Get my permit calendar

Stormwater permit due dates lookup

Pick your state and coverage to see every recurring duty in your industrial stormwater permit, the next due date for each and the permit section it comes from. Free, no account.

Arizona: Arizona Industrial Stormwater MSGP (non-mining) (AZMSG2024-001). Change state

Your coverage

Coverage by Notice of Intent in myDEQ, with the fee, after the SWPPP is prepared. The NOI Certificate, issued once a complete NOI and the fee are received, is the authorization to discharge and carries its effective date.

No Exposure Certification filed in myDEQ: the whole site has a storm-resistant shelter and no industrial materials or activities are exposed. Renewed every five years from the date it is issued.

Answer what you know. "Not sure" is fine: those duties are listed under "Only if" with the condition spelled out.

The sector code on your permit coverage or notice of intent. Names are from EPA's federal sector table; your state's permit uses the same letters but may word them differently.

Set by your past sampling results: a level starts when a pollutant is above the permit's benchmark, and goes up if it stays above. Your last annual report or the agency's online system shows it. Never had one? Choose None.

The state keeps a list of polluted lakes, rivers and bays (its 303(d) list). Your agency's water quality map shows whether the water your stormwater drains to is on it.

No industrial activity and nobody working on site, as you certified to the agency.

ELGs are federal discharge rules for certain industries, such as cement making, fertilizer, asphalt paving and landfills. If one applies to you, your coverage documents name it.