# South Carolina Industrial General Permit (IGP) Due Dates

> Every recurring duty in the South Carolina Industrial General Permit (IGP) with its due date rule and permit section. Get your own dates free.

Canonical page: https://stormdue.com/permits/us-sc-igp

[States](https://stormdue.com/states) / [South Carolina](https://stormdue.com/states/sc)

# South Carolina Industrial General Permit (IGP) due dates and duties

Every duty in the NPDES General Permit for Stormwater Discharges Associated with Industrial Activity (Except Construction), with when it is due and the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup?state=SC)

Free, no account. Your own dates in a minute.

- 38duties, each cited
- 6on a schedule
- 32when something happens

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

Today

July 1, 2022 June 30, 2027

**Notes on the permit's status and renewal**

The 2022 IGP was issued May 26, 2022, took effect July 1, 2022 and expires June 30, 2027 (cover page). It was issued by the Department of Health and Environmental Control (DHEC); the program moved to the Department of Environmental Services (SCDES) on July 1, 2024, and the permit text still says "the Department", DHEC and scdhec.gov. No modification, extension, draft or reissued permit is posted on the SCDES industrial stormwater page or found by a web search (read November 26, 2026); the SCDES ePermitting public notice search, where draft general permits are noticed, could not be read by script and was not checked. Under Part 1.3.2 the permit is administratively continued if it is not reissued or replaced before it expires. Sector J (mineral mining) is covered only by the separate general permit SCG730000, and Sectors H and I are reserved: none of the three is in this pack.

## What does full permit coverage require?

Coverage by Notice of Intent (NOI) filed in SCDES ePermitting; discharge is authorized 17 days after the Department receives the NOI unless it delays or denies coverage.

- Every quarter 2
- Every year 3
- When something happens 15
- Ongoing 1
- Only if... 13
- Where the permit is unclear 3

### Every quarter  2 duties

#### Quarterly visual assessment of a stormwater sample from each outfall

By the end of each calendar quarter.

Once each quarter, collect a stormwater sample from each outfall within the first 30 minutes of discharge from a storm at least 72 hours after the previous discharge, and examine it in a clean, clear container in a well-lit area for color, odor, clarity, floating, settled and suspended solids, foam, oil sheen and other signs of pollution. Document it with the SWPPP.

- If the facility is inactive and unstaffed: not required.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 4.2.1.a, page 28**

> "Once each quarter for the entire permit term, you must collect a stormwater sample from each outfall (except as noted in Part 4.2.3) and conduct a visual assessment of each of these samples."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=28)

#### Routine facility inspection every calendar quarter

By the end of each calendar quarter.

Qualified personnel, with at least one pollution prevention team member, inspect all areas where industrial materials or activities are exposed to stormwater and all stormwater control measures, while the facility is operating. At least one inspection each calendar year must be during a stormwater discharge. Document each inspection with the SWPPP.

- If the facility is inactive and unstaffed: No set date. One site inspection a year. The permit does not say whether that means each calendar year or every 12 months.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 4.1.1, page 26**

> "Routine facility inspections must be conducted at least quarterly (i.e., once each calendar quarter)"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=26)

### Every year  3 duties

#### Annual comprehensive site inspection (July 1 to June 30)

Once each permit year (from July 1).

Once in each inspection period from July 1 to June 30, qualified personnel with at least one pollution prevention team member inspect every area affected by the permit, review the past year's monitoring data, review the Department's TMDL and 303(d) lists, and check that non-stormwater discharges are eliminated. Document the findings with a signed certification and keep them with the SWPPP.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 4.3.1.a, page 30**

> "Annual, as defined in this Part, means once during each of the following inspection periods beginning with the period you are authorized to discharge under this permit:"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=30)

#### Check for unauthorized non-stormwater discharges once a year

Once each permit year (from July 1).

Evaluate the facility for non-stormwater discharges every year, as part of the annual comprehensive site inspection, eliminate unauthorized discharges, and document the evaluation in the SWPPP (date, criteria, outfalls observed, discharge types and sources, actions taken).

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 5.1.3.4. Check your copy of the permit.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 5.1.3.4, page 35**

> "This evaluation must be done annually (see Part 4.3.1.e.vii.)."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=35)

#### Train employees at least once a year

No set date. At least once a year. The permit does not say whether that means each calendar year or every 12 months.

Train all employees who work in areas where industrial materials or activities are exposed to stormwater, or who carry out permit duties (inspectors, maintenance staff, the pollution prevention team), at least annually, or more often if turnover is high. Keep the training content, schedule and a log of who was trained on which date in the SWPPP.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 2.1.2.9, page 21**

> "Training will be conducted at least annually (or more often if employee turnover is high) unless Sector-specific requirements dictate otherwise."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=21)

### When something happens  15 duties

#### After a four-quarter benchmark exceedance: review controls and keep sampling every quarter

By the end of each calendar quarter.

If the average of four quarterly samples exceeds a benchmark (or an exceedance is mathematically certain sooner), review the control measures under Part 3.2 and either make the needed changes and keep sampling that parameter each quarter until four more quarters average at or below the benchmark, or document that no further reduction is technologically available and economically practicable and keep sampling once a year.

Further steps with their own deadlines:

- **If no further reduction is achievable: sample once a year instead.** The permit gives the timing in words, quoted below. [Section 6.2.1.2.b.ii, page 44](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=44)
  > "in which case you must continue monitoring once per year."

- **When:** the four quarter benchmark average exceeded.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 6.2.1.2.b.i, page 44**

> "Make the necessary modifications and continue quarterly monitoring until you have completed 4 additional quarters of monitoring for which the average does not exceed the benchmark; or"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=44)

#### Inspect and maintain baghouses at least quarterly

By the end of each calendar quarter.

Inspect and maintain baghouses at least quarterly so dust does not escape, and immediately remove any dust accumulated at the base of the exterior baghouse.

- **When:** the facility has baghouses.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 2.1.2.3.c. Check your copy of the permit.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 2.1.2.3.c, page 18**

> "Inspecting and maintaining baghouses at least quarterly to prevent the escape of dust from the system"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=18)

#### Complete corrective action within 14 days of discovery (45 at most)

Within 14 days after the discovery of condition (up to 45 days where the permit allows more time).

When a Part 3.1 or 3.2 condition occurs (unauthorized release, effluent limit violation, controls not stringent enough or not maintained, a significant change, a four-quarter benchmark exceedance), take all reasonable steps the same day, then complete any further corrective action before the next storm if possible and within 14 calendar days of discovery. If that is infeasible, document why and finish no later than 45 days after discovery; notify the Department to go beyond 45 days.

Further steps with their own deadlines:

- **Modify the SWPPP after the corrective action.** Within 14 days after completion of the corrective action work. [Section 3.3.2, page 25](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=25)
  > "you must modify your SWPPP accordingly within 14 calendar days of completing corrective action work."
- **Notify the Department if the work will take more than 45 days.** The permit gives the timing in words, quoted below. [Section 3.3.2, page 25](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=25)
  > "provided that you notify the Department of your intention to exceed 45 days, your rationale for an extension, and a completion date"

- **When:** the corrective action condition.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 3.3.2, page 25**

> "within 14 calendar days from the time of discovery of the corrective action condition."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=25)

#### Document a corrective action condition within 24 hours and the response within 14 days

Within 24 hours of the discovery of condition.

Record the condition, a description of the problem and the date it was identified within 24 hours of discovery or by the end of the next business day. Within 14 days of discovery, record the corrective action taken or planned (or why none is needed), whether the SWPPP must change, and the start and completion dates. Keep it with the SWPPP.

Further steps with their own deadlines:

- **Document the corrective action taken or planned.** Within 14 days after the discovery of condition. [Section 3.4.b, page 26](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=26)
  > "Within 14 days of discovery of any condition listed in Parts 3.1 and 3.2, you must document the following information:"

- **When:** the corrective action condition.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 3.4.a, page 25**

> "Within 24 hours of discovery or by the end of the next business day (see 3.3 above) of any condition listed in Parts 3.1 and 3.2, you must document the following information:"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=25)

#### New owner or operator files an NOI at least 17 days before the transfer; the previous one files a Notice of Termination

At least 17 days before the transfer date.

When ownership or operation of a covered facility is transferred, the new owner or operator submits an NOI at least 17 days before the date of the transfer. The previous owner or operator submits a Notice of Termination within 30 days after the new one has taken over.

Further steps with their own deadlines:

- **Previous owner or operator submits the Notice of Termination.** Within 30 days after the new owner or operator takes over. [Section 1.4.2.a, page 13](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=13)
  > "You must submit a NOT within 30 days after one or more of the following conditions have been met:"

- **When:** the change of owner or operator.

- You file it in the agency's system (SCDES ePermitting).
- Keep the records 3 years.
- Signed or certified by a responsible official per SC Reg 61-9 122.22.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 1.3.1.c Table 1-2, page 11**

> "A minimum of 17 days prior to date that the transfer will take place to the new owner/operator."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=11)

#### Notify as soon as you know of a reportable-quantity spill

No set date. As soon as the facility has knowledge of the release; the permit sets no hour or day count.

As soon as the facility has knowledge of a leak, spill or other release containing a hazardous substance or oil at or above a reportable quantity in a 24-hour period, notify the National Response Center at 800-424-8802 and the Department's Emergency Response Section at 803-253-6488 or 888-481-0125.

- **When:** the reportable quantity release.

- You send it to the agency (National Response Center, 800-424-8802, and SCDES Emergency Response, 803-253-6488 or 888-481-0125 (by phone)).
- Keep the records 3 years.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 7.2.b.iii, page 52**

> "as soon as you have knowledge of a leak, spill, or other release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=52)

#### Pay the annual coverage fee within 30 days of the invoice

Within 30 days after the invoice date.

Coverage carries a recurring annual fee under SC Reg. 61-30 for each cycle from July 1 to June 30. The first year is paid with the NOI; later years are invoiced, and an invoice not paid within 30 days brings penalties and can lead to revocation of coverage after a hearing.

- **When:** receipt of the annual fee invoice.

- You send it to the agency (SCDES, as the invoice directs).
- Keep the records 3 years.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 1.3.1.d.x, page 12**

> "Failure to pay the recurring annual fee within 30 days of invoicing will result in penalties as per SC Reg. 61-30. D."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=12)

#### Promptly correct facts left out of or wrong in the NOI or a report

No set date. "Promptly"; the permit sets no day count.

If the facility learns that it failed to submit relevant facts, or submitted incorrect information, in the NOI or any report, it must promptly submit the facts or information.

- **When:** the omitted or incorrect information discovered.

- You file it in the agency's system (SCDES ePermitting).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 7.2.c.vi, page 53**

> "promptly submit facts or information if you become aware that you failed to submit relevant facts in your NOI or that you submitted incorrect information in your NOI or in any report."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=53)

#### Report noncompliance that may endanger health or the environment within 24 hours

Within 24 hours of the awareness of noncompliance.

Report orally to the Department's regional office (or the 24-hour emergency response line, 803-253-6488 or 1-888-481-0125) within 24 hours of becoming aware of any noncompliance that may endanger health or the environment, and follow up in writing within five days.

Further steps with their own deadlines:

- **Written follow-up.** Within 5 days after the awareness of noncompliance. [Section 7.2.b.ii, page 52](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=52)
  > "A written submission must also be provided within five days of the time you become aware of the circumstances;"

- **When:** the noncompliance that may endanger health or the environment.

- You send it to the agency (SCDES regional office (Part 7.4) or the 24-hour emergency response line (oral); written follow-up to the regional office).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 7.2.b.i, page 52**

> "Any information must be provided orally within 24 hours from the time you become aware of the circumstances;"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=52)

#### Send monitoring results within 30 days when the Department asks

Within 30 days after the request date.

Submit the results of required monitoring within 30 days after the Department specifically requests them.

- **When:** the department requests monitoring results.

- You send it to the agency (SCDES, as the request directs).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 7.2.c.vii, page 53**

> "You must submit, within 30 days after the request, results of required monitoring when specifically requested by the Department."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=53)

#### Submit a new NOI when the general permit is reissued

No set date. The deadline will be set by the reissued permit, which SCDES has not issued or public-noticed yet.

When the Department reissues or replaces this permit, existing permittees keep coverage by filing a complete NOI under the new permit when the Department asks for it. The 2022 permit expires June 30, 2027 and is administratively continued if no new permit is in place by then.

- **When:** issuance of the new general permit.

- You file it in the agency's system (SCDES ePermitting).
- Keep the records 3 years.
- Signed or certified by a responsible official per SC Reg 61-9 122.22.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 1.3.2, page 13**

> "If this permit is not reissued or replaced prior to the expiration date, it will be administratively continued in accordance with SC Reg. 61-9. Section 122.6 and remain in force and effect."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=13)

#### Submit a Notice of Termination within 30 days when coverage should end

Within 30 days after the termination condition date.

Submit a Notice of Termination (NOT) on the Department's form within 30 days after a new owner or operator takes over, operations and industrial stormwater discharges have ceased with sediment and erosion controls in place, a Sector G site has met its termination requirements, or all discharges are covered by an individual or alternative general permit.

- **When:** the termination condition met.

- You file it in the agency's system (SCDES ePermitting).
- Keep the records 3 years.
- Signed or certified by a responsible official per SC Reg 61-9 122.22.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 1.4.2, page 13**

> "You must submit a NOT within 30 days after one or more of the following conditions have been met:"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=13)

#### Submit the Notice of Intent at least 17 days before a new discharge starts

At least 17 days before commencing discharge.

New dischargers and new sources submit a complete Notice of Intent (NOI) electronically at least 17 days before discharging. The SWPPP must be prepared before the NOI is submitted. Discharge is authorized 17 days after the Department receives the NOI unless it delays or denies coverage.

- **When:** the new discharge or new source.

- You file it in the agency's system (SCDES ePermitting).
- Keep the records 3 years.
- Signed or certified by a responsible official per SC Reg 61-9 122.22.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 1.3.1.c Table 1-2, page 11**

> "A minimum of 17 days prior to commencing discharge."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=11)

#### Tell the Department as soon as possible about planned changes that add pollutants

No set date. "As soon as possible"; the permit sets no day count.

Give notice to the Department as soon as possible of any planned physical alteration or addition that makes the facility a new source or could significantly change the nature or significantly increase the quantity of pollutants discharged. Give advance notice of planned changes expected to result in noncompliance.

- **When:** the planned physical alteration or addition.

- You send it to the agency (SCDES Bureau of Water).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 7.2.c.i, page 52**

> "You must give notice to the Department as soon as possible of any planned physical alterations or additions to the permitted facility"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=52)

#### Tell the Department before stopping monitoring at an inactive, unstaffed site

No set date. Before monitoring stops; the permit sets no day count.

A facility that becomes inactive and unstaffed with no industrial materials or activities exposed to stormwater during the permit term must notify the Department before it stops benchmark or impaired waters monitoring, and keep a signed and certified statement with the SWPPP.

- **When:** the facility becomes inactive and unstaffed.

- You send it to the agency (SCDES Bureau of Water).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 6.2.1.3.b, page 46**

> "then you must notify the Department of this change before you cease monitoring under the permit."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=46)

### Ongoing  1 duty

#### Keep permit records for three years after coverage ends

No set date. Standing duty: three years counted from the date coverage expires or is terminated.

Keep the SWPPP and its modifications, the Part 5.4 documentation, all reports and certifications, monitoring data and the data used for the NOI for at least three years after coverage expires or is terminated. Keep the current SWPPP at the facility, immediately available to the Department, local agencies and the MS4 operator.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 7.3, page 53**

> "for a period of at least 3 years after the date that your coverage under this permit expires or is terminated."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=53)

### Only if...  13 duties

These apply only in the situation named on each one. Answer the questions to sort them.

#### Sector A wood surface protection and preserving: monthly inspection

By the end of each month.

Timber products facilities that perform wood surface protection or preservation inspect processing areas, transport areas and treated wood storage areas monthly, to assess practices that keep treatment chemicals off unprotected soils and out of areas that contact stormwater.

- **Only if:** your permit sector is A; the facility performs wood surface protection or preservation.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 8.A.5, page 56**

> "inspect processing areas, transport areas, and treated wood storage areas monthly"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=56)

#### Sector G mines discharging to outstanding waters or sediment or nitrogen impaired waters: monthly inspection

By the end of each month.

Metal mining sites that discharge to waters designated as outstanding waters, or to waters impaired for sediment or nitrogen, must be inspected monthly; other Sector G sites at least quarterly unless adverse weather makes the site inaccessible.

- **Only if:** your permit sector is G; the discharges to outstanding waters or waters impaired for sediment or nitrogen.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 8.G.7, page 80**

> "Sites which discharge to waters designated as outstanding waters or waters which are impaired for sediment or nitrogen must be inspected monthly."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=80)

#### Sector O steam electric plants: monthly inspection of listed areas

By the end of each month.

Steam electric generating facilities inspect monthly: coal handling areas, loading and unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas, areas next to disposal ponds and landfills, maintenance areas, liquid storage tanks, and long term and short term material storage areas.

- **Only if:** your permit sector is O.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 8.O.6, page 104**

> "inspect the following areas monthly: coal handling areas, loading or unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=104)

#### Sector S airports: record deicing chemicals used each month

By the end of each month.

Air transportation facilities that use deicing chemicals keep a record of the types used (with safety data sheets) and the monthly quantities, measured or estimated, for all deicing chemicals. Tenants and fixed-base operators that deice give this information to the airport authority.

- **Only if:** your permit sector is S; the facility uses deicing chemicals.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 8.S.5.2. Check your copy of the permit.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 8.S.5.2, page 117**

> "you must maintain a record of the types (including the Safety Data Sheets [SDS]) used and the monthly quantities"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=117)

#### Sector S airports: routine inspections at least monthly during the deicing season

By the end of each month.

Air transportation facilities conduct routine facility inspections at least monthly during the deicing season, and in every other month in which deicing chemicals may be used.

- **Only if:** your permit sector is S; the month in the deicing season or in which deicing chemicals may be used.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 8.S.6.1, page 117**

> "At a minimum conduct routine facility inspections at least monthly during the deicing season (e.g., October through April for most mid-latitude airports)."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=117)

#### Sector V textile mills: monthly inspection of listed activities and areas

By the end of each month.

Textile mills, apparel and other fabric product facilities inspect at least monthly: transfer and transmission lines, spill prevention, good housekeeping practices, management of process waste products, and all structural and nonstructural management practices.

- **Only if:** your permit sector is V.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 8.V.5, page 124**

> "Inspect, at least monthly, the following activities and areas (at a minimum): transfer and transmission lines, spill prevention, good housekeeping practices, management of process waste products"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=124)

#### Sector M auto salvage yards: quarterly leak inspection of equipment and fluid storage

By the end of each calendar quarter.

Automobile salvage yards inspect quarterly, for signs of leakage, all equipment containing oily parts, hydraulic fluids, other fluids or mercury switches, and all vessels and areas where hazardous materials and automotive fluids are stored. Vehicles arriving at the site are inspected for leaks immediately or as soon as feasible.

- **Only if:** your permit sector is M.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 8.M.4. Check your copy of the permit.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 8.M.4, page 95**

> "Inspect quarterly for signs of leakage all equipment containing oily parts, hydraulic fluids, any other types of fluids, or mercury switches."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=95)

#### After an effluent limit exceedance: follow-up sample within 30 days of the corrective action

Within 30 days after implementation of the corrective action.

After corrective action for an exceedance of a numeric effluent limit, sample again for the pollutant within 30 calendar days of implementing the action (or during the next qualifying runoff event if none occurs within 30 days). If the follow-up also exceeds the limit, keep monitoring at least quarterly until the discharge meets the limit or the Department waives further monitoring in writing.

Further steps with their own deadlines:

- **Keep monitoring at least quarterly until the limit is met.** The permit gives the timing in words, quoted below. [Section 6.3, page 51](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=51)
  > "you must continue to monitor, at least quarterly, until your discharge is in compliance with the effluent limit or until the Department waives the requirement in writing for additional monitoring."

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs); the numeric effluent limit exceeded.

- You file it in the agency's system (In a format approved by the Department (Part 7.1.i)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 6.3, page 51**

> "You must conduct follow-up monitoring within 30 calendar days (or during the next qualifying runoff event, should none occur within 30 days) of implementing corrective action(s)"

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=51)

#### Impaired waters with a TMDL: sample at least four times in each 12-month period

No set date. Four samples in each 12-month period counted from the facility's first monitoring quarter, which depends on its NOI date; the four need not fall in separate quarters.

A facility that discharges to a water with an EPA approved or established TMDL samples for the TMDL's pollutants of concern at least four times in each 12-month period, starting no later than the first full quarter after its NOI is submitted. Monitoring may stop after four consecutive events meet the water quality standard or the wasteload allocation, if drainage conditions stay the same.

- **Only if:** your stormwater reaches an impaired water body; a TMDL applies to your discharge.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 6.2.4.2.b.i, page 49**

> "Stormwater sampling and analytical monitoring must be carried out for the pollutants of concern in the TMDL not less than four times per 12-month period."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=49)

#### Quarterly benchmark monitoring in the first and fourth years of coverage

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins. Only in coverage years 1 and 4, counted from when your coverage began.

Sample each outfall for the benchmark parameters of the facility's sectors (primary and co-located) in Part 8 once in each of the first four full calendar quarters of permit coverage, and again in the four quarters of the fourth year of coverage. If a parameter's four-quarter average does not exceed the benchmark, its monitoring is done until the fourth year. Results are kept with the SWPPP and sent to the Department only when it asks in writing.

Further steps with their own deadlines:

- **Fourth-year monitoring (quarters 13 to 16 of coverage).** The permit gives the timing in words, quoted below. [Section 6.2.1.2, page 44](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=44)
  > "This monitoring must also be performed in the four quarters of your fourth year of permit coverage (i.e., your thirteenth through sixteenth quarters)"

- **Only if:** your permit subsector is A1, A2, A3, A4, B1, C1, C2, C3, C4, D1, E1, E2, E3, F1, F2, F3, F4, G1, K1, L1, M1, N1, Q1, S1, T1, U1, U2, U3, V1, Y1, Z1, AA1, AA2.
- If the facility is inactive and unstaffed: not required.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 6.2.1.2, page 44**

> "quarterly, as stated in Part 6.1.7, for your first 4 full quarters of permit coverage."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=44)

#### Sector E: sweep paved areas at least once a week where cement or aggregate is handled

No set date. At least once a week while those materials are handled or processed; the frequency is set in the SWPPP.

Glass, clay, cement, concrete and gypsum facilities sweep (or use equivalent measures on) paved areas exposed to stormwater at the frequency stated in the SWPPP, and at least once a week if cement, aggregate, kiln dust, fly ash or settled dust are being handled or processed.

- **Only if:** your permit sector is E; the cement aggregate kiln dust fly ash or settled dust handled or processed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 8.E.2, page 63**

> "it must be performed at least once a week if cement, aggregate, kiln dust, fly ash, or settled dust are being handled or processed."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=63)

#### Sector G waste rock and overburden piles: benchmark monitoring once in the first year, then twice a year for exceeded parameters

No set date. Once in the first year of coverage, then twice in each later year for parameters that exceeded; the permit does not define the year or space the two samples.

Active metal mining facilities sample discharges from waste rock and overburden piles for the Table 8.G-2 parameters once in the first year, and twice annually in every later year of coverage for any parameter whose benchmark was exceeded. The same schedule applies to the extra parameters Table 8.G-3 lists by type of ore.

- **Only if:** your permit sector is G; the discharges from waste rock or overburden piles at an active mine.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 8.G.8.2, page 80**

> "perform benchmark monitoring once in the first year for the parameters listed in Table 8.G-2, and twice annually in all subsequent years of coverage under this permit for any parameters for which the benchmark has been exceeded."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=80)

#### Sector L operating landfills: inspect at least once every 7 days

Within 7 days after the previous inspection date.

Operating landfills, open dumps and land application sites are inspected at least once every 7 days, with attention to areas not yet finally stabilized, active land application areas, exposed material and waste storage, stabilization and structural controls, leachate collection and treatment systems, and truck entrances and exits. Stabilized sites and completed land application areas are inspected at least once every month.

- **Only if:** your permit sector is L; operating landfill open dump or land application site.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 8.L.7.1, page 92**

> "inspect operating landfills, open dumps, and land application sites at least once every 7 days."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=92)

### Where the permit is unclear  3 duties

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

#### Annual effluent limit monitoring for regulated discharges

No set date. Part 6.2.2.1 requires effluent limit monitoring "once per year", beginning in the first full quarter of coverage. Which twelve months is that year: the calendar year, July 1 to June 30, or a year counted from the facility's first monitoring quarter?

Sample once per year each outfall that carries a discharge listed in Table 6-1 (wet deck log spray, phosphate fertilizer runoff, asphalt emulsion runoff, cement storage piles, hazardous and non-hazardous landfills, coal piles at steam electric plants, airport urea deicing) for the limits in Part 8, and report the results on a discharge monitoring report.

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs).

- You file it in the agency's system (Discharge Monitoring Report, as specified by the Department).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 6.2.2.1, page 46**

> "you must monitor once per year at each outfall containing the discharges identified in Table 6-1 for the parameters specified in the sector-specific section(s) of Part 8."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=46)

#### Impaired waters without a TMDL: sample once a year, and again in the fourth year

No set date. Part 6.2.4.2.a requires impaired waters monitoring "once per year", beginning no later than the first full quarter of coverage. Which twelve months is that year: the calendar year, July 1 to June 30, or a year counted from the facility's first monitoring quarter? Also: the SCDES web page says monitoring must begin within 180 days after a water body is newly listed; where is that period set?

A facility that discharges to an impaired water without an EPA approved or established TMDL samples each affected outfall once per year for the pollutants causing the impairment. Monitoring may stop once a sample meets the water quality standard and drainage conditions stay the same, but it must be done again in the fourth year of coverage whatever the earlier results.

- **Only if:** your stormwater reaches an impaired water body; a TMDL does not apply to your discharge.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 6.2.4.2.a, page 48**

> "you must monitor once per year at each outfall (except substantially identical outfalls) discharging stormwater to impaired waters without an EPA approved or established TMDL."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=48)

#### Submit the yearly discharge monitoring report for effluent limit monitoring

No set date. Part 7.1.ii requires the yearly DMR "by the 28th day of the month following the end of the monitoring period", and Parts 6.2.2.1 and 6.2.4.2.a require monitoring "once per year" starting in the first full quarter of coverage. Which twelve months is the monitoring period for effluent limit monitoring and for impaired waters monitoring: the calendar year, July 1 to June 30, or a year counted from the facility's first monitoring quarter? And in which system is the DMR filed?

Facilities with numeric effluent limit monitoring report the results on a Discharge Monitoring Report (DMR) once per year, by the 28th day of the month after the monitoring period ends. The permit leaves the monitoring period to be specified by the Department.

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs).

- You file it in the agency's system (Discharge Monitoring Report, as specified by the Department).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 7.1.ii, page 51**

> "DMRs shall be submitted once per year by the 28th day of the month following the end of the monitoring period."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=51)

## What does no-exposure certification require?

No Exposure Certification (NEC): the facility certifies that all industrial materials and activities are protected from rain, snow, snowmelt and runoff. It needs no permit while no exposure is maintained, and files the certification with its fee again every five years.

### Every few years  1 duty

#### No Exposure facilities: file the No Exposure Certification again every five years

Within 5 years after the last NEC certification date.

A facility excluded for no exposure submits a new No Exposure Certification, with the fee in SC Reg. 61-30, once every five years. Missing a five-year filing or losing no exposure conditions is noncompliance, and a facility that keeps operating is treated as violating the permit.

- You file it in the agency's system (SCDES ePermitting).
- Signed or certified by a responsible official per SC Reg 61-9 122.22.

Inferred from section 1.5.a. Check your copy of the permit.

**Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 1.5.a, page 14**

> "You must submit a No Exposure Certification to the Department once every five years."

[Open the permit at this section](https://des.sc.gov/sites/des/files/Documents/BOW/Stormwater/BOW_IndustrialStormwaterGP2022.pdf#page=14)

## Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

## Industrial General Permit (IGP) duties, topic by topic

How the Industrial General Permit (IGP) compares with the other checked permits on each kind of duty, in the permit's own words with the section for each:

- [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements#permit-us-sc-igp)
- [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements#permit-us-sc-igp)
- [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates#permit-us-sc-igp)
- [No-exposure certification](https://stormdue.com/guides/no-exposure-certification#permit-us-sc-igp)
- [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements#permit-us-sc-igp)

- [Every state's permit](https://stormdue.com/states)
- [How we check permit rules](https://stormdue.com/about-the-rules)
- [Deadline calculator](https://stormdue.com/tools/deadline-calculator)
- [Benchmark comparison](https://stormdue.com/tools/benchmark-comparison)
- [More free tools](https://stormdue.com/tools)
- [Duties compared across permits](https://stormdue.com/guides)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.