# Texas MSGP Due Dates and Duties

> Every recurring duty in the Texas MSGP with its due date rule and permit section, checked November 25, 2026. Get your own dates free.

Canonical page: https://stormdue.com/permits/us-tx-txr050000

[States](https://stormdue.com/states) / [Texas](https://stormdue.com/states/tx)

# Texas MSGP due dates and duties

The TPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (TXR050000) sets 36 duties below, each with when it is due and the permit section it comes from. Rules last checked November 25, 2026.

[Get my permit calendar](https://stormdue.com/lookup?state=TX)

Free, no account. Each date comes with the permit section and the permit's own words.

Next: choose your coverage and answer a few questions. You get your next due dates and a calendar file.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

- **Permit number**
  TXR050000
- **Agency**
  [Texas Commission on Environmental Quality (TCEQ)](https://www.tceq.texas.gov/permitting/stormwater/industrial)
- **Effective**
  August 14, 2026
- **Expires**
  August 14, 2031
- **Where you file**
  [STEERS / ePermits (NOI, NEC, NOC, NOT, delegation of signatory)](https://www3.tceq.texas.gov/steers/) ; [NetDMR (benchmark, hazardous-metal exceedances, ELG and impaired-water results)](https://npdes-ereporting.epa.gov/net-netdmr/action/login)
- **Official page**
  [tceq.texas.gov](https://www.tceq.texas.gov/permitting/stormwater/industrial)
- **Rules last checked**
  November 25, 2026 (version 2026-11-25.2 )

**Notes on the permit's status and renewal**

Issued July 22, 2026 and effective August 14, 2026 (TCEQ extension letter of October 28, 2026). Existing permittees under the 2021 MSGP had to renew by the 90th day (November 12, 2026); the Executive Director extended the renewal deadline to Monday, December 28, 2026 because of a STEERS outage. TCEQ's industrial stormwater page (read 2026-11-25) still shows December 28, 2026 and no later notice. Expiration is not settled by a readable source: the permit says only "an effective term not to exceed five (5) years" (II.C.11); the fact sheet (July 10, 2026, p.3) proposed August 14, 2031 "retaining the current expiration date", which conflicts with its own p.17 (the 2021 permit expires August 14, 2026); the Response to Comments (p.1) says five years "from the date it is issued" (July 22, 2026). The cover page is an image and could not be read. August 14, 2031 is kept as the working value (open question q1).

## What does full permit coverage require?

- Every week 1
- Every quarter 3
- Every year 5
- When something happens 21
- Ongoing 2
- Only if... 3

### Every week  1 duty

#### Check and log the rain gauge weekly (daily during storms)

Keep an on-site rain gauge or use a representative weather station; check it at least weekly and daily during storms, recording date and rainfall (zero if none). May pause for a period once that period's sampling and observations are done.

By the end of each week.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.D.1(c) , page 61](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=61)

> "must be monitored a minimum of once per week, and once per day during storm events."

### Every quarter  3 duties

#### Quarterly visual examination of each outfall's discharge

Each quarter during operating hours, collect a sample from each outfall in a clear container (within the first 30 minutes of discharge where practicable, and within the first hour) and record color, clarity, solids, foam, oil sheen, odor and other signs; the team reviews results and updates the SWP3.

By the end of each calendar quarter.

- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.B.3 , page 52](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=52)

> "Stormwater discharges from each outfall authorized by this general permit must be visually examined on a quarterly basis."

#### Routine facility inspection every quarter (monthly for Sector E)

Qualified personnel with at least one pollution prevention team member inspect the controls each quarter (one per calendar year during a discharge, if feasible) using a checklist; sign and keep on site. Some sectors must inspect monthly or weekly (Part V).

By the end of each calendar quarter.

- **Does not apply if:** the facility is inactive and unstaffed.
- If your permit sector is E: By the end of each month.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.B.2(a) , page 51](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=51)

> "Inspections must be conducted at least once per quarter unless otherwise specified in Part V of this permit."

#### Update the SWP3 list of spills and leaks every quarter

Each quarter, update the SWP3 list of spills and leaks: reportable quantity spills plus all other spills and leaks that could add pollutants to stormwater (the list may be limited to the previous five years).

By the end of each calendar quarter.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.A.3(e) , page 44](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=44)

> "The list must be updated on a quarterly basis and must include all additional spills and leaks that could contribute pollutants to stormwater discharges"

### Every year  5 duties

#### Annual Comprehensive Site Compliance Inspection

At least once each permit year, qualified staff (including a pollution prevention team member) inspect exposed-material areas, controls, spill areas from the last 3 years, downstream of each outfall, tracking and dust, and review the past year's monitoring.

No set date. III.B.5(a) requires the inspection "at least once each permit year" but "permit year" is not defined, and III.D.3(c) says annual inspections "must be conducted before December 31st of each calendar year". TCEQ to say which period applies and when it starts for a renewal NOI.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.B.5(a) , page 54](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=54)

> "The comprehensive site compliance inspection must be conducted at least once each permit year by one or more qualified employees or designated representatives"

#### Annual hazardous-metals sample (unless waived)

Collect one grab sample per year at the final outfall (or designated sampling point) for the 12 Table 1 metals not waived, before December 31. Keep the DMR on site by March 31. Exceedances of the daily maximum limits are violations and must be filed in NetDMR by March 31.

No set date. Is "prior to December 31" (III.C.1(b)(1)) meant to exclude December 31 itself?

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.C.1 , page 56](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=56)

> "All permittees are required to monitor for hazardous metals, unless they qualify for a waiver as described in item (c) below."

#### Employee stormwater training at least once a year

Train all employees responsible for SWP3 activities at least once per year on material handling, spill prevention and response, and SWP3 goals; keep training records and attendance lists in the SWP3.

No set date. "Training must be conducted at least once per year" (III.A.4(g)(1)): TCEQ to confirm whether this means once each calendar year or no more than 12 months between sessions.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.A.4(g)(1) , page 48](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=48)

> "Training must be conducted at least once per year and records of training activities and attendance lists must be maintained in the SWP3"

#### Pay the $200 annual water quality fee

Facilities covered by an NOI pay a $200 annual water quality fee (Texas Water Code 26.0291; 30 TAC Chapter 205). NEC and automatically authorized facilities pay none.

No set date. Billed by TCEQ; an invoice is sent if coverage is active on September 1. The invoice due date is not stated in the permit.

- You send it to the agency (TCEQ invoice).

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.10(b) , page 38](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=38)

> "A facility authorized under this general permit and required to submit an NOI must pay an annual water quality fee of $200.00"

#### Update the summary of all lab results once a year

Keep a summary of all laboratory results for stormwater samples, updated once a year to add new results, attached to or referenced in the SWP3 and available on request.

No set date. "Updated on an annual basis"; no date stated.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.A.3(f) , page 44](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=44)

> "All data from the laboratory analyses of stormwater discharge samples must be summarized. The summary must be updated on an annual basis to include the results of all additional analyses."

### When something happens  21 duties

#### Update stormwater treatment waste records monthly

Facilities that remove sludge or other waste from a stormwater treatment process keep records (volumes generated and disposed, dates, hauler, disposal site and method), update them every month and keep them five years.

By the end of each month.

- **When:** stormwater treatment waste generated.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.7(a)(5) , page 73](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=73)

> "The above records must be updated on a monthly basis. The records must be retained at the facility or must be readily available for review by authorized representatives of TCEQ for at least five years."

#### Renew coverage under the 2026 permit by December 28, 2026

Existing permittees submit a renewal NOI (INOI-R) or renewal NEC (INEC-R) in STEERS/ePermits with the $100 electronic application fee. Coverage of facilities that do not renew expires.

By December 28, 2026.

- **When:** covered under 2021 permit.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [MSGP TXR050000 Renewal Deadline Extension (letter, October 28, 2026) , section letter body , page 1](https://www.tceq.texas.gov/downloads/permitting/wastewater/general/msgp-txr050000-renewal-deadline-extension-10282026.pdf)

> "The Executive Director agrees and, therefore, grants the request for extension of the MSGP renewal deadline. The deadline is extended until Monday, December 28, 2026."

#### Report hazardous-metal limit exceedances in NetDMR by March 31

Submit results that exceed a Table 1 limit in NetDMR by March 31 following the annual monitoring period; also report exceedances over 40% in writing within 5 working days (see tx-msgp.noncompliance-24h).

By March 31, for the calendar year before.

- **When:** hazardous metal limit exceeded.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.C.1(b)(4) , page 58](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=58)

> "Results that exceed one or more of the numeric limitations listed above in Table 1, must be reported by March 31 following the annual monitoring period in which the violation(s) occurred."

#### Report other noncompliance found in the annual inspection by March 31

Report noncompliance identified in the annual comprehensive inspection to TCEQ by March 31 after the calendar year, e.g. by sending the annual inspection report or a narrative.

By March 31, for the calendar year before.

- **When:** noncompliance found in annual inspection.

- You send it to the agency (TCEQ Enforcement Division (MC-224) or reporting form if provided).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.6(b)(3) , page 71](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=71)

> "must be reported to TCEQ by March 31 following the calendar year in which the non-compliance(s) occurred."

#### Submit benchmark results in NetDMR before March 31

Report the average yearly result per pollutant per SIC code for the previous calendar year's benchmark samples in NetDMR before March 31 (not required for waived years three and four). The first report is for 2027 samples.

Before March 31 (the permit says "before", so by the day before), for the calendar year before.

- **When:** sector has part v benchmarks.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section IV.B.2(a) , page 76](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=76)

> "Results of analyses for sampling during benchmark monitoring years one through four, must be submitted to TCEQ before March 31 of each year following sample collection."

#### Benchmark sampling once every six months (2027 through 2030)

Sectors with Part V benchmarks sample once in each January-June and July-December period for four years; no sampling in the 2026 renewal year. Waiver for years three and four by NOC if the first two years' annual averages are all below benchmarks.

No set date. IV.B.1(b) limits benchmark sampling to "up to a total of four (4) years, or eight (8) semiannual monitoring periods", but IV.B.1(a) says it continues "during the remaining permit term". TCEQ to confirm whether a renewing facility samples 2027-2030 only or also January-June 2031.

- **When:** sector has part v benchmarks.
- **Does not apply if:** the facility is inactive and unstaffed.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: [2026 Multi-Sector General Permit TXR050000 , section IV.B.1 , page 75](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=75)

> "Benchmark monitoring must be conducted once every six months for four (4) years following permit issuance."

#### Complete a new hazardous-metals waiver form before the first sample of this permit term

A facility claiming a waiver from hazardous-metals monitoring (metal not used, never exposed, or not detected at the MAL) completes a new TCEQ certification form during each permit term, before the first sampling event it wants to waive, keeps it on site and names the criteria in the SWP3.

Before first hazardous metals sampling event of permit term.

- **When:** claiming hazardous metals waiver.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.C.1(c) , page 58](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=58)

> "A new form must be completed during each permit term, no later than prior to the first sampling event that the permittee is seeking to waive."

#### Evaluate and certify non-stormwater discharges within 180 days of the NOI

Survey potential non-stormwater sources, test or inspect the storm sewer system (for example dry-weather screening), eliminate unpermitted flows, update the SWP3 and sign a certification within 180 days after filing the NOI or renewal NOI.

Within 180 days after noi filing date.

- **When:** noi or renewal noi filed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.B.1(b)-(c) , page 50](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=50)

> "Within 180 days of filing an NOI for coverage (or a renewal NOI) the permittee shall conduct a survey of potential non-stormwater sources and shall provide the certification required"

#### File a Delegation of Signatory form when signing authority is delegated or changes

If an authorized representative delegates signatory authority for reports, submit a Delegation of Signatory form in STEERS, keep a copy in the SWP3, and submit a new form whenever the delegation moves to another person or position.

No set date. No deadline stated; the delegation must be on file before a delegate signs reports (30 TAC 305.128).

- **When:** signatory delegation made or changed.

- You file it in the agency's system (STEERS).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.6(f) , page 36](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=36)

> "A new Delegation of Signatory form must be submitted if the delegation changes to another individual or position."

#### File a Notice of Change within 14 days

Submit an NOC in STEERS within 14 days after discovering that NOI/NEC information changed, relevant facts were omitted, or incorrect information was submitted; send a copy to the MS4 operator and list the MS4 operators receiving copies in the SWP3.

Within 14 days after discovery of change.

- **When:** noi information changed.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.6(a) , page 35](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=35)

> "then correct information must be provided to the executive director in a notice of change (NOC) within 14 days after discovery:"

#### File an NOI (or NEC) before starting regulated industrial activity

Submit an NOI or NEC in STEERS with the $100 fee and a completed SWP3 before industrial activity begins (unless automatically authorized).

Before start of industrial activity.

- **When:** new facility.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.3(b) , page 34](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=34)

> "An NOI or NEC must be submitted prior to commencement of industrial activity that is regulated under this general permit"

#### Give advance notice of planned changes that may cause noncompliance

Notify the TCEQ Executive Director in advance of any planned change in the facility or activity that may result in noncompliance with the permit.

No set date. "Advance notice"; no number of days stated.

- **When:** planned change may cause noncompliance.

- You send it to the agency (TCEQ Executive Director (address not stated in III.E.2(d))).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.2(d) , page 68](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=68)

> "The permittee shall give advance notice to the executive director of any planned changes in the permitted facility or activity that may result in non-compliance with permit requirements."

#### Investigate each benchmark exceedance within 90 days

The pollution prevention team investigates the cause of each exceedance (spills, housekeeping, additional BMPs with a schedule, other SWP3 changes) and documents it in the SWP3 within 90 days of the sampling event.

Within 90 days after sampling event date.

- **When:** benchmark exceedance.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by your pollution prevention team.

Source: [2026 Multi-Sector General Permit TXR050000 , section IV.A.3 , page 74](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=74)

> "The Pollution Prevention Team must investigate the cause for each exceedance and must document the results of this investigation in the SWP3 within 90 days following the sampling event."

#### New operator files NOI and old operator files NOT at least 10 days before the change

Coverage is not transferable. The new operator submits an NOI or NEC and the previous operator submits a NOT at least ten days before the operator changes.

At least 10 days before change of operator date.

- **When:** change of operator.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.3(c) , page 34](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=34)

> "the new operator must submit an NOI or NEC, and the previous operator must submit an NOT, at least ten days before the change in operator occurs"

#### Notify by NOC when going inactive, and 48 hours before restarting

Facilities claiming inactive status submit an NOC; monitoring and inspections are waived while inactive; submit an NOC at least 48 hours before resuming industrial activity.

At least 2 days before planned restart.

- **When:** resuming from inactive status.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.D.4(b) , page 65](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=65)

> "Inactive facilities must notify the executive director by submitting an NOC according to Part II, Section C.6 at least 48 hours before commencing industrial activities and transferring to active status."

#### Notify TCEQ 90 days before closing a stormwater solid waste management unit

Facilities using a detention, retention or similar pond to treat stormwater (a solid waste management unit) give written notice to TCEQ's Corrective Action Section (MC-127) at least 90 days before any closure activity for that unit.

At least 90 days before planned closure start.

- **When:** stormwater swmu closure planned.

- You send it to the agency (TCEQ Remediation Division, Corrective Action Section (MC-127)).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.7(a)(3) , page 72](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=72)

> "informing the Commission of any closure activity involving a Solid Waste Management Unit, at least 90 days prior to conducting such an activity."

#### Report endangering noncompliance within 24 hours; large exceedances within 5 working days

Report noncompliance that may endanger health, safety or the environment to the TCEQ regional office orally or by fax within 24 hours, and in writing to the region and the Enforcement Division within five working days. Exceedances of a permit limit by more than 40% must be reported in writing within five working days.

Within 1 day after awareness of noncompliance.

- **When:** noncompliance endangering or limit exceeded by 40pct.
- If limit exceeded by more than 40pct: Within 5 working days after awareness of noncompliance.

- You send it to the agency (TCEQ regional office and Enforcement Division (MC-224)).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.6(b)(1)-(2) , page 71](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=71)

> "Report of such information must be provided orally or by electronic facsimile transmission (fax) to the appropriate TCEQ regional office within 24 hours of becoming aware of the non-compliance."

#### Send copies of NOI, NEC, NOC and NOT to the MS4 operator

Facilities discharging to any MS4 give the MS4 operator a copy of each completed NOI, NEC, NOC and NOT.

No set date. No deadline stated; send with each filing.

- **When:** discharges to ms4.

- You send a copy to the operator of your storm sewer system (MS4).
- Keep the records 3 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.9 , page 38](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=38)

> "Industrial facilities that contribute stormwater discharges to any MS4 must provide a copy of the completed NOI, NEC, NOC, and NOT to the operator of the system"

#### Terminate coverage within 10 days after discharges cease

Submit a NOT in STEERS within 10 days after the facility stops discharging industrial stormwater at the location, or within 10 days after obtaining an individual or alternative permit; also when switching between NOI and NEC (NOI first if becoming exposed). Copy the MS4.

Within 10 days after date discharges ceased.

- **When:** termination condition met.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.7(a) , page 37](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=37)

> "An NOT must be submitted within 10 days after the facility ceases discharging stormwater associated with industrial activity."

#### Update the exposed-materials inventory and narrative within 30 days of a significant change

Update the SWP3 inventory of exposed materials, and the narrative description of pollutant sources, within 30 days after a significant change in the materials exposed to precipitation or in how they are managed.

Within 30 days after date of significant change.

- **When:** significant change in exposed materials.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.A.3(a)-(b) , page 42](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=42)

> "The inventory must be updated within 30 days following a significant change in the types of materials that are exposed to precipitation or runoff"

#### Write the annual inspection report within 30 days

Prepare a signed report within 30 days of the annual inspection (personnel, dates, findings, control observations, SWP3 revisions, noncompliance or a compliance certification). Complete remedies for noncompliance and revise and implement the SWP3 within 12 weeks of the report.

Within 30 days after annual inspection date.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.B.5(b)-(c) , page 55](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=55)

> "Within 30 days of performing the annual site compliance inspection, the permittee shall prepare a report that includes a narrative discussion of compliance with the current SWP3."

### Ongoing  2 duties

#### Keep records three years

Keep monitoring and reporting records, all other required records and application data for three years from the record date; keep prior SWP3 versions (or a revision log) for three years; keep the SWP3 one year after coverage ends.

Ongoing, no set date.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.D.5 , page 65](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=65)

> "for a period of three (3) years from the date of the record or sample, measurement, report, application, or certification."

#### Keep the SWP3 current, dated and available

Develop and implement the SWP3 before the NOI, keep it at the site or readily available, modify it as often as necessary, date every revision, and keep prior versions (or a revision log) for three years.

Ongoing, no set date.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.A.6 , page 49](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=49)

> "The SWP3 must be modified by the permittee as often as necessary. Each revision must be dated, and all revisions must be retained according to Part III, Section D.5."

### Only if...  3 duties

These apply only in the situation named on each one. Answer the questions to sort them.

#### Sweep cement, aggregate and dust areas at least weekly (Sector E)

Sector E facilities sweep, or use an equivalent control, at least once a week where cement, aggregate, kiln dust, fly ash or settled dust are handled or processed.

By the end of each week.

- **Only if:** your permit sector is E.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section V.E.3(c) , page 89](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=89)

> "Sweeping or an equivalent control measure must be performed at least once each week in areas where cement, aggregate, kiln dust, fly ash, or settled dust are being handled or processed."

#### Annual ELG monitoring and DMR by March 31

Facilities with Table 3 regulated discharges (wet log decks, phosphate fertilizer, asphalt emulsion, cement storage piles, mine dewatering, coal piles, airport urea deicing) sample before December 31 and submit results in NetDMR by March 31; a no-discharge DMR if no discharge.

By March 31, for the calendar year before.

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs).

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.C.2(b)(2) , page 61](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=61)

> "Monitoring must be conducted prior to December 31 for each annual monitoring period and the results must be submitted to TCEQ by March 31 of the following year"

#### Annual monitoring for the pollutant of concern in impaired waters

Outfalls discharging a pollutant of concern at a level of concern to an impaired water (II.B.8) are sampled once a year (E. coli/enterococci for bacteria, BOD5/COD for dissolved oxygen, phosphorus/nitrogen for nutrients, the listed metal) and reported in NetDMR by March 31. Stop for the rest of the term if below the level of concern or not detected.

By March 31, for the calendar year before.

- **Only if:** your stormwater reaches an impaired water body.

- You file it in the agency's system (NetDMR).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.B.4(e) , page 54](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=54)

> "The permittee shall report the results of sampling for this section to TCEQ by March 31 following the calendar year in which the samples were collected."

## What does no-exposure certification require?

Conditional no exposure exclusion; facility-wide only; no annual water quality fee.

### When something happens  12 duties

#### Update stormwater treatment waste records monthly

Facilities that remove sludge or other waste from a stormwater treatment process keep records (volumes generated and disposed, dates, hauler, disposal site and method), update them every month and keep them five years.

By the end of each month.

- **When:** stormwater treatment waste generated.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.7(a)(5) , page 73](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=73)

> "The above records must be updated on a monthly basis. The records must be retained at the facility or must be readily available for review by authorized representatives of TCEQ for at least five years."

#### Renew coverage under the 2026 permit by December 28, 2026

Existing permittees submit a renewal NOI (INOI-R) or renewal NEC (INEC-R) in STEERS/ePermits with the $100 electronic application fee. Coverage of facilities that do not renew expires.

By December 28, 2026.

- **When:** covered under 2021 permit.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [MSGP TXR050000 Renewal Deadline Extension (letter, October 28, 2026) , section letter body , page 1](https://www.tceq.texas.gov/downloads/permitting/wastewater/general/msgp-txr050000-renewal-deadline-extension-10282026.pdf)

> "The Executive Director agrees and, therefore, grants the request for extension of the MSGP renewal deadline. The deadline is extended until Monday, December 28, 2026."

#### File a Delegation of Signatory form when signing authority is delegated or changes

If an authorized representative delegates signatory authority for reports, submit a Delegation of Signatory form in STEERS, keep a copy in the SWP3, and submit a new form whenever the delegation moves to another person or position.

No set date. No deadline stated; the delegation must be on file before a delegate signs reports (30 TAC 305.128).

- **When:** signatory delegation made or changed.

- You file it in the agency's system (STEERS).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.6(f) , page 36](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=36)

> "A new Delegation of Signatory form must be submitted if the delegation changes to another individual or position."

#### File a Notice of Change within 14 days

Submit an NOC in STEERS within 14 days after discovering that NOI/NEC information changed, relevant facts were omitted, or incorrect information was submitted; send a copy to the MS4 operator and list the MS4 operators receiving copies in the SWP3.

Within 14 days after discovery of change.

- **When:** noi information changed.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.6(a) , page 35](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=35)

> "then correct information must be provided to the executive director in a notice of change (NOC) within 14 days after discovery:"

#### File an NOI (or NEC) before starting regulated industrial activity

Submit an NOI or NEC in STEERS with the $100 fee and a completed SWP3 before industrial activity begins (unless automatically authorized).

Before start of industrial activity.

- **When:** new facility.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.3(b) , page 34](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=34)

> "An NOI or NEC must be submitted prior to commencement of industrial activity that is regulated under this general permit"

#### Give advance notice of planned changes that may cause noncompliance

Notify the TCEQ Executive Director in advance of any planned change in the facility or activity that may result in noncompliance with the permit.

No set date. "Advance notice"; no number of days stated.

- **When:** planned change may cause noncompliance.

- You send it to the agency (TCEQ Executive Director (address not stated in III.E.2(d))).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.2(d) , page 68](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=68)

> "The permittee shall give advance notice to the executive director of any planned changes in the permitted facility or activity that may result in non-compliance with permit requirements."

#### New operator files NOI and old operator files NOT at least 10 days before the change

Coverage is not transferable. The new operator submits an NOI or NEC and the previous operator submits a NOT at least ten days before the operator changes.

At least 10 days before change of operator date.

- **When:** change of operator.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.3(c) , page 34](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=34)

> "the new operator must submit an NOI or NEC, and the previous operator must submit an NOT, at least ten days before the change in operator occurs"

#### Notify TCEQ 90 days before closing a stormwater solid waste management unit

Facilities using a detention, retention or similar pond to treat stormwater (a solid waste management unit) give written notice to TCEQ's Corrective Action Section (MC-127) at least 90 days before any closure activity for that unit.

At least 90 days before planned closure start.

- **When:** stormwater swmu closure planned.

- You send it to the agency (TCEQ Remediation Division, Corrective Action Section (MC-127)).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.7(a)(3) , page 72](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=72)

> "informing the Commission of any closure activity involving a Solid Waste Management Unit, at least 90 days prior to conducting such an activity."

#### Report endangering noncompliance within 24 hours; large exceedances within 5 working days

Report noncompliance that may endanger health, safety or the environment to the TCEQ regional office orally or by fax within 24 hours, and in writing to the region and the Enforcement Division within five working days. Exceedances of a permit limit by more than 40% must be reported in writing within five working days.

Within 1 day after awareness of noncompliance.

- **When:** noncompliance endangering or limit exceeded by 40pct.
- If limit exceeded by more than 40pct: Within 5 working days after awareness of noncompliance.

- You send it to the agency (TCEQ regional office and Enforcement Division (MC-224)).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.6(b)(1)-(2) , page 71](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=71)

> "Report of such information must be provided orally or by electronic facsimile transmission (fax) to the appropriate TCEQ regional office within 24 hours of becoming aware of the non-compliance."

#### Send copies of NOI, NEC, NOC and NOT to the MS4 operator

Facilities discharging to any MS4 give the MS4 operator a copy of each completed NOI, NEC, NOC and NOT.

No set date. No deadline stated; send with each filing.

- **When:** discharges to ms4.

- You send a copy to the operator of your storm sewer system (MS4).
- Keep the records 3 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.9 , page 38](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=38)

> "Industrial facilities that contribute stormwater discharges to any MS4 must provide a copy of the completed NOI, NEC, NOC, and NOT to the operator of the system"

#### Switch from no exposure to an NOI before anything becomes exposed

A facility under an NEC that will expose industrial materials or activities prepares a SWP3 and submits an NOI (or applies for an individual permit) before making the change, then submits a NOT to end the NEC.

Before date of change causing exposure.

- **When:** anticipated exposure.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.1(c)(2) , page 32](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=32)

> "shall prepare a SWP3 and submit an NOI to apply for coverage under the MSGP or shall apply for an individual water quality permit (as applicable) to discharge stormwater from the facility before making any changes"

#### Terminate coverage within 10 days after discharges cease

Submit a NOT in STEERS within 10 days after the facility stops discharging industrial stormwater at the location, or within 10 days after obtaining an individual or alternative permit; also when switching between NOI and NEC (NOI first if becoming exposed). Copy the MS4.

Within 10 days after date discharges ceased.

- **When:** termination condition met.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.7(a) , page 37](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=37)

> "An NOT must be submitted within 10 days after the facility ceases discharging stormwater associated with industrial activity."

## What does automatic authorization require?

Automatic authorization for certain industrial activities meeting II.B.14 conditions; no NOI, NEC or NOT.

### When something happens  9 duties

#### Update stormwater treatment waste records monthly

Facilities that remove sludge or other waste from a stormwater treatment process keep records (volumes generated and disposed, dates, hauler, disposal site and method), update them every month and keep them five years.

By the end of each month.

- **When:** stormwater treatment waste generated.

- Nothing is filed; keep the record at the facility.
- Keep the records 5 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.7(a)(5) , page 73](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=73)

> "The above records must be updated on a monthly basis. The records must be retained at the facility or must be readily available for review by authorized representatives of TCEQ for at least five years."

#### File a Delegation of Signatory form when signing authority is delegated or changes

If an authorized representative delegates signatory authority for reports, submit a Delegation of Signatory form in STEERS, keep a copy in the SWP3, and submit a new form whenever the delegation moves to another person or position.

No set date. No deadline stated; the delegation must be on file before a delegate signs reports (30 TAC 305.128).

- **When:** signatory delegation made or changed.

- You file it in the agency's system (STEERS).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.6(f) , page 36](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=36)

> "A new Delegation of Signatory form must be submitted if the delegation changes to another individual or position."

#### File an NOI (or NEC) before starting regulated industrial activity

Submit an NOI or NEC in STEERS with the $100 fee and a completed SWP3 before industrial activity begins (unless automatically authorized).

Before start of industrial activity.

- **When:** new facility.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.3(b) , page 34](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=34)

> "An NOI or NEC must be submitted prior to commencement of industrial activity that is regulated under this general permit"

#### Give advance notice of planned changes that may cause noncompliance

Notify the TCEQ Executive Director in advance of any planned change in the facility or activity that may result in noncompliance with the permit.

No set date. "Advance notice"; no number of days stated.

- **When:** planned change may cause noncompliance.

- You send it to the agency (TCEQ Executive Director (address not stated in III.E.2(d))).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.2(d) , page 68](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=68)

> "The permittee shall give advance notice to the executive director of any planned changes in the permitted facility or activity that may result in non-compliance with permit requirements."

#### New operator files NOI and old operator files NOT at least 10 days before the change

Coverage is not transferable. The new operator submits an NOI or NEC and the previous operator submits a NOT at least ten days before the operator changes.

At least 10 days before change of operator date.

- **When:** change of operator.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.3(c) , page 34](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=34)

> "the new operator must submit an NOI or NEC, and the previous operator must submit an NOT, at least ten days before the change in operator occurs"

#### Notify TCEQ 90 days before closing a stormwater solid waste management unit

Facilities using a detention, retention or similar pond to treat stormwater (a solid waste management unit) give written notice to TCEQ's Corrective Action Section (MC-127) at least 90 days before any closure activity for that unit.

At least 90 days before planned closure start.

- **When:** stormwater swmu closure planned.

- You send it to the agency (TCEQ Remediation Division, Corrective Action Section (MC-127)).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.7(a)(3) , page 72](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=72)

> "informing the Commission of any closure activity involving a Solid Waste Management Unit, at least 90 days prior to conducting such an activity."

#### Report endangering noncompliance within 24 hours; large exceedances within 5 working days

Report noncompliance that may endanger health, safety or the environment to the TCEQ regional office orally or by fax within 24 hours, and in writing to the region and the Enforcement Division within five working days. Exceedances of a permit limit by more than 40% must be reported in writing within five working days.

Within 1 day after awareness of noncompliance.

- **When:** noncompliance endangering or limit exceeded by 40pct.
- If limit exceeded by more than 40pct: Within 5 working days after awareness of noncompliance.

- You send it to the agency (TCEQ regional office and Enforcement Division (MC-224)).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.128.

Source: [2026 Multi-Sector General Permit TXR050000 , section III.E.6(b)(1)-(2) , page 71](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=71)

> "Report of such information must be provided orally or by electronic facsimile transmission (fax) to the appropriate TCEQ regional office within 24 hours of becoming aware of the non-compliance."

#### Send copies of NOI, NEC, NOC and NOT to the MS4 operator

Facilities discharging to any MS4 give the MS4 operator a copy of each completed NOI, NEC, NOC and NOT.

No set date. No deadline stated; send with each filing.

- **When:** discharges to ms4.

- You send a copy to the operator of your storm sewer system (MS4).
- Keep the records 3 years.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.9 , page 38](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=38)

> "Industrial facilities that contribute stormwater discharges to any MS4 must provide a copy of the completed NOI, NEC, NOC, and NOT to the operator of the system"

#### Terminate coverage within 10 days after discharges cease

Submit a NOT in STEERS within 10 days after the facility stops discharging industrial stormwater at the location, or within 10 days after obtaining an individual or alternative permit; also when switching between NOI and NEC (NOI first if becoming exposed). Copy the MS4.

Within 10 days after date discharges ceased.

- **When:** termination condition met.

- You file it in the agency's system (STEERS/ePermits).
- Keep the records 3 years.
- Signed or certified by a responsible official per 30 TAC 305.44.

Source: [2026 Multi-Sector General Permit TXR050000 , section II.C.7(a) , page 37](https://www.tceq.texas.gov/downloads/permitting/stormwater/general/multi-sector/2026-msgp-renewal.pdf#page=37)

> "An NOT must be submitted within 10 days after the facility ceases discharging stormwater associated with industrial activity."

## When are my own dates?

Choose your coverage and answer a few questions to see each duty with its next due date, and download them as a calendar file.

[Every state's permit](https://stormdue.com/states). [How we check permit rules](https://stormdue.com/about-the-rules). [Deadline calculator](https://stormdue.com/tools/deadline-calculator), [benchmark comparison](https://stormdue.com/tools/benchmark-comparison) and [more free tools](https://stormdue.com/tools).

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.