# Florida industrial stormwater permit

> Who runs Florida's industrial stormwater permit, its number, dates and official link, checked November 23, 2026. Get one email when its duties are ready.

Canonical page: https://stormdue.com/states/fl

In Florida, industrial stormwater is covered by Florida Multi-Sector Generic Permit, adopted from EPA's 1995 MSGP, Rule 62-621.300(5) F.A.C, run by FDEP, NPDES Stormwater Program. Expiry or status: no permit-wide expiry; each facility's coverage lasts 5 years.

Tell me when Florida is ready

One email when its duties are checked. Nothing else.

Florida Multi-Sector Generic Permit

FDEP

- Duties not listed yet: we have not checked this permit's rules.
- no permit-wide expiry; each facility's coverage lasts 5 years
- Run by the state

Checked November 23, 2026 from the agency's own page.

## Who runs the permit, and when does it expire?

Checked November 23, 2026. "Confirmed" means read from the agency's page or permit that day. "Inferred" means worked out, for example a date from a five-year term. Agencies move pages often: use the official page as the final word.

## Can I get Florida's due dates yet?

Not yet. Leave your email and we will send one email when we have checked this permit's rules and can list its duties. We ask you to confirm your address first.

Free tools for any state: [is my industry on the federal list?](https://stormdue.com/tools/industry-coverage), the [no-exposure checklist](https://stormdue.com/tools/no-exposure-checklist) and [more free tools](https://stormdue.com/tools). [How we check permit rules](https://stormdue.com/about-the-rules).

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.
