Get my permit calendar

Stormwater permit due dates lookup

Pick your state and coverage to see every recurring duty in your industrial stormwater permit, the next due date for each and the permit section it comes from. Free, no account.

Nebraska: Nebraska Industrial Storm Water General Permit NER920000 (ISW-GP) (NER920000). Change state

Your coverage

Coverage under NER920000: a SWPPP first, then a complete electronic NOI through NDEE's website; new dischargers are authorized 30 days after NDEE receives a complete NOI, or on NDEE's notice.

Conditional exclusion for no exposure (NDEE Title 119, Chapter 10, 007.04D): a No Exposure Certification submitted electronically, renewed every five years and when the permit is reissued (Part 1.5).

Answer what you know. "Not sure" is fine: those duties are listed under "Only if" with the condition spelled out.

The sector code on your permit coverage or notice of intent. Names are from EPA's federal sector table; your state's permit uses the same letters but may word them differently.

Set by your past sampling results: a level starts when a pollutant is above the permit's benchmark, and goes up if it stays above. Your last annual report or the agency's online system shows it. Never had one? Choose None.

The state keeps a list of polluted lakes, rivers and bays (its 303(d) list). Your agency's water quality map shows whether the water your stormwater drains to is on it.

No industrial activity and nobody working on site, as you certified to the agency.

ELGs are federal discharge rules for certain industries, such as cement making, fertilizer, asphalt paving and landfills. If one applies to you, your coverage documents name it.

A TMDL is a cleanup plan the state wrote for a polluted water body, with a pollution limit for everyone who drains to it. Your agency's map or your coverage letter says if one covers your water.