# Wisconsin Tier 1 Industrial Storm Water General Permit due dates and duties

Every duty in the General Permit to Discharge under the Wisconsin Pollutant Discharge Elimination System, WPDES Permit No. WI-S067849-5, Tier 1 Industrial Facilities, Storm Water Associated with Industrial Activity, with when it is due and the section it comes from.

[Get my permit calendar](https://stormdue.com/lookup?state=WI&pack=us-wi-s067849)

Free, no account. Your own dates in a minute.

- 37duties, each cited
- 8on a schedule
- 29when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

## What is this permit, and where do I file?

**Notes on the permit's status and renewal**

Cover page (text layer): permit effective date May 31, 2021, permit expiration date June 2, 2025, signed May 14, 2021 by the Director of the Bureau of Watershed Management. Section 6.2 says the terms and conditions continue to apply until the permit is reissued or revoked, or until an individual permit is issued for the discharge (s. NR 205.08(9), Wis. Adm. Code, and s. 227.51, Wis. Stats.). DNR's industrial storm water permits page, read November 28, 2026, still links this file as the Tier 1 permit with its 2021 fact sheet and final determination, and names no draft or reissued Tier 1 permit; DNR's WPDES Permits on Public Notice page, read the same day, lists no storm water general permit. So on November 28, 2026 the 2021 permit was in force by continuation and no reissuance was on public notice. Existing permittees need not apply for reissuance unless DNR directs (section 6). Tier 1 covers the heavy manufacturers in SIC 24, 26, 28, 29, 311, 32, 33, 3441 and 373 (less the codes its note sends to Tier 2), recycling and salvage facilities, and bulk storage piles of coal, minerals, ores and scrap (section 2.1); lighter industry uses the Tier 2 permit WI-S067857-5, which has its own pack. Unlike Tier 2, Tier 1 requires annual chemical storm water sampling in the first two years of initial coverage and the submission of the first two AFSCI reports. The annual storm water permit fee is set by s. NR 216.30; no amount is shown here.

## What does full permit coverage require?

Coverage under WI-S067849-5: a complete NOI through the Water ePermitting System with the SWPPP summary (or the full SWPPP); coverage starts on the Start Date in DNR's cover letter. Facilities covered under the previous Tier 1 permit were covered automatically from May 31, 2021. Wisconsin's Conditional No Exposure Certification is a separate exclusion not covered by this pack.

- Every quarter 1
- Every year 4
- One time 3
- When something happens 23
- Ongoing 6

### Every quarter  1 duty

#### Do a quarterly visual inspection of storm water at each outfall

By the end of each calendar quarter.

Each quarter, inspect the storm water discharge at each outfall within the first 30 minutes of discharge, or as soon as practical but no later than 60 minutes, for color, odor, turbidity, floating solids, foam, oil sheen and other signs of pollution. Record the date, personnel, visual quality and probable sources on DNR's form (3400-176a). Four are due each year by the anniversary of the Start Date.

- Nothing is filed; keep the record at the facility.

Inferred from section 4.3.2. Check your copy of the permit.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 4.3.2, page 21**

> "Permittees shall perform and document quarterly visual inspections of storm water discharge quality at each storm water discharge outfall."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=21)

### Every year  4 duties

#### Do the annual impaired waters check by February 15

By February 15 each year.

By February 15 each calendar year, check whether the facility discharges a pollutant of concern via storm water to an impaired water body on Wisconsin's Section 303(d) list, and document the result with the Annual Facility Site Compliance Inspection.

- Nothing is filed; keep the record at the facility.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 2.7.2, page 10**

> "By February 15th of each calendar year, the permittee shall perform an annual check to determine whether its facility discharges a pollutant of concern via storm water to an impaired water body"

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=10)

#### Do the annual TMDL check by February 15

By February 15 each year.

By February 15 each calendar year, check whether the facility discharges a pollutant of concern via storm water to a water body in a State and Federal approved TMDL. If so, assess whether any wasteload allocation for the facility is being met by the existing controls or whether more controls or treatment are needed and feasible. Document the result with the Annual Facility Site Compliance Inspection.

- Nothing is filed; keep the record at the facility.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 2.7.5, page 10**

> "By February 15th each calendar year, the permittee shall perform an annual check to determine whether its facility discharges a pollutant of concern via storm water to a water body included in a State and Federal approved TMDL."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=10)

#### Pay the annual storm water permit fee by June 30

By June 30 each year.

Pay the annual storm water discharge permit fee for each covered facility. DNR bills in May; the fee is due by June 30 each year (s. NR 216.30, Wis. Adm. Code).

- You send it to the agency (DNR invoice).

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 6.9, page 27**

> "The permittee will be billed by the Department annually in May of each year and the fee is due by June 30 of each year"

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=27)

#### Do the Annual Facility Site Compliance Inspection (AFSCI) within each year of coverage

Within 365 days after your coverage Start Date, or its latest anniversary.

Do and document an Annual Facility Site Compliance Inspection that checks the SWPPP's drainage conditions and pollution sources are still accurate and its practices are carried out and maintained. The first is due within 12 months of the Start Date of coverage and the second between 12 and 24 months; each later one, with its report on DNR's form (3400-176), by the anniversary of the Start Date. The report includes the inspection date, personnel, scope, major observations, needed SWPPP revisions, the quarterly visual inspections, the non-storm water evaluation, any chemical sampling and the impaired water and TMDL checks.

Further steps with their own deadlines:

- **Prepare the AFSCI report.** Within 365 days after your coverage Start Date, or its latest anniversary. [Section 5.2.1, page 24](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=24)
  > "Subsequent AFSCIs shall be conducted and AFSCI reports prepared by the permittee by the anniversary of the Start Date for each year of coverage under this permit."

- Nothing is filed; keep the record at the facility.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 5.2.1, page 24**

> "The permittee shall conduct the first Annual Facility Site Compliance Inspection (AFSCI) within 12 months of the Start Date of coverage under this general permit"

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=24)

### One time  3 duties

#### Find out whether the facility discharges to a fish and aquatic life water

No set date. The permit sets no date (2.8.1).

Determine whether the facility will have a storm water discharge to a fish and aquatic life water (s. NR 102.13, Wis. Adm. Code). A new discharge there may not significantly lower water quality, an existing one may not be increased if that would, and any new or increased discharge must accommodate important economic or social development.

- Nothing is filed; keep the record at the facility.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 2.8.1, page 11**

> "The permittee shall determine whether it will have a storm water discharge to a fish and aquatic life water as defined in s. NR 102.13, Wis. Adm. Code."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=11)

#### Find out whether the facility discharges to an outstanding or exceptional resource water

When your coverage under this permit starts.

Determine whether any part of the facility discharges storm water to an outstanding resource water (ORW) or exceptional resource water (ERW) listed in ss. NR 102.10 and 102.11, Wis. Adm. Code. Sections 2.6.2 to 2.6.5 apply from the Start Date of coverage (from May 31, 2021 for facilities covered under the previous permit).

- Nothing is filed; keep the record at the facility.

Inferred from section 2.6.2. Check your copy of the permit.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 2.6.2, page 9**

> "The permittee shall determine whether any part of its facility discharges storm water to an outstanding resource water (ORW) or exceptional resource water (ERW)."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=9)

#### Submit the first two AFSCI reports to DNR, within 18 and 30 months of the Start Date

Within 546 days after your coverage under this permit starts.

Submit the first AFSCI report to DNR within 18 months of the Start Date of coverage and the second within 30 months, on DNR's form through the Water ePermitting System, with the first and second rounds of chemical sampling results. After the second-year report, later AFSCI reports need not be submitted.

Further steps with their own deadlines:

- **Submit the second AFSCI report.** Within 911 days after your coverage under this permit starts. [Section 5.2.1, page 24](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=24)
  > "the AFSCI report submitted to the Department within 30 months of the Start Date of coverage."

- You file it in the agency's system (Wisconsin DNR Water ePermitting System (6.7)).
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 5.2.1, page 24**

> "submit the AFSCI report to the Department within 18 months of the Start Date of coverage."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=24)

### When something happens  23 duties

#### Screen each outfall for non-storm water at least twice a year

By the end of each half year (June 30 and December 31).

Where end of pipe screening is the method used, make visual observations at each outfall at least twice a year during dry periods, recording any dry weather flow, stains, sludge, color, odor or other signs of a non-storm water discharge.

- **When:** you evaluate non-storm water discharges by end of pipe screening.

- Nothing is filed; keep the record at the facility.

Inferred from section 4.2.1.2. Check your copy of the permit.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 4.2.1.2, page 20**

> "End of pipe screening shall consist of visual observations made at least twice per year at each outfall of the storm sewer collection system."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=20)

#### Add an impaired waters section to the SWPPP within 180 days

Within 180 days after the annual check that found the impaired water discharge.

If the annual check finds the facility discharges a pollutant of concern to an impaired water, add a written SWPPP section within 180 days of that check naming the source area controls and storm water practices that will reduce, with the goal of eliminating, that discharge, and why they were chosen. Carry out the changes within the same 180 days.

Further steps with their own deadlines:

- **Carry out the SWPPP changes.** Within 180 days after the annual check that found the impaired water discharge. [Section 2.7.3, page 10](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=10)
  > "Changes identified in the storm water pollution prevention plan shall be implemented with the 180-day timeframe."

- **When:** the annual check finds the facility discharges a pollutant of concern to an impaired water.

- Nothing is filed; keep the record at the facility.
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 2.7.3, page 10**

> "within 180 days of the annual check that determines the facility discharges to an impaired water body, include a written section in the storm water pollution prevention plan"

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=10)

#### Add an ORW or ERW section to the SWPPP

No set date. Part of the SWPPP; the permit sets no separate date (3.5).

If storm water will discharge to an outstanding or exceptional resource water, include a written SWPPP section on the practices and control measures that will keep pollutants from exceeding the background level in the water body.

- **When:** the facility discharges storm water to an outstanding or exceptional resource water.

- Nothing is filed; keep the record at the facility.
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 3.5, page 19**

> "If the permittee's industrial storm water will discharge to an outstanding resource water or exceptional resource water, the permittee shall include a written section in the SWPPP that discusses and identifies the management practices and control measures"

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=19)

#### Amend the SWPPP and submit it to DNR within 30 days

Within 30 days after a change that will significantly increase pollutant exposure is planned, an inspection or other information shows the SWPPP is not working, or the Department gives written notice that it is ineffective.

Amend the SWPPP and submit it to DNR within 30 days when a change is planned that will significantly increase the exposure of pollutants to storm water, when the annual inspection, a quarterly visual inspection or other information shows the SWPPP is not controlling pollutants, or when DNR gives written notice that it is ineffective, unless DNR sets another time.

- **When:** a change that will significantly increase pollutant exposure is planned, an inspection or other information shows the SWPPP is not working, or the Department gives written notice that it is ineffective.

- You file it in the agency's system (Wisconsin DNR Water ePermitting System (6.7)).
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 3.4, page 19**

> "the permittee shall amend and submit the SWPPP to the department within 30 days of the occurrence of any of the following circumstances"

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=19)

#### Apply for coverage within 14 working days after a no exposure exclusion is denied or revoked

Within 14 working days after the Department's notice of the denial or revocation.

If DNR denies a Conditional No Exposure Certification, or revokes a no exposure exclusion it granted, apply for coverage under section 1.1 within 14 working days of DNR's notice.

- **When:** the Department denies or revokes your no exposure exclusion.

- You file it in the agency's system (Wisconsin DNR Water ePermitting System).
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 1.3, page 3**

> "shall apply for permit coverage in accordance with section 1.1 of this permit within 14-working days of being notified by the Department of the denial."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=3)

#### Describe and maintain the practices that meet the NR 151 performance standards

Ongoing, no set date.

A facility subject to the performance standards in s. NR 151.12 or ss. NR 151.121 to 151.128, Wis. Adm. Code, describes in the SWPPP the practices needed to keep meeting them and maintains those practices to their original design capability.

- **When:** the facility is subject to the performance standards in s. NR 151.12 or ss. NR 151.121 to 151.128.

- Nothing is filed; keep the record at the facility.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 2.11, page 13**

> "shall describe in the Storm Water Pollution Prevention Plan the best management practices necessary to maintain compliance with the applicable performance standards"

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=13)

#### Do additional chemical sampling when DNR directs

No set date. As DNR directs; the permit sets no deadline (4.3.3.2).

After the two annual rounds, sample again as DNR directs, if the first results show a reasonable potential to exceed a water quality standard, DNR believes the discharge may be a significant contributor of a pollutant, more sampling is needed to judge the SWPPP's effectiveness, or DNR needs it to assess compliance.

- **When:** the Department directs additional chemical sampling.

- You file it in the agency's system (Wisconsin DNR Water ePermitting System (6.7)).

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 4.3.3.2, page 21**

> "shall, as directed by the Department, perform additional sampling"

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=21)

#### Give the municipal storm sewer operator information on request

No set date. Upon request; the permit sets no deadline (5.3.1).

If storm water or non-storm water discharges enter a permitted municipal separate storm sewer system, give its owner or operator, on request, the facility's drainage areas, industrial activities and contamination sources, non-storm water discharges, practices and their effectiveness, monitoring data, and copies of the SWPPP and AFSCI reports. Help the operator find and eliminate illicit discharges that may come from the facility.

- **When:** the facility discharges to a municipal separate storm sewer system covered by a storm water permit; the municipal storm sewer operator asks for information.

- You send a copy to the operator of your storm sewer system (MS4).

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 5.3.1, page 25**

> "shall provide information on these discharges to the owner or operator of the municipal separate storm sewer system upon request."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=25)

#### Inspect an inactive or remote site at least once every 3 years under a monitoring waiver

Within 3 years after the last site inspection.

Where DNR waives monitoring because the facility is inactive or remote, it sets an alternative requirement that at a minimum has a qualified individual inspect the site at least once in every 3-year period. Follow the alternative DNR sets.

- **When:** the Department has waived monitoring because the facility is inactive or remote.

- Nothing is filed; keep the record at the facility.
- The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 4.3.4.3. Check your copy of the permit.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 4.3.4.3, page 23**

> "At a minimum, the Department shall establish an alternative requirement that the permittee make site inspections by a qualified individual at least once in every 3-year period."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=23)

#### Keep stored salt away from precipitation and runoff

Ongoing, no set date.

Build and keep salt storage piles on an impervious, curbed surface, enclosed by a building or structure with walls and a cover; or, for permittees that use brine with piles on impervious curbed surfaces, divert contaminated storm water to a brine treatment system for process use. Clean up salt spilled during loading or unloading immediately.

- **When:** the facility stores salt.

- Nothing is filed; keep the record at the facility.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 2.10.6, page 12**

> "Construct and maintain salt storage facilities so that neither precipitation nor storm water runoff can come into contact with the stored salt in order to minimize pollutant discharges."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=12)

#### Prepare the SWPPP before applying for coverage

No set date. Before the NOI is submitted (3.1, 5.1.1).

Prepare a Storm Water Pollution Prevention Plan (SWPPP) with the contents in section 3.3 before applying for coverage, signed under s. NR 216.22(7), Wis. Adm. Code, with the certification statement in section 3.3.2.11.

- **When:** a new facility is seeking coverage.

- Nothing is filed; keep the record at the facility.
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 3.1, page 14**

> "the owner or operator of a facility requiring coverage under this permit shall prepare a Storm Water Pollution Prevention Plan (SWPPP) prior to applying for permit coverage under s. NR 216.22, Wis. Adm. Code."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=14)

#### Report a hazardous substance release or spill to DNR immediately

When a hazardous substance is released or spilled to the environment.

Notify DNR immediately of any release or spill of a hazardous substance to the environment, under s. 292.11, Wis. Stats., and ch. NR 706, Wis. Adm. Code. DNR's 24-hour spills hotline is (800) 943-0003.

- **When:** a hazardous substance is released or spilled to the environment.

- You send it to the agency (DNR 24-hour spills hotline, (800) 943-0003).

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 6.6, page 26**

> "The permittee shall notify the Department immediately of any release or spill of a hazardous substance to the environment in accordance with s. 292.11, Wis. Stats., and ch. NR 706, Wis. Adm. Code."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=26)

#### Report an unknown non-storm water discharge to the municipal storm sewer operator immediately

When you discover a previously unknown, unauthorized non-storm water discharge to the municipal storm sewer system.

On discovering a previously unknown non-storm water discharge to the municipal separate storm sewer system that is not authorized under a required WPDES permit, or is an illicit discharge (s. NR 216.002(11)), report it to the system's owner or operator immediately.

- **When:** the facility discharges to a municipal separate storm sewer system covered by a storm water permit; you discover a previously unknown, unauthorized non-storm water discharge to the municipal storm sewer system.

- You send a copy to the operator of your storm sewer system (MS4).

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 5.3.2, page 25**

> "the permittee shall immediately report the discharge to the owner or operator of the municipal separate storm sewer system."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=25)

#### Report spills or dumping that enter the municipal storm sewer immediately

When spilled or dumped materials enter the municipal storm sewer system.

Report spills or dumping of materials that enter the municipal separate storm sewer system to its owner or operator immediately.

- **When:** the facility discharges to a municipal separate storm sewer system covered by a storm water permit; spilled or dumped materials enter the municipal storm sewer system.

- You send a copy to the operator of your storm sewer system (MS4).

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 5.3.3, page 25**

> "The permittee shall immediately report spills or dumping of materials that enter the municipal separate storm sewer system to the owner or operator of the system."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=25)

#### Request a transfer of coverage when the facility changes hands

No set date. The permit sets no deadline; coverage is not transferred until DNR sends its approval (1.4).

A permittee who will no longer control the facility may ask DNR to transfer coverage to the new owner or operator. The request (Form 3400-222) is signed by both and sent through the Water ePermitting System, with the facility name and address, Facility Identification Number, the people involved, any significant operating changes and the transferee's acknowledgement. Coverage moves only when DNR approves.

- **When:** the owner or operator changes.

- You file it in the agency's system (Wisconsin DNR Water ePermitting System).
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 1.4, page 3**

> "The transfer request shall be signed by both the permittee and the new owner or operator and sent electronically through the Department's Water ePermitting System."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=3)

#### Sample storm water at each outfall in the first and second years of coverage

Once each year of your coverage, counted from when it began. Only in coverage years 1 and 2, counted from when your coverage began.

A facility newly covered under this permit samples storm water at each outfall for the residual pollutants listed in its SWPPP once within 12 months of the Start Date and again between 12 and 24 months, from a rainfall event of more than 0.1 inch from March through November, and sends the results with the first and second AFSCI reports. Sampling may stop after the second AFSCI report unless DNR directs more.

- **When:** the facility was "granted initial coverage under this permit", not carried over from the previous Tier 1 permit.
- **Does not apply if:** the Department has approved an alternative monitoring plan in your SWPPP.

- You file it in the agency's system (Wisconsin DNR Water ePermitting System, with the AFSCI report (5.2.3)).

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 4.3.3.1, page 21**

> "permittees granted initial coverage under this permit shall, within 12 months of the start date of coverage under this permit, perform their first annual chemical storm water sampling at each outfall"

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=21)

#### Seek coverage for or eliminate an unpermitted non-storm water flow immediately

When you discover a non-storm water flow not covered by another WPDES permit.

On discovering a non-storm water flow not covered by another WPDES permit, immediately seek coverage under another DNR permit or eliminate the flow.

- **When:** you discover a non-storm water flow not covered by another WPDES permit.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 4.2.2, page 20**

> "Upon discovering non-storm water flows that are not covered under another WPDES permit, the permittee shall either immediately seek coverage under another permit from the Department or eliminate the non-storm water flow."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=20)

#### Send DNR a signed statement within 30 days when an outfall cannot be evaluated

Within 30 days after you determine you cannot evaluate an outfall for non-storm water discharges.

A permittee unable to evaluate an outfall for non-storm water discharges signs a statement certifying so, puts a copy in the SWPPP and the annual inspection report, and submits it to DNR within 30 days after determining it cannot evaluate the outfall.

- **When:** you determine you cannot evaluate an outfall for non-storm water discharges.

- You file it in the agency's system (Wisconsin DNR Water ePermitting System (6.7)).
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 4.2.3, page 20**

> "The statement shall be submitted to the Department within 30 days after the permittee determines that it is unable to evaluate an outfall."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=20)

#### Send the SWPPP summary with the NOI

No set date. With the NOI (5.1.1).

Submit the SWPPP summary (or the full SWPPP) to DNR when applying for coverage.

- **When:** a new facility is seeking coverage.

- You file it in the agency's system (Wisconsin DNR Water ePermitting System, with the NOI).
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 5.1.1, page 24**

> "shall submit the SWPPP summary to the Department when applying for coverage under this permit."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=24)

#### Submit a Notice of Intent for coverage

No set date. By the time frames in s. NR 216.22(2), Wis. Adm. Code, which the permit does not restate (1.1).

Submit a complete Notice of Intent (NOI, Form 3400-163) through the Water ePermitting System. Within 30 days DNR decides whether the facility is covered and sends a cover letter with the Start Date of coverage.

- **When:** a new facility is seeking coverage.

- You file it in the agency's system (Wisconsin DNR Water ePermitting System).
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 1.1, page 3**

> "shall submit a complete Notice of Intent (NOI) to the Department to apply for coverage under an industrial storm water discharge permit in accordance with the time frames in s. NR 216.22(2), Wis. Adm. Code."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=3)

#### Submit a Notice of Termination when coverage is no longer claimed

No set date. The permit sets no deadline; s. NR 216.32 governs (1.5).

When the permittee no longer claims coverage, submit a signed Notice of Termination (Form 3400-170) to DNR under s. NR 216.32, Wis. Adm. Code.

- **When:** you no longer claim coverage under this permit.

- You file it in the agency's system (Wisconsin DNR Water ePermitting System).
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 1.5, page 4**

> "If the permittee no longer claims coverage under this permit, the permittee shall submit a signed Notice of Termination (NOT) to the Department in accordance with s. NR 216.32, Wis. Adm. Code."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=4)

#### Submit a TMDL implementation plan within 180 days

Within 180 days after the annual check that found the TMDL water body.

If the annual check finds the facility discharges to a water body with an approved TMDL that includes it, submit to DNR within 180 days of that check a proposed implementation plan that meets the facility's wasteload allocation: feasible pollution prevention and treatment improvements, revisions or redesigns, and a time schedule for them.

- **When:** the annual check finds the facility discharges a pollutant of concern to a water body in an approved TMDL.

- You file it in the agency's system (Wisconsin DNR Water ePermitting System (6.7)).
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 2.7.6, page 11**

> "Within 180 days of the annual check that determines the facility discharges to a TMDL allocated water body, a permittee that is included in a State and Federal approved TMDL shall submit to the Department a proposed implementation plan"

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=11)

#### Submit results of DNR-directed sampling within 30 days of receiving them

Within 30 days after you receive the results of that sampling.

Submit the results of any chemical sampling DNR requires beyond the first two annual rounds within 30 days after receiving them.

- **When:** the Department directs additional chemical sampling.

- You file it in the agency's system (Wisconsin DNR Water ePermitting System (6.7)).
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 5.2.4, page 25**

> "shall be submitted to the Department within 30 days after the permittee receives the results of that chemical sampling."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=25)

### Ongoing  6 duties

#### Carry out the SWPPP and keep it current

Ongoing, no set date.

Carry out the SWPPP on its implementation schedule (section 3.3.2.10) unless DNR sets another, keep it current and correct deficiencies as they are found. Amend it and submit it to DNR after any operational change that may cause additional significant storm water contamination.

- Nothing is filed; keep the record at the facility.
- Signed or certified by a responsible official per NR 216.22 7.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 5.1.5, page 24**

> "The permittee shall keep the SWPPP current and correct deficiencies in the SWPPP as they are identified."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=24)

#### Evaluate every outfall for non-storm water discharges

No set date. Standing duty for the duration of the permit (4.2.1); end of pipe screening, twice a year, is listed separately.

For the duration of the permit, evaluate all storm water outfalls during dry periods for non-storm water contributions, either by detailed testing of the storm sewer system (dye, smoke or video) or by end of pipe screening. Put the results (date, method, outfall, results and likely sources) in the SWPPP and the annual inspection report and keep them on site.

- Nothing is filed; keep the record at the facility.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 4.2.1, page 20**

> "The permittee shall evaluate all storm water outfalls for non-storm water contributions to the storm drainage system for the duration of this permit."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=20)

#### Keep the inspection and evaluation reports on site

Ongoing, no set date.

Keep copies of all AFSCI reports, quarterly visual inspections and non-storm water monitoring reports at the facility for the duration of coverage and make them available to DNR on request.

- Nothing is filed; keep the record at the facility.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 5.2.1, page 24**

> "AFSCI reports, quarterly visual inspections and non-storm water monitoring reports shall be maintained on site at the facility and made available to the Department for inspection and copying upon request for the duration of permit coverage."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=24)

#### Keep the SWPPP at the facility and show it on request

Ongoing, no set date.

Keep the SWPPP at the facility and make it available to DNR for inspection and copying on request, and to the operator of a permitted municipal separate storm sewer system that receives the discharge.

- Nothing is filed; keep the record at the facility.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 5.1.3, page 24**

> "The SWPPP shall be kept at the facility and made available to the Department for inspection and copying upon request."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=24)

#### Meet the minimum source area controls and show how in the SWPPP

Ongoing, no set date.

Meet the minimum source area controls in section 2.10 and say in the SWPPP how each is met: minimize exposure of pollutant sources, good housekeeping, maintain controls and vehicles and equipment with routine visual inspections, prevent and respond to spills, stabilize bare soil, keep salt from precipitation and runoff, train employees, evaluate non-storm water discharges, minimize dust and off-site tracking, and control SARA Title III Section 313 water priority chemicals where they apply. Show structural controls on the drainage base map.

- Nothing is filed; keep the record at the facility.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 2.10, page 12**

> "All permittees shall comply with the following minimum source area control requirements. The Storm Water Pollution Prevention Plan required under section 3 shall identify how each source area control requirement will be met."

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=12)

#### Train employees on storm water pollution prevention

No set date. The permit sets no frequency (2.10.7).

Train employees as appropriate on storm water pollution prevention, the permit's requirements and their own responsibilities under the permit and the SWPPP.

- Nothing is filed; keep the record at the facility.

**Source: WPDES General Permit No. WI-S067849-5, Tier 1 Industrial Facilities (27 pages, text layer on every page), section 2.10.7, page 13**

> "Train and raise awareness of employees as appropriate on storm water pollution prevention, the requirements of this permit, and their specific responsibilities"

[Open the permit at this section](https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/S067849-5.pdf#page=13)

## Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

## Wisconsin Tier 1 Industrial Storm Water General Permit duties, topic by topic

How the Wisconsin Tier 1 Industrial Storm Water General Permit compares with the other checked permits on each kind of duty, in the permit's own words with the section for each:

- [Inspection requirements](https://stormdue.com/guides/stormwater-inspection-requirements#permit-us-wi-s067849)
- [Sampling and qualifying storms](https://stormdue.com/guides/stormwater-sampling-requirements#permit-us-wi-s067849)
- [Report due dates](https://stormdue.com/guides/stormwater-annual-report-due-dates#permit-us-wi-s067849)
- [SWPPP, training and records](https://stormdue.com/guides/swppp-requirements#permit-us-wi-s067849)

- [Every state's permit](https://stormdue.com/states)
- [How we check permit rules](https://stormdue.com/about-the-rules)
- [Deadline calculator](https://stormdue.com/tools/deadline-calculator)
- [Benchmark comparison](https://stormdue.com/tools/benchmark-comparison)
- [More free tools](https://stormdue.com/tools)
- [Duties compared across permits](https://stormdue.com/guides)

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.