition. [Section Part J, Table 11, page 34](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=39)
  > "ii. Within 7 calendar days, a report that contains a ... description of the sediment and actions taken to address"

- **When:** discharges deposit visible sediment in a stream or wetland.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section Part J, Table 11, page 34**

> "Visible sediment deposition from ... discharges covered under this ... i. Within 24 hours, an oral or electronic notification."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=39)

#### Send a new signature authorization when the representative changes

No set date. Before or with the first report the new representative signs (K-1(c)).

When a duly authorized representative's authorization is no longer accurate, send the Director a new written authorization before or together with any report signed by the new representative.

- **When:** the authorization of the duly authorized representative is no longer accurate.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official per ncg02 k1a.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section K-1(c), page 36**

> "a new authorization satisfying the requirements of paragraph (b) of this section must be submitted to the Director prior to or"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=41)

#### Send a schedule within 30 days of a SWPPP deficiency notice

Within 30 days after the Director's notice.

Within 30 days of the Director's notice that the SWPPP misses a minimum requirement, send the Director a schedule for fixing it, and certify in writing when the changes are made.

- **When:** the Director notifies you that the SWPPP misses a minimum requirement.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section B-17, page 9**

> "Within 30 days of such notice, the permittee shall submit a time schedule to the Director for modifying the SWPPP to meet minimum requirements."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=14)

#### Submit analytical results within 30 days of receiving them

Within 30 days after you receive all the sampling results.

Submit each monitoring period's analytical results on the DMR no later than 30 days from the date the facility receives all the sampling results, signed and certified under K-1.

- **When:** a monitoring sample is taken.

- You file it in the agency's system (NC DEQ Stormwater eDMR (deq.nc.gov/SW-eDMR); before registration, scanned DMRs through the DMR upload form and signed originals mailed to the Regional Office).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section I-2, page 32**

> "Analytical results within the monitoring period shall be submitted no later than 30 days from the date the facility receives all the sampling results."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=37)

#### Tell DEMLR in writing if the facility is sold or closed

No set date. No number of days set (K-5).

Notify DEMLR in writing if the permitted facility is sold or closed. After DEMLR releases a mine under the Mining Act, a rescission form may be sent to end coverage (B-6(b)).

- **When:** the facility is sold or closed.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section K-5, page 37**

> "The Permittee is required to notify DEMLR in writing in the event the permitted facility is sold or closed."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=42)

#### Tell the Director about planned changes as soon as possible

No set date. As soon as possible (K-3).

Give the Director notice as soon as possible of planned changes that could significantly alter the nature or quantity of pollutants discharged.

- **When:** a change that could significantly alter the pollutants discharged is planned.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section K-3, page 37**

> "The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=42)

#### Tier One: respond to a benchmark exceedance

Within 14 days after you receive the sampling results showing the exceedance.

For any result outside a benchmark: document each step in the SWPPP; within two weeks of receiving the results notify DEMLR's Regional Office of the date and value, inspect, and identify possible causes; within one month select feasible actions; within two months carry them out.

Further steps with their own deadlines:

- **Select feasible actions within one month.** Within 28 days after you receive the sampling results showing the exceedance. [Section F-8, Table 5, page 21](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=26)
  > "Table 5: Tier One Response for a Benchmark Exceedance ... Within one month v. Select specific, feasible courses of action"
- **Implement the actions within two months.** Within 59 days after you receive the sampling results showing the exceedance. [Section F-8, Table 5, page 21](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=26)
  > "Table 5: Tier One Response for a Benchmark Exceedance ... Within two months vi. Implement the selected feasible actions."

- **When:** a stormwater sample result is outside a benchmark.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from F-8, Table 5. Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section F-8, Table 5, page 21**

> "Table 5: Tier One Response for a Benchmark Exceedance ... Within two weeks ii. Notify DEMLR's Regional Office of the exceedance date and value"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=26)

#### Tier Three: send an Action Plan after four exceedances

Within 28 days after you receive the fourth result over the benchmark.

When four results for one parameter at an outfall exceed the benchmark within the permit term, notify DEMLR's Regional Office within two weeks, inspect and find the causes, and send a written Action Plan for review and approval. Carry out the approved plan and tell the Regional Office when it is done.

Further steps with their own deadlines:

- **Notify the Regional Office within two weeks.** Within 14 days after you receive the fourth result over the benchmark. [Section F-10, Table 7, page 23](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=28)
  > "Table 7: Tier Three Response for Four Benchmark Exceedances Within the Permit Term ... Within two weeks iii. Notify DEMLR's Regional Office of the exceedance date and value"
- **Tell the Regional Office when the Action Plan is complete.** The permit gives the timing in words, quoted below. [Section F-10(d), page 23](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=28)
  > "The permittee shall contact DEMLR's Regional Office when all actions in the Action Plan are completed."

- **When:** four results for one parameter at an outfall exceed the benchmark in the permit term.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from F-10(b), Table 7. Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section F-10(b), Table 7, page 23**

> "The permittee shall prepare a written Action Plan and submit to DEMLR's Regional Office for review and approval within thirty (30) days of receipt of the fourth analytic monitoring data point that exceeds the benchmark value."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=28)

#### Tier Two or Three: sample the outfall monthly

Within 28 days after the last sample.

After the Tier Two actions are carried out, and throughout Tier Three, sample every outfall that exceeded for all parameters each month until three samples in a row are below the benchmarks.

- **When:** two results in a row for one parameter at an outfall are outside the benchmark, or four results for one parameter at an outfall exceed the benchmark in the permit term.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- The permit says this is done by an accredited laboratory.

Inferred from F-9(b). Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section F-9(b), page 21**

> "After implementing the specific feasible courses of action, perform monthly ... monitoring at every outfall where a sampling result exceeded the benchmark value for two consecutive samples"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=26)

#### Tier Two: respond to two exceedances in a row

Within 14 days after you receive the sampling results showing the exceedance.

When two results in a row for the same parameter at an outfall are outside the benchmark, follow the same steps as Tier One (notice, inspection and causes within two weeks, actions chosen within one month and carried out within two months) and then monitor monthly.

Further steps with their own deadlines:

- **Select feasible actions within one month.** Within 28 days after you receive the sampling results showing the exceedance. [Section F-9, Table 6, page 22](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=27)
  > "Table 6: Tier Two Response for Two Consecutive Benchmark Exceedances ... Within one month v. Select specific, feasible courses of action"
- **Implement the actions within two months.** Within 59 days after you receive the sampling results showing the exceedance. [Section F-9, Table 6, page 22](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=27)
  > "Table 6: Tier Two Response for Two Consecutive Benchmark Exceedances ... Within two months vi. Implement the selected feasible actions."

- **When:** two results in a row for one parameter at an outfall are outside the benchmark.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from F-9, Table 6. Check your copy of the permit.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section F-9, Table 6, page 22**

> "Table 6: Tier Two Response for Two Consecutive Benchmark Exceedances ... Within two weeks ii. Notify DEMLR's Regional Office of the exceedance date and value"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=27)

### Ongoing  3 duties

#### Keep and carry out the Stormwater Pollution Prevention Plan

No set date. Standing duty (Part B).

Develop a Stormwater Pollution Prevention Plan (SWPPP) with the items in B-1 to B-18, keep it on site unless DEMLR exempts the facility, and implement it and all its Best Management Practices.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section Part B, page 3**

> "The permittee shall develop a Stormwater Pollution Prevention Plan (SWPPP). The SWPPP shall be maintained on site unless exempted from this requirement by DEMLR."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=8)

#### Keep reports and records for at least five years

No set date. Standing duty (I-10).

Keep calibration and maintenance records, strip charts, paper DMRs, qualitative monitoring records and NOI data on site or available electronically for at least five years from the sample, measurement, report or NOI date. SWPPP copies are also kept five years (B-18).

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section I-10, page 33**

> "These records or copies shall be maintained for a period of at least 5 years from the date of the sample, measurement, report, or Notice of Intent application."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=38)

#### Show the discharge does not raise receiving water turbidity

No set date. With each stormwater sample (F-5).

Show with each sample that the discharge does not push the receiving water above 10 NTU (trout waters), 25 NTU (lakes, reservoirs and salt waters) or 50 NTU (other streams), or raise turbidity where it is already above: by an outfall grab sample, a downstream sample, or upstream and downstream samples. Report the results on the DMR.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG020000, Active and Inactive Mining Sites (cover, contents and printed pages 1 to 52; 57 PDF pages), section F-5, page 19**

> "No discharge shall cause the turbidity in a receiving water to exceed (a) or to increase the turbidity levels of a receiving water that already exceeds (a)."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg02-general-permit-effective-jul-1-2025-june-30-2030/open#page=24)

## Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

## North Carolina NCG02 Mining Activities General Permit duties, topic by topic

How the North Carolina NCG02 Mining Activities General Permit compares with the other checked permits on each kind of duty, in the permit's own words with the section for each:

- [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements#permit-us-nc-ncg02)
- [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements#permit-us-nc-ncg02)
- [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates#permit-us-nc-ncg02)
- [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements#permit-us-nc-ncg02)

- [Every state's permit](https://stormdue.com/states)
- [How we check permit rules](https://stormdue.com/about-the-rules)
- [Deadline calculator](https://stormdue.com/tools/deadline-calculator)
- [Benchmark comparison](https://stormdue.com/tools/benchmark-comparison)
- [More free tools](https://stormdue.com/tools)
- [Duties compared across permits](https://stormdue.com/guides)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.
