# North Carolina NCG11 Treatment Works General Permit Due...

> Every recurring duty in the North Carolina NCG11 Treatment Works General Permit with its due date rule and permit section. Get your own dates free.

Canonical page: https://stormdue.com/permits/us-nc-ncg11

[States](https://stormdue.com/states) / [North Carolina](https://stormdue.com/states/nc)

# North Carolina NCG11 Treatment Works General Permit due dates and duties

Every duty in the General Permit No. NCG110000 to discharge stormwater under the National Pollutant Discharge Elimination System: Treatment Works, with when it is due and the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup?state=NC&pack=us-nc-ncg11)

Free, no account. Your own dates in a minute.

- 47duties, each cited
- 11on a schedule
- 36when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

Today

March 1, 2024 February 28, 2029

**Notes on the permit's status and renewal**

Cover page (scanned, read from the page image): effective March 1, 2024, expires at midnight on February 28, 2029, signed February 27, 2024. DEQ's general industrial permits page, read November 28, 2026, lists "NCG110000: Treatment Works, Effective 3-1-2024, Expires 2-28-2029" and links this file as "NCG11 General Permit (effective Mar 1, 2024)", with the Response to Comments of March 1, 2024 and the 2023 NCG11 General Permit (effective June 1, 2023), marked "Superseded by General Permit effective Mar 1, 2024". The response to comments says the 2024 permit reissued the 2023 one, removed the benchmarks and the tiered response, replaced fecal coliform with ammonia-nitrogen and moved the start of quarterly monitoring to the first quarter of 2025. No modification, amendment or draft renewal was found on that page or the stormwater public notices page on November 28, 2026. NCG11 is North Carolina's next largest NCG permit by active COCs without a pack, after NCG16 (140 of 140 rows in DEQ's permit list of November 2, 2026). It covers stormwater from treatment works treating domestic sewage or other sewage sludge, or wastewater treatment devices or systems for municipal or domestic sewage, with a design flow of 1.0 million gallons per day or more; facilities required to have an approved pretreatment program under 40 CFR Part 403; sludge disposal lands within the facility; and like activities DEMLR deems similar. The cover page names no SIC or NAICS code. E-2 lets the Director reopen the permit to require monitoring for emerging contaminants such as PFAS only if state or federal law changes; it is not a duty today. No permit fee amount is in this pack.

## What does full permit coverage require?

Coverage under NCG110000: a Notice of Intent and a Certificate of Coverage (COC) before any discharge. North Carolina's No Exposure Exclusion is a separate certification not covered by this pack.

- Every month 1
- Every quarter 3
- Every year 6
- One time 1
- When something happens 34
- Ongoing 2

### Every month  1 duty

#### Track monthly use of new motor and hydraulic oil

By the end of each month.

Track and record the facility's average monthly use of new motor and hydraulic oil for vehicle maintenance.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section E-1(b), page 13**

> "In addition to the grab samples, the average monthly usage of new motor and hydraulic oil used for vehicle maintenance at the facility shall be tracked and recorded."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=17)

### Every quarter  3 duties

#### Inspect industrial areas each calendar quarter

By the end of each calendar quarter.

Under the preventative maintenance and good housekeeping program, inspect material storage and handling areas, disposal areas, process areas, loading and unloading areas, haul roads and vehicle maintenance areas at least once each calendar quarter, and keep a record.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section B-10, page 6**

> "Inspections shall occur at a minimum on a quarterly schedule (January-March, April-June, July-September, October-December)."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=10)

#### Sample every stormwater outfall each calendar quarter

By the end of each calendar quarter; at least 30 days apart.

Take grab samples each calendar quarter, at least 30 days apart, at every stormwater outfall (or the representative outfalls DEMLR approved) for ammonia-nitrogen, total suspended solids and pH, adding non-polar oil and grease in vehicle or equipment maintenance areas using more than 55 gallons of new motor or hydraulic oil a month. Record the rainfall of each sampled event in inches.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- The permit says this is done by an accredited laboratory.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section E-1(d), page 13**

> "Samples shall be collected from four separate monitoring periods per year."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=17)

#### Visual inspection of each outfall each quarter

By the end of each calendar quarter.

At each stormwater outfall, with each analytical sample, record color, odor, clarity, floating and suspended solids, foam, oil sheen, deposition and erosion at the outfall and other signs of pollution on DEMLR's Qualitative Monitoring Report form.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section D-1, page 12**

> "Visual inspections shall be performed concurrent with required analytical monitoring."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=16)

### Every year  6 duties

#### Evaluate every outfall for non-stormwater discharges once a year

Within 1 year after the last outfall evaluation.

Each year, evaluate all stormwater outfalls for non-stormwater discharges. If any are present, identify the source and record whether it is otherwise permitted; take corrective action if it comes from the facility's operations and is not permitted. Keep a summary written record and certification statement, dated and signed, with the SWPPP.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from B-5. Check your copy of the permit.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section B-5, page 4**

> "On an annual basis, the permittee shall evaluate all stormwater outfalls for the presence of non-stormwater discharges."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=8)

#### Review and update the BMP Summary once a year

Within 1 year after the last BMP Summary review.

Review and update the SWPPP's Best Management Practice Summary every year.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-6. Check your copy of the permit.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section B-6, page 4**

> "BMP Summary shall be reviewed and updated annually."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=8)

#### Review and update the whole SWPPP once a year

Within 1 year after the last SWPPP review.

Review and update all of the SWPPP every year, including a review of the past year's sample results, on DEMLR's Annual Summary DMR form.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-14. Check your copy of the permit.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section B-14, page 7**

> "All aspects of the SWPPP shall be reviewed and updated on an annual basis."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=11)

#### Train employees once a year

Within 1 year after the last training.

Provide stormwater training every year to personnel whose work could contaminate stormwater, documented with the date, signature (or an identifier if done electronically) and printed or typed name of each employee trained.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-11. Check your copy of the permit.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section B-11, page 7**

> "Employee training shall be developed and provided on an annual basis for facility personnel responsible for operations that have the potential to contaminate stormwater runoff."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=11)

#### Update the list of significant spills once a year

Within 1 year after the last spill list update.

Update every year the SWPPP list of significant spills or leaks in the previous three years and the corrective actions taken (or a note that none happened).

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-8. Check your copy of the permit.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section B-8, page 6**

> "A list of significant spills or leaks of pollutants that have occurred during the previous three (3) years ... This list shall be updated on annual basis."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=10)

#### Update the solvent inventory once a year

Within 1 year after the last solvent inventory update.

Keep the Solvent Management Plan's quantified inventory of solvents on site in the previous three years updated every year. If no solvents are stored or used on site, certify that in the SWPPP instead.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-9. Check your copy of the permit.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section B-9, page 6**

> "an annually updated and quantified inventory of solvents present on site during the previous three years"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=10)

### One time  1 duty

#### Register for eDMR within 30 days of the COC

Within 30 days after the Certificate of Coverage is issued.

Register for the Stormwater eDMR system within 30 days of the date the Certificate of Coverage is issued, unless the Director says otherwise.

- You file it in the agency's system (NC DEQ Stormwater eDMR (deq.nc.gov/SW-eDMR)).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section F-1, page 16**

> "permittees are required to register for eDMR within 30 days of the Certificate of Coverage issuance date."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=20)

### When something happens  34 duties

#### No discharge all quarter: report it within 30 days

By April 30 (Q1), July 30 (Q2), October 30 (Q3) and January 30 (Q4).

If an outfall had no discharge from any measurable storm in the whole monitoring period, report "No Discharge" on the DMR, note it in the SWPPP and submit the DMR within 30 days after the period ends.

- **When:** an outfall had no discharge from any measurable storm in the quarter.

- You file it in the agency's system (NC DEQ Stormwater eDMR (deq.nc.gov/SW-eDMR); before registration, scanned DMRs through the DMR upload form and signed originals mailed to the Regional Office).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section E-3(f), page 14**

> "Submit the DMR within 30 days after the end of the monitoring period."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=18)

#### Apply for an individual permit 180 days before the permit expires if DEMLR finds TMDL reasonable potential

By September 1, 2028.

If DEMLR determines in writing that the discharges have reasonable potential to cause water quality standard violations under a TMDL, apply for an individual permit 180 days before this General Permit expires.

- **When:** DEMLR determines in writing that the discharges have reasonable potential to violate water quality standards under a TMDL.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official per ncg11 h1a.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section Part A, page 1**

> "If DEMLR determines that discharges have reasonable potential to cause water quality standard violations, the facility shall apply for an individual permit 180 days prior to the expiration date of this General Permit."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=5)

#### Amend the SWPPP when a change affects the discharge

No set date. When the change happens (B-14); the permit sets no number of days.

Amend the SWPPP whenever a change in design, construction, operation, site drainage, maintenance or physical features may significantly affect the potential discharge of pollutants.

- **When:** a change in design, operation, drainage, maintenance or site features may affect the discharge of pollutants.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section B-14, page 7**

> "The permittee shall amend the SWPPP whenever there is a change in design, construction, operation"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=11)

#### Apply for an individual permit if DEMLR does not renew this permit

No set date. When DEMLR says (I-11).

No NOI or renewal request is needed at reissuance unless DEMLR asks. If DEMLR decides not to renew this General Permit, it will tell permittees to apply for individual permits.

- **When:** DEMLR decides not to renew this general permit.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official per ncg11 h1a.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section I-11, page 28**

> "If DEMLR chooses not to renew this General Permit, the permittee will be notified to submit an application for an individual permit"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=32)

#### Ask for a COC change before discharging to a water not on the COC

No set date. Before the discharge starts (F-7).

Before discharging from a new stormwater outfall to a waterbody not listed on the current COC, ask DEMLR to modify the COC.

- **When:** a new stormwater outfall to a waterbody not on the COC is planned.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section F-7, page 16**

> "The permittee shall request a modification to the COC from DEMLR prior to discharging from a new stormwater discharge outfall (SDO) to a waterbody that is not listed on the most current COC."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=20)

#### Ask for an electronic reporting waiver 60 days before reporting starts

At least 60 days before the date electronic reporting must begin.

A facility that cannot use eDMR (demonstrated hardship, or an area where under 10 percent of households have broadband) asks DEMLR in writing for a temporary waiver at least sixty days before it must start submitting data. A waiver lasts at most five years.

- **When:** you need a waiver from electronic reporting.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section H-10, page 23**

> "Requests for temporary electronic reporting waivers must be submitted in writing to DEMLR for written approval at least sixty (60) days prior to the date the facility would be required under this permit to begin submitting monitoring data"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=27)

#### Check and document stored stormwater before a settling pond drawdown

No set date. Before the release (C-5); no number of days.

A settling pond may be drawn down only for essential inspection or maintenance, after the accumulated stormwater has been evaluated for color, foam, odor and visible sheens before release and the evaluation documented.

- **When:** a settling pond is drawn down for essential inspection or maintenance.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section C-5(a), page 9**

> "The permittee has evaluated any accumulated stormwater for color, foam, odor, and visible sheens prior to release and documented such evaluation"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=13)

#### Clean out settling ponds at half their sediment capacity

No set date. When the condition is reached (C-2); no number of days.

Where the facility has settling ponds, clean one out when its sediment storage reaches 50 percent of the design sediment volume.

- **When:** a settling pond reaches 50 percent of its design sediment volume.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section C-2, page 9**

> "When applicable, settling ponds must be cleaned out when sediment storage capacity equals or exceeds 50 percent of the design sediment volume."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=13)

#### Complete corrective actions as soon as possible

No set date. As soon as possible (C-4); no number of days.

Take corrective action when a self-inspection shows the need, or when DEMLR finds the facility operating out of compliance, and complete it as soon as possible considering weather and site conditions.

- **When:** a self-inspection shows corrective action is needed, or DEMLR finds the facility out of compliance.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section C-4, page 9**

> "Corrective actions shall be completed as soon as possible considering adverse weather and site conditions"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=13)

#### Contact DEMLR before industrial changes that affect the discharges

No set date. Before the change (Part A).

If industrial activities expand or change after the COC is issued so that the types of discharges are affected, contact DEMLR first to find out whether the COC must be modified.

- **When:** industrial activities expand or change so that the types of discharges are affected.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section Part A, page 2**

> "If industrial activities expand or change after issuance of the COC such that the types of discharges are affected, the permittee must first contact the Division to determine if modifications to the COC are necessary."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=6)

#### Correct wrong or missing information promptly

No set date. Promptly (H-9).

On learning that the NOI or a report left out relevant facts or gave incorrect information, promptly submit the facts or corrections.

- **When:** you find that the NOI or a report left out facts or was wrong.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section H-9, page 23**

> "Where the permittee becomes aware that it failed to submit any relevant facts in a Notice of Intent ... it shall promptly submit such facts or information"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=27)

#### Existing facility newly covered: SWPPP and secondary containment within 12 months of coverage

Within 365 days after the Certificate of Coverage takes effect.

An existing facility covered for the first time develops and implements the SWPPP, and puts secondary containment in place, within 12 months of the effective date of its COC.

Further steps with their own deadlines:

- **Secondary containment in place within 12 months.** Within 365 days after the Certificate of Coverage takes effect. [Section I-1(a), page 25](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=29)
  > "Secondary containment, as specified in Part B-7 of this General Permit, shall be accomplished within 12 months of the effective date of the issuance of the Certificate of Coverage."

- **When:** an existing facility is covered for the first time.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from section I-1(a). Check your copy of the permit.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section I-1(a), page 25**

> "The Stormwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the Certificate of Coverage"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=29)

#### Fix problems found by visual monitoring within 60 days

Within 60 days after the visual monitoring.

If visual monitoring shows the SWPPP or BMPs are not working or stormwater contamination is present, investigate the causes, evaluate corrective actions and carry out the feasible ones within sixty days, unless the Regional Engineer approves otherwise. Keep a written record in the SWPPP.

- **When:** visual monitoring shows the SWPPP or BMPs are not working, or stormwater is contaminated.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section D-2, page 12**

> "then the permittee shall investigate potential causes, evaluate the feasibility of corrective actions, and implement those feasible corrective actions within sixty (60) days"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=16)

#### Get a Certificate of Coverage before any discharge

No set date. Before any discharge (Part A).

File a Notice of Intent (NOI) with DEMLR and pay the applicable fees. The NOI must be submitted and a Certificate of Coverage (COC) issued before any point source discharge of stormwater associated with industrial activity.

- **When:** a new facility is seeking coverage.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official per ncg11 h1a.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section Part A, page 1**

> "The NOI shall be submitted and a Certificate of Coverage (COC) issued prior to any discharge of stormwater associated with industrial activity"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=5)

#### Get DEMLR's approval before changing a monitoring point

No set date. Before the change (E-4(b)).

Do not change a monitoring point set under this permit without written notice to DEMLR and its approval.

- **When:** you plan to change a monitoring point.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section E-4(b), page 14**

> "Monitoring points as specified in this General Permit shall not be changed without written notification to and approval by DEMLR"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=18)

#### Get the Director's approval before a transfer

No set date. Before the transfer (H-4).

Coverage cannot be transferred to anyone without prior written notice to and approval from the Director.

- **When:** the permit is to be transferred to a new owner or operator.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section H-4, page 21**

> "This General Permit is not transferable to any person without prior written notice to and approval from the Director in accordance with 40 CFR 122.61."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=25)

#### Give DEMLR requested information within a reasonable time

No set date. Within a reasonable time (I-7).

Furnish, within a reasonable time, any information the Permit Issuing Authority asks for, and copies of records this permit requires.

- **When:** DEMLR asks for information or records.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section I-7, page 27**

> "The permittee shall furnish to the Permit Issuing Authority, within a reasonable time, any information which the Permit Issuing Authority may request"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=31)

#### New facility: SWPPP and secondary containment before discharges begin

No set date. Before discharges from the industrial activity begin (I-1(b)).

A new facility develops and implements the SWPPP, and puts secondary containment in place, before discharges from the industrial activity begin.

- **When:** a new facility is seeking coverage.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section I-1(b), page 25**

> "The Stormwater Pollution Prevention Plan shall be developed and implemented prior to the beginning of discharges from the operation of the industrial activity"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=29)

#### Pay the annual fee within 30 days of the bill

Within 30 days after you are billed.

Pay the annual permit fee within 30 days after DEMLR bills it. Late payment may lead DEMLR to revoke coverage.

- **When:** DEMLR bills the annual fee.

- You send it to the agency (DEMLR, as the bill directs).
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section H-11, page 23**

> "The permittee must pay the annual fee within 30 (thirty) days after being billed by DEMLR."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=27)

#### Record every release from secondary containment

No set date. At each release (B-7).

Before releasing stormwater from a secondary containment system, look at it for color, foam, outfall staining, sheens and dry weather flow, and record who observed it, a description of the water and the date and time. Keep these records five years.

- **When:** the facility has secondary containment.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section B-7, page 5**

> "Records on every release from a secondary containment system that include: the individual making the observation, a description of the accumulated stormwater, and the date and time of the release."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=9)

#### Renewed coverage: new SWPPP elements within 6 months of March 1, 2024

By August 29, 2024.

A facility renewed under this permit develops and implements the SWPPP elements new in this renewal within 6 months of the permit taking effect on March 1, 2024. Everything else applies as soon as the COC is issued.

- **When:** the facility was covered under the previous NCG11 permit and renewed.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from section I-1(c). Check your copy of the permit.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section I-1(c), page 25**

> "New elements of the Stormwater Pollution Prevention Plan for this permit renewal shall be developed and implemented within 6 months of the effective date of this General Permit"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=29)

#### Report a hazardous substance release over a reportable quantity within 24 hours

Within 24 hours after you discover the release.

Notify DEMLR's Regional Office orally or electronically within 24 hours of discovering a release of hazardous substances over the reportable quantities under Section 311 of the Clean Water Act, with the date, time, nature, volume and location.

- **When:** hazardous substances are released over a Clean Water Act Section 311 reportable quantity.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section Part G, Table 6, page 18**

> "Releases of hazardous substances in excess of reportable quantities"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=22)

#### Report a reportable oil spill within 24 hours

Within 24 hours after you discover the oil spill.

Notify DEMLR's Regional Office orally or electronically within 24 hours of discovering an oil spill of 25 gallons or more, one under 25 gallons not cleaned up within 24 hours, one that causes a sheen on surface waters, or one within 100 feet of surface waters, with the date, time, nature, volume and location.

- **When:** an oil spill of 25 gallons or more, one not cleaned up in 24 hours, one causing a sheen, or one within 100 feet of surface waters happens.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section Part G, Table 6, page 18**

> "Oil spills if they are: ... 25 gallons or more,"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=22)

#### Report an anticipated bypass at least 10 days before

At least 10 days before the anticipated bypass.

Send DEMLR's Regional Office a written report at least ten days before an anticipated bypass of a stormwater control measure, with the expected quantity, quality and effect.

- **When:** you know in advance that a bypass of a stormwater control measure is needed.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section C-8, Table 1, page 11**

> "Written report at least ten days prior to the anticipated bypass."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=15)

#### Report an unanticipated bypass or upset within 24 hours

Within 24 hours after an unanticipated bypass or upset happens.

Notify DEMLR's Regional Office orally or electronically within 24 hours of an unanticipated bypass or upset, and send a written report with the quantity, quality and effect within 7 calendar days.

Further steps with their own deadlines:

- **Written report within 7 calendar days.** Within 7 days after an unanticipated bypass or upset happens. [Section C-8, Table 1, page 11](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=15)
  > "Written report within 7 calendar days of the event."

- **When:** an unanticipated bypass or upset happens.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section C-8, Table 1, page 11**

> "Oral or electronic notification within 24 hours of the event,"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=15)

#### Report noncompliance that may endanger health or the environment within 24 hours

Within 24 hours after you discover the noncompliance.

Notify DEMLR's Regional Office orally or electronically within 24 hours of discovering noncompliance that may endanger health or the environment, and send a report within 7 calendar days with its causes, exact dates and times, expected duration and the steps taken to stop it recurring.

Further steps with their own deadlines:

- **Written report within 7 calendar days.** Within 7 days after you discover the noncompliance. [Section Part G, Table 6, page 19](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=23)
  > "Within 7 calendar days, a report that contains a description of the noncompliance, and its causes"

- **When:** noncompliance happens that may endanger health or the environment.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section Part G, Table 6, page 19**

> "Noncompliance with the conditions of this permit that may endanger health or the environment"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=23)

#### Report visible sediment in a stream or wetland within 24 hours

Within 24 hours after you discover the sediment deposition.

If discharges deposit visible sediment in a stream or wetland, notify DEMLR's Regional Office orally or electronically within 24 hours of discovery and send a report within 7 calendar days describing the sediment and the actions taken.

Further steps with their own deadlines:

- **Report within 7 calendar days.** Within 7 days after you discover the sediment deposition. [Section Part G, Table 6, page 18](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=22)
  > "Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition."

- **When:** discharges deposit visible sediment in a stream or wetland.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section Part G, Table 6, page 18**

> "Visible sediment deposition from discharges covered under this permit into a stream or wetland. ... Within 24 hours, an oral or electronic notification."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=22)

#### Send a new signature authorization when the representative changes

No set date. Before or with the first report the new representative signs (H-1(c)).

When a duly authorized representative's authorization is no longer accurate, send the Director a new written authorization before or together with any report signed by the new representative.

- **When:** the authorization of the duly authorized representative is no longer accurate.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official per ncg11 h1a.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section H-1(c), page 20**

> "Changes to authorization: If an authorization under paragraph (b) of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=24)

#### Send a schedule within 30 days of a SWPPP deficiency notice

Within 30 days after the Director's notice.

Within 30 days of the Director's notice that the SWPPP misses a minimum requirement, send the Director a schedule for fixing it, and certify in writing when the changes are made.

- **When:** the Director notifies you that the SWPPP misses a minimum requirement.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section B-15, page 8**

> "Within 30 days of such notice, the permittee shall submit a time schedule to the Director for modifying the SWPPP to meet minimum requirements."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=12)

#### Sign the solvent certification, or report solvent spills, on each DMR

No set date. With each DMR (B-9).

On each discharge monitoring report, include either a summary of any leak, spill or dumping of solvents that occurred, or the signed certification that none happened since the last DMR and that the facility is carrying out its Solvent Management Plan.

- **When:** you submit a Discharge Monitoring Report.

- You file it in the agency's system (NC DEQ Stormwater eDMR (deq.nc.gov/SW-eDMR); before registration, scanned DMRs through the DMR upload form and signed originals mailed to the Regional Office).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section B-9, page 6**

> "The permittee shall include either; a summary of any leak, spill, or dumping that occurred; or the following signed certification statement on each discharge monitoring report"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=10)

#### Submit analytical results within 30 days of receiving them

Within 30 days after you receive all the sampling results.

Submit each monitoring period's analytical results on the DMR no later than 30 days from the date the facility receives all the sampling results, signed and certified under H-1.

- **When:** a monitoring sample is taken.

- You file it in the agency's system (NC DEQ Stormwater eDMR (deq.nc.gov/SW-eDMR); before registration, scanned DMRs through the DMR upload form and signed originals mailed to the Regional Office).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section F-2, page 16**

> "Analytical results within the monitoring period shall be submitted no later than 30 days from the date the facility receives all the sampling results."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=20)

#### Tell DEMLR in writing if the facility is sold or closed

No set date. No number of days set (H-4).

Notify DEMLR in writing if the permitted facility is sold or closed.

- **When:** the facility is sold or closed.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section H-4, page 21**

> "The permittee is required to notify DEMLR in writing in the event the permitted facility is sold or closed."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=25)

#### Tell DEMLR of site changes that affect representative outfall status

No set date. No number of days set (B-12).

With representative outfall status, notify DEMLR of any site or activity change that results in a change to ROS.

- **When:** DEMLR has granted representative outfall status.

- You send it to the agency (DEMLR Regional Office (email, in writing or DEMLR's electronic form); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section B-12, page 7**

> "The permittee shall notify DEMLR of any site or activity modifications that result in a change to ROS."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=11)

#### Tell the Director about planned changes as soon as possible

No set date. As soon as possible (H-3).

Give the Director notice as soon as possible of planned changes that could significantly alter the nature or quantity of pollutants discharged.

- **When:** a change that could significantly alter the pollutants discharged is planned.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section H-3, page 21**

> "The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=25)

### Ongoing  2 duties

#### Keep and carry out the Stormwater Pollution Prevention Plan

No set date. Standing duty (Part B).

Develop a Stormwater Pollution Prevention Plan (SWPPP) with the items in B-1 to B-16, keep it on site unless DEMLR exempts the facility, and implement it and all its Best Management Practices.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section Part B, page 3**

> "The permittee shall develop a Stormwater Pollution Prevention Plan (SWPPP). The SWPPP shall be maintained on site unless exempted from this requirement by DEMLR."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=7)

#### Keep reports and records for at least five years

No set date. Standing duty (F-10).

Keep calibration and maintenance records, original recordings for continuous monitoring, DMRs and eDMRs, qualitative monitoring records and NOI data on site or available electronically for at least five years from the sample, measurement, report or NOI date. SWPPP copies are also kept five years (B-16).

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG110000, Treatment Works (scanned cover page, three contents pages and printed pages 1 to 34; 38 PDF pages), section F-10, page 17**

> "These records or copies shall be maintained for a period of at least 5 years from the date of the sample, measurement, report, or Notice of Intent application."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg110000-general-permit-2024-reissued/download#page=21)

## Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

## North Carolina NCG11 Treatment Works General Permit duties, topic by topic

How the North Carolina NCG11 Treatment Works General Permit compares with the other checked permits on each kind of duty, in the permit's own words with the section for each:

- [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements#permit-us-nc-ncg11)
- [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements#permit-us-nc-ncg11)
- [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates#permit-us-nc-ncg11)
- [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements#permit-us-nc-ncg11)

- [Every state's permit](https://stormdue.com/states)
- [How we check permit rules](https://stormdue.com/about-the-rules)
- [Deadline calculator](https://stormdue.com/tools/deadline-calculator)
- [Benchmark comparison](https://stormdue.com/tools/benchmark-comparison)
- [More free tools](https://stormdue.com/tools)
- [Duties compared across permits](https://stormdue.com/guides)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.
