# North Carolina industrial stormwater permit

> North Carolina's industrial stormwater permit: agency, permit number, dates and official link, checked November 23, 2026.

Canonical page: https://stormdue.com/states/nc

In North Carolina, industrial stormwater is covered by No single MSGP: sector general permits NCG02-NCG24, e.g. NCG03 metal fab, NCG06 food, NCG08 transit (all 2026-07-01 to 2031-06-30); NCG14 ready-mix and NCG15 airports to 2027-06-30; NCG20 scrap metal to 2029-05-31, run by NC DEQ, DEMLR Stormwater Program. Expiry or status: per permit.

Tell me when North Carolina is ready

One email when its duties are checked. Nothing else.

No single MSGP: sector general permits NCG02-NCG24

NC DEQ

- Duties not listed yet: we have not checked this permit's rules.
- per permit
- Run by the state

Checked November 23, 2026 from the agency's own page.

## Who runs the permit, and when does it expire?

Checked November 23, 2026. "Confirmed" means read from the agency's page or permit that day. "Inferred" means worked out, for example a date from a five-year term. Agencies move pages often: use the official page as the final word.

## Can I get North Carolina's due dates yet?

Not yet. Leave your email and we will send one email when we have checked this permit's rules and can list its duties. We ask you to confirm your address first.

Free tools for any state: [is my industry on the federal list?](https://stormdue.com/tools/industry-coverage), the [no-exposure checklist](https://stormdue.com/tools/no-exposure-checklist) and [more free tools](https://stormdue.com/tools). [How we check permit rules](https://stormdue.com/about-the-rules).

---

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.
