# Tennessee Multi-Sector General Permit (TMSP) Due Dates

> Every recurring duty in the Tennessee Multi-Sector General Permit (TMSP) with its due date rule and permit section. Get your own dates free.

Canonical page: https://stormdue.com/permits/us-tn-tmsp

[States](https://stormdue.com/states) / [Tennessee](https://stormdue.com/states/tn)

# Tennessee Multi-Sector General Permit (TMSP) due dates and duties

Every duty in the Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, with when it is due and the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup?state=TN)

Free, no account. Your own dates in a minute.

- 59duties, each cited
- 7on a schedule
- 52when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

Today

July 1, 2025 June 30, 2030

**Notes on the permit's status and renewal**

Issued June 30, 2025, effective July 1, 2025, expires June 30, 2030 (cover page). It replaced the previous TMSP, which expired June 30, 2025. TDEC's document list for TNR050000 (read November 26, 2026) shows the signed permit, a redline of the final against the draft, and the Notice of Determination (response to comments, dated June 30, 2025); nothing later: no modification, extension or draft replacement. TDEC's permit page was last updated November 5, 2026. An expired general permit continues in force until a replacement is issued (2.1.4). Facilities covered under the previous permit had to submit a new NOI by September 30, 2025. Each facility has its own permit tracking number; coverage starts with the Notice of Coverage. Fees: TDEC's permit page says there are no application fees, that annual maintenance fees became applicable in September 2014, set by site size in TDEC Rule 0400-40-11, and that the Division invoices the fee once the NOI is processed. Kept as a note, not a duty: the page refuses automated requests, so it cannot be re-checked by check-proof (read in a browser on November 27, 2026).

## What does full permit coverage require?

Coverage by Notice of Intent filed in MyTDEC Forms; discharge is authorized when the Division issues the Notice of Coverage.

- Every quarter 1
- Every year 4
- One time 1
- When something happens 14
- Ongoing 2
- Only if... 34
- Where the permit is unclear 2

### Every quarter  1 duty

#### Visual assessment of every outfall each quarter

By the end of each calendar quarter.

Once a quarter, visually assess all outfalls and their runoff for color, odor, clarity, floating, settled and suspended solids, sediment buildup, foam, oil sheen and other signs of pollution. Document each assessment in a signed report kept with the SWPPP. If you see evidence of pollution, start corrective actions.

- If the facility is inactive and unstaffed: not required.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 4.1. Check your copy of the permit.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 4.1, page 20**

> "Visual assessments of all outfalls must be conducted quarterly."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=29)

### Every year  4 duties

#### Comprehensive facility inspection once a year

By December 31 each year.

Once a year, inspect areas with exposed materials, areas where spills and leaks happened in the past three years, the outfalls and the stormwater control measures. At least one member of the stormwater pollution prevention team takes part. Document it in a signed report kept with the SWPPP.

- If the facility is inactive and unstaffed: not required.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by your pollution prevention team.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 4.2. Check your copy of the permit.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 4.2, page 21**

> "Comprehensive facility inspections must be conducted once per year."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=30)

#### Do at least one visual assessment while it is raining each calendar year

By December 31 each year.

At least one of the quarterly visual assessments each calendar year must be done while it is raining. Take a grab sample of runoff as soon as the outfall starts discharging (within 30 minutes, and no later than one hour) and examine it for signs of pollution.

- If the facility is inactive and unstaffed: not required.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 4.1, page 20**

> "At least one of these visual assessments must be conducted when it's raining each calendar year."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=29)

#### Evaluate for non-stormwater discharges and certify the results every year

By December 31 each year.

Each year, evaluate the facility for non-stormwater (dry weather) discharges, certify the results in the SWPPP, and eliminate any that are not authorized by Subpart 1.4 or another NPDES permit.

Further steps with their own deadlines:

- **First inspection of all discharge points for unauthorized non-stormwater discharges.** The timing is not settled: Section 3.2.5 requires all discharge points to be inspected for unauthorized non-stormwater discharges "By the end of the first year of permit coverage". Is that twelve months from the coverage date on the Notice of Coverage, or the end of the calendar year in which coverage starts? [Section 3.2.5, page 14](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=23)
  > "By the end of the first year of permit coverage, the permittee must inspect and document all discharge points at the facility for unauthorized non-stormwater"

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 1.4.1. Check your copy of the permit.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 1.4.1, page 4**

> "The permittee must evaluate for the presence of non-stormwater (dry weather) discharges at the facility and certify evaluation results (Section 3.2.5) annually."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=13)

#### Sign and date the SWPPP every year

By December 31 each year.

Sign and date the Stormwater Pollution Prevention Plan each year. The signer is a responsible official or a duly authorized representative under Subpart 8.4.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 3.2.11. Check your copy of the permit.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 3.2.11, page 18**

> "The permittee must sign and date the SWPPP annually in accordance with Subpart 8.4."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=27)

### One time  1 duty

#### Put the SWPPP into effect within 6 months of receiving the Notice of Coverage

No set date. Six months after you receive the Notice of Coverage, or the day discharge starts if the Notice of Coverage was issued before industrial operations began.

Prepare the Stormwater Pollution Prevention Plan (new facilities) or update it (existing facilities) before submitting the NOI, then implement it within 6 months after receiving the Notice of Coverage, or when discharge starts if the Notice of Coverage came before industrial operations began.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 2.1.1, page 6**

> "SWPPP must be implemented 6 months following the receipt of the Notice of Coverage (NOC) (Section 2.1.3) or when commencing discharge (if NOC was issued prior to the start of industrial operations)."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=15)

### When something happens  14 duties

#### After a benchmark or effluent limit exceedance: start corrective actions within 30 days

Within 30 days after you receive the monitoring results.

Within 30 days of receiving monitoring results above a benchmark or effluent limit, start the listed corrective actions: a comprehensive facility inspection (preferably in wet weather) to find the source, a decision on whether the SWPPP needs changes, starting those changes, updating the SWPPP with the findings, and a summary of the actions submitted with the NetDMR results.

- **When:** a benchmark or effluent limit is exceeded.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 6.3, page 28**

> "the permittee must initiate the following corrective actions within 30 days of receiving the monitoring results:"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=37)

#### After a repeated exceedance: hire a licensed professional or sample quarterly

No set date. The permit sets no deadline for choosing an option, and does not say how long quarterly sampling continues.

When the same pollutant exceeds its benchmark or effluent limit again at the same outfall, either engage a licensed professional to evaluate the facility and recommend improvements to stormwater controls, or raise sampling for that pollutant at that outfall to once a quarter.

- **When:** the same pollutant is exceeded again at the same outfall.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 6.3, page 29**

> "If the triggering event was due to repeated (subsequent) exceedance of the benchmark value or ELG limit for the same parameter at the same outfall, the facility must implement one of the two following options:"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=38)

#### Effluent limits for coal pile runoff (any sector)

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Any stormwater discharge made up of coal pile runoff must not exceed 50 mg/L total suspended solids at any time and must have a pH within 6.0 to 9.0. It may not be diluted to meet the limit.

- **When:** the discharge is made up of coal pile runoff.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 5.1.9, page 25**

> "Any stormwater discharge composed of coal pile runoff shall not exceed a maximum concentration for any time of 50 mg/L total suspended solids (TSS)."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=34)

#### Give notice of a bypass: ten days ahead if planned, within 24 hours if not

Within 24 hours after you become aware of the bypass.

A bypass of treatment is prohibited unless it was unavoidable, there was no feasible alternative, and notice was given. For an anticipated bypass give prior notice, if possible at least ten days before. For an unanticipated bypass notify the appropriate Environmental Field Office within 24 hours of becoming aware of it.

Further steps with their own deadlines:

- **Prior notice of an anticipated bypass.** At least 10 days before the bypass. [Section 8.11, page 41](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=50)
  > "For anticipated bypass, the permittee submits prior notice, if possible at least ten days before the date of the bypass; or"

- **When:** a treatment facility is bypassed.

- You send it to the agency (TDEC Environmental Field Office).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 8.11, page 41**

> "For unanticipated bypass, the permittee submits notice of an unanticipated bypass within 24 hours from the time that the permittee becomes aware of the bypass to the appropriate EFO."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=50)

#### If the Division asks for an individual or other permit: respond within 60, 120 or 180 days

Within 60 days after you are notified.

When the Division notifies a facility that it must get an individual permit or other general permit coverage, the facility chooses among three options: show within 60 days that the discharge does not cause or contribute to a water quality violation, modify its stormwater controls within 120 days, or apply for the other permit within 180 days. Coverage continues while it does so.

Further steps with their own deadlines:

- **Option 2: modify stormwater control measures.** Within 120 days after you are notified. [Section 2.2.3, page 9](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=18)
  > "Modify SCMs at the facility to address the concerns within 120 days of the notification; or"
- **Option 3: apply for other general permit coverage or an individual permit.** Within 180 days after you are notified. [Section 2.2.3, page 9](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=18)
  > "file an individual permit application within 180 days of the notification."

- **When:** the Division requires an individual or alternative permit.

- You send it to the agency (water.permits@tn.gov).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 2.2.3, page 9**

> "Provide a demonstration to the Division within 60 days of the notification that the discharge does not cause or contribute to a violation of water quality standard;"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=18)

#### New operator: submit an NOI at least five days before the operator change

At least 5 days before the operator changes.

When a facility changes operator, the new operator submits a Notice of Intent in MyTDEC Forms at least five days before the change takes place.

- **When:** the operator changes.

- You file it in the agency's system (MyTDEC Forms).
- Keep the records 3 years.
- Signed or certified by a responsible official per tmsp 8.4.1.

Inferred from section 2.1.2. Check your copy of the permit.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 2.1.2, page 6**

> "New operators should submit an NOI at least five days prior to the operator change."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=15)

#### Report dangerous noncompliance within 24 hours, then in writing within five days

Within 24 hours after you become aware of the noncompliance.

Report any noncompliance that could threaten human health or the environment to the commissioner within 24 hours of becoming aware of it, and send the appropriate Environmental Field Office a written account within five days.

Further steps with their own deadlines:

- **Written submission to the Environmental Field Office.** Within 5 days after you become aware of the noncompliance. [Section 8.12, page 42](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=51)
  > "A written submission must be provided within five days of the time the permittee becomes aware of the noncompliance."

- **When:** noncompliance that could threaten health or the environment happens.

- You send it to the agency (TDEC Environmental Field Office).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 8.12, page 41**

> "the permittee shall report the noncompliance to the commissioner within 24 hours from the time the permittee becomes aware of the"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=50)

#### Send records to the Division within 15 days of a written request

Within 15 days after the request.

Submit monitoring records, reports and application data to the Division within 15 days of its written request. Copies of visual assessment and inspection reports are also due within 15 days of a request.

Further steps with their own deadlines:

- **Copies of visual assessment and inspection reports.** Within 15 days after the request. [Section 4.4, page 22](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=31)
  > "Copies of reports should be submitted to the Division within 15 days of request."

- **When:** the Division asks for records.

- You send it to the agency (TDEC Division of Water Resources).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 7.4. Check your copy of the permit.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 7.4, page 34**

> "Permittees must submit any such records to the Division within 15 days upon written request."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=43)

#### Submit a new NOI by the date the replacement permit sets

No set date. The deadline will be set by the replacement permit, which TDEC has not issued.

This permit expires June 30, 2030. An expired general permit stays in force until a replacement is issued. To stay covered, submit a new Notice of Intent by the date the replacement permit specifies.

- **When:** a replacement general permit is issued.

- You file it in the agency's system (MyTDEC Forms).
- Keep the records 3 years.
- Signed or certified by a responsible official per tmsp 8.4.1.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 2.1.4, page 8**

> "a replacement general permit must submit an NOI by the date specified in that future permit."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=17)

#### Submit a Notice of Termination within 30 days when coverage should end

Within 30 days after a condition for ending coverage is met.

Submit a Notice of Termination (NOT) in MyTDEC Forms within 30 days after the facility closes, industrial stormwater discharges cease, a Sector G, H or J site meets its termination requirements, or all industrial stormwater discharges are covered by a different permit.

- **When:** a condition for ending coverage is met.

- You file it in the agency's system (MyTDEC Forms).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 2.2.1, page 8**

> "The permittee must submit a Notice of Termination (NOT) within 30 days after one of the following conditions have been met:"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=17)

#### Submit an NOI modification no later than 30 days after a substantive change

Within 30 days after the change.

When something substantive changes at a facility that already has coverage, submit a modified Notice of Intent in MyTDEC Forms as soon as possible and no later than 30 days after the change occurs.

- **When:** a substantive change happens at the facility.

- You file it in the agency's system (MyTDEC Forms).
- Keep the records 3 years.
- Signed or certified by a responsible official per tmsp 8.4.1.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 2.1.2, page 7**

> "NOI modifications (regarding substantive changes at an already permitted facility) should be submitted as soon as possible but no later than 30 days after the change occurs."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=16)

#### Submit the Notice of Intent at least 30 days before a new facility starts discharging

At least 30 days before you start discharging.

A new facility without TMSP coverage prepares its Stormwater Pollution Prevention Plan, then submits the Notice of Intent (NOI) and a site map in MyTDEC Forms at least 30 calendar days before it starts discharging. Discharges are not authorized until the Division issues the Notice of Coverage (NOC).

- **When:** a new facility does not have TMSP coverage yet.

- You file it in the agency's system (MyTDEC Forms).
- Keep the records 3 years.
- Signed or certified by a responsible official per tmsp 8.4.1.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 2.1.2, page 6**

> "New facilities without TMSP coverage should submit NOI at least 30 calendar days prior to commencing discharge."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=15)

#### Tell the director as soon as possible about planned physical changes

No set date. As soon as possible; the permit sets no number of days.

Give the director notice as soon as possible of planned physical alterations or additions that would make the facility a new source, could significantly change the nature or increase the quantity of pollutants discharged, or significantly change sludge use or disposal.

- **When:** a physical alteration or addition is planned.

- You send it to the agency (TDEC Division of Water Resources).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 8.5, page 38**

> "The permittee shall give notice to the director as soon as possible of any planned physical alterations or additions to the permitted facility."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=47)

#### To claim the water quality exception: demonstrate it to the Division within 30 days

Within 30 days after an AIM triggering event happens.

A facility that wants the exception for a triggering event that does not exceed water quality standards submits its demonstration to the Division within 30 days of the triggering event. If that is not feasible it may take up to 90 days and must record why in the SWPPP.

- **When:** you claim the water quality standards exception.

- You send it to the agency (TDEC Division of Water Resources).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 6.5.5, page 31**

> "The permittee must demonstrate to the Division within 30 days of the AIM triggering event that the triggering event does not result in any exceedance of water quality standards."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=40)

### Ongoing  2 duties

#### Keep an employee SWPPP training schedule and attendance history in the SWPPP

No set date. The permit sets no training frequency. The schedule is the one the facility writes into its SWPPP.

Document employee SWPPP training in the plan: what is covered, the schedule, and who took part. The permit sets no training frequency; the facility sets the schedule in its SWPPP.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 3.2.7, page 16**

> "Employee SWPPP training, including content, schedule and participation history;"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=25)

#### Keep monitoring records, reports and application data for at least three years

No set date. A standing duty: each record is kept for three years from its own date.

Keep all monitoring information (including calibration and maintenance records), copies of every report the permit requires and the data used for the application for at least three years from the date of the sample, measurement, report or application.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 7.4, page 34**

> "for a period of at least three years from the date of sample, measurement, report or application."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=43)

### Only if...  34 duties

These apply only in the situation named on each one. Answer the questions to sort them.

#### (Sector L) Inspect finally stabilized landfill areas at least once a month

By the end of each month.

Where landfill areas have been finally stabilized and land application has been completed, inspections are at least once every month.

- **Only if:** your permit sector is L; landfill areas are finally stabilized or land application is complete.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.12.4, page 71**

> "inspections will be conducted at least once every month."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=80)

#### (Sector O) Monthly inspection of coal, ash, fuel and storage areas

By the end of each month.

A qualified person inspects each month: coal handling areas, loading and unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas, areas next to disposal ponds and landfills, maintenance areas, liquid storage tanks, and long-term and short-term material storage areas. Keep the inspection records on site for at least 3 years.

- **Only if:** your permit sector is O.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.15.3, page 84**

> "qualified person shall be identified to inspect the following areas on a monthly basis:"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=93)

#### (Sector Q) Clean blasting debris and paint chips from stormwater conveyances at least monthly

By the end of each month.

Water transportation facilities clean stormwater conveyances of deposits of abrasive blasting debris and paint chips at least once per month.

- **Only if:** your permit sector is Q.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.17.1.2, page 89**

> "At least once per month, the permittee must clean stormwater conveyances of deposits of abrasive blasting debris and paint chips."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=98)

#### (Sector M) Inspect fluid-bearing equipment and outdoor fluid storage at least quarterly

By the end of each calendar quarter.

Automobile salvage yards inspect at least quarterly: equipment containing oily parts, hydraulic fluids or other fluids; outdoor storage of fluids such as brake fluid, transmission fluid, radiator water and antifreeze; and all outdoor liquid storage containers. Vehicles are inspected for leaks on arrival or as soon as feasible.

- **Only if:** your permit sector is M.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 9.13.2. Check your copy of the permit.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.13.2, page 74**

> "The following facility areas must be inspected at least quarterly:"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=83)

#### Annual benchmark monitoring for the sector's pollutants

By December 31 each year.

If the facility's sector table says sampling is required, collect at least one grab sample a year from each outfall during a measurable storm event, have it analyzed for the pollutants in the sector's benchmark table, and report the results in NetDMR. A result above a benchmark starts the corrective actions in tn-tmsp.exceedance-corrective-actions.

- **Only if:** your permit sector is A, H, M, N, Q, AA, AB, AD, AF, or your permit sector is B and your SIC code starts with 2631, or your permit sector is C and your SIC code starts with 2812, 2813, 2816, 2819, 2821, 2822, 2823, 2824, 2841, 2842, 2843, 2844, 2873, 2875, 2879, or your permit sector is D and your SIC code starts with 2951, 2952, or your permit sector is E and your SIC code starts with 3211, 3221, 3229, 3231, 3241, 325, 326, 3271, 3272, 3274, 3275, 3281, 329, or your permit sector is F and your SIC code starts with 3312, 3313, 3315, 3316, 3317, 332, 335, 336, or your SIC code starts with 2911, or your permit sector is J and your SIC code starts with 1411, 142, 1442, 1455, 1459, 147, 1481, 1499, or your discharge is not subject to federal effluent limitation guidelines (ELGs) and your permit sector is K, L, or your permit sector is U and your SIC code starts with 204, 207, or your permit sector is Y and your SIC code starts with 301, 302, 305, 306.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 5.1.8, page 25**

> "The effective date of coverage may not align with the calendar year, but the monitoring and reporting requirements in the TMSP are based on the calendar year."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=34)

#### Annual monitoring for discharges with numeric effluent limits

By December 31 each year.

Facilities with a discharge subject to a numeric effluent limit in their sector (or the coal pile runoff limit) sample it once a year and report the results in NetDMR. Every outfall with a limit is sampled: the substantially identical outfall allowance does not apply.

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs).

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 5.1.12, page 26**

> "Annual effluent limitations guidelines (ELG) monitoring;"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=35)

#### Quarterly monitoring for pollutants of concern in discharges to impaired waters

By the end of each calendar quarter.

Existing facilities that discharge to waters with unavailable parameters (impaired waters) sample each outfall where the pollutant of concern is expected, once a quarter, and report in NetDMR. No waiver elsewhere in the permit applies to this monitoring.

- **Only if:** your stormwater reaches an impaired water body.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 1.3.2. Check your copy of the permit.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 1.3.2, page 3**

> "Monitoring frequency for pollutants of concern is quarterly."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=12)

#### Submit the annual Discharge Monitoring Report in NetDMR by March 31

By March 31, for the calendar year before.

Report each calendar year's stormwater monitoring results, with any supporting laboratory data, in NetDMR no later than March 31 of the following year.

- **Only if:** your permit sector is A, H, M, N, Q, AA, AB, AD, AF, or your permit sector is B and your SIC code starts with 2631, or your permit sector is C and your SIC code starts with 2812, 2813, 2816, 2819, 2821, 2822, 2823, 2824, 2841, 2842, 2843, 2844, 2873, 2875, 2879, or your permit sector is D and your SIC code starts with 2951, 2952, or your permit sector is E and your SIC code starts with 3211, 3221, 3229, 3231, 3241, 325, 326, 3271, 3272, 3274, 3275, 3281, 329, or your permit sector is F and your SIC code starts with 3312, 3313, 3315, 3316, 3317, 332, 335, 336, or your SIC code starts with 2911, or your permit sector is J and your SIC code starts with 1411, 142, 1442, 1455, 1459, 147, 1481, 1499, or your discharge is not subject to federal effluent limitation guidelines (ELGs) and your permit sector is K, L, or your permit sector is U and your SIC code starts with 204, 207, or your permit sector is Y and your SIC code starts with 301, 302, 305, 306, or your discharge is subject to federal effluent limitation guidelines (ELGs), or your stormwater reaches an impaired water body.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 7.1.1, page 32**

> "submitted electronically using NetDMR, no later than the March 31 of the calendar year following the end of the annual monitoring period."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=41)

#### (Sector A) Benchmark values and effluent limits for timber products

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Tables A-2 to A-5, and the effluent limits for wet decking discharges at log storage and handling areas.

- **Only if:** your permit sector is A.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.1.2 Table A-1, page 44**

> "Table A-1: Numeric Effluent Limitations"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=53)

#### (Sector AA) Benchmark values for fabricated metal products

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for every Sector AA code.

- **Only if:** your permit sector is AA.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.27.2.1 Table AA-1, page 119**

> "Table AA-1: Fabricated Metal Products"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=128)

#### (Sector AB) Benchmark value for transportation equipment and industrial or commercial machinery

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentration for every Sector AB code.

- **Only if:** your permit sector is AB.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.28.1.1 Table AB-1, page 121**

> "Table AB-1: Transportation Equipment, Industrial or Commercial Machinery"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=130)

#### (Sector AD) Benchmark values for discharges designated by the Director

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for facilities the Director designates as needing a permit with monitoring.

- **Only if:** your permit sector is AD.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.30.1.1 Table AD-1, page 124**

> "Table AD-1: Designated as Requiring Permit Coverage with Monitoring"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=133)

#### (Sector AF) Benchmark value for borrow pits, soil harvesting sites and spoil piles

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentration for Sector AF.

- **Only if:** your permit sector is AF.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.32.4.1 Table AF-1, page 130**

> "Table AF-1: Borrow Pits, Soil Harvesting Sites And Spoil Piles"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=139)

#### (Sector AF) Inspect all erosion controls every 7 calendar days

No set date. At least once every 7 calendar days. You choose the days.

At borrow pits, soil harvesting sites and spoil piles, the SWPPP must provide for inspecting every erosion control on the site at least once every 7 calendar days.

- **Only if:** your permit sector is AF.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.32.2.1, page 127**

> "Procedures in a plan shall provide that all erosion controls on the site are inspected at least once every 7 calendar days."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=136)

#### (Sector AF) Start vegetative practices within 14 calendar days of finishing an at-grade area

Within 14 days after the at-grade area is finished.

At borrow pits, soil harvesting sites and spoil piles, start appropriate vegetative practices (such as seeding, mulching or sod) on every completed at-grade area within 14 calendar days of its completion.

- **Only if:** your permit sector is AF; the at-grade area is finished.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.32.2.1, page 127**

> "The operator shall initiate appropriate vegetative practices on all completed at-grade areas within 14 calendar days of completion."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=136)

#### (Sector B) Benchmark value for paperboard mills

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentration for paperboard mills (SIC 2631). Other Sector B codes have no sampling.

- **Only if:** your permit sector is B.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.2.2.1 Table B-1, page 46**

> "Table B-1: Paperboard Mills"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=55)

#### (Sector C) Benchmark values and effluent limits for chemical and allied products

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Tables C-2 to C-5, and the effluent limits for the phosphate subcategory of fertilizer manufacturing (SIC 2874).

- **Only if:** your permit sector is C.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.3.1 Table C-1, page 48**

> "Table C-1: Numeric Effluent Limitations"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=57)

#### (Sector D) Benchmark value and effluent limits for asphalt paving and roofing materials

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentration for SIC 2951 and 2952, and the effluent limits for areas where asphalt paving and roofing emulsions are produced (SIC 2951).

- **Only if:** your permit sector is D.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.4.2 Table D-1, page 51**

> "This table applies only to discharges from areas where production of asphalt paving and roofing emulsions occurs."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=60)

#### (Sector E) Benchmark value and effluent limits for glass, clay, cement, concrete and gypsum products

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentration for the Table E-2 codes, and the Table E-1 effluent limits the permit assigns to SIC 3273.

- **Only if:** your permit sector is E.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.5.1 Table E-1, page 53**

> "dischargers from Cement Manufacturing Facility, Material Storage Runoff (SIC"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=62)

#### (Sector F) Benchmark values for primary metals

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Tables F-1 to F-4.

- **Only if:** your permit sector is F.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.6.2 Tables F-1 to F-4, page 55**

> "Table F-1: Steel Works, Blast Furnaces, and Rolling and Finishing Mills"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=64)

#### (Sector H) Benchmark value for inactive coal mines and coal mining-related facilities

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentration for SIC 1221, 1222, 1231 and 1241.

- **Only if:** your permit sector is H.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.8.4.1 Table H-1, page 59**

> "Table H-1: Inactive Coal Mining Facilities"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=68)

#### (Sector I) Benchmark values for oil refining

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for oil refining (SIC 2911). The other Sector I codes have no sampling.

- **Only if:** your SIC code starts with 2911.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.9.3.1 Table I-1, page 61**

> "Table I-1: Oil Refining Facilities"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=70)

#### (Sector J) Benchmark value and effluent limits for sand, gravel and stone mining

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentration for Table J-3, and the effluent limits for industrial sand (SIC 1446) and for crushed stone and construction sand and gravel (SIC 1422, 1423, 1429, 1442).

- **Only if:** your permit sector is J.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.10.1.1 Table J-1, page 62**

> "Table J-1: Numeric Effluent Limits for Industrial Sand Mining Facilities"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=71)

#### (Sector K) Benchmark values and effluent limits for hazardous waste treatment, storage or disposal

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Effluent limits for hazardous waste landfills subject to 40 CFR Part 445 Subpart A (Table K-1), and benchmark concentrations for the other facilities (Table K-2).

- **Only if:** your permit sector is K.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.11.4 Table K-1, page 67**

> "Table K-1: Numeric Effluent Limitations"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=76)

#### (Sector L) Benchmark value and effluent limits for landfills, land application sites and open dumps

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Effluent limits for landfills subject to 40 CFR Part 445 Subpart B (Table L-1), and the benchmark concentration for the other facilities (Table L-2).

- **Only if:** your permit sector is L.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.12.5 and 9.12.6.1 Tables L-1 and L-2, page 73**

> "Table L-2: Facilities not Subject to Numeric Limitations in Table L-1"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=82)

#### (Sector L) Inspect operating landfills, land application sites and open dumps every 7 days

No set date. At least once every 7 days while the site operates. You choose the days.

A qualified person inspects operating landfills, land application sites and open dumps at least once every 7 days: areas not yet finally stabilized, active land application areas, exposed material and waste storage areas, stabilization and structural controls, leachate collection and treatment systems, and truck entrances and exits.

- **Only if:** your permit sector is L.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.12.4, page 71**

> "For operating landfills, land application sites and open dumps, inspections shall be conducted at least once every 7 days."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=80)

#### (Sector M) Benchmark values for automobile salvage yards

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for SIC 5015.

- **Only if:** your permit sector is M.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.13.3.1 Table M-1, page 75**

> "Table M-1: Automobile Salvage Yards"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=84)

#### (Sector N) Benchmark values for scrap recycling and waste recycling

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for SIC 5093.

- **Only if:** your permit sector is N.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.14.4.1 Table N-1, page 80**

> "Table N-1: Scrap Recycling and Waste Recycling"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=89)

#### (Sector N) Sample for PCBs within 30 days of a TSS result above 100 mg/L

Within 30 days after you receive the TSS sampling results.

Scrap and waste metal recycling facilities sample for total PCBs within 30 days of receiving a total suspended solids result above the 100 mg/L benchmark, and report the result.

- **Only if:** your permit sector is N; a TSS result is above 100 mg/L.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.14.4.1 Table N-1 footnote, page 81**

> "if concentration of TSS exceeds the benchmark of 100 mg/L, PCB sampling must be conducted within 30 days of receiving the TSS sampling results."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=90)

#### (Sector O) Effluent limits for coal storage pile discharges at steam electric generating facilities

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Effluent limits for discharges from coal storage piles at steam electric generating facilities (SIC 4911). Sector O has no benchmark table.

- **Only if:** your permit sector is O.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.15.4 Table O-1, page 85**

> "The following pollutants of concern shall be monitored at least annually:"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=94)

#### (Sector Q) Benchmark values for water transportation

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for the Sector Q codes.

- **Only if:** your permit sector is Q.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.17.2.1 Table Q-1, page 91**

> "Table Q-1: Water Transportation"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=100)

#### (Sector S) Benchmark values and the ammonia limit for air transportation

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for airports above the deicing chemical thresholds (Table S-2), and the ammonia effluent limit for primary airports that do not certify that they use no urea pavement deicers (Table S-1).

- **Only if:** your permit sector is S.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.19.3 Table S-1, page 99**

> "Table S-1: Numeric Effluent Limitations"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=108)

#### (Sector U) Benchmark values for grain mill and fats and oils products

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for grain mill products (SIC 2041-2048) and fats and oils products (SIC 2074-2079). Other Sector U codes have no sampling.

- **Only if:** your permit sector is U.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.21.3 Tables U-1 and U-2, page 103**

> "Table U-1: Grain Mill Products"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=112)

#### (Sector Y) Benchmark value for rubber products manufacturing

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentration for SIC 3011, 3021, 3052, 3053, 3061 and 3069. Other Sector Y codes have no sampling.

- **Only if:** your permit sector is Y.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.25.2.1 Table Y-1, page 114**

> "Table Y-1: Rubber Products Manufacturing"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=123)

### Where the permit is unclear  2 duties

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

#### (Sector S) Large deicing airports: benchmark monitoring for BOD, COD, ammonia and pH during the deicing season

No set date. Section 9.19.2.9 refers to "the four required benchmark monitoring event results" during the deicing season, while Part 5 requires annual sampling. Do airports above the deicing thresholds owe four samples each deicing season or one sample a year, and is the period the deicing season or the calendar year?

Airports where one permittee or a group of permitted facilities uses more than 100,000 gallons of pure glycol in glycol-based deicing fluids, or 100 tons or more of urea, on an average annual basis monitor BOD5, COD, ammonia and pH at the outfalls that collect stormwater from deicing areas, during the deicing season they define.

- **Only if:** your permit sector is S; the airport uses deicing chemicals above the permit's thresholds.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.19.2.9, page 98**

> "the deicing season identified is the timeframe during which the permittee must obtain the four required benchmark monitoring event results for deicing-related parameters, i.e., BOD, COD, ammonia and pH."

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=107)

#### (Sector S) Primary airports: certify each year that no urea pavement deicers are used, or meet the ammonia limit

No set date. Section 9.19.3.1 has primary airports "certify annually on the annual report" that no urea pavement deicers are used, but the permit has no annual report. Where and by what date is the certification filed (with the NetDMR report due March 31, in MyTDEC Forms, or kept with the SWPPP)?

Primary airports with 1,000 or more annual non-propeller aircraft departures that discharge stormwater from airfield pavement deicing may not discharge pavement deicers containing urea. They either certify each year that none are used, or meet the ammonia limit in Table S-1.

- **Only if:** your permit sector is S; the facility is a primary airport with 1,000 or more non-propeller departures a year.

- You file it in the agency's system (not stated in the permit).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 9.19.3.1, page 99**

> "certify annually on the annual report that pavement deicers containing urea are not used; or"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=108)

## What does no-exposure certification require?

No Exposure Certification: all industrial materials and activities are protected by a storm-resistant shelter, for the whole facility. The certification is submitted again every five years from the first submittal.

### Every few years  1 duty

#### No Exposure facilities: submit the certification again every five years

Within 5 years after your last no exposure certification.

A facility excluded from permitting because no industrial materials or activities are exposed to stormwater submits the No Exposure Certification form in MyTDEC Forms again every five years, counted from the date of its first submittal, for as long as it still qualifies.

- You file it in the agency's system (MyTDEC Forms).
- Signed or certified by a responsible official or duly authorized representative.

**Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 2.2.2, page 8**

> "No exposure certification form, if still applicable, shall be submitted once every five years"

[Open the permit at this section](https://dataviewers.tdec.tn.gov/dataviewers/BGWPC.GET_WPC_DOCUMENTS?p_file=456824553124174057#page=17)

## Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

## Tennessee Multi-Sector General Permit (TMSP) duties, topic by topic

How the Tennessee Multi-Sector General Permit (TMSP) compares with the other checked permits on each kind of duty, in the permit's own words with the section for each:

- [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements#permit-us-tn-tmsp)
- [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements#permit-us-tn-tmsp)
- [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates#permit-us-tn-tmsp)
- [No-exposure certification](https://stormdue.com/guides/no-exposure-certification#permit-us-tn-tmsp)
- [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements#permit-us-tn-tmsp)

- [Every state's permit](https://stormdue.com/states)
- [How we check permit rules](https://stormdue.com/about-the-rules)
- [Deadline calculator](https://stormdue.com/tools/deadline-calculator)
- [Benchmark comparison](https://stormdue.com/tools/benchmark-comparison)
- [More free tools](https://stormdue.com/tools)
- [Duties compared across permits](https://stormdue.com/guides)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.
