# North Carolina NCG24 Composting General Permit Due Dates

> Every recurring duty in the North Carolina NCG24 Composting General Permit with its due date rule and permit section. Get your own dates free.

Canonical page: https://stormdue.com/permits/us-nc-ncg24

[States](https://stormdue.com/states) / [North Carolina](https://stormdue.com/states/nc)

# North Carolina NCG24 Composting General Permit due dates and duties

Every duty in the General Permit No. NCG240000 to discharge stormwater and process wastewater under the National Pollutant Discharge Elimination System: Composting, with when it is due and the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup?state=NC&pack=us-nc-ncg24)

Free, no account. Your own dates in a minute.

- 59duties, each cited
- 9on a schedule
- 50when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

Today

July 1, 2022 June 30, 2027

**Notes on the permit's status and renewal**

Cover page (text layer) names the covered and excluded composting operations; the second page, a scanned image with no text layer read from the page image, says the permit becomes effective July 1, 2022 and expires at midnight on June 30, 2027, signed June 30, 2022 by the DEMLR Director. DEQ's general industrial permits page, read November 28, 2026, lists "NCG240000: Composting Operations, Effective 7-1-2022, Expires 6-30-2027", says it applies to NAICS 325315 and like activities, and links this file as "NCG24 General Permit (effective July 1, 2022)"; it lists no modification. The permit expires within a year: no draft renewal, modification or amendment of NCG240000 was on that page or on DEMLR's stormwater public notices page on November 28, 2026 (the spring 2026 notice covered NCG03, NCG06, NCG08, NCG09, NCG10 and NCG12 only). Existing permittees need not apply for renewal unless DEMLR directs (K-2, L-12); this pack must be rechecked when the renewal is noticed or issued. NCG24 had 25 active COCs (25 rows) in DEQ's permit list of November 2, 2026. It covers stormwater and the process wastewater listed in the COC from composting operations (SIC 2875 and/or 2879) classified as large Type 1, Type 2 and small Type 3 facilities under 15A NCAC 13B .1402(f), and their vehicle and equipment maintenance. No permit fee amount is in this pack.

## What does full permit coverage require?

Coverage under NCG240000: a Notice of Intent and a Certificate of Coverage (COC) before any discharge. North Carolina's No Exposure Exclusion is a separate certification not covered by this pack.

- Every quarter 3
- Every year 6
- When something happens 48
- Ongoing 2

### Every quarter  3 duties

#### Inspect industrial areas each calendar quarter

By the end of each calendar quarter.

Under the preventative maintenance and good housekeeping program, inspect material storage and handling, disposal, process, loading and unloading areas, haul roads and vehicle maintenance areas at least once each calendar quarter, and keep a record.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section B-11, page 6**

> "Inspections shall occur at a minimum on a quarterly schedule (January-March, April-June, July-September, October-December)."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=11)

#### Sample every stormwater outfall each calendar quarter

By the end of each calendar quarter; at least 30 days apart.

Take grab samples each calendar quarter, at least 30 days apart, at every stormwater outfall (or the approved representative outfalls) for TSS, pH (analyzed within 15 minutes), COD, BOD5, fecal coliform (freshwater) or Enterococcus (saltwater), total nitrogen, total phosphorus, total recoverable copper and non-polar oil and grease, record rainfall, and compare the results with the Table 2 benchmarks.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- The permit says this is done by an accredited laboratory.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section E-1(d), page 12**

> "Samples shall be collected from four separate monitoring periods per year unless the facility is in Tier Two or Tier Three status."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=17)

#### Visual inspection of each outfall each quarter

By the end of each calendar quarter.

At each stormwater outfall, with each analytical sample, record color, odor, clarity, floating and suspended solids, foam, oil sheen, deposition and erosion at the outfall and other signs of pollution on DEMLR's Qualitative Monitoring Report form.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section D-1, page 11**

> "Visual inspections shall be performed concurrent with required analytical monitoring."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=16)

### Every year  6 duties

#### Evaluate every outfall for non-stormwater discharges once a year

Within 1 year after the last outfall evaluation.

Each year, evaluate all stormwater outfalls for non-stormwater discharges. If any are present, identify the source, record whether another permit or rule covers it, evaluate its significance, and keep a dated, signed summary and certification with the SWPPP.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from B-6. Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section B-6, page 4**

> "On an annual basis, the permittee shall evaluate all stormwater outfalls for the presence of non-stormwater discharges."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=9)

#### Review and update the BMP Summary once a year

Within 1 year after the last BMP Summary review.

Review and update the SWPPP's Best Management Practice Summary every year.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-7. Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section B-7, page 4**

> "BMP Summary shall be reviewed and updated annually."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=9)

#### Review and update the whole SWPPP once a year

Within 1 year after the last SWPPP review.

Review and update all of the SWPPP every year, including a comparison of the past year's results with the benchmarks and a discussion of tier status on DEMLR's Annual Summary DMR form.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-14. Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section B-14, page 7**

> "All aspects of the SWPPP shall be reviewed and updated on an annual basis."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=12)

#### Train employees once a year

Within 1 year after the last training.

Provide stormwater training every year to personnel whose work could contaminate stormwater, documented with the date, signature and printed name of each employee trained.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-12. Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section B-12, page 6**

> "Employee training shall be developed and provided on an annual basis for facility personnel responsible for operations that have the potential to contaminate stormwater runoff."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=11)

#### Update the list of significant spills once a year

Within 1 year after the last spill list update.

Update every year the SWPPP list of significant spills or leaks in the previous three years and the corrective actions taken (or a note that none happened).

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-9. Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section B-9, page 5**

> "A list of significant spills or leaks of pollutants that have occurred during the previous three (3) years ... This list shall be updated on annual basis."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=10)

#### Update the solvent inventory once a year

Within 1 year after the last solvent inventory update.

Keep the Solvent Management Plan's quantified inventory of solvents on site in the previous three years updated every year. If no solvents are stored or used on site, certify that in the SWPPP instead.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from B-10. Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section B-10, page 6**

> "an annually updated and quantified inventory of solvents present on site during the previous three years"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=11)

### When something happens  48 duties

#### Sample wastewater discharges each calendar quarter

By the end of each calendar quarter; at least 30 days apart.

Take grab samples at each authorized process wastewater outfall each calendar quarter, at least 30 days apart, for TSS, pH, BOD5, fecal coliform and non-polar oil and grease, plus Enterococcus for SB or SC waters, and meet the Table 6 limits.

- **When:** the COC authorizes process wastewater discharges (process wastewater, commingled stormwater and wastewater, or recycle system discharges).

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- The permit says this is done by an accredited laboratory.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section G-1(a), page 19**

> "Process wastewater discharges shall be monitored quarterly beginning on July 1, 2022."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=24)

#### Apply for an individual permit 180 days before the permit expires if DEMLR finds TMDL reasonable potential

By January 1, 2027.

If DEMLR determines that the discharges have reasonable potential to cause water quality standard violations under a TMDL, apply for an individual permit 180 days before this General Permit expires.

- **When:** DEMLR determines that the discharges have reasonable potential to violate water quality standards under a TMDL.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official per ncg24 k1a.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section Part A, page 1**

> "If DEMLR determines that discharges have reasonable potential to cause water quality standard violations, the facility shall apply for an individual permit 180 days prior to the expiration date of this General Permit."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=6)

#### No stormwater discharge all quarter: report it within 30 days

By April 30 (Q1), July 30 (Q2), October 30 (Q3) and January 30 (Q4).

If an outfall had no discharge from any measurable storm in the whole monitoring period, report "No Discharge" on the DMR, note it in the SWPPP and submit the DMR within 30 days after the period ends.

- **When:** an outfall had no discharge from any measurable storm in the quarter.

- You file it in the agency's system (Before eDMR: scanned signed DMRs through DEMLR's electronic DMR submittal form (deq.nc.gov/SW-Industrial), then the signed originals mailed to the Regional Office; NC DEQ Stormwater eDMR once DEMLR says to register).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section E-3(e), page 14**

> "Submit the DMR within 30 days after the end of the monitoring period."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=19)

#### No wastewater discharge all quarter: record it within 30 days

By April 30 (Q1), July 30 (Q2), October 30 (Q3) and January 30 (Q4).

If no wastewater discharge happens in a sampling period, record "No Flow" or "No Discharge" in the facility's monitoring records within 30 days after the period ends.

- **When:** the COC authorizes process wastewater discharges (process wastewater, commingled stormwater and wastewater, or recycle system discharges); no wastewater was discharged in the quarter.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section G-2(h), page 19**

> "If no discharge occurs during the sampling period, the permittee shall record "No Flow" or "No Discharge" within 30 days of the end of the sampling period in the facility's monitoring records."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=24)

#### Ask DEMLR to reissue representative outfall status 30 days before the permit expires

By May 31, 2027.

To keep representative outfall status (ROS), send DEMLR's Central Office a written request for reissuance within thirty days before this General Permit expires on June 30, 2027.

- **When:** DEMLR has granted representative outfall status.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from B-13. Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section B-13, page 7**

> "The permittee must request reissuance of ROS by submitting a written request to DEMLR's Central Office within thirty (30) days prior to the expiration of this General Permit to maintain ROS."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=12)

#### Amend the SWPPP when a change affects the discharge

No set date. When the change happens (B-14); the permit sets no number of days.

Amend the SWPPP whenever a change in design, construction, operation, site drainage, maintenance or physical features may significantly affect the potential discharge of pollutants.

- **When:** a change in design, operation, drainage, maintenance or site features may affect the discharge of pollutants.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section B-14, page 7**

> "The permittee shall amend the SWPPP whenever there is a change in design, construction, operation, site drainage, maintenance, or configuration of the physical features"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=12)

#### Apply for an individual permit if DEMLR does not renew this permit

No set date. When DEMLR says (L-12).

No NOI or renewal request is needed at reissuance unless DEMLR asks. If DEMLR decides not to renew this General Permit, it will tell permittees to apply for individual permits.

- **When:** DEMLR decides not to renew this general permit.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official per ncg24 k1a.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section L-12, page 32**

> "If DEMLR chooses not to renew this General Permit, the permittee will be notified to submit an application for an individual permit"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=37)

#### Ask for a COC change before discharging to a water not on the COC

No set date. Before the discharge starts (I-7).

Before discharging from a new stormwater outfall to a waterbody not listed on the current COC, ask DEMLR to modify the COC.

- **When:** a new stormwater outfall to a waterbody not on the COC is planned.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section I-7, page 24**

> "The permittee shall request a modification to the COC from DEMLR prior to discharging from a new SDO to a waterbody that is not listed on the most current COC."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=29)

#### Ask for an electronic reporting waiver 60 days before reporting starts

At least 60 days before the date electronic reporting must begin.

A facility that cannot use eDMR (demonstrated hardship, or an area where under 10 percent of households have broadband) asks DEMLR in writing for a temporary waiver at least sixty days before it must start submitting data. A waiver lasts at most five years.

- **When:** you need a waiver from electronic reporting.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section K-10, page 28**

> "Requests for temporary electronic reporting waivers must be submitted in writing to DEMLR for written approval at least sixty (60) days prior to the date the facility would be required under this permit to begin submitting monitoring data"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=33)

#### Clean out stormwater control measures at half their sediment capacity

No set date. When the condition is reached (C-2); no number of days.

Clean out a stormwater control measure when its sediment storage reaches 50 percent of the design volume, or when visible sedimentation is leaving the property.

- **When:** a stormwater control measure reaches 50 percent of its sediment capacity, or visible sediment leaves the property.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section C-2, page 8**

> "SCMs must be cleaned out when sediment storage capacity equals or exceeds 50 percent of the design sediment volume or if visible sedimentation is leaving the property."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=13)

#### Complete corrective actions as soon as possible

No set date. As soon as possible (C-4); no number of days.

Take corrective action when a self-inspection shows the need, a facility performs poorly or creates nuisance conditions, and complete it as soon as possible considering weather and site conditions.

- **When:** a self-inspection shows corrective action is needed, or a facility performs poorly or creates a nuisance.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section C-4, page 8**

> "Corrective actions shall be completed as soon as possible considering adverse weather and site conditions"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=13)

#### Contact DEMLR before changes that affect the discharges

No set date. Before the change (Part A).

If the activities covered by this permit expand or change after the COC is issued so that the types of discharges are affected, contact DEMLR first to find out whether the COC must be modified.

- **When:** the activities covered by this permit expand or change so that the types of discharges are affected.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section Part A, page 2**

> "If activities covered by this permit expand or change after issuance of the COC such that the types of discharges are affected, the permittee must first contact DEMLR to determine if modifications to the COC are necessary."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=7)

#### Correct wrong or missing information promptly

No set date. Promptly (K-9).

On learning that the NOI or a report left out relevant facts or gave incorrect information, promptly submit the facts or corrections.

- **When:** you find that the NOI or a report left out facts or was wrong.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section K-9, page 28**

> "Where the permittee becomes aware that it failed to submit any relevant facts in a Notice of Intent ... it shall promptly submit such facts or information"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=33)

#### Discharge only the wastewater listed in the NOI and approved in the COC

No set date. Before the discharge (F-1).

Only process wastewater specifically identified in the Notice of Intent and approved by DEMLR in the COC may be discharged: process wastewater, commingled stormwater and wastewater, and recycle system discharges. Get the COC changed before discharging any other wastewater.

- **When:** you plan to discharge process wastewater not listed in the NOI and the COC.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section F-1(b), page 18**

> "The permittee is only authorized to discharge process wastewater specifically identified in the Notice of Intent and approved by DEMLR by issuance of the COC"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=23)

#### Existing facility newly covered: SWPPP and secondary containment within 12 months of coverage

Within 365 days after the Certificate of Coverage takes effect.

An existing facility covered for the first time develops and implements the SWPPP, and puts secondary containment in place, within 12 months of the effective date of its COC.

Further steps with their own deadlines:

- **Secondary containment in place within 12 months.** Within 365 days after the Certificate of Coverage takes effect. [Section L-1(a), page 30](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=35)
  > "Secondary containment, as specified in B-9 of this General Permit, shall be accomplished within 12 months of the effective date of the issuance of the Certificate of Coverage."

- **When:** an existing facility is covered for the first time.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from section L-1(a). Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section L-1(a), page 30**

> "The Stormwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the Certificate of Coverage"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=35)

#### Fix problems found by visual monitoring within 60 days

Within 60 days after the visual monitoring.

If visual monitoring shows the SWPPP or BMPs are not working or stormwater is significantly contaminated, investigate the causes, evaluate corrective actions and carry out the feasible ones within sixty days. Keep a written record in the SWPPP.

- **When:** visual monitoring shows the SWPPP or BMPs are not working, or stormwater is significantly contaminated.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section D-2, page 11**

> "then the permittee shall investigate potential causes, evaluate the feasibility of corrective actions, and implement those feasible corrective actions within sixty (60) days."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=16)

#### Get a Certificate of Coverage before any discharge

No set date. Before any discharge (Part A).

File a Notice of Intent (NOI) with DEMLR and pay the applicable fees. The NOI must be submitted and a Certificate of Coverage (COC) issued before any point source discharge of stormwater associated with industrial activity or of authorized process wastewater.

- **When:** a new facility is seeking coverage.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official per ncg24 k1a.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section Part A, page 1**

> "The NOI shall be submitted and a Certificate of Coverage (COC) issued prior to any discharge of stormwater associated with industrial activity"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=6)

#### Get DEMLR's approval before changing a monitoring point

No set date. Before the change (E-4(b)).

Do not change a monitoring point set under this permit without written notice to DEMLR and its approval.

- **When:** you plan to change a monitoring point.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section E-4(b), page 14**

> "Monitoring points as specified in this General Permit shall not be changed without written notification to and approval by DEMLR"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=19)

#### Get the Director's approval before a transfer

No set date. Before the transfer (K-4).

Coverage cannot be transferred to anyone without prior written notice to and approval from the Director.

- **When:** the permit is to be transferred to a new owner or operator.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section K-4, page 27**

> "This General Permit is not transferable to any person without prior written notice to and approval from the Director in accordance with 40 CFR 122.61."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=32)

#### Give DEMLR requested information within a reasonable time

No set date. Within a reasonable time (L-8).

Furnish, within a reasonable time, any information the Permit Issuing Authority asks for, and copies of records this permit requires.

- **When:** DEMLR asks for information or records.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section L-8, page 32**

> "The permittee shall furnish to the Permit Issuing Authority, within a reasonable time, any information which the Permit Issuing Authority may request"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=37)

#### Keep an up-to-date list of the chemicals used in the industrial process

No set date. Standing duty (H-2(i)).

Keep on site an up-to-date list of the detergents, additives, polymers, brighteners, solvents, cleaning agents and like chemicals used in the industrial process, with use schedule, quantity, safety data sheets and aquatic toxicity data if available.

- **When:** the facility operates a wastewater treatment facility for authorized process wastewater.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section H-2(i), page 22**

> "A list of detergents, additives, polymers, brighteners and any other solvent, cleaning agents, or like chemicals used on site in the industrial process, must be kept on site and up to date."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=27)

#### New facility: SWPPP and secondary containment before discharges begin

No set date. Before discharges from the industrial activity begin (L-1(b)).

A new facility develops and implements the SWPPP, and puts secondary containment in place, before discharges from the industrial activity begin.

- **When:** a new facility is seeking coverage.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section L-1(b), page 30**

> "The Stormwater Pollution Prevention Plan shall be developed and implemented prior to the beginning of discharges from the operation of the industrial activity"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=35)

#### Notify the Regional Office 72 hours before a new or expanded wastewater treatment facility starts

At least 3 days before the new or expanded treatment facility starts operating.

After building a new or expanded wastewater treatment facility, notify DEMLR's Regional Supervisor at least 72 hours before it starts operating, during business hours (8:00 a.m. to 5:00 p.m., Monday to Friday, not State holidays), so the Regional Office can inspect it.

- **When:** a new or expanded wastewater treatment facility is built.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section H-1, page 21**

> "Permittee shall notify the DEMLR Regional Office at least seventy-two (72) hours in advance of operation of the installed facilities so that an in-place inspection can be made"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=26)

#### Pay the annual fee within 30 days of the bill

Within 30 days after you are billed.

Pay the annual administering and compliance monitoring fee within 30 days after DEMLR bills it. Late payment may lead DEMLR to revoke coverage.

- **When:** DEMLR bills the annual fee.

- You send it to the agency (DEMLR, as the bill directs).
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section K-11, page 29**

> "The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days after being billed by DEMLR."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=34)

#### Record every release from secondary containment

No set date. At each release (B-8).

Before releasing stormwater from a secondary containment system, look at it for color, foam, outfall staining, sheens and dry weather flow, release only uncontaminated water, and record who observed it, a description of the water and the date and time. Keep these records five years.

- **When:** the facility has secondary containment.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section B-8, page 5**

> "Records on every release from a secondary containment system that include: the individual making the observation, a description of the accumulated stormwater, and the date and time of the release."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=10)

#### Record the daily wastewater flow rate

No set date. Every day there is a discharge (G-2(f)).

Record the daily wastewater flow rate with a continuous flow measurement instrument, or calculate it from pump curves and pump logs.

- **When:** the COC authorizes process wastewater discharges (process wastewater, commingled stormwater and wastewater, or recycle system discharges).

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section G-2(f), page 19**

> "Daily flow rate shall be recorded by a continuous flow measurement instrument."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=24)

#### Record unauthorized releases from a closed-loop recycle system

No set date. At each release (H-2(j)); no number of days.

Where a closed-loop recycle system is permitted by DWR's Non-discharge Permitting Program, record every unauthorized wastewater release from it to surface waters, wetlands or the ground surface, and keep the records on site five years.

- **When:** the facility has a closed-loop recycle system permitted by DWR's Non-discharge Permitting Program.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section H-2(j), page 22**

> "A record of unauthorized wastewater releases to surface waters, wetlands, or ground surface from closed-loop recycle systems permitted by the DWR's Non-discharge Permitting Program shall be documented and kept on site"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=27)

#### Register for eDMR when DEMLR says to

No set date. When DEMLR notifies the facility (I-3); no number of days.

When DEMLR notifies the facility that it is time, register for and begin reporting in the eDMR system. Until then, upload scanned signed DMRs and mail the originals to the Regional Office.

- **When:** DEMLR tells you it is time to register for eDMR.

- You file it in the agency's system (NC DEQ Stormwater eDMR).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section I-3, page 23**

> "Permittees shall be notified by DEMLR when it is time to register and begin reporting in eDMR."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=28)

#### Renewed coverage: new SWPPP elements within 6 months of July 1, 2022

By December 29, 2022.

A facility renewed under this permit develops and implements the SWPPP elements new in this renewal within 6 months of the permit taking effect on July 1, 2022. Everything else applies as soon as the COC is issued.

- **When:** the facility was covered under the previous NCG24 permit and renewed.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from section L-1(c). Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section L-1(c), page 30**

> "New elements of the Stormwater Pollution Prevention Plan for this permit renewal shall be developed and implemented within 6 months of the effective date of this General Permit"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=35)

#### Report a hazardous substance release over a reportable quantity within 24 hours

Within 24 hours after you discover the release.

Notify DEMLR's Regional Office orally or electronically within 24 hours of discovering a release of hazardous substances over the reportable quantities under Section 311 of the Clean Water Act, CERCLA section 102 or G.S. 143-215.85, with the date, time, nature, volume and location.

- **When:** hazardous substances are released over a reportable quantity.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section Part J, Table 7, page 25**

> "Releases of hazardous substances ... in excess of reportable quantities"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=30)

#### Report a reportable oil spill within 24 hours

Within 24 hours after you discover the oil spill.

Notify DEMLR's Regional Office orally or electronically within 24 hours of discovering an oil spill of 25 gallons or more, one under 25 gallons not cleaned up within 24 hours, one that causes a sheen on surface waters, or one within 100 feet of surface waters, with the date, time, nature, volume and location.

- **When:** an oil spill of 25 gallons or more, one not cleaned up in 24 hours, one causing a sheen, or one within 100 feet of surface waters happens.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section Part J, Table 7, page 25**

> "Oil spills if they are: ... 25 gallons or more,"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=30)

#### Report an anticipated bypass at least 10 days before

At least 10 days before the anticipated bypass.

Send DEMLR's Regional Office a written report at least ten days before an anticipated bypass of a stormwater or wastewater treatment facility, with the expected quantity, quality and effect.

- **When:** you know in advance that a bypass of a stormwater or process wastewater treatment facility is needed.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section C-9, Table 1, page 10**

> "Written report at least ten days prior to the anticipated bypass."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=15)

#### Report an unanticipated bypass or upset within 24 hours

Within 24 hours after an unanticipated bypass or upset happens.

Notify DEMLR's Regional Office orally or electronically within 24 hours of an unanticipated bypass or upset, and send a written report with the quantity, quality and effect within 7 calendar days.

Further steps with their own deadlines:

- **Written report within 7 calendar days.** Within 7 days after an unanticipated bypass or upset happens. [Section C-9, Table 1, page 10](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=15)
  > "Written report within 7 calendar days of the event."

- **When:** an unanticipated bypass or upset happens.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from C-9, Table 1. Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section C-9, Table 1, page 10**

> "Oral or electronic notification within 24 hours of the event,"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=15)

#### Report noncompliance that may endanger health or the environment within 24 hours

Within 24 hours after you discover the noncompliance.

Notify DEMLR's Regional Office orally or electronically within 24 hours of discovering noncompliance that may endanger health or the environment, and send a report within 7 calendar days with its causes, exact dates and times, expected duration and the steps taken to stop it recurring.

Further steps with their own deadlines:

- **Report within 7 calendar days.** Within 7 days after you discover the noncompliance. [Section Part J, Table 7, page 25](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=30)
  > "Within 7 calendar days, a report that contains a description of the ... noncompliance, and its causes"

- **When:** noncompliance happens that may endanger health or the environment.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section Part J, Table 7, page 25**

> "Noncompliance with the ... conditions of this permit that may ... endanger health or the"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=30)

#### Report visible sediment in a stream or wetland within 24 hours

Within 24 hours after you discover the sedimentation.

If visible sedimentation is found in a stream or wetland, notify DEMLR's Regional Office orally or electronically within 24 hours of discovery and send a report within 7 calendar days describing the sediment and the actions taken.

Further steps with their own deadlines:

- **Report within 7 calendar days.** Within 7 days after you discover the sedimentation. [Section Part J, Table 7, page 25](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=30)
  > "Within 7 calendar days, a report that contains a description of the ... sediment and actions taken to address the cause of the deposition."

- **When:** visible sedimentation is found in a stream or wetland.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section Part J, Table 7, page 25**

> "Visible sedimentation in a stream ... Within 24 hours, an oral or electronic notification."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=30)

#### Sample stored stormwater within 14 days before a treatment facility drawdown

No set date. Sampling no more than 14 calendar days before the drawdown (C-5(b)).

A stormwater treatment facility may be drawn down only for essential maintenance, in a way that meets benchmarks and limits, and only after sampling of the stored water, taken no more than 14 calendar days before, shows the discharge will not exceed the benchmarks.

- **When:** a stormwater treatment facility is drawn down for essential maintenance.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section C-5, page 8**

> "The sampling data shall be collected no more than 14 calendar days prior to the draw down"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=13)

#### Send a new signature authorization when the representative changes

No set date. Before or with the first report the new representative signs (K-1(c)).

When a duly authorized representative's authorization is no longer accurate, send the Director a new written authorization before or together with any report signed by the new representative.

- **When:** the authorization of the duly authorized representative is no longer accurate.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official per ncg24 k1a.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section K-1(c), page 26**

> "a new authorization satisfying the requirements of paragraph (b) of this section must be submitted to the Director prior to or together with any reports, information, or applications to be signed by an authorized representative"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=31)

#### Send a schedule within 30 days of a SWPPP deficiency notice

Within 30 days after the Director's notice.

Within 30 days of the Director's notice that the SWPPP misses a minimum requirement, send the Director a schedule for fixing it, and certify in writing when the changes are made.

- **When:** the Director notifies you that the SWPPP misses a minimum requirement.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section B-16, page 7**

> "Within 30 days of such notice, the permittee shall submit a time schedule to the Director for modifying the SWPPP to meet minimum requirements."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=12)

#### Submit analytical results within 30 days of receiving them

Within 30 days after you receive all the sampling results.

Submit each monitoring period's analytical results on the DMR no later than 30 days from the date the facility receives all the sampling results, signed and certified under K-1.

- **When:** a monitoring sample is taken.

- You file it in the agency's system (Before eDMR: scanned signed DMRs through DEMLR's electronic DMR submittal form (deq.nc.gov/SW-Industrial), then the signed originals mailed to the Regional Office; NC DEQ Stormwater eDMR once DEMLR says to register).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section I-6, page 24**

> "Analytical results within the monitoring period shall be submitted no later than 30 days from the date the facility receives all the sampling results."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=29)

#### Tell DEMLR in writing if the facility is sold or closed

No set date. No number of days set (K-4).

Notify DEMLR in writing if the permitted facility is sold or closed.

- **When:** the facility is sold or closed.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section K-4, page 27**

> "The permittee is required to notify DEMLR in writing in the event the permitted facility is sold or closed."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=32)

#### Tell DEMLR of site changes that affect representative outfall status

No set date. No number of days set (B-13).

With representative outfall status, notify DEMLR of any site or activity change that results in a change to ROS.

- **When:** DEMLR has granted representative outfall status.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section B-13, page 7**

> "The permittee shall notify DEMLR of any site or activity modifications that result in a change to ROS."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=12)

#### Tell the Director about planned changes as soon as possible

No set date. As soon as possible (K-3).

Give the Director notice as soon as possible of planned changes that could significantly alter the nature or quantity of pollutants discharged.

- **When:** a change that could significantly alter the pollutants discharged is planned.

- You send it to the agency (DEMLR Stormwater Program Central Office, 1612 Mail Service Center, Raleigh NC 27699-1612).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section K-3, page 27**

> "The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=32)

#### Tier One: respond to a benchmark exceedance

Within 14 days after you receive the sampling results showing the exceedance.

For any result above a benchmark or outside the benchmark range: document each step in the SWPPP; within two weeks of receiving the results notify DEMLR's Regional Office of the date and value by email, inspect, and identify possible causes; within one month select feasible actions; within two months carry them out.

Further steps with their own deadlines:

- **Select feasible actions within one month.** Within 28 days after you receive the sampling results showing the exceedance. [Section E-5, Table 3, page 15](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=20)
  > "Table 3: Tier One Response for a Benchmark Exceedance ... Within one month ... Select specific, feasible courses of action"
- **Carry out the actions within two months.** Within 59 days after you receive the sampling results showing the exceedance. [Section E-5, Table 3, page 15](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=20)
  > "Table 3: Tier One Response for a Benchmark Exceedance ... Within two months ... Implement the selected feasible actions."

- **When:** a stormwater sample result is above a benchmark or outside the benchmark range.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from E-5, Table 3. Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section E-5, Table 3, page 15**

> "Table 3: Tier One Response for a Benchmark Exceedance ... Within two weeks ... Notify DEMLR's Regional Office of the exceedance or hit outside benchmark range date and value via email"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=20)

#### Tier Three: send an Action Plan after four exceedances

Within 28 days after you receive the fourth result over the benchmark.

When four results for one parameter at an outfall exceed the benchmark or fall outside the range within the permit term, notify DEMLR's Regional Office in writing within two weeks, inspect and find the causes, and send a written Action Plan for review and approval. Carry out the approved plan and tell the Regional Office when it is done.

Further steps with their own deadlines:

- **Notify the Regional Office within two weeks.** Within 14 days after you receive the fourth result over the benchmark. [Section E-7, Table 5, page 17](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=22)
  > "Table 5: Tier Three Response for Four Benchmark Exceedances Within the Permit Term ... Within two weeks ... Notify DEMLR's Regional Office in writing of the affected outfall"
- **Tell the Regional Office when the Action Plan is done.** The permit gives the timing in words, quoted below. [Section E-7(d), page 17](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=22)
  > "The permittee shall contact DEMLR's Regional Office when all actions in the Action Plan are completed."

- **When:** four results for one parameter at an outfall exceed the benchmark or fall outside the range within the permit term.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from E-7(b). Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section E-7(b), page 16**

> "The permittee shall prepare a written Action Plan and submit to DEMLR's Regional Office for review and approval within thirty (30) days of receipt of the fourth analytic monitoring data point that exceeds the benchmark value"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=21)

#### Tier Two or Three: sample the outfall monthly

Within 28 days after the last sample.

After the Tier Two actions are carried out, and throughout Tier Three, sample every outfall that exceeded for all parameters each month until three samples in a row are below the benchmark or inside the range.

- **When:** two results in a row for one parameter at an outfall are above the benchmark or outside the range, or four results for one parameter at an outfall exceed the benchmark or fall outside the range within the permit term.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.
- The permit says this is done by an accredited laboratory.

Inferred from E-6(b). Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section E-6(b), page 15**

> "After implementing the specific feasible courses of action, perform monthly monitoring at every outfall where a sampling result exceeded the benchmark value or was outside the benchmark range for two consecutive samples"

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=20)

#### Tier Two: respond to two exceedances in a row

Within 14 days after you receive the sampling results showing the exceedance.

When two results in a row for the same parameter at an outfall are above the benchmark, follow the Tier One steps (written notice, inspection and causes within two weeks, actions chosen within one month and carried out within two months) and then monitor monthly.

Further steps with their own deadlines:

- **Select feasible actions within one month.** Within 28 days after you receive the sampling results showing the exceedance. [Section E-6, Table 4, page 16](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=21)
  > "Table 4: Tier Two Response for Two Consecutive Benchmark Exceedances ... Within one month ... Select specific, feasible courses of action"
- **Carry out the actions within two months.** Within 59 days after you receive the sampling results showing the exceedance. [Section E-6, Table 4, page 16](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=21)
  > "Table 4: Tier Two Response for Two Consecutive Benchmark Exceedances ... Within two months ... Implement the selected feasible actions."

- **When:** two results in a row for one parameter at an outfall are above the benchmark or outside the range.

- You send it to the agency (DEMLR Regional Office (email or in writing); outside business hours the Environmental Emergency Center, (800) 858-0368).
- Keep the records 5 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from E-6, Table 4. Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section E-6, Table 4, page 16**

> "Table 4: Tier Two Response for Two Consecutive Benchmark Exceedances ... Within two weeks ... Notify DEMLR's Regional Office in writing of the exceedance or hit outside benchmark range date and value."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=21)

#### Update the phosphate-free detergent feasibility study every year

Within 1 year after the last update of the phosphate-free detergent feasibility study.

If phosphate-containing detergents are used on site, keep on site a feasibility study of using phosphate-free detergents, and update it every year.

- **When:** the facility operates a wastewater treatment facility for authorized process wastewater; phosphate-containing detergents are used on site.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Inferred from H-2(i). Check your copy of the permit.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section H-2(i), page 22**

> "If phosphate-containing detergents are used on site, a feasibility study must be performed to show the viability of using phosphate-free detergents. The feasibility study shall be kept on the site and updated annually."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=27)

#### Use only flocculants DEMLR has evaluated

No set date. Standing duty (H-2(g)).

Use only flocculants DEMLR has evaluated, at no more than the maximum application doses; any other chemical flocculant in the treatment facility needs DEMLR's written authorization first.

- **When:** the facility uses flocculants in a wastewater treatment facility.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section H-2(g), page 21**

> "No other chemical flocculants shall be used in the treatment facility without prior written authorization from DEMLR."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=26)

### Ongoing  2 duties

#### Keep and carry out the Stormwater Pollution Prevention Plan

No set date. Standing duty (Part B).

Develop a Stormwater Pollution Prevention Plan (SWPPP) with the items in B-1 to B-17, keep it on site unless DEMLR exempts the facility, and implement it and all its Best Management Practices.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section Part B, page 3**

> "The permittee shall develop a Stormwater Pollution Prevention Plan (SWPPP). The SWPPP shall be maintained on site unless exempted from this requirement by DEMLR."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=8)

#### Keep reports and records for at least five years

No set date. Standing duty (I-9).

Keep calibration and maintenance records, strip charts, DMRs, qualitative monitoring records and NOI data on site or available electronically for at least five years from the sample, measurement, report or NOI date. SWPPP copies are also kept five years.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

**Source: General Permit No. NCG240000, Composting (cover page, scanned signature page, three contents pages and printed pages 1 to 39; 44 PDF pages), section I-9, page 24**

> "These records or copies shall be maintained for a period of at least 5 years from the date of the sample, measurement, report or Notice of Intent application."

[Open the permit at this section](https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg240000-general-permit-july-2022/download#page=29)

## Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

## North Carolina NCG24 Composting General Permit duties, topic by topic

How the North Carolina NCG24 Composting General Permit compares with the other checked permits on each kind of duty, in the permit's own words with the section for each:

- [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements#permit-us-nc-ncg24)
- [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements#permit-us-nc-ncg24)
- [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates#permit-us-nc-ncg24)
- [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements#permit-us-nc-ncg24)

- [Every state's permit](https://stormdue.com/states)
- [How we check permit rules](https://stormdue.com/about-the-rules)
- [Deadline calculator](https://stormdue.com/tools/deadline-calculator)
- [Benchmark comparison](https://stormdue.com/tools/benchmark-comparison)
- [More free tools](https://stormdue.com/tools)
- [Duties compared across permits](https://stormdue.com/guides)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.
