# Vermont Multi-Sector General Permit 3-9003 (2025 MSGP) due dates and duties

Every duty in the National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP), with when it is due and the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup?state=VT)

Free, no account. Your own dates in a minute.

- 93duties, each cited
- 9on a schedule
- 84when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

Today

July 14, 2025 July 13, 2030

**Notes on the permit's status and renewal**

Cover page: "This permit becomes effective on July 14, 2025" and "This permit shall expire at midnight, July 13, 2030", signed July 14, 2025 by the Secretary of the Agency of Natural Resources and the Watershed Management Division Director. DEC’s MSGP page, read November 28, 2026, links this permit as the 2025 MSGP that replaces the 2011 MSGP and posts no modification; the separate Parts 1-7, Part 8 and Appendices files have the same text as the combined file read. Operators covered under the 2011 MSGP had to submit a new NOI within 180 days of issuance (January 10, 2026), and existing no exposure facilities a NOX within 180 days of the effective date (Part 1.4.E.2); both dates have passed and are not shown. DEC’s page says the SWPPP template was updated in October 2026 and must be used from October 13, 2026. If not reissued before it expires, the permit is administratively continued (Part 1.2.B).

## What does full permit coverage require?

Authorization under the MSGP: an eNOI with the SWPPP, site plan and fee through ANR Online, public notice, and the Secretary’s written determination before discharge.

- Every quarter 3
- Every year 2
- One time 3
- When something happens 26
- Ongoing 4
- Only if... 51

### Every quarter  3 duties

#### Quarterly visual assessment of a stormwater sample from each outfall

By the end of each calendar quarter.

Each quarter, collect a sample from each outfall within the first 30 minutes of a discharge (or as soon as practicable, saying why), at least 72 hours after the last rain, and look at it in a clean clear container in good light for color, odor, clarity, solids, foam, oil sheen and other signs of pollution. Record it, signed and certified, with the SWPPP; evidence of pollution starts corrective action.

- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 3.2.A, page 30**

> "Once each quarter for the entire permit term, you must collect a stormwater sample from each outfall (except as noted in Part 3.2.C) and conduct a visual assessment of each of these samples."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=34)

#### Routine facility inspection each calendar quarter

By the end of each calendar quarter.

During normal operating hours, qualified personnel with at least one member of the stormwater pollution prevention team inspect exposed areas, SWPPP source areas, places where spills happened in the past three years, discharge points and outfalls, and control measures at least once each calendar quarter, and record the findings, signed and certified, with the SWPPP.

- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 3.1, page 28**

> "Inspections must be conducted at least quarterly (i.e., once each calendar quarter), or in some instances more frequently (e.g., monthly)."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=32)

#### Submit an eDMR every quarter, with a NODI code when no monitoring is required

By the end of each calendar quarter.

Every quarter of coverage, submit an eDMR: results when samples were taken, a "no data" (NODI) code when monitoring is not required that quarter or an outfall had no discharge, or the statement that the site was inactive and unstaffed with nothing exposed. A site that becomes active again submits an eDMR at the end of that quarter even without data.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 6.2.A.2.a.i. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 6.2.A.2.a.i, page 50**

> "until monitoring resumes in year four of permit coverage. The facility must continue to submit an electronic discharge monitoring report (eDMR) using a "no data" or "NODI" code at the end of each quarter"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=54)

### Every year  2 duties

#### Do one routine inspection a year while stormwater is discharging

By December 31 each year.

At least once each calendar year, hold a routine inspection while a stormwater discharge is occurring, and observe the control measures and the discharge points (or nearby downstream points if they cannot be reached).

- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 3.1, page 28**

> "At least once each calendar year, the routine inspection must be conducted during a period when a stormwater discharge is occurring."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=32)

#### Submit the Annual Report by February 15

By February 15, for the calendar year before.

Submit an Annual Report to the Secretary by February 15 each year of coverage, covering the past calendar year: summaries of the routine inspections, the quarterly visual assessments and the corrective action documentation, the response to any four-sample benchmark average exceedance, the status of open corrective actions and any noncompliance, signed and certified. Send any SWPPP updated during the year with it.

Further steps with their own deadlines:

- **Send the updated SWPPP with the Annual Report.** By February 15, for the calendar year before. [Section 5.6, page 46](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=50)
  > "If you make modifications to your SWPPP during the year, you must submit a copy of the updated SWPPP with your Annual Report."

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 7.5, page 57**

> "You must submit an Annual Report to the Secretary by February 15th for each year of permit coverage containing information generated from the past calendar year."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=61)

### One time  3 duties

#### Reapply before the permit expires

By July 12, 2030.

To keep discharging after the authorization expires, submit an administratively complete application for coverage before the expiration date (the permit expires at midnight, July 13, 2030). If the discharge no longer qualifies, apply for an individual permit by the same date.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official per vt msgp appendix b11.

Inferred from section 1.2.B. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 1.2.B, page 9**

> "the permittee shall reapply for coverage under this permit prior to the expiration date of the authorization to discharge."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=13)

#### Evaluate for unauthorized non-stormwater discharges and send the results with the application

No set date. With the application (Part 2.1.B.9).

Evaluate the facility for non-stormwater discharges, eliminate any not authorized by Part 1.1.C or another NPDES permit, give the results with the application (unless the facility is not operating then), and document the evaluation in the SWPPP: date, criteria, outfalls observed and actions taken.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 2.1.B.9, page 24**

> "You must provide the results of your evaluation at the time of application, except when a facility is not operating at the time of application."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=28)

#### Write the SWPPP on DEC’s template and send it with the NOI

No set date. Before the NOI is submitted (Part 1.2.A.1); the permit gives no number of days.

Prepare the Stormwater Pollution Prevention Plan (SWPPP) on the template the Secretary provides, meeting Part 5, before submitting the NOI, and attach it, the site plan and any other application materials to the eNOI in ANR Online.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 1.2.A.1, page 8**

> "You must complete the SWPPP using the template provided by the Secretary consistent with Part 5 prior to submitting your NOI for coverage under this permit. A copy of your SWPPP must accompany your NOI submittal."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=12)

### When something happens  26 duties

#### Equipment and vehicles unused for long periods: inspect for leaks at least monthly

By the end of each month.

Unless infeasible, drain fluids from equipment and vehicles to be decommissioned, and inspect equipment and vehicles that will stay unused for extended periods for leaks at least once a month.

- **When:** equipment or vehicles will stay unused for extended periods.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 2.1.B.1. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 2.1.B.1, page 20**

> "Drain fluids from equipment and vehicles that will be decommissioned, and, for any equipment and vehicles that will remain unused for extended periods of time, inspect at least monthly for leaks."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=24)

#### After a benchmark average exceedance: keep monitoring that parameter quarterly

By the end of each calendar quarter.

After a four-quarter average exceeds a benchmark (or is mathematically certain to), keep monitoring that parameter at that outfall every quarter until four additional quarters average at or below the benchmark, alongside the Part 4.3.C measures.

- **When:** a four-quarter benchmark average for a parameter is exceeded, or is mathematically certain to be.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 6.2.A.2.a.ii, page 50**

> "you must comply with Part 4.3C (Additional Implementation Measures). You must also continue quarterly monitoring until you have completed four additional quarters of monitoring for which the average does not exceed the benchmark"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=54)

#### Baghouses: inspect and maintain at least quarterly

By the end of each calendar quarter.

Inspect and maintain baghouses at least once a quarter to keep dust from escaping, and remove dust that collects at the base of an exterior baghouse immediately.

- **When:** the facility has baghouses.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 2.1.B.3. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 2.1.B.3, page 21**

> "Inspecting and maintaining baghouses at least quarterly to prevent the escape of dust from the system and immediately removing any accumulated dust at the base of the exterior baghouse."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=25)

#### Amend coverage for a new SIC code or new mine earth disturbance

No set date. The permit sets no number of days (Part 1.2.C).

Submit an eNOI and updated SWPPP to amend the authorization when an industrial activity under a SIC code not in the current authorization is added or changed, when a Sector J site plans new earth disturbance for mine site preparation or reclamation not in the authorization, or for other changes the Secretary approves. Amendments are publicly noticed.

- **When:** an activity under a new SIC code is added, or a Sector J site plans new earth disturbance not in its authorization.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official per vt msgp appendix b11.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 1.2.C, page 9**

> "You may amend your authorization at any time during the permit term by submitting an eNOI and updated SWPPP. ... You must amend your authorization for the following reasons:"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=13)

#### Change in owner or operator that changes the discharge: new NOI and a NOT, 30 days before

At least 30 days before the transfer of control.

When a change in ownership or operational control will change the facility’s discharges or activities (including adding, removing or changing a SIC code), the new operator submits a new NOI and the current permittee a Notice of Termination; Table 1-2 sets the NOI at least 30 days before the transfer of control.

- **When:** a change in owner or operator will change the facility’s discharges, activities or SIC codes.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official per vt msgp appendix b11.

Inferred from section 1.2.D.3. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 1.2.D.3, page 10**

> "the proposed permittee must submit a new Notice of Intent and the current permittee must submit a Notice of Termination, consistent with the requirements of this general permit."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=14)

#### Change in owner or operator: file the joint Notice of Change in Operator 30 days before

At least 30 days before the proposed transfer date.

For coverage to transfer automatically, the current and proposed permittees jointly complete the Secretary’s Notice of Change in Operator at least 30 days before the proposed transfer date, with both names and addresses, the transfer date and the new permittee’s signed certification that operations and discharges will not change.

- **When:** the owner or operator of the facility changes.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official per vt msgp appendix b11.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 1.2.D.1.a, page 9**

> "The current and proposed permittees jointly complete a Notice of Change in Operator on a form provided by the Secretary at least 30 days before the proposed transfer date."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=13)

#### Control measure needs repair: act the same day, finish within 14 days

Within 14 days after you find that the control measure needs repair.

When a control measure needs maintenance, do it immediately (the same day, or the next workday if found too late), repair or replace as needed to prevent discharge meanwhile, and complete final repairs as soon as feasible and within 14 days, or within 45 days if 14 is infeasible. Tell the Secretary if repairs will take longer than 45 days.

Further steps with their own deadlines:

- **Notify the Secretary if repairs will take longer than 45 days.** The permit gives the timing in words, quoted below. [Section 2.1.B.3.d, page 21](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=25)
  > "If the repairs/replacement will exceed the 45-day timeframe, you must notify the Secretary. You shall provide a rationale for exceeding the 45- day timeframe and a clear plan for completion."

- **When:** a control measure needs maintenance, repair or replacement.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 2.1.B.3, page 21**

> "Complete final repairs/replacement of stormwater controls as soon as feasible but no later than 14 days or, if that is infeasible, within 45 days"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=25)

#### Corrective action: document the condition within 24 hours, fix it within 14 days

Within 24 hours after you become aware of the condition.

When a Part 4.1 condition (an unauthorized release, an effluent limit violation, controls not enough for water quality standards, a control never installed or not maintained, or a visual assessment showing pollution) or a Part 4.2 condition (a significant change, or a benchmark average exceedance) arises, document it within 24 hours, take reasonable steps the same day, and complete the corrective action within 14 calendar days.

Further steps with their own deadlines:

- **Complete the corrective action within 14 days.** Within 14 days after you discover the condition. [Section 4.3.B, page 34](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=38)
  > "complete the corrective actions (e.g., install a new or modified control and make it operational, complete the repair) before the next storm event if possible, and within 14 calendar days from the time of discovery of the corrective action condition."
- **Document the corrective actions within 14 days.** Within 14 days after you discover the condition. [Section 4.4, page 36](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=40)
  > "You must also document the corrective actions taken or to be taken as a result of the conditions listed in Part 4.1 or 4.2 ... within 14 days from the time of discovery of any of those conditions."
- **Finish within 45 days of discovery, or notify the Secretary.** Within 45 days after you discover the condition. [Section 4.3.B, page 34](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=38)
  > "You must also identify your schedule for completing the work, which must be done as soon as practicable after the 14- day timeframe but no longer than 45 days after discovery."
- **Modify the SWPPP within 14 days of finishing the work.** Within 14 days after the corrective action work is finished. [Section 4.3.B, page 34](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=38)
  > "Where your corrective actions result in changes to any of the controls or procedures documented in your SWPPP, you must modify ... your SWPPP accordingly within 14 calendar days of completing corrective action work."

- **When:** you find a condition that needs corrective action.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 4.4, page 35**

> "You must document the existence of any of the conditions listed in Parts 4.1 or 4.2 within 24 hours of becoming aware of such condition."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=39)

#### Coverage denied for an existing discharge: apply for an individual permit or stop within 60 days

Within 60 days after the Secretary’s denial.

If the Secretary denies authorization to continue an existing discharge under this permit, apply for an individual permit or cease the discharge within 60 days of the denial.

- **When:** the Secretary denies coverage for an existing discharge.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official per vt msgp appendix b11.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 1.2.1, page 11**

> "within sixty (60) days of the Secretary's denial you must either submit an application for an individual permit or cease the discharge."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=15)

#### Discharging without coverage: submit the NOI immediately

When you learn the facility discharges without coverage.

An operator whose industrial activities began discharging before July 14, 2025 without coverage under the 2011 MSGP or another NPDES permit submits the NOI and SWPPP immediately.

- **When:** the facility began discharging industrial stormwater before July 14, 2025 without coverage under the 2011 MSGP or another NPDES permit.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official per vt msgp appendix b11.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section Table 1-2, page 8**

> "Immediately, to minimize the time discharges from the facility will continue to be unauthorized."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=12)

#### Effluent limit exceeded: follow-up sample within 30 days of the corrective action

Within 30 days after the corrective action is put in place.

If a result exceeds a numeric effluent limit, show the exceedance on the eDMR and take a follow-up sample within 30 calendar days of putting the Part 4 corrective action in place (or at the next qualifying runoff event if none occurs within 30 days). If the follow-up also exceeds, report it on the eDMR within 30 days of the lab results and monitor at least quarterly until the discharge meets the limit or the Secretary waives it.

Further steps with their own deadlines:

- **Follow-up result also exceeds: report it on the eDMR within 30 days of the lab results.** Within 30 days after you receive the follow-up lab results. [Section 7.6, page 58](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=62)
  > "If follow-up monitoring per Part 6.2.B.3 exceeds a numeric effluent limit, you must indicate the exceedance in eDMR no later than 30 days after you have received your laboratory results."

- **When:** a result exceeds a numeric effluent limit.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 6.2.B.3, page 54**

> "you must conduct follow-up monitoring within 30 calendar days (or during the next qualifying runoff event, should none occur within 30 days) of implementing corrective action(s) taken per Part 4."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=58)

#### Enclose or cover salt piles

No set date. Standing duty (Part 2.1.B.7).

Enclose or cover piles of salt, or piles containing salt, used for deicing or other commercial or industrial purposes, and minimize exposure while adding to or taking from them, unless runoff from the piles is not discharged or is covered by another NPDES permit. Record their location in the SWPPP.

- **When:** the facility has salt piles or piles containing salt.

- Nothing is filed; keep the record at the facility.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 2.1.B.7, page 23**

> "You must enclose or cover storage piles of salt, or piles containing salt, used for deicing or other commercial or industrial purposes, including maintenance of paved surfaces, in order to minimize pollutant discharges."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=27)

#### Get DEC’s written approval before using flocculants or other active treatment

No set date. Before first use; the permit gives no number of days (Part 2.1.B.5).

Do not use active stormwater treatment, including flocculants, until DEC has approved it in writing.

- **When:** you plan to use active stormwater treatment such as flocculants.

- You send it to the agency.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 2.1.B.5, page 22**

> "The use of active stormwater treatments, including flocculants, shall not occur until the permittee has received written approval from DEC."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=26)

#### Give advance notice of changes that may cause noncompliance

No set date. In advance of the change; the permit gives no number of days (Appendix B.12.B).

Give the Secretary advance notice of any planned change in the facility or activity that may result in noncompliance with the permit.

- **When:** a planned change may cause noncompliance.

- You send it to the agency.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section Appendix B.12.B, page 192**

> "You must give advance notice to the Secretary of any planned changes in the permitted facility or activity which may result in noncompliance with permit requirements."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=196)

#### Give notice at least 30 days before planned changes

At least 30 days before the planned change starts.

Give the Secretary notice promptly, and no fewer than 30 days ahead, of planned physical alterations or additions that could make the facility a new source or significantly change the nature or increase the quantity of pollutants discharged. Copy the MS4 operator if you discharge to one.

- **When:** a physical alteration or addition is planned that may make the facility a new source or significantly change its pollutants.

- You send it to the agency.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 7.7, page 59**

> "You must give notice to the Secretary promptly, no fewer than 30 days prior to making any planned physical alterations or additions to the permitted facility"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=63)

#### Give notice of an anticipated bypass at least 10 days before

At least 10 days before the bypass.

If you know in advance that a bypass of a treatment facility is needed, give the Secretary notice, if possible at least ten days before the bypass. An unanticipated bypass that exceeds a limit is a 24-hour report.

- **When:** you know in advance that a bypass of a treatment facility is needed.

- You send it to the agency.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section Appendix B.13.C.1, page 193**

> "If you know in advance of the need for a bypass, you must submit prior notice, if possible at least ten days before the date of the bypass."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=197)

#### Irregular runoff: report a revised benchmark schedule by the first sample’s due date

No set date. By the due date of the first benchmark sample (Part 6.2.A.2).

A facility where little rain falls or long freezes stop runoff may spread its benchmark samples over seasons with runoff, if it reports the revised schedule to the Secretary by the due date of the first benchmark sample and keeps it with the SWPPP. It still collects four samples and reports any quarter without one (NODI).

- **When:** the facility spreads benchmark samples over seasons with runoff because of little rain or long freezes.

- You send it to the agency.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 6.2.A.2, page 51**

> "may modify this quarterly schedule provided that this revised schedule is reported directly to the Secretary by the due date of the first benchmark sample"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=55)

#### Name change: notify the Secretary in writing within 30 days

Within 30 days after the name change takes effect.

If the name of the permittee or the facility changes with no change in legal ownership or operational control, notify the Secretary in writing no later than 30 days after the name change takes effect.

- **When:** the permittee’s or facility’s name changes with no change in ownership or control.

- You send it to the agency.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 1.2.D.4, page 10**

> "the permittee shall notify the Secretary in writing no later than 30 days after the effective date of the name change."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=14)

#### New discharge: submit the NOI at least 30 days before discharge starts

At least 30 days before discharge begins.

An operator whose industrial activities start discharging after July 14, 2025 submits a complete NOI with the SWPPP through ANR Online at least 30 days before the discharge begins.

- **When:** the facility will start a new industrial stormwater discharge.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official per vt msgp appendix b11.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section Table 1-2, page 8**

> "operators of industrial activities that commence discharging after General Permit issuance date. A minimum of 30 days prior to the date of transfer of control to the new operator or prior to the commencement of the discharge."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=12)

#### Promptly correct missing or wrong information in the NOI or a report

No set date. Promptly; the permit gives no number of days (Appendix B.12.G).

If you learn that relevant facts were left out of the NOI, or that the NOI or any report gave incorrect information, promptly submit the facts or the correct information.

- **When:** you learn that the NOI or a report left out relevant facts or gave incorrect information.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section Appendix B.12.G, page 193**

> "Where you become aware that you failed to submit any relevant facts in your NOI, or submitted incorrect information in your NOI or in any report to the Secretary, you must promptly submit such facts or information."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=197)

#### Report a reportable quantity spill as soon as you know of it

No set date. As soon as you know of the release (Parts 2.1.B.4 and 7.7).

For a leak, spill or other release of a hazardous substance or oil at or above a reportable quantity (40 CFR 110, 117 or 302) in 24 hours, notify the Waste Management Division (802-828-1138, weekdays 7:45 am to 4:30 pm; otherwise Emergency Management, 800-641-5005) as soon as you know of it, and the National Response Center (800-424-8802) if surface waters may be affected. Copy the MS4 operator if you discharge to one.

- **When:** a release reaches a reportable quantity of a hazardous substance or oil.

- You send it to the agency.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 7.7, page 58**

> "You must provide notification, as required under Part 2.1.B.4, as soon as you have knowledge of a leak, spill, or other release containing a hazardous ... substance or oil"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=62)

#### Report monitoring results on the eDMR within 30 days of the lab results

Within 30 days after you receive the complete lab results for all monitored outfalls.

Submit all Part 6 monitoring data through ANR’s eDMR system (paper only with an approved waiver) no later than 30 days after receiving the complete lab results for all monitored outfalls for the period. Results from several storms in one quarter are each reported within 30 days of their lab results.

- **When:** you take monitoring samples.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 7.4, page 56**

> "no later than 30 days after you have received your complete laboratory results for all monitoring outfalls for the reporting period."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=60)

#### Report noncompliance that may endanger health or the environment within 24 hours

Within 24 hours after you become aware of the circumstances.

Report any noncompliance that may endanger health or the environment orally to the MSGP Coordinator within 24 hours of becoming aware of it (including an unanticipated bypass or upset exceeding an effluent limit, or a violation of a maximum daily limit), and in writing within five days with the cause, the period, whether it continues and the steps taken. Copy the MS4 operator if you discharge to one.

Further steps with their own deadlines:

- **Written submission within five days.** Within 5 days after you become aware of the circumstances. [Section Appendix B.12.E.1, page 192](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=196)
  > "A written submission must also be provided within five days of the time you become aware of the circumstances."

- **When:** noncompliance may endanger health or the environment.

- You send it to the agency.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section Appendix B.12.E, page 192**

> "Any information must be provided orally within 24 hours from the time you become aware of the circumstances. A written submission must also be provided within five days of the time you become aware of the circumstances."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=196)

#### Report on each compliance schedule date within 14 days

Within 14 days after each date in the compliance schedule.

Where the permit or the Secretary sets a compliance schedule, report compliance or noncompliance with each interim and final requirement, or progress, no later than 14 days after each schedule date.

- **When:** the Secretary sets a compliance schedule for the facility.

- You send it to the agency.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section Appendix B.12.D, page 192**

> "Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this permit must be submitted no later than 14 days following each schedule date."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=196)

#### Report other noncompliance with the monitoring reports

No set date. With the next monitoring report (Appendix B.12.F, Part 7.7).

Report every instance of noncompliance not already reported (as a 24-hour report, a compliance schedule report or in the Annual Report) when monitoring reports are submitted, with the description, cause, period and steps taken.

- **When:** other noncompliance occurs.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section Appendix B.12.F, page 193**

> "You must report all instances of noncompliance not reported under Appendix B, Subsections 12.D, 12.E, and 12.F, at the time monitoring reports are submitted."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=197)

#### Submit the Notice of Termination within 30 days

Within 30 days after the termination condition is met.

Submit a complete Notice of Termination within 30 days after a new operator takes over (when no transfer under Part 1.2.D applies), operations cease with no more industrial stormwater discharges and erosion controls in place, a Sector G, H or J site meets its termination requirements, or another permit covers all discharges.

- **When:** a new operator takes over, the facility stops industrial discharges, a Sector G, H or J site meets its termination conditions, or another permit covers all discharges.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official per vt msgp appendix b11.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 1.3.B, page 12**

> "You must submit a Notice of Termination within 30 days after one or more of the following conditions have been met"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=16)

### Ongoing  4 duties

#### Keep permit records for three years after coverage ends

No set date. Standing duty (Part 7.8).

Keep the SWPPP and its modifications, the Part 5.5 documentation (including corrective actions), all reports and certifications, monitoring data and the data used for the NOI for at least three years from the date coverage expires or is terminated. The Secretary may extend this.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 7.8, page 59**

> "for a period of at least three years from the date that your coverage under this permit expires or is terminated."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=63)

#### Keep the current SWPPP and records at the facility

No set date. Standing duty (Parts 5.4 and 5.5).

Keep a complete, current copy of the SWPPP (with documents it refers to, eligibility records and the signed certification) at the facility in any accessible format, immediately available to employees, EPA, the state, the MS4 operator and federal wildlife agencies at an inspection, with the Part 5.5 records: the NOI and correspondence, the authorization, the permit, maintenance records, inspection and visual assessment reports, corrective action and benchmark records.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 5.4, page 44**

> "You must retain a complete copy of your current SWPPP required by this permit at the facility in any accessible format."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=48)

#### Pay the permit operating fees

No set date. The permit sets no date; DEC bills by its own procedures (Appendix B.17).

Discharges under this permit are subject to state fees under 3 V.S.A. 2822; pay them by DEC’s procedures. The application fee is paid through ANR Online with the NOI. Not paying is a permit violation.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section Appendix B.17, page 196**

> "You shall submit all fees in accordance with procedures provided by the Secretary. Failure to pay operating fees shall constitute violation of this permit."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=200)

#### Train employees on the schedule the SWPPP sets

No set date. The permit sets no frequency for all sectors; the SWPPP sets the schedule (Part 5.2.E.1). Sectors G and J train at least once a year.

Train every employee who works where industrial materials or activities are exposed to stormwater or who carries out the permit’s duties (inspectors, maintenance staff, the pollution prevention team) in the parts of the SWPPP, spill response, controls, inspections and corrective actions that fit their jobs. The SWPPP sets the training content and schedule and keeps a log of training dates.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 2.1.B.8, page 23**

> "You must train all employees who work in areas where industrial materials or activities are exposed to stormwater, or who are responsible for implementing activities necessary to meet the conditions of this permit"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=27)

### Only if...  51 duties

These apply only in the situation named on each one. Answer the questions to sort them.

#### Sector A wood preserving: inspect processing, transport and treated wood storage areas monthly

By the end of each month.

Facilities that protect or preserve wood surfaces inspect processing areas, transport areas and treated wood storage areas each month for treatment chemicals reaching unprotected soil or areas that contact stormwater.

- **Only if:** your permit sector is A; the facility protects or preserves wood surfaces.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 8.A.5. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.A.5, page 61**

> "If your facility performs wood surface protection and preservation activities, inspect processing areas, transport areas, and treated wood storage areas monthly"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=65)

#### Sector G: inspect active mine sites at least monthly

By the end of each month.

Active metal mining sites are inspected at least monthly unless adverse weather makes the site inaccessible. Inactive and unstaffed sites follow Part 8.G.8.4 (an annual site inspection).

- **Only if:** your permit sector is G.
- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.G.7. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.G.7, page 80**

> "Inspect sites at least monthly unless adverse weather conditions make the site inaccessible."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=84)

#### Sector J: inspect active mine sites at least monthly

By the end of each month.

Active non-metallic mineral mining sites are inspected at least monthly unless adverse weather makes the site inaccessible. Earth-disturbing and reclamation activities before or after active mining follow the weekly schedule instead, and inactive and unstaffed sites an annual inspection.

- **Only if:** your permit sector is J.
- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.J.7. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.J.7, page 107**

> "perform inspections at least monthly unless adverse weather conditions make the site inaccessible."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=111)

#### Sector O: inspect coal, ash, fuel and storage areas monthly

By the end of each month.

Steam electric generating facilities inspect coal handling, loading and unloading, switchyards, fueling, bulk storage, ash handling, areas next to disposal ponds and landfills, maintenance areas, liquid storage tanks and material storage areas each month.

- **Only if:** your permit sector is O.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 8.O.6. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.O.6, page 132**

> "As part of your inspection, inspect the following areas monthly: coal handling areas, loading or unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=136)

#### Sector S: inspect monthly during the deicing season

By the end of each month.

Airports inspect at least monthly during the deicing season they define (for example October through April), extended to every month deicing chemicals may be used. The Secretary may require more.

- **Only if:** your permit sector is S; it is the deicing season, or a month in which deicing chemicals may be used.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 8.S.6. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.S.6, page 149**

> "At a minimum conduct facility inspections at least monthly during the deicing season (e.g., October through April for most mid-latitude airports)."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=153)

#### Sector S: record the deicing chemicals used and the monthly quantities

By the end of each month.

Airports that use deicing chemicals keep a record of the types used (with Safety Data Sheets) and the quantities each month, metered or estimated, for all deicing chemicals, and deicing operators give it to the airport authority for any airport-wide SWPPP.

- **Only if:** your permit sector is S; the airport uses deicing chemicals.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 8.S.5.2. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.S.5.2, page 149**

> "If deicing chemicals are used, a record of the types (including the Safety Data Sheets [SDS]) used and the monthly quantities, either as measured or, in the absence of metering, using best estimates, must be maintained."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=153)

#### Sector V: inspect transfer lines, housekeeping and controls monthly

By the end of each month.

Textile, apparel and fabric product facilities inspect at least monthly: transfer and transmission lines, spill prevention, good housekeeping, process waste management and all structural and nonstructural practices.

- **Only if:** your permit sector is V.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 8.V.5. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.V.5, page 157**

> "Inspect, at least monthly, the following activities and areas (at a minimum): transfer and transmission lines, spill prevention, good housekeeping practices, management of process waste products, and all structural and nonstructural management practices."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=161)

#### Effluent limit monitoring once each calendar year

By December 31 each year.

Facilities with a discharge subject to a stormwater effluent limitation guideline (Table 6-1: wet deck log spray, phosphate fertilizer runoff, asphalt emulsion, cement storage piles, mine dewatering at stone, sand and gravel mines, hazardous and non-hazardous waste landfills, coal piles at steam electric plants, urea airfield deicing) take a grab sample once each calendar year at every such outfall for the Part 8 parameters, starting in the first calendar year of coverage. Substantially identical outfalls do not apply.

- **Only if:** your discharge is subject to federal effluent limitation guidelines (ELGs).

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 6.2.B.1, page 53**

> "You must monitor once per calendar year at each outfall containing the discharges identified in Table 6-1 for the parameters specified in the sector- specific section of Part 8."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=57)

#### Sector L: inspect inactive landfills at least quarterly

By the end of each calendar quarter.

Qualified personnel inspect inactive landfills, open dumps and land application sites at least quarterly: stabilization and erosion controls, leachate collection and treatment, and closed land application areas.

- **Only if:** your permit sector is L; the landfill, open dump or land application site is inactive.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.L.7.2, page 118**

> "Inspect inactive landfills, open dumps, and land application sites at least quarterly."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=122)

#### Sector M: inspect equipment and fluid storage for leaks each quarter

By the end of each calendar quarter.

Each quarter, automobile salvage yards inspect equipment containing oily parts, hydraulic fluids, other fluids or mercury switches, and the vessels and areas storing hazardous materials and automotive fluids, for signs of leakage.

- **Only if:** your permit sector is M.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.M.4, page 121**

> "Inspect quarterly for signs of leakage all equipment containing oily parts, hydraulic fluids, any other types of fluids, or mercury switches."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=125)

#### Sector S primary airports: certify no urea pavement deicers in the Annual Report

By February 15, for the calendar year before.

Existing and new primary airports with 1,000 or more annual non-propeller departures that discharge from airfield pavement deicing either certify each year in the Annual Report that they do not use pavement deicers containing urea, or meet the ammonia limit in Table 8.S-2.

- **Only if:** your permit sector is S; the airport is a primary airport with 1,000 or more annual non-propeller aircraft departures that discharges from airfield pavement deicing.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.

Inferred from section 8.S.8.1. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.S.8.1, page 150**

> "certify annually on the annual report that you do not use pavement deicers containing urea, or (2) meet the effluent limitation in Table 8.S-2."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=154)

#### (Sector A) Timber products: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Sawmills (A1), wood preserving (A2), log storage (A3) and other wood products (A4) each have their own benchmarks. Wet deck log spray down must also meet the Table 8.A-2 limits, sampled once a year.

- **Only if:** your permit sector is A.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.A.6, page 61**

> "Table 8.A-1 identifies benchmarks that apply to the specific subsectors of Sector A."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=65)

#### (Sector AA) Fabricated metal products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Fabricated metal products except coating (AA1) monitor aluminum, zinc and nitrate plus nitrite nitrogen; fabricated metal coating and engraving (AA2) monitor zinc and nitrate plus nitrite nitrogen on the benchmark schedule.

- **Only if:** your permit sector is AA.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.AA.5, page 167**

> "Table 8.AA-2 identifies benchmarks that apply to the specific subsectors of Sector AA."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=171)

#### (Sector AD1) Anaerobic digesters: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Anaerobic digesters processing organics, including the production and storage of digestate, nutrient cake and biogas (a Vermont sector), monitor TSS, nitrate plus nitrite nitrogen, total phosphorus, E. coli, BOD5, lead, zinc, aluminum and pH on the benchmark schedule. DEC may change these after reviewing monitoring history.

- **Only if:** your permit subsector is AD1.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.AD1.2, page 171**

> "Table 8.AD1 identifies benchmarks that apply to Sector AD1. Benchmarks may be subject to change after review of monitoring history over the course of the permit term."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=175)

#### (Sector B) Paperboard mills: benchmark value

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Paperboard mills (B1) monitor COD on the benchmark schedule.

- **Only if:** your permit sector is B.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.B.2, page 64**

> "Table 8.B-1 identifies benchmarks that apply to the specific subsectors of Sector B."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=68)

#### (Sector C) Chemicals: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Agricultural chemicals (C1), industrial inorganic chemicals (C2), soaps and cosmetics (C3) and plastics and resins (C4) have their own benchmarks. Phosphate fertilizer runoff (SIC 2874) must also meet the Table 8.C-2 limits, sampled once a year.

- **Only if:** your permit sector is C.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.C.3, page 65**

> "Table 8.C-1 identifies benchmarks that apply to the specific subsectors of Sector C."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=69)

#### (Sector D) Asphalt paving and roofing: benchmark value and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Asphalt paving and roofing materials (D1) monitor TSS on the benchmark schedule. Asphalt emulsion facilities must also meet the Table 8.D-2 limits, sampled once a year.

- **Only if:** your permit sector is D.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.D.3, page 68**

> "Table 8.D-1 identifies benchmarks that apply to the specific subsectors of Sector D."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=72)

#### (Sector E) Glass, clay, cement, concrete and gypsum: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Clay product manufacturers (E1) monitor aluminum and concrete and gypsum product manufacturers (E2) monitor TSS on the benchmark schedule. Cement manufacturing material storage piles (SIC 3241) must also meet the Table 8.E-2 limits, sampled once a year.

- **Only if:** your permit sector is E.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.E.4, page 71**

> "Subsector E1. Clay Product Manufacturers (SIC 3251-3259, 3261- 3269) Total Recoverable Aluminum 1.1 mg/L"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=75)

#### (Sector F) Primary metals: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Steel works (F1), iron and steel foundries (F2), nonferrous rolling and drawing (F3) and nonferrous foundries (F4) each have their own benchmarks.

- **Only if:** your permit sector is F.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.F.4, page 73**

> "Table 8.F-1 identifies benchmarks that apply to the specific subsectors of Sector F."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=77)

#### (Sector G) Active copper ore mining: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Active copper ore mining and dressing facilities (G1) monitor TSS, nitrate plus nitrite nitrogen and COD on the benchmark schedule. Waste rock and overburden pile values (G2) are in vt-msgp.sector-g-waste-rock-monitoring.

- **Only if:** your permit sector is G.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.G.8.1, page 80**

> "Table 8.G-1 identifies benchmarks that apply to active copper ore mining and dressing facilities."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=84)

#### (Sector H) Coal mines: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Coal mines and related areas (H1) monitor aluminum and TSS on the benchmark schedule.

- **Only if:** your permit sector is H.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.H.8, page 90**

> "Table 8.H-1 identifies benchmarks that apply to the specific subsectors of Sector H."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=94)

#### (Sector J) Sand, gravel and stone: benchmark values and mine dewatering limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Sand and gravel mining (J1) and dimension and crushed stone and other nonmetallic minerals (J2) have their own benchmarks. Mine dewatering discharges at crushed stone, sand and gravel, industrial sand, dimension stone and other nonmetallic mineral mines must also meet the Table 8.J-2 limits, sampled once a year, and the Part 8.J.9.2 peak outflow limits.

- **Only if:** your permit sector is J.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.J.8, page 107**

> "Table 8.J-1 identifies benchmarks that apply to the specific subsectors of Sector J."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=111)

#### (Sector K) Hazardous waste treatment, storage and disposal: benchmark values and landfill limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Hazardous waste treatment, storage and disposal facilities (K1) monitor the Table 8.K-1 benchmarks for discharges not subject to 40 CFR Part 445 Subpart A. Hazardous waste landfills under Subpart A must meet the Table 8.K-2 limits, sampled once a year.

- **Only if:** your permit sector is K.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.K.5, page 112**

> "Table 8.K-1 identifies benchmarks that apply to the specific subsectors of Sector K."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=116)

#### (Sector L) Landfills and land application sites: benchmark value and landfill limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Landfills, land application sites and open dumps (L1) monitor TSS on the benchmark schedule for discharges not subject to 40 CFR Part 445 Subpart B. Non-hazardous waste landfills under Subpart B must meet the Table 8.L-2 limits, sampled once a year.

- **Only if:** your permit sector is L.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.L.9, page 118**

> "Table 8.L-1 identifies benchmarks that apply to the specific subsectors of Sector L."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=122)

#### (Sector M) Automobile salvage yards: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Automobile salvage yards (M1) monitor TSS, aluminum and lead on the benchmark schedule.

- **Only if:** your permit sector is M.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.M.5, page 122**

> "Table 8.M-1 identifies benchmarks that apply to Sector M."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=126)

#### (Sector N) Scrap and waste recycling: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Scrap recycling and waste recycling facilities (N1, except those receiving only source-separated recyclables mainly from non-industrial and residential sources) monitor COD, TSS, aluminum, copper, lead and zinc on the benchmark schedule.

- **Only if:** your permit sector is N.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.N.6, page 128**

> "Table 8.N-1 identifies benchmarks that apply to Sector N."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=132)

#### (Sector O) Steam electric generating facilities: coal pile runoff limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Sector O has no benchmarks. Coal storage pile runoff at steam electric generating facilities must meet the Table 8.O-1 limits, sampled once a year.

- **Only if:** your permit sector is O.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.O.8, page 133**

> "Discharges from coal storage piles at Steam Electric Generating Facilities Total Suspended Solids(TSS) 50 mg/l2"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=137)

#### (Sector Q) Water transportation: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Water transportation facilities (Q1) monitor aluminum, lead and zinc on the benchmark schedule.

- **Only if:** your permit sector is Q.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.Q.6, page 139**

> "Table 8.Q-1 identifies benchmarks that apply to Sector Q."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=143)

#### (Sector U) Food and kindred products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Grain mill products (U1) monitor TSS; fats and oils products (U2) monitor BOD5, COD, nitrate plus nitrite nitrogen and TSS on the benchmark schedule.

- **Only if:** your permit sector is U.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.U.6, page 155**

> "Subsector U1. Grain Mill Products (SIC 2041-2048) Total Suspended Solids (TSS) 100 mg/L"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=159)

#### (Sector Y) Rubber products: benchmark value

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Rubber products manufacturers (Y1) monitor zinc on the benchmark schedule.

- **Only if:** your permit sector is Y.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.Y, page 162**

> "Table 8.Y-1 identifies benchmarks that apply to Sector Y."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=166)

#### Benchmark average exceeded after the first round: add housekeeping measures within 14 days

Within 14 days after the benchmark average is exceeded after the first round of quarterly monitoring.

When the four-quarter benchmark average (or a mathematically certain one) for a parameter at an outfall is exceeded after the first round of quarterly monitoring, review the SWPPP and put in place additional pollution prevention and good housekeeping measures within 14 calendar days of finding it (45 at most if 14 is infeasible), then monitor that parameter at that outfall for four more quarters.

- **Only if:** a parameter is at round 1.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 4.3.C.1. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 4.3.C.1, page 35**

> "If the average benchmark exceedance occurs after the first round of quarterly monitoring, you must implement additional pollution prevention/good housekeeping stormwater control measures, considering good engineering practices according to the timeframe in 4.3.B."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=39)

#### Benchmark average exceeded again in the second round: add further measures within 14 days

Within 14 days after the benchmark average is exceeded again in the second round of quarterly monitoring.

If the benchmark average is exceeded again in the second round of quarterly monitoring, put in place more pollution prevention and good housekeeping measures, beyond those added after the first round, within 14 calendar days (45 at most), and monitor four more quarters.

- **Only if:** a parameter is at round 2.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 4.3.C.2. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 4.3.C.2, page 35**

> "If the average benchmark exceedance occurs again in the second round of quarterly monitoring, you must implement additional pollution prevention/good housekeeping stormwater control measures, considering good engineering practices according to the timeframe in 4.3.B."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=39)

#### Benchmark exceedance continues after three rounds: install structural or treatment controls within 14 days

Within 14 days after the benchmark exceedance continues after three rounds of quarterly monitoring.

If the benchmark exceedance continues after three rounds of quarterly monitoring, install structural source controls (permanent cover, berms, secondary containment) and or treatment controls (sand filters, hydrodynamic separators, oil-water separators, retention ponds, infiltration) within the Part 4.3.B timeframe, and monitor four more quarters.

- **Only if:** a parameter is at round 3.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 4.3.C.3. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 4.3.C.3, page 35**

> "If the benchmark exceedance continues to occur after three rounds of quarterly monitoring, you must install structural source controls ... and/or treatment controls ... according to the timeframe in 4.3.B."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=39)

#### Benchmark monitoring each quarter in coverage years 1 and 4

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins. Only in coverage years 1 and 4, counted from when your coverage began.

Facilities in a subsector with benchmarks sample each outfall (or one of each group of substantially identical outfalls) once in each calendar quarter of their first and fourth years of coverage, starting with the first full quarter after authorization, within the first 30 minutes of a discharge from a measurable storm event, for the Part 8 benchmarks of every sector at the site. A parameter whose four-quarter average does not exceed its benchmark stops until year four (or for the rest of coverage after year four).

- **Only if:** your permit subsector is A1, A2, A3, A4, B1, C1, C2, C3, C4, D1, E1, E2, F1, F2, F3, F4, G1, H1, J1, J2, K1, L1, M1, N1, Q1, U1, U2, Y1, AA1, AA2, AD1.
- **Does not apply if:** the facility is inactive and unstaffed.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 6.2.A.2, page 50**

> "Benchmark monitoring must be conducted quarterly, as identified in Part 6.1.G, at least in the first and fourth year of permit coverage"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=54)

#### Hardness-dependent benchmarks: send the receiving water hardness with the NOI

No set date. With the NOI (Part 6.2.A.1, Appendix E).

Facilities with a hardness-dependent benchmark (cadmium, lead, nickel, silver or zinc) determine the receiving water hardness by their own grab sample, a group of dischargers or third-party data (Appendix E), document the method, and submit a representative value with the NOI so the eDMR carries the right benchmark.

- **Only if:** your permit subsector is A1, C1, C3, C4, F1, F2, F3, F4, G2, K1, M1, N1, Q1, Y1, AA1, AA2, AD1.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 6.2.A.1, page 50**

> "you are required to submit to the Secretary with your NOI a hardness value, established consistent with the procedures in Appendix E, which is representative of your receiving water."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=54)

#### Impaired waters: monitor for the impairment pollutants when the Secretary says so

No set date. The Secretary’s notice sets the frequency (Part 6.2.D.1).

A facility discharging to an impaired water (with or without a TMDL) monitors for the pollutants causing the impairment only when the Secretary informs it that monitoring is required; the notice sets the parameters and frequency.

- **Only if:** your stormwater reaches an impaired water body; the Secretary tells you to monitor for the pollutants impairing the receiving water.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 6.2.D.1, page 54**

> "you are not required to monitor for the pollutant(s) causing the impairment unless the Secretary informs you that monitoring is required."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=58)

#### Pre-production plastics: put practices in place to eliminate plastic in stormwater

No set date. Standing duty (Part 2.1.B.2).

Facilities that handle pre-production plastic (resin pellets, powders, flakes, additives, regrind, scrap, waste and recycling) put best management practices in place to eliminate discharges of plastic in stormwater.

- **Only if:** the facility handles plastic materials (a plastics facility).

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 2.1.B.2, page 20**

> "Facilities that handle pre-production plastic must implement best management practices to eliminate discharges of plastic in stormwater."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=24)

#### Sector AD: get the Secretary’s written permission before the NOI

No set date. Before the NOI; the permit gives no number of days (Part 8.AD.1.1).

A discharge designated by the Secretary (Sector AD) needs the Secretary’s written permission to use this permit before the NOI is submitted. The Secretary sets any monitoring and reporting before authorizing coverage.

- **Only if:** your permit sector is AD.

- You send it to the agency.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.AD.1.1, page 171**

> "you must obtain the Secretary's written permission to use this permit prior to submitting an NOI."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=175)

#### Sector E: clean dust areas at least once a week

Within 7 days after the last cleaning.

Glass, clay, cement, concrete and gypsum product facilities sweep or otherwise clean areas where cement, aggregate, kiln dust, fly ash or settled dust is handled or processed and may reach stormwater at least once a week, and store fine granular solids in silos, hoppers, buildings or under cover where practicable.

- **Only if:** your permit sector is E; cement, aggregate, kiln dust, fly ash or settled dust is handled or processed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 8.E.2.1. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.E.2.1, page 70**

> "it must be performed at least once a week in areas where cement, aggregate, kiln dust, fly ash or settled dust are being handled or processed and may be discharged in stormwater."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=74)

#### Sector G: train employees at least once a year

Within 1 year after the last training.

Active and temporarily inactive metal mining facilities train employees at least once a year and document the training in the SWPPP.

- **Only if:** your permit sector is G.
- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 8.G (Technology-Based Effluent Limits, Employee training). Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.G (Technology-Based Effluent Limits, Employee training), page 78**

> "Conduct employee training at least annually at active and temporarily inactive facilities."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=82)

#### Sector G2: waste rock and overburden piles, benchmark monitoring once in the first year, then twice a year

Once each year of your coverage, counted from when it began.

Discharges from waste rock and overburden piles at active metal mines are sampled once in the first year of coverage for the Table 8.G-2 parameters, then twice a year in later years for any parameter that exceeded its benchmark. Ore-specific parameters (Table 8.G-3) follow the quarterly schedule of Part 6.2.A.2.

- **Only if:** your permit subsector is G2; the site has discharges from waste rock or overburden piles at an active metal mine.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

Inferred from section 8.G.8.2. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.G.8.2, page 80**

> "perform benchmark monitoring once in the first year for the parameters listed in Table 8.G-2, and twice annually in all subsequent years of coverage under this permit"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=84)

#### Sector I: inspect erosion and sediment controls every 7 days

Within 7 days after the last inspection.

Oil and gas extraction sites inspect all erosion and sediment controls every 7 days, or once every 14 calendar days and within 24 hours of a storm of 0.25 inches or more.

- **Only if:** your permit sector is I.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.I.5, page 94**

> "All erosion and sediment controls must be inspected either: 1) every 7 days; or 2) once every 14 calendar days and within 24 hours of a storm event of 0.25 inches or greater."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=98)

#### Sector J earth disturbance or reclamation: inspect every 7 days, report within 24 hours

Within 7 days after the last inspection.

While earth-disturbing or reclamation activities are under way, inspect site access points, disturbed areas and their perimeter, erosion and sediment controls, stabilized areas, storage areas, stormwater flow paths and discharge points at least once every 7 calendar days, and complete a signed report within 24 hours of each inspection.

Further steps with their own deadlines:

- **Complete the inspection report within 24 hours.** The permit gives the timing in words, quoted below. [Section 8.J.4.4.5, page 104](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=108)
  > "Within 24 hours of an inspection, complete a report that includes:"

- **Only if:** your permit sector is J; earth-disturbing or reclamation activities are under way before or after active mining.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.J.4.4.1, page 104**

> "At least once every 7 calendar days while earth disturbing or reclamation activities are underway"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=108)

#### Sector J earth disturbance: stabilize within 14 days, final stabilization within 48 hours of final grade

Within 14 days after the initial disturbance.

Disturbed areas get temporary or permanent stabilization within 14 days of the initial disturbance and afterwards at the end of each workday; final stabilization is required within 48 hours of reaching final grade or finishing earth-disturbing activities. Soil stabilizers need the Secretary’s approval first.

Further steps with their own deadlines:

- **Final stabilization within 48 hours of reaching final grade.** Within 2 days after reaching final grade. [Section 8.J.4.1.3, page 100](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=104)
  > "Final stabilization is required within 48-hrs of reaching final grade, or when earth-disturbing activities are completed."

- **Only if:** your permit sector is J; earth-disturbing or reclamation activities are under way before or after active mining.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.J.4.1.3, page 100**

> "permanently) within 14 days of initial disturbance. ... After this time, any disturbance must be stabilized at the end of each workday."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=104)

#### Sector J earth disturbance: update the EPSC Plan within 7 days of a reportable release

Within 7 days after you learn of the release.

If a release of oil or hazardous substances above a reportable quantity occurs, update the Erosion Prevention and Sediment Control (EPSC) Plan within seven calendar days of learning of it with a description, the circumstances and the date, and the measures to prevent and respond to such releases.

- **Only if:** your permit sector is J; earth-disturbing or reclamation activities are under way before or after active mining; a release reaches a reportable quantity of a hazardous substance or oil.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from Appendix B.19.B. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section Appendix B.19.B, page 196**

> "If a release of oil or hazardous substances in excess of reportable quantities occurs, the permittee must modify the EPSC Plan required under Part 6 within seven calendar days of knowledge of the release"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=200)

#### Sector J inactive and unstaffed sites: inspect once a year

Within 1 year after the last inspection.

An inactive and unstaffed non-metallic mineral mining site using the waiver from routine inspections, visual assessments and benchmark and impaired waters monitoring still does an annual site inspection under Part 3.1.

- **Only if:** your permit sector is J; the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.J.8.1. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.J.8.1, page 108**

> "You must still conduct an annual site inspection in accordance with Part 3.1."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=112)

#### Sector J: train employees at least once a year

Within 1 year after the last training.

Active and temporarily inactive non-metallic mineral mining sites (sand and gravel pits, quarries) train employees at least once a year and document the training in the SWPPP.

- **Only if:** your permit sector is J.
- **Does not apply if:** the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

Inferred from section 8.J.5.1. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.J.5.1, page 105**

> "Conduct employee training at least annually at active and temporarily inactive sites."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=109)

#### Sector L: inspect operating landfills every 7 days

Within 7 days after the last inspection.

Inspect operating landfills, open dumps and land application sites at least once every 7 days, focusing on unstabilized areas, active land application areas, exposed storage, controls, leachate systems and truck entrances. Stabilized sites and completed land application areas are inspected monthly.

- **Only if:** your permit sector is L; the landfill, open dump or land application site is operating.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.L.7.1, page 117**

> "inspect operating landfills, open dumps, and land application sites at least once every 7 days."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=121)

#### Sector M: inspect arriving vehicles for leaks

No set date. Immediately, or as soon as practicable, on arrival (Part 8.M.4).

Automobile salvage yards inspect vehicles arriving at the site for leaks immediately, or as soon as practicable.

- **Only if:** your permit sector is M.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.M.4, page 121**

> "Immediately (or as soon thereafter as practicable) inspect vehicles arriving at the site for leaks."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=125)

#### Sector S large deicing airports: four benchmark samples during the deicing season

No set date. During the deicing season the facility defines (Part 8.S.4.2); the permit gives no fixed date.

Airports where one or more permittees use more than 100,000 gallons of pure glycol or 100 tons or more of urea a year (on average) collect the four benchmark samples for BOD5, COD, ammonia and pH, and any follow-up samples, from outfalls draining deicing areas during the deicing season they define.

- **Only if:** your permit sector is S; the airport’s permittees use more than 100,000 gallons of pure glycol or 100 tons or more of urea for deicing a year.

- You file it in the agency's system (ANR eDMR (electronic Discharge Monitoring Report system)).
- Keep the records 3 years.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section Table 8.S-1, page 150**

> "Collect the four benchmark samples, and any required follow-up benchmark samples, during the timeframe defined in Part 8.S.4.2 when deicing activities are occurring."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=154)

#### Sectors G and H inactive and unstaffed sites: inspect once a year

Within 1 year after the last inspection.

An inactive and unstaffed metal or coal mining site using the waiver from routine inspections and visual assessments still does an annual site inspection under Part 3.1.

- **Only if:** your permit sector is G, H; the facility is inactive and unstaffed.

- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.G.8.4. Check your copy of the permit.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 8.G.8.4, page 83**

> "you are waived from the requirement to conduct quarterly visual assessments and routine facility inspections. You must still do an annual site inspection in accordance with Part 3.1."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=87)

## What does no-exposure certification require?

Conditional Exclusion for No Exposure: a No Exposure Certification (NOX) through ANR Online instead of permit coverage; it ends existing coverage without a NOT.

- One time 1
- When something happens 3

### One time  1 duty

#### Submit the No Exposure Certification (NOX) before operations start

No set date. New industrial activities submit it before operations start; the permit gives no number of days (Part 1.4.E.2).

A facility whose industrial materials and activities are all inside a storm-resistant shelter submits a completed and signed No Exposure Certification (NOX) through ANR Online. New industrial activities submit it before operations start. A NOX ends existing permit coverage without a separate NOT.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official per vt msgp appendix b11.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 1.4.E.2, page 15**

> "For existing facilities, the NOX must be submitted to the Agency within 180 days of the effective date of this general permit. For new industrial activities, the NOX must be submitted prior to commencing operations"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=19)

### When something happens  3 duties

#### No exposure ending: prepare a SWPPP and get permit coverage before the change

No set date. Before the change; the permit gives no number of days (Part 1.4.D.2).

If industrial materials or activities will become exposed to rain, snow, snowmelt or runoff, the no exposure exclusion ends: prepare a SWPPP and apply for and obtain coverage under this permit before the change.

- **When:** industrial materials or activities are expected to become exposed to precipitation or runoff.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official per vt msgp appendix b11.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 1.4.D.2, page 15**

> "If you anticipate such changes in circumstances, you must prepare a SWPPP and apply for and obtain authorization under this permit prior to those changes."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=19)

#### No exposure: a new operator submits a new NOX within 30 days

Within 30 days after the change in operator.

If the operator of a no exposure facility changes, the new operator completes and submits a new NOX within 30 days of the change.

- **When:** the owner or operator of the facility changes.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official per vt msgp appendix b11.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 1.4.E.6, page 15**

> "the new operator must complete and submit a new NOX form within 30 days of the effective date of the change in operator"

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=19)

#### No exposure: submit a Notice of Termination within 30 days of closing

Within 30 days after operations end.

If a no exposure facility closes and ceases operations, submit a Notice of Termination within 30 days of the date operations end.

- **When:** the facility closes and operations end.

- You file it in the agency's system (ANR Online (Agency of Natural Resources online services portal)).
- Keep the records 3 years.
- Signed or certified by a responsible official per vt msgp appendix b11.

**Source: Vermont NPDES Multi-Sector General Permit MSGP 3-9003 (2025), Parts 1 to 9 with Appendices A to F, final, 223 PDF pages, section 1.4.E.7, page 15**

> "If you close your facility and cease operations, a Notice of Termination form must be submitted within 30 days of the date operations end."

[Open the permit at this section](https://dec.vermont.gov/sites/dec/files/wsm/stormwater/docs/MultiSectorGeneralPermit/2025%20MSGP/Final_MSGP.pdf#page=19)

## Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

## Vermont Multi-Sector General Permit 3-9003 (2025 MSGP) duties, topic by topic

How the Vermont Multi-Sector General Permit 3-9003 (2025 MSGP) compares with the other checked permits on each kind of duty, in the permit's own words with the section for each:

- [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements#permit-us-vt-msgp)
- [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements#permit-us-vt-msgp)
- [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates#permit-us-vt-msgp)
- [Exceedance response](https://stormdue.com/guides/benchmark-exceedance-response#permit-us-vt-msgp)
- [No-exposure certification](https://stormdue.com/guides/no-exposure-certification#permit-us-vt-msgp)
- [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements#permit-us-vt-msgp)

- [Every state's permit](https://stormdue.com/states)
- [How we check permit rules](https://stormdue.com/about-the-rules)
- [Deadline calculator](https://stormdue.com/tools/deadline-calculator)
- [Benchmark comparison](https://stormdue.com/tools/benchmark-comparison)
- [More free tools](https://stormdue.com/tools)
- [Duties compared across permits](https://stormdue.com/guides)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.