# No exposure certification checklist

> Answer the eleven questions from 40 CFR 122.26(g) and EPA's no exposure form to see whether you may be able to certify no exposure. Free, cited.

Canonical page: https://stormdue.com/tools/no-exposure-checklist

A facility whose industrial materials and activities are all under a storm-resistant roof or cover can certify "no exposure" instead of holding full permit coverage. These are the eleven questions the federal rule and EPA's form ask. Answer each one for the whole facility: one "yes" means it does not qualify as it is.

Free, no account. Each question links to the regulation it comes from.

**Last checked November 25, 2026.** StormDue does not guarantee that these facts are accurate or current. Verify them with your agency before you rely on them.

## What does "no exposure" mean?

In the regulation's words: "No exposure" means that all industrial materials and activities are protected by a storm resistant shelter to prevent exposure to rain, snow, snowmelt, and/or runoff.  [Source](https://www.ecfr.gov/current/title-40/part-122/section-122.26#p-122.26(g))  What it says  "No exposure" means that all industrial materials and activities are protected by a storm resistant shelter to prevent exposure to rain, snow, snowmelt, and/or runoff.  40 CFR 122.26(g) (ecfr.gov). Retrieved November 25, 2026.

## What are the limits?

- This conditional exclusion from the requirement for an NPDES permit is available on a facility-wide basis only, not for individual outfalls.
  [Source](https://www.ecfr.gov/current/title-40/part-122/section-122.26#p-122.26(g)(3)(ii))
  **What it says**
  This conditional exclusion from the requirement for an NPDES permit is available on a facility-wide basis only, not for individual outfalls.  40 CFR 122.26(g)(3)(ii) (ecfr.gov). Retrieved November 25, 2026.
- Storm water discharges from construction activities identified in paragraphs (b)(14)(x) and (b)(15) are not eligible for this conditional exclusion.
  [Source](https://www.ecfr.gov/current/title-40/part-122/section-122.26#p-122.26(g)(3)(i))
  **What it says**
  Storm water discharges from construction activities identified in paragraphs (b)(14)(x) and (b)(15) are not eligible for this conditional exclusion.  40 CFR 122.26(g)(3)(i) (ecfr.gov). Retrieved November 25, 2026.
- If circumstances change and industrial materials or activities become exposed to rain, snow, snow melt, and/or runoff, the conditions for this exclusion no longer apply.
  [Source](https://www.ecfr.gov/current/title-40/part-122/section-122.26#p-122.26(g)(3)(iii))
  **What it says**
  If circumstances change and industrial materials or activities become exposed to rain, snow, snow melt, and/or runoff, the conditions for this exclusion no longer apply.  40 CFR 122.26(g)(3)(iii) (ecfr.gov). Retrieved November 25, 2026.
- The NPDES permitting authority retains the authority to require permit authorization (and deny this exclusion) upon making a determination that the discharge causes, has a reasonable potential to cause, or contributes to an instream excursion above an applicable water quality standard.
  [Source](https://www.ecfr.gov/current/title-40/part-122/section-122.26#p-122.26(g)(3)(iv))
  **What it says**
  The NPDES permitting authority retains the authority to require permit authorization (and deny this exclusion) upon making a determination that the discharge causes, has a reasonable potential to cause, or contributes to an instream excursion above an applicable water quality standard.  40 CFR 122.26(g)(3)(iv) (ecfr.gov). Retrieved November 25, 2026.
- Submit the signed certification to the NPDES permitting authority once every five years. The federal minimum. A state permit can ask for more often: see state_notes.
  [Source](https://www.ecfr.gov/current/title-40/part-122/section-122.26#p-122.26(g)(1)(iii))
  **What it says**
  Submit the signed certification to the NPDES permitting authority once every five years.  40 CFR 122.26(g)(1)(iii) (ecfr.gov). Retrieved November 25, 2026.

## Do states ask for more?

Some do. A state can ask for renewal more often than every five years, charge a fee, or use its own form. California's Industrial General Permit asks facilities with no exposure coverage to recertify each reporting year by October 1, or apply for full coverage.  [Source](https://www.waterboards.ca.gov/water_issues/programs/stormwater/docs/industrial/2014indgenpermit/order.pdf#page=71)  What it says  By October 1 of each reporting year beginning in 2015, any Discharger who has previously registered for NEC coverage shall either submit and certify an NEC ... or apply for NOI coverage.  Industrial General Permit, Order 2014-0057-DWQ, Section XVII.G, page 68, printed page 68 (waterboards.ca.gov). Retrieved November 23, 2026.     Your state's page has the agency and the official link: [find your state's permit](https://stormdue.com/states).

The form's own words: If you answer "Yes" to any of these questions, you are not eligible for the no exposure exclusion.  [Source](https://www.epa.gov/sites/default/files/2021-01/documents/2021_msgp_-_appendix_k_-_no_exposure_certification_nec_form.pdf#page=3)  What it says  If you answer "Yes" to any of these questions, you are not eligible for the no exposure exclusion.  NPDES Form 3510-11, Section E, Exposure Checklist, printed page K-3 (epa.gov). Retrieved November 25, 2026.    . Download the questions as [JSON](https://stormdue.com/data/no-exposure.json). Not sure your industry is listed at all? [Check your industry](https://stormdue.com/tools/industry-coverage), or see [all free tools](https://stormdue.com/tools).

See my checklist result

---