# Pennsylvania PAG-03 Due Dates and Duties

> Every recurring duty in the Pennsylvania PAG-03 with its due date rule and permit section, checked November 26, 2026. Get your own dates free.

Canonical page: https://stormdue.com/permits/us-pa-pag03

[States](https://stormdue.com/states) / [Pennsylvania](https://stormdue.com/states/pa)

# Pennsylvania PAG-03 due dates and duties

Every duty in the NPDES General Permit for Discharges of Stormwater Associated with Industrial Activity, with when it is due and the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup?state=PA)

Free, no account. Your own dates in a minute.

- 57duties, each cited
- 9on a schedule
- 48when something happens

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

Today

March 24, 2023 March 23, 2028

**Notes on the permit's status and renewal**

Reissued for a five-year term by notice in the Pennsylvania Bulletin on December 24, 2022 (52 Pa.B. 7974); effective March 24, 2023, expires March 23, 2028. Existing permittees had to submit a renewal NOI by March 23, 2023. The permit document in DEP's eLibrary on November 26, 2026 is still revision 12/2022. DEP's industrial stormwater page (read November 26, 2026), the eLibrary folder and web searches of the Pennsylvania Bulletin and DEP sites on November 26, 2026 show no amendment, modification, extension or draft reissuance; the Bulletin's own search could not be run by script, so that search is not exhaustive. The NOI Instructions were revised in September 2026 (they now describe DEP's Public Upload tool); that revision changes no date. A replacement permit will be needed by March 2028 (open question q1).

## What does full permit coverage require?

Coverage under PAG-03 approved by DEP after a Notice of Intent; the facility follows Parts A, B and C and its sector appendix or appendices.

- Every half year 2
- Every year 6
- When something happens 18
- Ongoing 2
- Only if... 25
- Where the permit is unclear 2

### Every half year  2 duties

#### Routine site inspection twice a year

By the end of each half year (June 30 and December 31), once.

In each calendar half year (January to June, July to December) visually inspect: areas where industrial materials or activities are exposed to stormwater; the potential pollutant sources named in the PPC Plan; areas where spills or leaks happened in the past three years; outfalls and places where authorized non-stormwater discharges may mix with stormwater; and the physical BMPs. Record the findings in the Annual Report.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C III.A, page 21**

> "The permittee shall visually inspect the following areas and BMPs on a semiannual basis (calendar periods), at a minimum:"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=21)

#### Submit the semiannual DMR by July 28 and January 28

By July 28 (January to June) and January 28 (July to December).

Submit a Discharge Monitoring Report through eDMR for each representative outfall so that DEP receives it within 28 days after each calendar half year: by July 28 for January 1 to June 30 and by January 28 for July 1 to December 31. Attach the supplemental forms. If a basin or other control structure did not discharge during the period, report "No Discharge".

- **Does not apply if:** your permit sector is K.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part A III.B.4, page 10**

> "Semiannual DMRs must be received within 28 days following the end of each calendar semiannual period, i.e., January 28 for the period July 1 - December 31 and July 28 for the period January 1 - June 30"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=10)

### Every year  6 duties

#### Do one routine inspection a year during a storm discharge

By December 31 each year.

At least once each calendar year, carry out the routine inspection during a storm of more than 0.1 inch that comes at least 72 hours after the previous measurable (more than 0.1 inch) storm, while stormwater is discharging.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C III.A, page 21**

> "At least once each calendar year, the routine inspection must be conducted during a storm event that is greater than 0.1 inch in magnitude"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=21)

#### Review the PPC Plan at least once a year

By December 31 each year.

Review the PPC Plan, and update it if needed, at least once a year. Keep the updates on site and document them in the Annual Report.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from Part C IV.B. Check your copy of the permit.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C IV.B, page 22**

> "The permittee shall review and, if necessary, update the PPC Plan on an annual basis, at a minimum, and when one or more of the following occur:"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=22)

#### Train employees and contractors on spill response at least once a year

By December 31 each year.

Train employees and contractors at least once a year on stopping, containing and cleaning up leaks, spills and other releases, including the sector-specific procedures for the site, and document the training in the Annual Report.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from Part C II.G.3. Check your copy of the permit.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C II.G.3, page 21**

> "The permittee shall conduct periodic training, no less than annually, on these procedures to ensure that all personnel operating on-site are able to appropriately respond to leaks, spills, and other releases."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=21)

#### Train employees on pollution prevention at least once a year

By December 31 each year.

Train employees routinely, and at least once a year, on the pollution prevention practices in the PPC Plan.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from Part C II.D.11. Check your copy of the permit.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C II.D.11, page 20**

> "Train employees routinely (no less than annually) on pollution prevention practices as contained in the PPC Plan."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=20)

#### Pay the $500 annual installment of the NOI fee by March 23

By March 23 each year.

Pay the $500 annual installment of the NOI fee to DEP's Bureau of Clean Water by March 23 each year of coverage, by check or money order payable to "Commonwealth of Pennsylvania" or through DEP's electronic payment system. The fee is due whether or not DEP sends an invoice. A new permittee's first installment is due by the March 23 that follows its first full year of coverage.

Further steps with their own deadlines:

- **New permittees: first installment.** The permit gives the timing in words, quoted below. [Section Part A III.C.2.b, page 11](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=11)
  > "For new permittees, the first installment is due by March 23 following the first full year of General Permit coverage."

- **Does not apply if:** the new coverage with less than one full year before march 23.

- You send it to the agency (DEP Bureau of Clean Water, by check or money order or DEP electronic payment).

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part A III.C.2.a, page 11**

> "Thereafter, the permittee shall pay the NOI fee annual installment payment by March 23 for each remaining year of General Permit coverage."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=11)

#### Submit the Annual Report by March 23

By March 23, for the calendar year before.

Submit the Annual Report on DEP's template (3800-PM-BCW0083h) to the Clean Water Program of the DEP office that approved coverage by March 23, covering the previous calendar year. It records the routine inspections, sampling events, PPC Plan updates and training. If the facility discharges to a municipal storm sewer system (MS4), send a copy to the MS4 operator. A new permittee's first report is due by the March 23 that follows its first full year of coverage.

Further steps with their own deadlines:

- **New permittees: first Annual Report.** The permit gives the timing in words, quoted below. [Section Part A III.C.1.b, page 11](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=11)
  > "For new permittees, the first Annual Report is due by March 23 following the first full year of General Permit coverage."
- **Copy to the MS4 operator.** The permit gives the timing in words, quoted below. [Section Part A III.C.1.a, page 11](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=11)
  > "If the permittee discharges to a municipal separate storm sewer system (MS4), a copy of the Annual Report shall be submitted to the operator of the MS4."

- **Does not apply if:** the new coverage with less than one full year before march 23.

- You send it to the agency (Clean Water Program of the DEP office that approved coverage).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part A III.C.1.a, page 11**

> "Thereafter, the permittee shall submit Annual Reports to DEP by March 23 for each remaining year of General Permit coverage."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=11)

### When something happens  18 duties

#### Check equipment and vehicles left unused for long periods for leaks every month

By the end of each month.

Drain fluids from equipment and vehicles that will be decommissioned. Inspect any equipment and vehicles that will stay unused for extended periods at least once a month for leaks.

- **When:** the equipment or vehicles left unused for extended periods.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from Part C II.D.8. Check your copy of the permit.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C II.D.8, page 19**

> "for any equipment and vehicles that will remain unused for extended periods of time, inspect at least monthly for leaks."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=19)

#### After a fourth consecutive exceedance, submit a new CAP with the Stormwater BMPs Checklist within 90 days

Within 90 days after the end of the monitoring period with the fourth or later consecutive exceedance.

After four or more consecutive benchmark exceedances at the same outfall, submit a new corrective action plan together with the Stormwater BMPs Checklist (3800-PM-BCW0083l) within 90 days after the end of the monitoring period of the fourth or later consecutive exceedance. For each BMP on the checklist that is not implemented, state why. Include the checklist with the CAP for every additional consecutive exceedance.

- **When:** the fourth or later consecutive benchmark exceedance at one outfall.

- You send it to the agency (DEP regional office that approved coverage).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C V.I.2, page 25**

> "certify that all applicable controls have been considered for implementation within 90 days of the end of the monitoring period for which the fourth or more consecutive exceedance was identified."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=25)

#### Apply for an individual permit within 90 days if you cannot meet a modified or reissued PAG-03

Within 90 days after the publication of final general permit.

If DEP modifies or reissues the General Permit and the facility is unable to meet the new terms, submit an individual NPDES permit application within 90 days of the Pennsylvania Bulletin notice of the final General Permit.

- **When:** the unable to meet a modified or reissued general permit.

- You send it to the agency (DEP regional office, by the Public Upload tool or by mail).
- Keep the records 3 years.
- Signed or certified by a responsible official per 25 Pa Code 92a.22.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Authority conditions, item 6, page 5**

> "the permittee shall submit an application for an individual permit within 90 days of publication of the final General Permit."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=5)

#### Call the National Response Center about a reportable quantity release

No set date. As soon as the permittee becomes aware of the discharge; no number of hours is stated.

When a leak, spill or other release within a 24-hour period contains a hazardous substance or oil at or above a reportable quantity under 40 CFR Parts 110, 117 or 302, notify the National Response Center at (800) 424-8802 as soon as you become aware of it, in addition to the DEP notifications.

- **When:** the release at or above a reportable quantity.

- Keep the records 3 years.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C II.G, page 21**

> "notify the National Response Center (NRC) at (800) 424-8802 in accordance with the requirements of 40 CFR Parts 110, 117, and 302 as soon as the permittee becomes aware of the discharge."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=21)

#### Give DEP notice at least 30 days before planned physical changes

At least 30 days before the planned start of the alteration or addition.

Notify DEP as soon as possible, and no later than 30 days before, planned physical alterations or additions that may make the facility a new source, could significantly change the nature or increase the quantity of pollutants discharged (for example new impervious surface, newly exposed bulk chemicals, stored materials or solid wastes, or off-site stormwater flowing onto the site), or may result in not meeting permit requirements.

- **When:** the planned physical alteration or addition.

- You send it to the agency (DEP regional office that approved coverage).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part A III.C.3, page 12**

> "The permittee shall give notice to DEP as soon as possible but no later than 30 days prior to planned physical alterations or additions to the permitted facility."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=12)

#### Notify DEP at least 30 days before transferring coverage to a new owner or operator

At least 30 days before the proposed transfer date.

For an automatic transfer, the current permittee notifies DEP at least 30 days before the proposed transfer date, with DEP's transfer form signed by both parties and naming the date responsibility, coverage and liability pass. If DEP does not approve the transfer, the new owner or operator must submit a new NOI.

- **When:** the change of owner or operator.

- You send it to the agency (DEP regional office that approved coverage).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part B III.B.2.a, page 16**

> "The current permittee notifies DEP at least 30 days in advance of the proposed transfer date in paragraph 2.b. of this section;"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=16)

#### Notify DEP at least 90 days before ceasing operations or discharging

At least 90 days before the planned date operations or discharging cease.

To end coverage, submit a Notice of Termination (3800-PM-BCW0410) to the DEP office that approved coverage. If you intend to cease operations or discharging, notify DEP at least 90 days beforehand unless DEP allows a later date. Keep following the General Permit until DEP approves the Notice of Termination.

- **When:** the planned end of operations or discharge.

- You send it to the agency (DEP regional office that approved coverage).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part B I.B.5, page 14**

> "the permittee shall notify DEP at least 90 days prior to cessation of operations or discharging unless permission has been granted by DEP for a later date."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=14)

#### Phone DEP within four hours of an incident causing or threatening pollution

Within 4 hours of the time the permittee becomes aware of the incident.

Report immediately any incident that causes or threatens pollution. Phone DEP with the location and nature of the danger as soon as possible and no later than four hours after learning of it; if the discharge goes to an MS4, notify its operator too, and notify downstream users where reasonably possible. Remove residual substances from the ground and affected waters within 15 days of the incident.

Further steps with their own deadlines:

- **Remove residual substances.** Within 15 days after the date of the incident. [Section Part A III.C.4.a(iii), page 13](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=13)
  > "within 15 days from the incident, shall remove the residual substances from the ground and from the affected waters of this Commonwealth to the extent required by applicable law."

- **When:** the incident causing or threatening pollution.

- You send it to the agency (DEP regional office, by telephone).
- Keep the records 3 years.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part A III.C.4.a(i), page 12**

> "Oral notification to DEP is required as soon as possible, but no later than four hours after the permittee becomes aware of the incident causing or threatening pollution."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=12)

#### Register for eDMR within 30 days of coverage approval

Within 30 days after the approval of coverage.

A permittee not yet using DEP's electronic Discharge Monitoring Report (eDMR) system sends the registration and trading partner agreement forms to DEP's Bureau of Clean Water within 30 days after coverage is approved, and starts using eDMR when DEP says so. Until then, paper DMRs go to the DEP regional office that issued coverage.

- **When:** the not yet registered for edmr.

- You send it to the agency (DEP Bureau of Clean Water).
- Keep the records 3 years.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part A III.B.2, page 10**

> "Permittees that are not using the eDMR system shall submit the necessary registration and trading partner agreement forms to DEP's Bureau of Clean Water (BCW) within 30 days following approval of coverage under this General Permit"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=10)

#### Report all other non-compliance with the DMR

No set date. Due with the DMR for the period (July 28 or January 28; April 28 or October 28 for salt storage sites).

Report every other instance of non-compliance, including missed compliance schedule requirements, on the Non-Compliance Reporting Form (3800-FM-BCW0440) when the DMR is submitted.

- **When:** the other instance of non compliance.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part A III.C.5, page 13**

> "the permittee shall report to DEP all other instances of non-compliance, including non-compliance with specific requirements of compliance schedules, at the time DMRs are submitted, on the Non-Compliance Reporting Form (3800-FM-BCW0440)."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=13)

#### Report non-compliance that may endanger health or the environment within 24 hours

Within 24 hours of the time the permittee becomes aware.

Report orally to DEP within 24 hours of learning of any non-compliance with the permit that may endanger health or the environment, then send a written report within five days describing the non-compliance, its cause, its period with exact dates and times, how long it is expected to continue if not corrected, and the steps taken or planned to prevent it recurring.

Further steps with their own deadlines:

- **Written report.** Within 5 days after the time the permittee becomes aware. [Section Part A III.C.4.b(ii), page 13](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=13)
  > "The permittee shall submit a written report to DEP within five days of the time the permittee becomes aware of any non-compliance which may endanger human health or the environment"

- **When:** the non compliance that may endanger health or the environment.

- You send it to the agency (DEP regional office that approved coverage).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part A III.C.4.b(i), page 13**

> "The permittee shall orally report any non-compliance with this permit which may endanger health or the environment within 24 hours from the time the permittee becomes aware of the circumstances."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=13)

#### Send the Supplemental Laboratory Accreditation Form with the first DMR

No set date. Due with the first DMR after coverage approval, and with the next DMR after a laboratory or method changes.

Complete DEP's Supplemental Laboratory Accreditation Form (3800-FM-BCW0189) and submit it with the first DMR after coverage is approved, and again whenever the laboratory or the methods change.

- **When:** the first dmr or change of laboratory or method.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part A III.B.3, page 10**

> "DEP's Supplemental Laboratory Accreditation Form (3800-FM-BCW0189) must be completed and submitted to DEP with the first DMR following approval of coverage under this General Permit"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=10)

#### Submit a corrective action plan within 90 days after a second consecutive benchmark exceedance

Within 90 days after the end of the monitoring period with the second consecutive exceedance.

When a pollutant is above its benchmark value at the same outfall for two or more consecutive monitoring periods, develop a corrective action plan (CAP) and submit it to DEP within 90 days after the end of the monitoring period that triggered it. Carry it out immediately or on the schedule proposed in the CAP unless DEP says otherwise in writing.

- **When:** the second consecutive benchmark exceedance at one outfall.

- You send it to the agency (DEP regional office that approved coverage).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C V.I.1, page 25**

> "The permittee shall submit the CAP to DEP within 90 days of the end of the monitoring period triggering the need for the plan"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=25)

#### Submit an NOI to amend coverage for a new outfall, a new activity or new sampling outfalls

No set date. No number of days is stated: the NOI is due "any time" one of the listed changes is identified or proposed (Part C V.D).

Submit a Notice of Intent to amend coverage any time a new outfall is identified or proposed, a change of activity would change or add an appendix, or you want to change the representative outfalls you sample. Tell DEP, so it can decide whether an amendment is needed, before changes that let off-site stormwater flow onto the site, add impervious surface in an industrial outfall's drainage area, or put new bulk chemicals, materials or wastes where rain or runoff reaches them.

- **When:** the new outfall or change of activity or sampling outfalls.

- You send it to the agency (DEP regional office, by the Public Upload tool or by mail).
- Keep the records 3 years.
- Signed or certified by a responsible official per 25 Pa Code 92a.22.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C V.D, page 24**

> "The permittee shall submit an NOI to amend coverage under the General Permit any time: a new outfall is identified or proposed;"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=24)

#### Submit the Notice of Intent at least 60 days before a new discharge

At least 60 days before the planned start of new discharge.

A facility that wants coverage submits a complete Notice of Intent (form 3800-PM-BCW0083b) to the DEP regional office for its county at least 60 days before the planned start of any new discharge. No new discharge may start until DEP sends a signed copy of the General Permit approving coverage.

- **When:** the new discharge planned.

- You send it to the agency (DEP regional office, by the Public Upload tool or by mail).
- Keep the records 3 years.
- Signed or certified by a responsible official per 25 Pa Code 92a.22.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section NOI Requirements, Deadlines for NOI, page 3**

> "A facility seeking coverage under this PAG-03 NPDES General Permit shall submit an administratively complete and acceptable NOI at least 60 days prior to the planned date for commencing any new discharge."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=3)

#### Take grab samples within the first 30 minutes of a discharge

No set date. Within the first 30 minutes of a discharge; if that is not possible, as soon as possible afterwards (Part C V.G).

Collect every grab sample within the first 30 minutes of a discharge. If that is not possible, collect it as soon as possible afterwards and explain why in the Annual Report. Sample when non-stormwater discharges are not mixing in, or upstream of where they mix. Composite samples are allowed instead of grab samples.

- **When:** the sampled storm discharge.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C V.G, page 24**

> "The permittee shall collect all grab samples within the first 30 minutes of a discharge, unless the permittee determines that this is not possible"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=24)

#### Tell DEP in writing if the discharge stops being eligible for PAG-03

No set date. The permit says "promptly" and gives no number of days.

If a covered discharge develops a condition that makes it ineligible (see "Discharges Not Authorized by this General Permit"), promptly act to restore eligibility, notify DEP in writing, and, if eligibility cannot be restored, submit an individual NPDES permit application.

- **When:** the discharge becomes ineligible.

- You send it to the agency (DEP regional office that approved coverage).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Authority conditions, item 7, page 5**

> "the permittee promptly shall take action to restore eligibility, to notify DEP in writing of the condition, and, if eligibility cannot be restored, to submit an individual NPDES permit application to DEP."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=5)

#### Valve-controlled retention structures: check for sheen and sample in the first five minutes

No set date. Each time the structure is discharged: inspect before opening the valve, sample within the first five minutes.

Before releasing stormwater from a valve-controlled retention structure, look for a visible sheen or floating material and remove and properly dispose of any before discharging. Collect the samples the appendix requires within the first five minutes of the discharge, and release the water so that settled solids are not carried out.

- **When:** the discharge from a valve controlled retention structure.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C V.A.2.c, page 23**

> "The permittee shall collect samples for the purpose of satisfying monitoring requirements in the applicable appendix to this General Permit within the first five minutes of the onset of the discharge."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=23)

### Ongoing  2 duties

#### Keep a Preparedness, Prevention and Contingency (PPC) Plan and follow it

No set date. Standing duty; updates are driven by the listed events (Part C IV.B).

Develop and implement a PPC Plan under 25 Pa. Code 91.34 that names pollutant sources, preventive measures and BMPs, spill response, erosion controls, security, the training plan and a site map. Update it when rules or the General Permit change, when it fails in an emergency, when the facility changes in a way that raises the risk of fire, explosion or release, when the emergency coordinators or equipment change, or when DEP says so in writing. Keep updates on site and report them in the Annual Report.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part C IV.A, page 22**

> "The permittee shall develop and implement a PPC Plan in accordance with 25 Pa. Code § 91.34"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=22)

#### Keep monitoring records and reports for three years

No set date. Standing duty: three years from the date of each sample, report or application.

Keep all monitoring records and results, copies of every report the permit requires and the data used for the NOI for three years from the date of the sample, report or application, or longer if the permit, DEP or EPA says so. For each sample record the place, date and time, who sampled, the analysis dates, who analysed, the methods and detection levels, and the results.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part A III.A.2, page 9**

> "The permittee shall retain all records of monitoring activities and results, copies of all reports required by this permit, and records of all data used to complete the application for this permit for three years"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=9)

### Only if...  25 duties

These apply only in the situation named on each one. Answer the questions to sort them.

#### Appendix A (Hazardous waste treatment, storage or disposal facilities): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix A (Hazardous waste treatment, storage or disposal facilities; facilities operating under interim status or a permit under subtitle C of RCRA): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., TSS 100 mg/L, COD 120 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, ammonia-nitrogen, total arsenic, total cadmium, total cyanide, total lead, total mercury, total selenium, total silver.

- **Only if:** your permit sector is A.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix A III, page A-1, page 26**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=26)

#### Appendix B (Primary metals): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix B (Primary metals; SIC 3312 to 3317, 3321 to 3325, 3331 to 3339, 3341, 3351 to 3357, 3363 to 3369 and 3398 to 3399): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: TSS 100 mg/L, oil and grease 30 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, total aluminum, total zinc, total copper, total iron, total lead.

- **Only if:** your permit sector is B.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix B II, page B-1, page 28**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=28)

#### Appendix C (Landfills and land application sites): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix C (Landfills and land application sites; landfills and land application sites that receive or have received industrial waste): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., TSS 100 mg/L, COD 120 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, ammonia-nitrogen, total iron.

- **Only if:** your permit sector is C.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix C III, page C-3, page 30**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=30)

#### Appendix D (Timber products): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix D (Timber products; SIC 2411, 2421, 2426, 2429, 2431 to 2439 (except 2434), 2441, 2448, 2449, 2451, 2452, 2491, 2493 and 2499): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., COD 120 mg/L, TSS 100 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, pentachlorophenol, total arsenic, total chromium, total copper. Pentachlorophenol is required only where chlorophenolic formulations are used, and total arsenic, chromium and copper only where chromium, copper and arsenic formulations are used.

- **Only if:** your permit sector is D.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix D IV, page D-1, page 32**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=32)

#### Appendix E (Paper and allied products): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix E (Paper and allied products; SIC 2611, 2621, 2631, 2652 to 2657 and 2671 to 2679): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., COD 120 mg/L, TSS 100 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus.

- **Only if:** your permit sector is E.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix E II, page E-1, page 34**

> "The requirements in Appendix E apply to stormwater discharges associated with industrial activity from Paper and Allied Products facilities ... The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs)"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=34)

#### Appendix F (Chemicals and allied products): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix F (Chemicals and allied products; SIC 2812 to 2819, 2821 to 2824, 2833 to 2836, 2841 to 2844, 2851, 2861 to 2869, 2873 to 2879, 2891 to 2899, 2911 and 3952): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., COD 120 mg/L, TSS 100 mg/L, nitrate plus nitrite nitrogen 3.0 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, total lead, total zinc, total iron, total aluminum.

- **Only if:** your permit sector is F.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix F III, page F-1, page 35**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=35)

#### Appendix G (Air transportation): sample in October to December and in January to March

By December 31 (October 1 to December 31) and March 31 (January 1 to March 31).

Appendix G (Air transportation facilities; SIC 4512 to 4581): during the deicing season, collect one sample from October 1 to December 31 (reported on the DMR due January 28) and one from January 1 to March 31 (reported on the DMR due July 28), only at outfalls that receive runoff from vehicle maintenance, equipment cleaning or deicing areas. Benchmark values: pH 9.0 S.U., BOD5 30 mg/L, COD 120 mg/L, TSS 100 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, ammonia-nitrogen, total dissolved solids. Airports that are not large airports may drop to one sample a year (January 1 to March 31) after a first year with both samples below the benchmark values.

Further steps with their own deadlines:

- **Sampling windows and DMR dates.** The permit gives the timing in words, quoted below. [Section Appendix G III, footnote (1), page G-2, page 38](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=38)
  > "submitted on a DMR due January 28) and one sample must be collected during the period January 1 - March 31 (to be submitted on a DMR due July 28)."

- **Only if:** your permit sector is G.
- If the airport monitoring reduced to once a year: By March 31 each year.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix G III, page G-1, page 37**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=37)

#### Appendix H (Steam electric generating facilities): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix H (Steam electric generating facilities; SIC 4911): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., TSS 100 mg/L, oil and grease 30 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, total iron.

- **Only if:** your permit sector is H.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix H III, page H-1, page 41**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=41)

#### Appendix I (Food and kindred products): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix I (Food and kindred products; SIC 2011 to 2015, 2021 to 2026, 2032 to 2038, 2041 to 2048, 2051 to 2053, 2061 to 2068, 2074 to 2079, 2082 to 2087, 2091 to 2099 and 2111 to 2141): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., BOD5 30 mg/L, TSS 100 mg/L, COD 120 mg/L, oil and grease 30 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, nitrate plus nitrite nitrogen.

- **Only if:** your permit sector is I.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix I III, page I-1, page 44**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=44)

#### Appendix J (Additional facilities): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix J (Additional facilities; facilities whose industrial activity is not described by any other appendix): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: TSS 100 mg/L, oil and grease 30 mg/L, pH 9.0 S.U., COD 120 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus.

- **Only if:** your permit sector is J.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix J III, page J-1, page 46**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=46)

#### Appendix L (Land transportation and petroleum stations and terminals): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix L (Land transportation and petroleum stations and terminals; SIC 4011, 4013, 4111 to 4173, 4212 to 4231, 4311 and 5171): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: TSS 100 mg/L, oil and grease 30 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus.

- **Only if:** your permit sector is L.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix L IV, page L-1, page 51**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=51)

#### Appendix M (Asphalt paving, roofing materials and lubricants): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix M (Asphalt paving, roofing materials and lubricants; SIC 2951, 2952, 2992 and 2999): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., oil and grease 30 mg/L, TSS 100 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus.

- **Only if:** your permit sector is M.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix M III, page M-1, page 55**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=55)

#### Appendix N (Glass, clay, cement, concrete and gypsum products): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix N (Glass, clay, cement, concrete and gypsum products; SIC 3211, 3221, 3229, 3231, 3241, 3251 to 3259, 3261 to 3269, 3271 to 3275, 3281 and 3291 to 3299): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., TSS 100 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, total aluminum, total iron.

- **Only if:** your permit sector is N.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix N III, page N-1, page 57**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=57)

#### Appendix O (Automobile salvage yards): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix O (Automobile salvage yards; SIC 5015): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: TSS 100 mg/L, oil and grease 30 mg/L, COD 120 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, total aluminum, total iron, total lead.

- **Only if:** your permit sector is O.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix O II, page O-1, page 59**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=59)

#### Appendix P (Scrap and waste recycling facilities): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix P (Scrap and waste recycling facilities; SIC 5093): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: TSS 100 mg/L, oil and grease 30 mg/L, COD 120 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, total aluminum, total copper, total lead, total zinc.

- **Only if:** your permit sector is P.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix P III, page P-1, page 61**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=61)

#### Appendix Q (Textile mills, apparel and other fabric products): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix Q (Textile mills, apparel and other fabric products; SIC 2211 to 2299, 2311 to 2399 and 3131 to 3199): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., TSS 100 mg/L, COD 120 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus.

- **Only if:** your permit sector is Q.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix Q III, page Q-1, page 65**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=65)

#### Appendix R (Printing and publishing): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix R (Printing and publishing; SIC 2711 to 2796): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., TSS 100 mg/L, COD 120 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus.

- **Only if:** your permit sector is R.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix R II, page R-1, page 67**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=67)

#### Appendix S (Rubber, miscellaneous plastic products and miscellaneous manufacturing): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix S (Rubber, miscellaneous plastic products and miscellaneous manufacturing; SIC 3011, 3021, 3052, 3053, 3061, 3069, 3081 to 3089, 3931, 3942 to 3949, 3951, 3953, 3954, 3955, 3961, 3965 and 3991 to 3999): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., TSS 100 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, total zinc.

- **Only if:** your permit sector is S.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix S II, page S-1, page 69**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=69)

#### Appendix T (Leather tanning and finishing): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix T (Leather tanning and finishing; SIC 3111): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., TSS 100 mg/L, COD 120 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, total Kjeldahl nitrogen.

- **Only if:** your permit sector is T.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix T II, page T-1, page 71**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=71)

#### Appendix U (Fabricated metal products): sample each representative outfall every six months

By the end of each half year (June 30 and December 31), once.

Appendix U (Fabricated metal products; SIC 3411 to 3499, 3511 to 3599 and 3911 to 3915): at least once in each calendar half year, sample each representative outfall and report the results on the DMR. Benchmark values: pH 9.0 S.U., TSS 100 mg/L, oil and grease 30 mg/L, nitrate plus nitrite nitrogen 3.0 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, total aluminum, total iron, total zinc.

- **Only if:** your permit sector is U.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix U II, page U-1, page 73**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=73)

#### Asphalt, roofing and lubricant plants: clear vegetated ditches and swales at least once a year

By December 31 each year.

Keep vegetated drainage ditches and swales properly seeded and remove accumulated materials from them at least once a year.

- **Only if:** your permit sector is M.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from Appendix M IV.J, page M-2. Check your copy of the permit.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix M IV.J, page M-2, page 56**

> "Ensure that vegetated drainage ditches and swales are properly seeded and any accumulated materials in them have been removed at least annually."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=56)

#### Appendix K (Salt storage): sample in October to March and in April to September

By March 31 (October 1 to March 31) and September 30 (April 1 to September 30).

Appendix K (Existing salt storage and distribution sites, in use for roadway deicing material as of September 24, 2016, that do not discharge to an MS4 covered by an NPDES permit): collect one sample from October 1 to March 31 (DMR due April 28) and one from April 1 to September 30 (DMR due October 28) at representative outfalls that receive runoff from salt storage and handling areas. Benchmark values: pH 9.0 S.U., TSS 100 mg/L, chloride 2,000 mg/L. Monitor and report without a benchmark value: total nitrogen, total phosphorus, total dissolved solids. Sites with small stockpiles (designed for less than 3,000 tons) may drop to one sample a year (October 1 to March 31) after a first year with both samples below the benchmark values.

Further steps with their own deadlines:

- **Sampling windows.** The permit gives the timing in words, quoted below. [Section Appendix K III, footnote (1), page K-2, page 49](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=49)
  > "be collected during the period October 1 - March 31 (to be submitted on a DMR due April 28)"

- **Only if:** your permit sector is K.
- If the salt site monitoring reduced to once a year: By March 31 each year.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix K III, page K-1, page 48**

> "The permittee must monitor and report analytical results for the pollutants listed below on Discharge Monitoring Reports (DMRs) for representative outfalls, subject to footnotes provided."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=48)

#### Salt storage sites: submit DMRs by April 28 and October 28

By April 28 (October to March) and October 28 (April to September).

Existing salt storage and distribution sites under Appendix K report the sample taken from October 1 to March 31 on a DMR due April 28, and the sample taken from April 1 to September 30 on a DMR due October 28.

- **Only if:** your permit sector is K.

- You file it in the agency's system (eDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix K III, footnote (1), page 49**

> "(to be submitted on a DMR due April 28) and one sample must be collected during the period April 1 - September 30 (to be submitted on a DMR due October 28)."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=49)

#### Petroleum bulk stations and terminals: analyze hydrostatic test water before discharging it

No set date. Before each discharge of hydrostatic test water; results go with the Annual Report due March 23.

Hydrostatic test water from tanks at petroleum bulk stations and terminals (no chemical additives) may be discharged only if tanks that held product were cleaned first, the wash and rinse water was removed, and the test water was analyzed before discharge and meets the listed concentrations. Attach all results and the date, flow rate and duration of each discharge to the Annual Report.

- **Only if:** your permit sector is L; the hydrostatic test water discharge.

- You send it to the agency (DEP regional office that approved coverage).
- Keep the records 3 years.
- The permit says this is done by an accredited laboratory.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix L V.C.4.b, page L-3, page 53**

> "Hydrostatic test water shall be analyzed before discharge and shall achieve the following discharge requirements:"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=53)

#### Petroleum bulk stations and terminals: check the oil/water separator after each rain

No set date. After each precipitation event; no number of days is stated.

After each precipitation event, inspect the oil/water separator to confirm petroleum product is being removed properly and measure the solids build-up; remove solids when they exceed one foot in depth or the design criteria or hinder operation. Keep a record of removal dates and the disposal site for at least three years.

- **Only if:** your permit sector is L; the petroleum bulk station or terminal with an oil water separator.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix L V.C.3.a, page L-3, page 53**

> "The oil/water separator shall be inspected after each precipitation event to ensure that the petroleum product is being properly removed."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=53)

### Where the permit is unclear  2 duties

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

#### Scrap and waste recycling: inspect processing equipment at least once a month

No set date. Appendix P IV.A.5 says to "implement control measures including but not limited to the following: inspect equipment at least once per month for spills or leaks and malfunctioning, worn, or corroded parts or equipment". Is the monthly equipment inspection required of every scrap and waste recycling facility with processing equipment, or is it one example of an acceptable control measure?

Appendix P lists, among the control measures for scrap and recyclable waste processing areas, inspecting equipment at least once a month for spills or leaks and for malfunctioning, worn or corroded parts. The permit introduces the list with "including but not limited to", so it is not clear that the monthly inspection itself is required.

- **Only if:** your permit sector is P.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from Appendix P IV.A.5, page P-3. Check your copy of the permit.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Appendix P IV.A.5, page P-3, page 63**

> "inspect equipment at least once per month for spills or leaks and malfunctioning, worn, or corroded parts or equipment;"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=63)

#### Submit a renewal Notice of Intent when the General Permit is reissued

No set date. Part B III.D says a permittee renews by submitting "a timely and complete NOI", and condition 5 on page 5 says a permittee "shall submit an NOI to continue coverage under the reissued General Permit". Neither states a date. For the 2023 reissuance DEP required the NOI to be received by March 23, 2023, the day before the reissued permit took effect. By what date must the renewal NOI be received for the permit that replaces the one expiring March 23, 2028?

To stay covered when DEP reissues PAG-03, submit a renewal Notice of Intent. The current General Permit expires March 23, 2028. The permit does not state the date the renewal NOI is due; DEP sets it when it reissues the permit.

- You send it to the agency (DEP regional office, by the Public Upload tool or by mail).
- Keep the records 3 years.
- Signed or certified by a responsible official per 25 Pa Code 92a.22.

Inferred from Part B III.D. Check your copy of the permit.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section Part B III.D, page 17**

> "To renew coverage under this General Permit, the permittee shall submit a renewal NOI."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=17)

## What does no-exposure certification require?

No Exposure Certification approved by DEP for up to five years, applied for with a PAG-03 NOI. The facility is then excluded from permit coverage while no exposure holds.

- Every few years 1
- When something happens 2

### Every few years  1 duty

#### Renew the No Exposure Certification every five years

No set date. DEP's approval letter states the date the renewal application is due; the instructions give no other date.

A facility with an approved No Exposure Certification submits the signed certification to DEP once every five years, with a PAG-03 NOI. DEP's approval letter states the date by which the renewal application must be submitted.

Further steps with their own deadlines:

- **Date set in the approval letter.** The permit gives the timing in words, quoted below. [Section Conditions for approval, page 2](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813713&nativeExt=pdf&docName=PAG-03-No-Exposure-Certification-Instructions.pdf#page=2)
  > "DEP's approval letter will specify the date by which an application to renew the No Exposure Certification must be submitted."

- You send it to the agency (DEP regional office, by the Public Upload tool or by mail).
- Signed or certified by a responsible official per 25 Pa Code 92a.22.

**Source: PAG-03 No Exposure Certification Instructions (3800-PM-BCW0083f, revision 12/2022), section Qualifying conditions, item 3, page 1**

> "Submit the signed certification to DEP once every five years;"

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813713&nativeExt=pdf&docName=PAG-03-No-Exposure-Certification-Instructions.pdf#page=1)

### When something happens  2 duties

#### If no exposure no longer holds, apply for permit coverage

No set date. No number of days is stated in the instructions.

If conditions change during the approval term so that the facility can no longer certify no exposure, submit an NOI for PAG-03 coverage or an individual permit application.

- **When:** no exposure condition no longer holds.

- You send it to the agency (DEP regional office, by the Public Upload tool or by mail).
- Signed or certified by a responsible official per 25 Pa Code 92a.22.

**Source: PAG-03 No Exposure Certification Instructions (3800-PM-BCW0083f, revision 12/2022), section Conditions for approval, page 2**

> "the discharger must submit an NOI for General Permit coverage or an individual permit application."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813713&nativeExt=pdf&docName=PAG-03-No-Exposure-Certification-Instructions.pdf#page=2)

#### Submit the Notice of Intent at least 60 days before a new discharge

At least 60 days before the planned start of new discharge.

A facility that wants coverage submits a complete Notice of Intent (form 3800-PM-BCW0083b) to the DEP regional office for its county at least 60 days before the planned start of any new discharge. No new discharge may start until DEP sends a signed copy of the General Permit approving coverage.

- **When:** the new discharge planned.

- You send it to the agency (DEP regional office, by the Public Upload tool or by mail).
- Keep the records 3 years.
- Signed or certified by a responsible official per 25 Pa Code 92a.22.

**Source: PAG-03 General Permit (3800-PM-BCW0083d, revision 12/2022), section NOI Requirements, Deadlines for NOI, page 3**

> "A facility seeking coverage under this PAG-03 NPDES General Permit shall submit an administratively complete and acceptable NOI at least 60 days prior to the planned date for commencing any new discharge."

[Open the permit at this section](https://greenport.pa.gov/elibrary/PDFProvider.ashx?action=PDFStream&docID=4813621&nativeExt=pdf&docName=PAG-03-General-Permit.pdf#page=3)

## Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

## PAG-03 duties, topic by topic

How the PAG-03 compares with the other checked permits on each kind of duty, in the permit's own words with the section for each:

- [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements#permit-us-pa-pag03)
- [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements#permit-us-pa-pag03)
- [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates#permit-us-pa-pag03)
- [Exceedance response](https://stormdue.com/guides/benchmark-exceedance-response#permit-us-pa-pag03)
- [No-exposure certification](https://stormdue.com/guides/no-exposure-certification#permit-us-pa-pag03)
- [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements#permit-us-pa-pag03)

- [Every state's permit](https://stormdue.com/states)
- [How we check permit rules](https://stormdue.com/about-the-rules)
- [Deadline calculator](https://stormdue.com/tools/deadline-calculator)
- [Benchmark comparison](https://stormdue.com/tools/benchmark-comparison)
- [More free tools](https://stormdue.com/tools)
- [Duties compared across permits](https://stormdue.com/guides)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.