Do a quarterly visual inspection of storm water at each outfall
By the end of each calendar quarter.
Each quarter, inspect the storm water discharge at each outfall within the first 30 minutes of discharge, or as soon as practical but no later than 60 minutes, for color, odor, turbidity, floating solids, foam, oil sheen and other signs of pollution. Record the date, personnel, visual quality and probable sources on DNR's form (3400-176a). Four are due each year by the anniversary of the Start Date.
- Nothing is filed; keep the record at the facility.
Inferred from section 4.3.2. Check your copy of the permit.
Source: WPDES General Permit No. WI-S067857-5, Tier 2 Industrial Facilities (27 pages, text layer on every page), section 4.3.2, page 23
"Permittees shall perform and document quarterly visual inspections of storm water discharge quality at each storm water discharge outfall."Open the permit at this section