Get my permit calendar

States / California

Industrial General Permit (IGP) due dates and duties

The General Permit for Storm Water Discharges Associated with Industrial Activities (CAS000001) sets 50 duties below, each with when it is due and the permit section it comes from. Rules last checked November 25, 2026.

Get my permit calendar

Free, no account. Each date comes with the permit section and the permit's own words.

Next: choose your coverage and answer a few questions. You get your next due dates and a calendar file.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
CAS000001
Agency
State Water Resources Control Board (with the nine Regional Water Quality Control Boards)
Effective
July 1, 2015
Expires
June 30, 2020 , administratively continued until a new permit is issued
Where you file
SMARTS (Storm Water Multiple Application and Report Tracking System)
Official page
waterboards.ca.gov
Rules last checked
November 25, 2026 (version 2026-11-25.3 )
Notes on the permit's status and renewal

The order's cover page states an expiration date of June 30, 2020. The program page says the permit "is administratively continued in accordance with 40 Code of Federal Regulations 122.6 until a new permit is issued". No draft reissuance was found on the program pages read on 2026-11-23. An October 16, 2026 State Water Board letter on the 2026-27 El Nino season restates that all permit requirements remain in effect. State Water Board Significant General Permits table (A-26, updated 2026-09-08): staff are developing an informal draft reissued permit; release for comment, hearing and adoption are TBD. No new amendment as of 2026-11-25. Re-checked 2026-11-25: the program page still lists only the 2015 and 2018 amendments and the administrative continuance; the El Nino letter changes no deadline. The Significant General Permits table was not re-fetched in this pass.

What does full permit coverage require?

Full permit coverage. SWPPP, monitoring, sampling, annual evaluation and annual report apply.

Every month 1 duty

Do the monthly visual observation of every drainage area

Once each calendar month, during daylight, during scheduled operating hours and on a day without precipitation, observe each drainage area for unauthorized non-storm water discharges, authorized ones and their BMPs, and outdoor equipment, storage and activity areas. Record date, time, locations, findings, observer and responses.

By the end of each month.

  • Does not apply if: inactive mining certification in effect.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XI.A.1 , page 42

"At least once per calendar month, the Discharger shall visually observe each drainage area for the following:"

Every quarter 1 duty

(Question) Upload non-significant SWPPP revisions each quarter

Whether non-significant SWPPP revisions must be certified and uploaded in SMARTS once a quarter is not settled: the order only limits how often they can be required, while the Water Board's To-Do List says quarterly uploads are required. Shown as a question until the Water Board answers.

No set date. X.B.3: "not required to certify and submit via SMARTS their SWPPP revisions more than once every three (3) months"; To-Do List: updates "are required to be uploaded in SMARTS at least once a quarter". Which governs?

  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section X.B.3 , page 29

"With the exception of significant revisions, the Discharger is not required to certify and submit via SMARTS their SWPPP revisions more than once every three (3) months in the reporting year."

Every half year 2 duties

Sample qualifying storm events, July 1 to December 31

Collect and analyze samples from two Qualifying Storm Events (QSEs) between July 1 and December 31, at every discharge location (unless a representative-sampling reduction applies), within 4 hours of the start of discharge or of the start of operations if the QSE began in the previous 12 hours. Analyze TSS, oil and grease, pH, Table 1 parameters for the SIC code, and any facility-specific, impaired-water, TMDL, Regional Board and ELG parameters.

Between July 1 and December 31, 2 times.

  • Does not apply if: inactive mining certification in effect.
  • If you are in a compliance group: once.
  • If you have certified a sampling frequency reduction: once.
  • If you are in a compliance group and you have certified a sampling frequency reduction: once per reporting year.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XI.B.2; XI.B.4-6 , page 43

"The Discharger shall collect and analyze storm water samples from two (2) QSEs within the first half of each reporting year (July 1 to December 31)"

Sample qualifying storm events, January 1 to June 30

Same as the first-half sampling, for the January 1 to June 30 half of the reporting year.

Between January 1 and June 30, 2 times.

  • Does not apply if: inactive mining certification in effect.
  • If you are in a compliance group: once.
  • If you have certified a sampling frequency reduction: once.
  • If you are in a compliance group and you have certified a sampling frequency reduction: not required.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XI.B.2 , page 43

"and two (2) QSEs within the second half of each reporting year (January 1 to June 30)."

Every year 4 duties

Do the Annual Comprehensive Facility Compliance Evaluation

Once per reporting year, review all records from the previous reporting year, inspect all industrial areas, no-exposure areas, BMP equipment and BMPs, and assess BMP effectiveness. Revise and implement SWPPP changes within 90 days.

By the end of each reporting year (it starts July 1).

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XV , page 64

"The Discharger shall conduct one Annual Evaluation for each reporting year (July 1 to June 30)."

Submit the Annual Report by July 15

Certify and submit the Annual Report in SMARTS with the compliance checklist, explanations of any noncompliance (including missed observations and samples), SWPPP revisions made during the year, and the date of the Annual Evaluation.

By July 15, after each reporting year ends.

  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XVI.A , page 64

"The Discharger shall certify and submit via SMARTS an Annual Report no later than July 15th following each reporting year using the standardized format and checklists in SMARTS."

Implement SWPPP changes within 90 days of the Annual Evaluation

Revise the SWPPP as appropriate and implement the revisions within 90 days of the Annual Evaluation.

Within 90 days after annual evaluation date.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XV , page 64

"The Discharger shall revise the SWPPP, as appropriate, and implement the revisions within 90 days of the Annual Evaluation."

Pay the annual permit fee

Pay the annual fee set by California Code of Regulations, title 23, section 2200 et seq.

No set date. Due date is stated on the State Water Board's annual fee notice (CCR tit. 23 §2200.1); invoices may be semiannual.

  • You file it in the agency's system (SMARTS electronic funds transfer or mail (footnote 6)).

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section II.B.1.c; II.B.2.d , page 18

"The Discharger shall pay the appropriate Annual Fee in accordance with California Code of Regulations, title 23, section 2200 et seq."

When something happens 21 duties

Inactive mining operation annual inspection and certification

Inspect the inactive mining site annually and certify in SMARTS that it still meets the inactive mining conditions.

By July 15 each reporting year.

  • When: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XIII.C.2 , page 61

"The Discharger shall annually inspect the inactive mining site and certify via SMARTS no later than July 15th of each reporting year"

(Optional) Certify the sampling frequency reduction

After four consecutive sampled QSEs with no NAL/TNAL/NEL exceedance, full compliance, and all required documents, data and reports certified in SMARTS for that period, certify in SMARTS to drop to one QSE per half year (Compliance Group participants: one QSE per reporting year). The Regional Board may bar it during enforcement or reject it. Lost on any exceedance.

No set date. optional.

  • When: four consecutive qses without exceedance.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XI.C.7 , page 52

"An eligible Discharger shall certify via SMARTS that it meets the conditions in subsection 7.a above."

(Optional) Submit the Qualified Combined Samples justification

To have the lab combine equal-volume samples from up to four discharge locations, certify and submit in SMARTS the Monitoring Implementation Plan revisions with the Qualified Combined Samples justification before combining. The Regional Board may reject it.

No set date. optional; must be submitted before the reduction is used.

  • When: qualified combined samples elected.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XI.C.5.c-d , page 51

"A Discharger that satisfies the conditions of subsection 5.b.i through iv above shall submit and certify via SMARTS the revisions to the Monitoring Implementation Plan that includes the Qualified Combined Samples justification."

Collect each storm sample within 4 hours

For each QSE sampled, collect samples within 4 hours of the start of discharge, or of the start of facility operations if the QSE occurred in the previous 12 hours.

Within 4 hours of start of discharge or start of operations.

  • When: qse discharge.
  • Does not apply if: inactive mining certification in effect.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XI.B.5 , page 44

"Samples from each discharge location shall be collected within four (4) hours of: a. The start of the discharge; or,"

Facility discharging to ocean waters sets up an Ocean Plan monitoring program before operating

A facility with outfalls to ocean waters that are subject to the California Ocean Plan's model monitoring provisions must develop and implement a monitoring plan meeting those provisions at least 7 days before operations begin; otherwise it is not eligible for coverage. The XI.C sampling reductions and exceptions do not apply to those outfalls.

At least 7 days before start of industrial activity.

  • When: new facility; discharges to ocean waters subject to ocean plan model monitoring.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section VIII.A , page 27

"Dischargers who have not developed and implemented a monitoring program in compliance with the California Ocean Plan's model monitoring provisions by July 1, 2015, or seven (7) days prior to commencing of operations"

File a temporary suspension at least 7 days ahead

To suspend monitoring during a planned shutdown of 10 or more consecutive days, upload stabilization SWPPP revisions, the justification, the stabilization date and the projected restart date in SMARTS 7 days ahead; confirm the restart date when operations resume.

At least 7 days before planned suspension start.

  • When: planned suspension 10 days or more.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section X.H.3 , page 39

"The Discharger shall upload via SMARTS (7) seven calendar days prior to the planned temporary suspension of industrial activities:"

Give advance notice of planned changes that may cause noncompliance

Notify the Regional Water Board and the local MS4 in advance of planned changes in industrial activity that may result in noncompliance.

No set date. "Advance notice"; no number of days stated.

  • When: planned change may cause noncompliance.
  • You send it to the agency (Regional Water Board and local MS4).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XXI.M , page 78

"Dischargers shall give advance notice to the Regional Water Board and local MS4 of any planned changes in the industrial activity that may result in noncompliance with this General Permit."

New owner or operator files new registration before the transfer

Coverage is not transferable. The new operator certifies and submits new PRDs before the transfer (or at least 7 days before first operations at a relocated facility). The seller must tell the buyer about the permit requirements (II.C.2).

Before transfer date.

  • When: change of operator or location.
  • If facility relocation: At least 7 days before first day of operations at new location.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XXI.R , page 79

"new PRDs for NOI and NEC coverage must be certified and submitted via SMARTS prior to the transfer, or at least seven (7) days prior to the first day of operations for a relocated facility."

Observe the discharge whenever a sample is taken

At each discharge location sampled, observe and record floating and suspended materials, oil and grease, discoloration, turbidity, odors, trash and likely sources, at the time of sampling.

At the time of sampling event.

  • When: sampling event.
  • Does not apply if: inactive mining certification in effect.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XI.A.2 , page 42

"Sampling event visual observations shall be conducted at the same time sampling occurs at a discharge location."

Provide records within 10 days of a written request

On written request by U.S. EPA or the local MS4, provide copies of Annual Reports or other requested records within 10 days.

Within 10 days after receipt of written request.

  • When: written records request.
  • You send it to the agency (requesting agency or MS4).

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XXI.J.5 , page 76

"provide paper or electronic copies of Annual Reports or other requested records to the Water Boards, U.S. EPA, or local MS4 within ten (10) days from receipt of the request."

Recertify the site map after a significant layout change

When the facility layout changes significantly (new building, storage locations, boundary), revise the site map and certify and submit it in SMARTS.

No set date. No deadline in II.B.3.a. For NOI sites the 30-day significant SWPPP revision rule (X.B.2) likely applies (inferred); no deadline for NEC sites.

  • When: significant layout change.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section II.B.3.a , page 19

"a revision to the site map is required and shall be certified and submitted via SMARTS."

Register for coverage before starting industrial activity

Certify and submit Permit Registration Documents (NOI, site map, SWPPP) in SMARTS and pay the annual fee before industrial activity starts.

At least 7 days before start of industrial activity.

  • When: new facility.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section II.B.5.a , page 20

"shall certify and submit PRDs via SMARTS at least seven (7) days prior to commencement of industrial activities"

Request termination of coverage when it no longer applies

Certify and submit a Notice of Termination in SMARTS when operation is transferred, the facility has closed and removed industrial pollutants, or operations no longer need the permit.

No set date. No deadline; obligations and fees continue until a valid NOT is received.

  • When: transfer or closure or no longer subject.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section II.C.1 , page 20

"Until a valid NOT is received, the Discharger remains responsible for compliance with this General Permit and payment of accrued annual fees."

Revise BMPs when visual observations show unaddressed pollutant sources

When monthly or sampling event visual observations show pollutant sources the SWPPP does not adequately address, revise the BMPs as necessary.

No set date. No deadline stated in XI.A.4.

  • When: visual observation shows unaddressed sources.
  • Does not apply if: inactive mining certification in effect.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XI.A.4 , page 43

"The Discharger shall revise BMPs as necessary when the visual observations indicate pollutant sources have not been adequately addressed in the SWPPP."

Send the un-redacted copy of a redacted submittal within 30 days

When a SMARTS submittal had trade secrets redacted, send the complete un-redacted version, clearly labelled CONFIDENTIAL, to the Regional Water Board within 30 days of the redacted submittal.

Within 30 days after redacted submittal date.

  • When: redacted submittal.
  • You send it to the agency (Regional Water Board (delivery method not stated in II.B.3.d)).
  • Keep the records 5 years.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section II.B.3.d , page 19

"Dischargers must submit complete and un-redacted versions of the information that are clearly labeled "CONFIDENTIAL" to the Regional Water Board within 30 days of the submittal of the redacted information."

Submit any alternative discharge location in SMARTS

Certify and submit in SMARTS any alternative discharge location, or revisions to alternative discharge locations, in the Monitoring Implementation Plan.

No set date. No deadline stated in XI.C.3.b.

  • When: alternative discharge location designated or revised.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XI.C.3.b , page 49

"The Discharger shall submit and certify via SMARTS any alternative discharge location or revisions to the alternative discharge locations in the Monitoring Implementation Plan."

Update SMARTS when a new LRP or Duly Authorized Representative is designated

When a new Legally Responsible Person or Duly Authorized Representative is designated, make the matching revisions in SMARTS so the authorization is current before the next submittal.

No set date. No deadline stated; the authorization must be current before the next submittal (XXI.K.2; XXI.K.5.c).

  • When: new lrp or dar designated.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XXI.K.2; XXI.K.5.c , page 76

"When a new LRP or Duly Authorized Representative is designated, the Discharger shall ensure that the appropriate revisions are made via SMARTS."

Upload a significantly revised inactive mining SWPPP within 30 days

While an inactive mining certification is in effect, certify and submit any significantly revised SWPPP in SMARTS within 30 days of the revision. Significant updates are signed by a California licensed PE.

Within 30 days after date of significant revision.

  • When: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • The permit says this is done by a California licensed professional engineer.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XIII.C.3-4 , page 62

"The Discharger shall certify and submit via SMARTS any significantly revised SWPPP within 30 days of the revision(s)."

Upload a significantly revised SWPPP within 30 days

Certify and submit the SWPPP in SMARTS within 30 days whenever it contains significant revisions. Other revisions need not be uploaded more than once every three months.

Within 30 days after date of significant revision.

  • When: significant swppp revision.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section X.B.2-3 , page 29

"Certify and submit via SMARTS their SWPPP within 30 days whenever the SWPPP contains significant revision(s)"

Upload lab results within 30 days

Submit all sampling and analytical results for each sampling event in SMARTS within 30 days of obtaining all results.

Within 30 days after all results obtained for sampling event.

  • When: lab results received.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS (Ad Hoc monitoring report)).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XI.B.11.a , page 45

"The Discharger shall submit all sampling and analytical results for all individual or Qualified Combined Samples via SMARTS within 30 days of obtaining all results for each sampling event."

Water quality based corrective actions after an NEL exceedance or receiving-water violation

Evaluate the facility's pollutant sources and SWPPP implementation, assess whether more BMPs are needed, and certify and submit documentation in SMARTS that BMPs were added or that none are needed.

No set date. No deadline stated in XX.B.

  • When: nel exceedance, or receiving water limitation violation.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XX.B.1 , page 73

"Certify and submit via SMARTS documentation based upon the above facility evaluation and assessment that:"

Ongoing 4 duties

Keep all monitoring records and reports for five years

Keep a paper or electronic copy of all storm water monitoring information, records, data and reports the permit requires for at least five years, available to Water Board staff at the facility during scheduled operating hours.

Ongoing, no set date.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XXI.J.4 , page 76

"Dischargers shall retain, for a period of at least five (5) years, either a paper or electronic copy of all storm water monitoring information, records, data, and reports required by this General Permit."

Track NAL exceedances and Level status for each parameter

Compare results with Table 2 NALs (and Attachment E TNALs). An annual NAL exceedance is a reporting-year average above the annual NAL; an instantaneous exceedance is two or more results in a reporting year above the instantaneous maximum (or outside pH 6.0 to 9.0). An exceedance moves the parameter from Baseline to Level 1, or Level 1 to Level 2, on July 1 after the reporting year in which it occurred.

No set date. Status changes take effect July 1 after the reporting year of the exceedance.

  • Does not apply if: inactive mining certification in effect.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XII.A-D , page 54

"Level 1 status will commence on July 1 following the reporting year during which the exceedance(s) occurred."

Train the team members who carry out the permit

Run the employee training program described in the SWPPP (materials, who is trained, a training schedule) and keep training records. Once the facility is in Level 1, the appropriate team members must be trained by a QISP.

No set date. The permit requires a training schedule but sets no frequency; the facility's own SWPPP schedule governs.

  • If a parameter is at level 1 or higher: a different schedule.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section X.H.1.f; X.H.1.g.iii , page 37

"Ensure that all team members implementing the various compliance activities of this General Permit are properly trained to implement the requirements of this General Permit"

Only if... 13 duties

These apply only in the situation named on each one. Answer the questions to sort them.

PE-prepared volume and mass calculations for petroleum refining and asphalt facilities

Facilities subject to 40 CFR 419 or 443 estimate discharge volumes and pollutant mass per drainage area; a California licensed PE must complete them; include them in the Annual Report.

By July 15, after each reporting year ends.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); your SIC code starts with 2911, 2951, 2952, 3996.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • The permit says this is done by a California licensed professional engineer.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XI.D.1-2; II.D.2.a , page 53

"Ensure that the volume/mass estimates or calculations required in subsection b are completed by a California licensed professional engineer."

Submit the representative flow estimate with the Annual Report (Los Penasquitos Lagoon TMDL)

Responsible Dischargers under the Los Penasquitos Lagoon Sediment TMDL estimate the representative flow rate from the facility for one QSE each reporting year and submit it as a PDF attachment to the Annual Report in SMARTS.

By July 15, after each reporting year ends.

  • Only if: a TMDL applies to your discharge; responsible discharger los penasquitos sediment tmdl.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS (PDF attachment to the Annual Report)).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Attachment E, List of Existing TMDLs Applicable to Industrial Storm Water Discharges , section Los Penasquitos Lagoon Sediment TMDL , page 124

"The Responsible Discharger shall submit the representative flow estimate as a PDF attachment to the Annual Report"

Update (or certify no change to) the Level 2 Technical Report with each Annual Report

While in Level 2, have the QISP update the Level 2 ERA Technical Report for new exceedances of the same parameter and drainage area, operational or source changes, or new information, and submit it with each Annual Report; if nothing changed, certify that in the Annual Report.

By July 15, after each reporting year ends.

  • Only if: a parameter is at level 2; level 2 technical report submitted.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • The permit says this is done by a Qualified Industrial Storm Water Practitioner (QISP).
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XII.D.3.c , page 59

"The Level 2 ERA Technical Report shall be prepared by a QISP and be certified and submitted via SMARTS by the Discharger with each Annual Report."

(Optional) Submit the Representative Sampling Reduction justification

To sample fewer locations in a drainage area, certify and submit in SMARTS the Monitoring Implementation Plan revisions with the Representative Sampling Reduction justification before using the reduction. The Regional Board may reject it.

No set date. optional; must be submitted before the reduction is used.

  • Only if: not: your discharge is subject to federal effluent limitation guidelines (ELGs); representative sampling reduction elected.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XI.C.4.c-d , page 50

"A Discharger that satisfies the conditions of subsection 4.b.i through v above shall submit and certify via SMARTS the revisions to the Monitoring Implementation Plan that includes the Representative Sampling Reduction justification."

Amend the SWPPP with TNAL or NEL exceedance information

Responsible Dischargers under an Attachment E TMDL amend the SWPPP with the TNAL or NEL exceedance information and certify and submit it in SMARTS.

No set date. No deadline stated in VII.C.3.

  • Only if: a TMDL applies to your discharge; tnal or nel exceedance.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section VII.C.3 , page 26

"The SWPPP is required to be amended with the TNAL or NEL exceedance information, and to be certified and submitted via SMARTS."

Annual training for employees handling plastic materials

Plastics facilities using the eight-BMP alternative to a 1 mm containment system must train employees handling plastic materials every year (hazards, corrective-action duties, cleanup).

No set date. "annually"; calendar vs reporting year not stated.

  • Only if: the facility handles plastic materials (a plastics facility); plastics eight bmp option in use.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XVIII.A.2.b.i , page 70

"Plastics Facilities shall annually train employees handling Plastic Materials."

Complete the Level 1 ERA Evaluation by October 1

With a QISP, evaluate the industrial pollutant sources related to the exceedance, identify the SWPPP BMPs and any additional BMPs and SWPPP revisions needed. All drainage areas must be evaluated.

By October 1 after the status begins (after level 1 start).

  • Only if: a parameter is at level 1.
  • Does not apply if: inactive mining certification in effect.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by a Qualified Industrial Storm Water Practitioner (QISP).

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XII.C.1 , page 55

"By October 1 following commencement of Level 1 status for any parameter with sampling results indicating an NAL/TNAL exceedance, the Discharger shall:"

Designate a trained QISP when Level 1 begins

Designate a Qualified Industrial Storm Water Practitioner who has completed the State Water Board QISP course, and have the QISP train the appropriate team members.

By October 1 after the status begins (after level 1 start).

  • Only if: a parameter is at level 1 or higher.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS (QISP ID, name and contact submitted with the Level 1 ERA Report)).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section IX.A.3 , page 28

"Dischargers with Level 1 status shall: a. Designate a person to be the facility's QISP"

Finish the Level 2 Action Plan within one year

Implement all elements of the Level 2 ERA Action Plan as soon as practicable and no later than 1 year after submitting it.

Within 365 days after level 2 action plan submitted.

  • Only if: a parameter is at level 2.
  • Does not apply if: inactive mining certification in effect.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XII.D.1.d , page 56

"All elements of the Level 2 ERA Action Plan shall be implemented as soon as practicable and completed no later than 1 year after submitting the Level 2 ERA Action Plan."

New facility discharging to an impaired water body submits a QISP-prepared demonstration

A new facility applying for NOI coverage that will discharge to a water body with a 303(d) listed impairment must submit, with its registration, data or information prepared by a QISP showing that the impairment pollutant is not exposed, not present at the facility, or will not cause or contribute to an exceedance of a water quality standard. Without it the facility is not eligible for coverage.

At least 7 days before start of industrial activity.

  • Only if: new facility; your stormwater reaches an impaired water body.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • The permit says this is done by a Qualified Industrial Storm Water Practitioner (QISP).
  • Signed or certified by the Legally Responsible Person.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section VII.B , page 25

"New Dischargers applying for NOI coverage under this General Permit that will be discharging to a water body with a 303(d) listed impairment are ineligible for coverage unless the Discharger submits data and/or information, prepared by a QISP,"

Submit the Level 1 ERA Report by January 1

Revise the SWPPP and implement the additional BMPs, then certify and submit a Level 1 ERA Report prepared by a QISP (evaluation summary and BMP/SWPPP changes per parameter) plus the QISP's ID number, name, phone and email.

By January 1 after the status begins (after level 1 start).

  • Only if: a parameter is at level 1.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • The permit says this is done by a Qualified Industrial Storm Water Practitioner (QISP).
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XII.C.2.a , page 55

"as soon as practicable but no later than January 1 following commencement of Level 1 status:"

Submit the Level 2 ERA Action Plan by January 1

Certify and submit a Level 2 ERA Action Plan prepared by a QISP for each new Level 2 exceedance, choosing the demonstration(s) to perform (industrial BMPs, non-industrial source, natural background), with a schedule and task list. Update QISP details if changed.

By January 1, after each reporting year ends (after end of reporting year with level 2 exceedance).

  • Only if: a parameter is at level 2.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • The permit says this is done by a Qualified Industrial Storm Water Practitioner (QISP).
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XII.D.1.a , page 56

"shall certify and submit via SMARTS a Level 2 ERA Action Plan prepared by a QISP that addresses each new Level 2 NAL/TNAL exceedance by January 1 following the reporting year during which the NAL/TNAL exceedance(s) occurred."

Submit the Level 2 ERA Technical Report

Certify and submit a Level 2 ERA Technical Report prepared by a QISP containing one or more of the demonstrations (industrial activity BMPs, non-industrial source, natural background).

No set date. XII.D.2: "On January 1 of the reporting year following the submittal of the Level 2 ERA Action Plan"; SMARTS guide: "by January 1 following the submission". Which date applies to Action Plans filed July to December?

  • Only if: a parameter is at level 2.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • The permit says this is done by a Qualified Industrial Storm Water Practitioner (QISP).
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XII.D.2; XII.D.3.a; XII.D.5 , page 57

"On January 1 of the reporting year following the submittal of the Level 2 ERA Action Plan, a Discharger with Level 2 status shall certify and submit a Level 2 ERA Technical Report prepared by a QISP"

What does no-exposure certification require?

No Exposure Certification. Excluded from SWPPP and monitoring, but must do an annual evaluation, pay an annual fee and recertify each year (II.B.2; XVII).

Every year 2 duties

Inspect and evaluate the no-exposure facility each year

Inspect and evaluate the facility once a year to confirm that no storm water exposed to industrial materials or equipment has been or will be discharged. Keep the records 5 years.

By the end of each reporting year (it starts July 1).

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XVII.C.2; II.B.2.b , page 66

"Inspect and evaluate the facility annually to determine that storm water exposed to industrial materials or equipment has not and will not be discharged to waters of the United States."

Recertify no exposure (or apply for full coverage) by October 1

Each reporting year, certify and submit an NEC in SMARTS showing the facility was evaluated and nothing listed in XVII.F.2 is exposed, or apply for NOI coverage. The $75 renewal fee (CCR tit. 23 §2200.5) is invoiced and mailed separately; no payment is made in SMARTS at recertification (SMARTS NEC recertification guide, p.4).

By October 1 each reporting year.

  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XVII.G , page 68

"By October 1 of each reporting year beginning in 2015, any Discharger who has previously registered for NEC coverage shall either submit and certify an NEC demonstrating that the facility has been evaluated"

When something happens 9 duties

Give advance notice of planned changes that may cause noncompliance

Notify the Regional Water Board and the local MS4 in advance of planned changes in industrial activity that may result in noncompliance.

No set date. "Advance notice"; no number of days stated.

  • When: planned change may cause noncompliance.
  • You send it to the agency (Regional Water Board and local MS4).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XXI.M , page 78

"Dischargers shall give advance notice to the Regional Water Board and local MS4 of any planned changes in the industrial activity that may result in noncompliance with this General Permit."

New owner or operator files new registration before the transfer

Coverage is not transferable. The new operator certifies and submits new PRDs before the transfer (or at least 7 days before first operations at a relocated facility). The seller must tell the buyer about the permit requirements (II.C.2).

Before transfer date.

  • When: change of operator or location.
  • If facility relocation: At least 7 days before first day of operations at new location.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XXI.R , page 79

"new PRDs for NOI and NEC coverage must be certified and submitted via SMARTS prior to the transfer, or at least seven (7) days prior to the first day of operations for a relocated facility."

Provide records within 10 days of a written request

On written request by U.S. EPA or the local MS4, provide copies of Annual Reports or other requested records within 10 days.

Within 10 days after receipt of written request.

  • When: written records request.
  • You send it to the agency (requesting agency or MS4).

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XXI.J.5 , page 76

"provide paper or electronic copies of Annual Reports or other requested records to the Water Boards, U.S. EPA, or local MS4 within ten (10) days from receipt of the request."

Recertify the site map after a significant layout change

When the facility layout changes significantly (new building, storage locations, boundary), revise the site map and certify and submit it in SMARTS.

No set date. No deadline in II.B.3.a. For NOI sites the 30-day significant SWPPP revision rule (X.B.2) likely applies (inferred); no deadline for NEC sites.

  • When: significant layout change.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section II.B.3.a , page 19

"a revision to the site map is required and shall be certified and submitted via SMARTS."

Register for no-exposure coverage before starting industrial activity

Certify and submit the NEC Permit Registration Documents in SMARTS at least 7 days before industrial activity starts, and pay the NEC fee.

At least 7 days before start of industrial activity.

  • When: new facility.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section II.B.5.b , page 20

"New Dischargers registering for NEC coverage shall electronically certify and submit PRDs via SMARTS by October 1, 2015, or at least seven (7) days prior to commencement of industrial activities, whichever is later."

Request termination of coverage when it no longer applies

Certify and submit a Notice of Termination in SMARTS when operation is transferred, the facility has closed and removed industrial pollutants, or operations no longer need the permit.

No set date. No deadline; obligations and fees continue until a valid NOT is received.

  • When: transfer or closure or no longer subject.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section II.C.1 , page 20

"Until a valid NOT is received, the Discharger remains responsible for compliance with this General Permit and payment of accrued annual fees."

Send the un-redacted copy of a redacted submittal within 30 days

When a SMARTS submittal had trade secrets redacted, send the complete un-redacted version, clearly labelled CONFIDENTIAL, to the Regional Water Board within 30 days of the redacted submittal.

Within 30 days after redacted submittal date.

  • When: redacted submittal.
  • You send it to the agency (Regional Water Board (delivery method not stated in II.B.3.d)).
  • Keep the records 5 years.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section II.B.3.d , page 19

"Dischargers must submit complete and un-redacted versions of the information that are clearly labeled "CONFIDENTIAL" to the Regional Water Board within 30 days of the submittal of the redacted information."

Switch from no exposure to full coverage before materials become exposed

If changes will expose industrial materials or activities, register for NOI coverage at least 7 days before the exposure.

At least 7 days before anticipated exposure date.

  • When: anticipated exposure, or unplanned exposure.
  • If unplanned exposure: Within 7 days after unplanned exposure date.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XVII.E.2 , page 67

"A Discharger with NEC coverage that anticipates changes in circumstances should register for NOI coverage at least seven (7) days before anticipated exposure."

Update SMARTS when a new LRP or Duly Authorized Representative is designated

When a new Legally Responsible Person or Duly Authorized Representative is designated, make the matching revisions in SMARTS so the authorization is current before the next submittal.

No set date. No deadline stated; the authorization must be current before the next submittal (XXI.K.2; XXI.K.5.c).

  • When: new lrp or dar designated.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XXI.K.2; XXI.K.5.c , page 76

"When a new LRP or Duly Authorized Representative is designated, the Discharger shall ensure that the appropriate revisions are made via SMARTS."

Ongoing 1 duty

Keep all monitoring records and reports for five years

Keep a paper or electronic copy of all storm water monitoring information, records, data and reports the permit requires for at least five years, available to Water Board staff at the facility during scheduled operating hours.

Ongoing, no set date.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018) , section XXI.J.4 , page 76

"Dischargers shall retain, for a period of at least five (5) years, either a paper or electronic copy of all storm water monitoring information, records, data, and reports required by this General Permit."

When are my own dates?

Choose your coverage and answer a few questions to see each duty with its next due date, and download them as a calendar file.

Every state's permit. How we check permit rules. Deadline calculator, benchmark comparison and more free tools.