# Nevada MSGP NVR050000 Due Dates and Duties

> Every recurring duty in the Nevada MSGP NVR050000 with its due date rule and permit section, checked November 27, 2026. Get your own dates free.

Canonical page: https://stormdue.com/permits/us-nv-nvr050000

[States](https://stormdue.com/states) / [Nevada](https://stormdue.com/states/nv)

# Nevada MSGP NVR050000 due dates and duties

Every duty in the Multi Sector General Permit (MSGP) for Stormwater Discharges Associated with Industrial Activities, with when it is due and the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup?state=NV)

Free, no account. Your own dates in a minute.

- 56duties, each cited
- 10on a schedule
- 46when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

**Notes on the permit's status and renewal**

The cover page (a scanned image with no text layer, read from a page image) names General Permit NVR050000, the Multi Sector General Permit (MSGP) for Stormwater Discharges Associated with Industrial Activities, signed June 10, 2019 by the Bureau of Water Pollution Control: "This permit shall become effective on: June 10, 2019" and "shall expire at midnight June 9, 2024." NDEP's industrial stormwater page, read November 27, 2026, says the 2019 Multi-Sector General Permit (NVR050000) "will be administratively continued while a permit renewal is being drafted. Renewal notices will be mailed once the new permit has been reissued." Part 2.5.1 of the permit says that if it is not reissued or replaced before it expires it is administratively continued and remains in force and effect, and that discharges authorized before the expiration date stay covered until the permittee obtains coverage under the renewal, submits an NOT, or NDEP decides not to reissue it. No draft renewal, public notice or modification was found on NDEP's pages or the web on November 27, 2026. Whether NDEP still grants new coverage under the continued permit is open question q7 (NDEP's page still offers new NOIs). Metals mining (SIC code 10) needs NDEP's separate Mining Stormwater General Permit NVR300000 (Part 1.3.3). An application fee and an annual fee apply (Part 10.1; NAC 445A.268); amounts are on NDEP's fee page.

## What does full permit coverage require?

Permit coverage: SWPPP first, then an NOI and filing fee at least 14 days before the permitted activity starts; coverage begins only when NDEP's approval letter arrives.

- Every quarter 2
- Every year 4
- One time 2
- When something happens 14
- Ongoing 1
- Only if... 30

### Every quarter  2 duties

#### Inspect the facility once each calendar quarter

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins.

A qualified person on the stormwater pollution prevention team (or with a team member taking part) inspects all areas where industrial materials or activities are exposed to stormwater and all control measures at least once each calendar quarter, starting with the first full calendar quarter after coverage. Record the findings with the SWPPP and sign the report.

- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 4.1.2, page 14**

> "Routine inspections shall be conducted at least once each calendar quarter beginning with the first full calendar quarter after the facility becomes covered under this permit."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=19)

#### Look at a stormwater sample every quarter

By the end of each calendar quarter; at least 30 days apart.

Four times a year (quarterly), at least 30 days apart, collect a sample in a clean, clear container within the first 30 minutes of a discharge at least 72 hours after the previous one, and check color, odor, clarity, solids, foam, oil sheen and other signs of pollution. Record the results with the SWPPP.

- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 4.5.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 4.5.1, page 16**

> "The Permittee shall perform four (quarterly) visual stormwater assessments each year. Visual assessments shall occur not less than 30 calendar days apart."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=21)

### Every year  4 duties

#### Do one routine inspection each year while stormwater is discharging

By December 31 each year.

At least once each calendar year, the routine inspection takes place while stormwater is discharging. If no measurable storm happens in a year, document why and still do the quarterly inspections.

- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 4.1.4, page 14**

> "At least once each calendar year, the routine inspection shall be conducted during a period when stormwater discharge is occurring."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=19)

#### Complete the Annual Report by January 28 and keep it with the SWPPP

By January 28, for the calendar year before.

Every covered facility completes the Industrial Stormwater Annual Report (Appendix C) for January 1 to December 31 by January 28, with the year's inspection and visual assessment findings, corrective actions and their status, and any noncompliance or a signed certification. Keep it with the SWPPP; only facilities with effluent limit or impaired waters monitoring send it to NDEP (separate duty).

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 8.2.1, page 32**

> "The Annual Report for the reporting period January 1 to December 31 shall be completed by January 28"

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=37)

#### Pay the annual permit fee by July 1

By July 1 each year.

Pay NDEP the nonrefundable annual fee no later than July 1 of each year the facility is covered. An applicant that applies before July 1 also pays that year's annual fee by July 1. A fee applies; the amount is on NDEP's fee page.

- You send it to the agency (NDEP e-Payments, or a check with the site ID mailed to the Bureau of Water Pollution Control (Part 10.30)).
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 10.1.1, page 79**

> "a discharger who is covered under a general permit shall pay to the Director the applicable nonrefundable annual fee not later than July 1 of each year that the discharger is covered under that permit."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=84)

#### Train employees at least once a year

Within 1 year after the last training.

Train every employee who works where industrial materials or activities are exposed to stormwater, or who carries out permit duties (including the stormwater pollution prevention team), at least annually, or more often if turnover is high. Record training dates in the SWPPP.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 3.2.9.2. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 3.2.9.2, page 12**

> "Training shall be conducted at least annually (or more often if circumstances warrant, such as high employee turnover)."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=17)

### One time  2 duties

#### Keep coverage under the continued permit until NDEP reissues it

No set date. NDEP has not reissued the permit. NDEP's page says renewal notices will be mailed once the new permit is reissued (Part 2.5.1).

The permit expired June 9, 2024 and is administratively continued. A facility covered before then stays covered until it obtains coverage under the renewed permit, files an NOT, or NDEP decides not to reissue. When NDEP reissues the permit, follow its renewal steps.

- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 2.5.1, page 6**

> "If this permit is not reissued or replaced prior to the expiration date, it will be administratively continued and remain in force and effect."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=11)

#### Write the SWPPP before submitting the NOI

No set date. Before the NOI is submitted and before industrial activity starts (2.2.1.4.1).

Prepare a Stormwater Pollution Prevention Plan (SWPPP) under Section 6 of the permit before submitting the Notice of Intent, and put it in place before industrial activity starts. A qualified person develops it and it is signed under Section 10.27.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 2.2.1.4.1, page 4**

> "The SWPPP shall be prepared prior to submission of the NOI and shall be implemented prior to the start of industrial activity."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=9)

### When something happens  14 duties

#### Correct a problem the same day and finish the fix within 14 days

Within 14 days after you discover the condition.

When a condition requiring corrective action is found (an unauthorized discharge, an effluent limit violation, a water quality exceedance, a finding by NDEP or an MS4, or a change at the facility), take temporary steps the same day, review the SWPPP, and install or repair the control within 14 calendar days of discovery. If 14 days is infeasible, record the reason and schedule in the SWPPP.

Further steps with their own deadlines:

- **Take temporary corrective action the same day.** When you discover the condition. [Section 5.3.1.1, page 19](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=24)
  > "Temporary corrective action must be taken the same day a problem is identified."

- **When:** a condition requires corrective action.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 5.3.2, page 19**

> "they shall install a new or modified control and make it operational or complete the repair before the next storm event if possible, within 14 calendar days from the time of discovery."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=24)

#### Document corrective action in the SWPPP within 14 days of discovery

Within 14 days after you discover the condition.

Within 14 calendar days of discovery, record in the SWPPP when and what the problem was, where and how much was discharged, the actions taken and their dates, the expected completion date if later, and whether the SWPPP must change. The Annual Report gives the status of unfinished corrective actions.

- **When:** a condition requires corrective action.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 5.4.1, page 19**

> "Within 14 calendar days of discovery, the Permittee shall document the following information to be maintained in the SWPPP:"

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=24)

#### Facility becomes inactive and unstaffed with no exposure: notify NDEP

No set date. The permit sets no date (6.2.5.5.3).

If a covered facility becomes inactive and unstaffed with no industrial materials or activities exposed to stormwater, notify NDEP and update the SWPPP (signed statement) before using the reduced inspection, visual assessment and monitoring schedule.

- **When:** the facility becomes inactive and unstaffed.
- **Does not apply if:** the facility is inactive and unstaffed.

- You send it to the agency (NDEP Bureau of Water Pollution Control, 901 South Stewart Street, Suite 4001, Carson City, Nevada 89701 (Part 10.30)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 6.2.5.5.3, page 25**

> "then the Permittee shall notify the Division of this change and update the SWPPP accordingly."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=30)

#### Fix control measures within 14 days of finding a problem

Within 14 days after you discover the problem.

When control measures are not working as intended (they need repair or replacement), make the necessary changes within 14 calendar days of discovery or before the next measurable storm event, whichever is sooner. If that cannot be done, record in the SWPPP why, the schedule, the completion date and any back-up measures.

- **When:** a control measure is not working.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 3.2.4.3, page 10**

> "the permittee shall make any necessary changes within 14 calendar days following the discovery or prior to the next measureable storm event (see Section 7.1.4), whichever is sooner."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=15)

#### Give NDEP advance notice of planned changes

No set date. The permit says "advance notice" and sets no number of days (10.20.1).

Give NDEP advance notice of planned changes to the facility or activity that may lead to noncompliance, and report anticipated new, different or increased discharges of pollutants.

- **When:** a change to the facility is planned.

- You send it to the agency (NDEP Bureau of Water Pollution Control, 901 South Stewart Street, Suite 4001, Carson City, Nevada 89701 (Part 10.30)).
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 10.20.1, page 83**

> "The Permittee shall give advance notice to the Division of any planned changes in the permitted facility or activity which may result in noncompliance with permit requirements."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=88)

#### Give notice at least 10 days before a planned bypass

At least 10 days before the bypass.

If a bypass of a stormwater control is known in advance, give NDEP prior notice, if possible, at least 10 calendar days before the bypass.

- **When:** a bypass is planned.

- You send it to the agency (NDEP Bureau of Water Pollution Control, 901 South Stewart Street, Suite 4001, Carson City, Nevada 89701 (Part 10.30)).
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 10.5.1.3, page 79**

> "If the Permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible, at least ten calendar days before the date of bypass."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=84)

#### New facility: submit the NOI and filing fee at least 14 days before starting

At least 14 days before the permitted activity starts.

Submit the NOI in NDEP's General Permits System, and mail the signed NOI certification page with the filing fee, no later than 14 calendar days before the permitted activity starts. Coverage begins only when NDEP confirms it with an approval letter and site authorization number.

- **When:** the facility is a new discharger.

- You file it in the agency's system (NDEP General Permits System (genpermits.ndep.nv.gov); signed certification page and fee by mail).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 2.3.2, page 5**

> "New dischargers seeking authorization for stormwater discharges under this general permit shall submit an NOI and filing fee with the Division no later than 14 calendar days prior to the start of the permitted activity."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=10)

#### New owner or operator: submit an NOI at least 14 days before taking over

At least 14 days before you take over operational control.

When a facility changes owner or operator, the new owner or operator updates or writes the SWPPP and files an NOI at least 14 calendar days before taking over operational control. The current permittee tells the successor about the permit by letter, with a copy to NDEP, and files a Notice of Termination within 30 days after the new owner or operator takes responsibility.

Further steps with their own deadlines:

- **Current permittee files the Notice of Termination within 30 days after the transfer.** Within 30 days after the new owner takes responsibility. [Section 10.15.1.1, page 82](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=87)
  > "The current owner/operator shall file a Notice of Termination within thirty (30) calendar days after the new owner/operator has assumed responsibility for the facility."
- **Current permittee tells the successor about the permit by letter, with a copy to NDEP.** The permit gives the timing in words, quoted below. [Section 10.15.1, page 82](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=87)
  > "the Permittee shall notify the succeeding owner/operator of the existence of this permit by letter, a copy of which shall be forwarded to the Division."

- **When:** the owner or operator changes.

- You file it in the agency's system (NDEP General Permits System).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 10.15.1.1, page 82**

> "the new owner/operator shall complete and file a Notice of Intent in accordance with Section 2.3, at least 14 calendar days prior to taking over operational control of the facility."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=87)

#### Report an unauthorized discharge, bypass, spill or upset to the NDEP Spill Hotline within 24 hours

Within 24 hours after the event happens.

Report any diversion, bypass, spill, overflow, upset, or discharge of treated or untreated stormwater not authorized by the permit to the NDEP Spill Hotline or online spill report within 24 hours. If such an event is imminent, notify NDEP immediately.

Further steps with their own deadlines:

- **Notify NDEP immediately when such an event is imminent.** The permit gives the timing in words, quoted below. [Section 5.1.2, page 18](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=23)
  > "In the event the Permittee has knowledge that a diversion, bypass, spill, overflow, upset, or discharge not authorized by this permit is imminent, the permittee shall notify the Division immediately."

- **When:** an unauthorized discharge, bypass, spill or upset happens.

- You send it to the agency (NDEP Spill Hotline (775) 687-9485 or (888) 331-6337, or the online spill report).
- Keep the records 3 years.

Inferred from section 5.1.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 5.1.1, page 18**

> "The Permittee shall notify the Administrator by reporting to the Division Spill Hotline within twenty-four hours of any diversion, bypass, spill, overflow, upset, or discharge of treated or untreated stormwater other than that which is authorized by the permit."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=23)

#### Report reportable-quantity spills to the agencies

No set date. The permit says to notify when the release occurs and sets no time here; the Spill Hotline duty sets 24 hours.

When a leak, spill or other release contains a hazardous substance or oil at or above a reportable quantity (40 CFR 110, 117 or 302), notify emergency response agencies, NDEP, EPA or other applicable agencies. Keep contact information where it is easy to reach.

- **When:** a release of a reportable quantity happens.

- You send it to the agency (NDEP Spill Hotline (775) 687-9485 or (888) 331-6337, or the online spill report).
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 3.2.5.5, page 11**

> "notify emergency response agencies, the Division, EPA, or other applicable regulatory agencies when a leak, spill, or other release occurs that contains a hazardous substance or oil in an amount equal to or in excess of a reportable quantity"

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=16)

#### Send an Exceedance Report within 30 days when the discharge exceeds a water quality standard

Within 30 days after you receive the lab results.

If the permittee becomes aware, or NDEP determines, that the discharge causes or contributes to an exceedance of a water quality standard, take corrective action and send NDEP an Exceedance Report no later than 30 calendar days after receiving the lab results. Keep the corrective action record with the SWPPP.

- **When:** a water quality standard is exceeded.

- You send it to the agency (NDEP Bureau of Water Pollution Control, 901 South Stewart Street, Suite 4001, Carson City, Nevada 89701 (Part 10.30)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 3.4.1, page 13**

> "The Permittee shall submit an Exceedance Report to the Division no later than 30 calendar days after receiving the lab results in accordance with Section 8.3."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=18)

#### Send NDEP a letter within 15 days when NOI contact details change

Within 15 days after the contact or address in your NOI changes.

If the contact information or addresses on the NOI change while covered, send NDEP a letter on official letterhead with the updated information within 15 calendar days of the change.

- **When:** the contact or address in your NOI changes.

- You send it to the agency (NDEP Bureau of Water Pollution Control, 901 South Stewart Street, Suite 4001, Carson City, Nevada 89701 (Part 10.30)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 2.3.5, page 5**

> "If the contact information or addresses on the NOI change during the permit coverage, the Permittee shall, within 15 calendar days of the change, submit a letter on official letterhead indicating the updated information."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=10)

#### Send NDEP copies of the SWPPP within 14 days of a request

Within 14 days after NDEP asks for the SWPPP.

If NDEP asks, submit copies of the SWPPP documents within 14 calendar days of the request.

- **When:** NDEP asks for the SWPPP.

- You send it to the agency (NDEP Bureau of Water Pollution Control, 901 South Stewart Street, Suite 4001, Carson City, Nevada 89701 (Part 10.30)).
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 6.5.3, page 26**

> "If otherwise requested by the Division, the Permittee shall submit copies of the SWPPP documents within 14 calendar days of the request."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=31)

#### Submit the Notice of Termination electronically when coverage should end

No set date. The permit sets no deadline except after a transfer (10.15.1.1).

To end coverage, submit a complete NOT electronically once a new operator has taken over, operations and industrial discharges have stopped with erosion and sediment controls in place, Sector J termination conditions are met, or all discharges are covered by another NPDES permit. Authorization ends at midnight on the day NDEP receives a complete NOT.

- **When:** your coverage should end.

- You file it in the agency's system (NDEP online Notice of Termination form).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 2.6.1, page 7**

> "To terminate coverage, the Permittee shall submit electronically a complete and accurate NOT form"

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=12)

### Ongoing  1 duty

#### Keep permit records for at least three years after coverage ends

No set date. Standing duty.

Keep the SWPPP and its changes, corrective action records, all reports and certifications, monitoring data and the NOI records for at least three years from the date coverage ends.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 8.4.1, page 33**

> "The Permittee shall retain copies of the SWPPP ... for a period of at least 3 years from the date that the facility's coverage under this permit is terminated."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=38)

### Only if...  30 duties

These apply only in the situation named on each one. Answer the questions to sort them.

#### Sector E: sweep weekly where cement, aggregate or dust is handled

By the end of each week.

Sweep or vacuum (or wash down and collect) exposed paved areas at least once a week where cement, aggregate, kiln dust, fly ash or settled dust is handled or processed and may be discharged in stormwater; record the frequency in the SWPPP.

- **Only if:** your permit sector is E; the facility handles cement, aggregate, kiln dust, fly ash or settled dust.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 9.6.1.1.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.6.1.1.1, page 36**

> "but it shall be performed at least once a week in areas where cement ... is being handled or processed and may be discharged in stormwater."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=41)

#### Sector I: inspect erosion and sediment controls every 7 days

By the end of each week.

Inspect all erosion and sediment controls every 7 calendar days, or once every 14 calendar days and within 24 hours of a storm of 0.25 inches or more.

- **Only if:** your permit sector is I.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 9.8.6.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.8.6.1, page 39**

> "All erosion and sediment controls shall be inspected either: every 7 calendar days or once every 14 calendar days and within 24 hours of a storm event of 0.25 inches or greater."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=44)

#### Sector J, before active mining, discharging to an impaired water: inspect every 7 days and after storms

By the end of each week.

Where earth-disturbing activities before active mining discharge to an impaired or 303(d) listed water, inspect once every 7 calendar days and within 24 hours of a storm of 0.25 inches or more, and complete initial stabilization within 7 calendar days of stopping construction work.

Further steps with their own deadlines:

- **Complete initial stabilization within 7 days of stopping construction work.** Within 7 days after construction work stops. [Section 9.9.5.1.1, page 46](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=51)
  > "Complete initial stabilization activities within 7 calendar days of stopping construction work."

- **Only if:** your permit sector is J; your stormwater reaches an impaired water body; earth-disturbing activities are under way before active mining.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.9.5.1.2, page 46**

> "More frequent site inspections: Once every 7 calendar days and within 24 hours of a storm event of 0.25 inches or greater."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=51)

#### Sector J, before active mining: inspect earth-disturbing areas every 7 days

By the end of each week.

For earth-disturbing activities before active mining, inspect disturbed areas, controls, stabilized areas, storage areas and discharge points at least once every 7 calendar days, or every 14 days and within 24 hours of a storm of 0.25 inches or more (with a rain gauge on site). Complete a report within 24 hours of each inspection.

Further steps with their own deadlines:

- **Complete the inspection report within 24 hours.** Within 24 hours after the inspection. [Section 9.9.6.1.5.1, page 47](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=52)
  > "Within 24 hours of an inspection, complete a report which includes the inspection date, the name and title of the inspector(s), a summary of inspection findings, and the rainfall amount."

- **Only if:** your permit sector is J; earth-disturbing activities are under way before active mining.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 9.9.6.1.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.9.6.1.1, page 46**

> "Inspection Frequency ... At least once every 7 calendar days, or ... Once every 14 calendar days and within 24 hours of a storm event of 0.25 inches or greater."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=51)

#### Sector L, operating landfills outside arid climates: inspect every 7 days

By the end of each week.

Except in arid and semi-arid climates, inspect operating landfills, open dumps and land application sites at least once every 7 calendar days, focusing on areas not yet finally stabilized, active land application areas, exposed storage, leachate systems and vehicle entrances and exits.

- **Only if:** your permit sector is L; the site is an operating landfill or land application site.
- **Does not apply if:** the site is in an arid or semi-arid climate.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.11.5.1, page 52**

> "Except in arid and semi-arid climates, inspect operating landfills, open dumps, and land application sites at least once every 7 calendar days."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=57)

#### Sector J, discharging to a 303(d) water or one impaired for sediment or nitrogen: inspect monthly

By the end of each month.

Mineral mining sites (other than earth-disturbing activities before active mining) that discharge to 303(d) listed waters, or waters impaired for sediment or nitrogen, inspect monthly instead of quarterly.

- **Only if:** your permit sector is J; your stormwater reaches an impaired water body.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.9.10.1, page 49**

> "Sites which discharge to waters which are 303(d) listed or waters which are impaired for sediment or nitrogen shall be inspected monthly."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=54)

#### Sector L, stabilized sites or arid climates: inspect monthly

By the end of each month.

Inspect stabilized landfill sites, completed land application areas, and sites in arid or semi-arid climates at least once every month.

- **Only if:** your permit sector is L; the site is stabilized or in an arid climate.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.11.5.1, page 52**

> "For stabilized sites and areas where land application has been completed, or where the climate is arid or semi-arid, conduct inspections at least once every month."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=57)

#### Sector O: inspect coal, fuel, ash and storage areas monthly

By the end of each month.

Each month, inspect coal handling, loading and unloading areas, switchyards, fueling and bulk storage areas, ash handling areas, areas next to disposal ponds and landfills, maintenance areas, liquid storage tanks and material storage areas.

- **Only if:** your permit sector is O.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 9.14.5.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.14.5.1, page 60**

> "As part of the inspection requirements, inspect the following areas monthly: coal handling areas, loading or unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas,"

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=65)

#### Sector Q: clean blasting debris and paint chips from conveyances monthly

By the end of each month.

Clean stormwater conveyances of abrasive blasting debris and paint chips at least once a month.

- **Only if:** your permit sector is Q; the facility does blasting or painting.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 9.16.2.2.2. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.16.2.2.2, page 63**

> "At least once per month, the Permittee shall clean stormwater conveyances of deposits of abrasive blasting debris and paint chips."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=68)

#### Sector S airports: inspect monthly during the deicing season

By the end of each month.

Inspect the facility at least monthly during the deicing season the facility defines, and in any other month deicing chemicals may be used. Record the types and monthly quantities of deicing chemicals used.

- **Only if:** your permit sector is S; it is the deicing season.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.18.5.1, page 70**

> "At a minimum conduct facility inspections at least monthly during the deicing season."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=75)

#### Sector V: inspect monthly

By the end of each month.

Inspect at least monthly the transfer and transmission lines, spill prevention, good housekeeping, process waste management, and all structural and nonstructural management practices.

- **Only if:** your permit sector is V.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 9.21.4.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.21.4.1, page 74**

> "Inspect, at least monthly, the following activities and areas (at a minimum): transfer and transmission lines, spill prevention, good housekeeping practices, management of process waste products, and all structural and nonstructural management practices."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=79)

#### After an effluent limit exceedance: monitor quarterly for one year

By the end of each calendar quarter.

For one year after a numeric effluent limit exceedance, monitor quarterly and keep the results with the SWPPP. If no exceedance occurs in that year, the normal schedule resumes; any new exceedance needs another Exceedance Report.

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs); a numeric effluent limit was exceeded within the last year.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

Inferred from section 7.6.1.2. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 7.6.1.2, page 31**

> "For one year after the exceedance, monitoring shall be conducted quarterly and the quarterly monitoring shall be kept with the SWPPP."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=36)

#### Discharging to an impaired water without a TMDL: sample each outfall once a year

By December 31 each year, starting with the calendar year that includes the first full quarter after your coverage begins.

A facility whose first receiving water is on NDEP's 303(d) list without an approved TMDL samples each outfall (except substantially identical outfalls) once a year for every pollutant causing the impairment that has a standard method (TSS for sediment or turbidity), starting with the first full quarter after authorization. Monitoring for a pollutant may stop after the first year if it is not detected or is only from natural background, documented in the SWPPP.

- **Only if:** your stormwater reaches an impaired water body; a TMDL does not apply to your discharge.
- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

Inferred from section 7.5.2. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 7.5.2, page 30**

> "Beginning with the first full quarter following the issuance of this permit or the date of discharge authorization, whichever comes later, the Permittee shall monitor once per year at each outfall ... without an approved TMDL"

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=35)

#### Effluent limit discharges: sample each outfall once a year

By December 31 each year, starting with the calendar year that includes the first full quarter after your coverage begins.

Facilities with a discharge in Table 7.3.1 (Sectors A wet decking, C phosphate fertilizer, D asphalt emulsion, E cement storage piles, J mine dewatering, K and L landfills, O coal piles, S airport urea deicing) take a grab sample once a year at each such outfall, starting with the first full quarter after authorization, and compare it with the Section 9 limits. Every outfall is sampled; substantially identical outfalls do not apply.

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs).
- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

Inferred from section 7.3.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 7.3.1, page 29**

> "Beginning with the first full quarter following the issuance of this permit, or the date of discharge authorization, whichever comes later, the Permittee shall monitor, as applicable, once per year at each outfall"

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=34)

#### Inactive and unstaffed site with no exposure: inspect once a year

By December 31 each year.

A facility that is inactive and unstaffed with no industrial materials or activities exposed to stormwater inspects once a year instead of quarterly, with a signed statement in the SWPPP. Quarterly inspections resume immediately if that changes.

- **Only if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 4.4.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 4.4.1, page 15**

> "Such a facility is only required to conduct an annual inspection in accordance with Section 4.0."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=20)

#### Sector L, inactive landfills: inspect quarterly

By the end of each calendar quarter.

Qualified personnel inspect inactive landfills, open dumps and land application sites at least quarterly: stabilization and structural erosion controls, leachate systems and closed land application areas.

- **Only if:** your permit sector is L; the site is an inactive landfill or land application site.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 9.11.5.2. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.11.5.2, page 52**

> "Inspect inactive landfills, open dumps, and land application sites at least quarterly."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=57)

#### Sector M: inspect equipment and fluid storage for leaks every quarter

By the end of each calendar quarter.

Inspect quarterly for leaks all equipment containing oily parts, hydraulic or other fluids or mercury switches, and all vessels and areas where hazardous materials and automotive fluids are stored.

- **Only if:** your permit sector is M.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 9.12.3.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.12.3.1, page 54**

> "Inspect quarterly for signs of leakage all equipment containing oily parts, hydraulic fluids, any other types of fluids, or mercury switches."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=59)

#### With effluent limit or impaired waters monitoring: send the Annual Report and results to NDEP by January 28

By January 28, for the calendar year before.

A facility with effluent limit monitoring (7.3) or impaired waters monitoring (7.4) sends its analytical results to NDEP as part of the Annual Report each January 28 for the previous calendar year.

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs), or your stormwater reaches an impaired water body.

- You send it to the agency (NDEP Bureau of Water Pollution Control, 901 South Stewart Street, Suite 4001, Carson City, Nevada 89701 (Part 10.30)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 7.2.4, page 28**

> "Analytical Results for monitoring required in Sections 7.3 and 7.4 of this permit shall be submitted, as part of an Annual Report (Appendix C), to the Division each January ... 28th for the previous calendar year."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=33)

#### Discharging to a 303(d) listed water: keep a demonstration with the SWPPP

No set date. Before authorization; the permit sets no separate date (1.3.8).

A discharge to a water on NDEP's current 303(d) impaired waters list is not automatically eligible. Show that the facility prevents exposure to the impairment pollutants, that its discharge cannot contain them, or that it will not cause or contribute to an exceedance, and keep the data with the SWPPP. Without an approved TMDL, the SWPPP also describes the listing and shows the BMPs are sufficient (3.4.1.3).

- **Only if:** your stormwater reaches an impaired water body.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 1.3.8, page 3**

> "To receive authorization, the applicant shall make one of the following demonstrations and retain such data and technical information on site with the Stormwater Pollution Prevention Plan (SWPPP):"

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=8)

#### Discharging to a water with an approved TMDL: monitor if NDEP says so

No set date. NDEP's notice sets the monitoring parameters and frequency (7.5.1).

Where the receiving water has an approved TMDL waste load allocation, monitoring for the TMDL pollutant is required only if NDEP notifies the facility; the notice sets the parameters and frequency.

- **Only if:** a TMDL applies to your discharge; NDEP tells you to do TMDL monitoring.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 7.5.1, page 30**

> "the Permittee is not required to monitor for the pollutant(s) for which the TMDL was written unless the Division informs the Permittee ... that the Permittee is subject to such a requirement"

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=35)

#### Inactive site becomes active or exposed: tell NDEP and resume quarterly inspections

No set date. The permit says to resume immediately and sets no date for informing NDEP (6.2.5.5.2).

If an inactive and unstaffed facility becomes active or staffed, or materials or activities become exposed to stormwater, immediately resume quarterly inspections, visual assessments and monitoring, and inform NDEP.

- **Only if:** the facility is inactive and unstaffed; the facility becomes active, staffed or exposed.

- You send it to the agency (NDEP Bureau of Water Pollution Control, 901 South Stewart Street, Suite 4001, Carson City, Nevada 89701 (Part 10.30)).
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 6.2.5.5.2, page 25**

> "The Permittee shall inform the Division that the facility has materials or activities exposed to stormwater or has become active and/or staffed."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=30)

#### Report a bypass or upset that exceeds an effluent limit within 24 hours

Within 24 hours after the event happens.

Report within 24 hours any unanticipated bypass, and any upset, that exceeds an effluent limitation in the permit.

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs); a bypass or upset exceeds an effluent limit.

- You send it to the agency (NDEP Spill Hotline (775) 687-9485 or (888) 331-6337 (Part 5.1.1)).
- Keep the records 3 years.

Inferred from section 5.4.2. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 5.4.2, page 19**

> "The following shall be included as information which shall be reported within twenty four hours: ... Any unanticipated bypass which exceeds any effluent limitation in the permit; and ... Any upset which exceeds any effluent limitation in the permit."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=24)

#### Sector I: start vegetative practices within 14 days after the last activity

Within 14 days after the last activity in a disturbed area happens.

Begin appropriate vegetative practices (seeding, mulching, sod, buffer strips) on all disturbed areas within 14 calendar days after the last activity in each area.

- **Only if:** your permit sector is I; the last activity in a disturbed area happens.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.8.4.1, page 38**

> "Begin implementing appropriate vegetative practices on all disturbed areas within 14 calendar days following the last activity in that area."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=43)

#### Sector J, active mining: train employees at least once a year

Within 1 year after the last training.

Train employees at least annually at active and temporarily inactive mineral mining sites, and document the training with the SWPPP.

- **Only if:** your permit sector is J.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 9.9.8.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.9.8.1, page 48**

> "Employee Training - shall be conducted at least annually at active and temporarily inactive sites."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=53)

#### Sector J, before active mining: fix a control by the end of the next work day

Within 1 working day after you discover the problem.

When an erosion or sediment control needs maintenance, start the fix immediately and finish by the end of the next work day. A control that must be replaced or significantly repaired is finished within 7 calendar days, unless infeasible.

Further steps with their own deadlines:

- **Replace or significantly repair a control within 7 days.** Within 7 days after you discover the problem. [Section 9.9.3.2.3, page 40](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=45)
  > "When a stormwater control shall be replaced or significantly repaired, complete the work within 7 calendar days, unless infeasible."

- **Only if:** your permit sector is J; earth-disturbing activities are under way before active mining; a control needs maintenance.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 9.9.3.2.2. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.9.3.2.2, page 40**

> "initiate efforts to fix the problem immediately after its discovery and complete such work by the end of the next work day."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=45)

#### Sector J, mine site preparation: start final stabilization within 14 days

Within 14 days after mine site preparation stops for good.

Where earth-disturbing activities for mine site preparation have permanently stopped, start final stabilization immediately and no later than 14 calendar days after; use temporary stabilization until final stabilization is reached.

- **Only if:** your permit sector is J; mine site preparation stops for good.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.9.3.9.1.2, page 42**

> "Final stabilization measures shall be initiated immediately where earth-disturbing activities performed for purposes of mine site preparation have permanently ceased, but in no case more than 14 calendar days after the earth-disturbing activities have permanently ceased."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=47)

#### Sector J, staging areas and access roads: start stabilization by the end of the next work day

Within 1 working day after construction stops in the area.

When construction of staging areas or access roads stops in an area, permanently or for 14 days or more, start stabilization by the end of the next work day, and seed, plant or install non-vegetative cover within 14 calendar days after starting.

Further steps with their own deadlines:

- **Seed or plant the area within 14 days after starting stabilization.** Within 14 days after construction stops in the area. [Section 9.9.4.14.1.2, page 46](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=51)
  > "If using vegetative measures, by no later than 14 calendar days after initiating stabilization, seed or plant the area."

- **Only if:** your permit sector is J; construction of a staging area or access road stops.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 9.9.4.14.1.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.9.4.14.1.1, page 46**

> "By no later than the end of the next work day after construction, work in an area has stopped permanently or temporarily"

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=51)

#### Sector M: inspect arriving vehicles for leaks

No set date. On arrival or as soon as practicable (9.12.3.1).

Inspect vehicles for leaks immediately on arrival (or as soon as practicable), and drain vehicles to be dismantled of all fluids on arrival or use equivalent measures.

- **Only if:** your permit sector is M.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.12.3.1, page 54**

> "Immediately (or as soon thereafter as practicable) inspect vehicles arriving at the site for leaks."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=59)

#### Sector P: train personnel at least once a year

Within 1 year after the last training.

Train personnel at least once a year on used oil and spent solvent management, fueling, good housekeeping, painting procedures and used battery management, as applicable.

- **Only if:** your permit sector is P.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 9.15.3.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 9.15.3.1, page 62**

> "Train personnel at least once a year and address the following activities, as applicable: used oil and spent solvent management, fueling procedures, general good housekeeping practices, proper painting procedures, and used battery management."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=67)

#### Send an Exceedance Report within 30 days of lab results above an effluent limit

Within 30 days after you receive the lab results.

If a monitoring result exceeds a numeric effluent limit, send NDEP an Exceedance Report no later than 30 calendar days after receiving the lab results, with the site ID, the facility and receiving water, the current and previous data, the corrective actions taken or planned, and a contact.

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs); a numeric effluent limit is exceeded.

- You send it to the agency (NDEP Bureau of Water Pollution Control, 901 South Stewart Street, Suite 4001, Carson City, Nevada 89701 (Part 10.30)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 8.3.1, page 32**

> "If monitoring pursuant to Section 7.0 exceeds a numeric effluent limit, the Permittee shall ... submit an Exceedance Report to the Division no later than 30 calendar days after receiving the facility's lab results."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=37)

## What does no-exposure certification require?

No Exposure Certification, submitted electronically and again every five years.

- Every few years 1
- One time 1
- When something happens 1

### Every few years  1 duty

#### No exposure: submit the certification again every five years

Within 5 years after you submitted your last no exposure certification.

Submit a new No Exposure Certification once every five years.

- You file it in the agency's system (NDEP General Permits System).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 2.8.1. Check your copy of the permit.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 2.8.1, page 8**

> "The No Exposure Certification incorporates the conditions of 40 CFR 122.26(g)(4)(iii) and shall be submitted once every five years."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=13)

### One time  1 duty

#### No exposure: submit the No Exposure Certification

No set date. The permit sets no date for a first certification.

A facility whose industrial materials and activities are all protected from rain, snow, snowmelt and runoff may claim the no exposure exclusion by submitting a No Exposure Certification electronically, signed under Section 10.27. It is not transferable. The facility lets NDEP and any receiving MS4 inspect it.

- You file it in the agency's system (NDEP General Permits System).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 2.8.1, page 8**

> "provision by submitting electronically a No Exposure Certification to the Division."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=13)

### When something happens  1 duty

#### No exposure lost: submit an NOI for permit coverage

No set date. The permit sets no deadline for this NOI (2.8.4).

If the facility can no longer meet the no exposure conditions, permit coverage is required: submit an NOI and follow the permit.

- **When:** the no exposure conditions are no longer met.

- You file it in the agency's system (NDEP General Permits System).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NVR050000 Multi Sector General Permit (2019), with Appendices A to D, section 2.8.4, page 8**

> "if at any time the facility can no longer satisfy the conditions of no exposure, renewed permit coverage is required and the owner/operator shall submit an NOI requesting coverage and comply with the permit."

[Open the permit at this section](https://ndep.nv.gov/uploads/water-wpc-permitting-docs/Multisector_permit_.pdf#page=13)

## Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

## Nevada MSGP NVR050000 duties, topic by topic

How the Nevada MSGP NVR050000 compares with the other checked permits on each kind of duty, in the permit's own words with the section for each:

- [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements#permit-us-nv-nvr050000)
- [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements#permit-us-nv-nvr050000)
- [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates#permit-us-nv-nvr050000)
- [No-exposure certification](https://stormdue.com/guides/no-exposure-certification#permit-us-nv-nvr050000)
- [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements#permit-us-nv-nvr050000)

- [Every state's permit](https://stormdue.com/states)
- [How we check permit rules](https://stormdue.com/about-the-rules)
- [Deadline calculator](https://stormdue.com/tools/deadline-calculator)
- [Benchmark comparison](https://stormdue.com/tools/benchmark-comparison)
- [More free tools](https://stormdue.com/tools)
- [Duties compared across permits](https://stormdue.com/guides)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.
