Missouri industrial stormwater permit
In Missouri, industrial stormwater is covered by No single MSGP: site-specific permits plus sector Master General Permits, e.g. MO-R203000 fabricating metal/light industrial (2024-09-10 to 2029-09-09), MO-R80C000 motor freight (to 2027-11-30), MO-R60A000 vehicle salvage (to 2028-12-11), MO-R23D000 plastics/rubber (to 2027-05-09, renewal in process), run by Missouri DNR. Expiry or status: per permit.
Tell me when Missouri is ready
One email when its duties are checked. Nothing else.
No single MSGP: site-specific permits plus sector Master General Permits
Missouri DNR
- Duties not listed yet: we have not checked this permit's rules.
- per permit
- Run by the state
Checked November 23, 2026 from the agency's own page.
Who runs the permit, and when does it expire?
- Agency
- Missouri DNR (confirmed)
- Permit
- No single MSGP: site-specific permits plus sector Master General Permits, e.g. MO-R203000 fabricating metal/light industrial (September 10, 2024 to September 9, 2029), MO-R80C000 motor freight (to November 30, 2027), MO-R60A000 vehicle salvage (to December 11, 2028), MO-R23D000 plastics/rubber (to May 9, 2027, renewal in process) (confirmed)
- Effective
- per permit (confirmed)
- Expires or status
- per permit (confirmed)
- Official page
- dnr.mo.gov
- Where you file
- eDMR via MoGEM; ePermitting (confirmed)
- Public permit list
- not checked (not checked)
Checked November 23, 2026. "Confirmed" means read from the agency's page or permit that day. "Inferred" means worked out, for example a date from a five-year term. Agencies move pages often: use the official page as the final word.
Can I get Missouri's due dates yet?
Not yet. Leave your email and we will send one email when we have checked this permit's rules and can list its duties. We ask you to confirm your address first.
Free tools for any state: is my industry on the federal list?, the no-exposure checklist and more free tools. How we check permit rules.