Industrial stormwater inspection requirements, permit by permit

The 4 permits below set 15 inspection and observation duties between them. The most frequent check is every month under California Industrial General Permit (IGP) and Washington ISGP and every quarter under Texas MSGP and EPA 2021 MSGP. The inspections every facility does:

  • California Industrial General Permit (IGP): Do the monthly visual observation of every drainage area (every month); Do the Annual Comprehensive Facility Compliance Evaluation (every year).
  • Texas MSGP: Quarterly visual examination of each outfall's discharge (every quarter); Routine facility inspection every quarter (monthly for Sector E) (every quarter); Annual Comprehensive Site Compliance Inspection (every year).
  • Washington ISGP: Monthly site inspection, at least a week apart, signed by two people (every month); Inspect dumpsters for holes or defects once a year (every year).
  • EPA 2021 MSGP: Quarterly visual assessment of a stormwater sample from each discharge point (every quarter); Routine facility inspection every calendar quarter (every quarter).

Get my permit calendar

Free, no account. Pick your state and coverage and see the next date for each duty.

Next: answer a few questions about your site. You get your dates, the permit section for each, and a calendar file.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

Compared here: California Industrial General Permit (IGP), rules checked November 25, 2026; Texas MSGP, rules checked November 25, 2026; Washington ISGP, rules checked November 25, 2026; EPA 2021 MSGP, rules checked November 26, 2026. Duties for other states are not listed until their rules are checked: find your state.

How often each permit asks for an inspection

Count of inspection and observation duties in each permit, by how often they come round. Click a permit to see its duties.

Inspection duties by permit and frequency
Permit Every monthEvery quarterEvery yearWhen something happensOnly if...
California Industrial General Permit (IGP) 1 - 1 1 -
Texas MSGP - 2 1 - -
Washington ISGP 1 - 1 1 1
EPA 2021 MSGP - 2 - - 3

Every inspection due in 2027

For a facility covered all year, the last day of each inspection window in 2027, worked out from each permit's rule.

Permit JanFebMarAprMayJunJulAugSepOctNovDec
California Industrial General Permit (IGP) January 31, 2027: Do the monthly visual observation of every drainage area. February 28, 2027: Do the monthly visual observation of every drainage area. March 31, 2027: Do the monthly visual observation of every drainage area. April 30, 2027: Do the monthly visual observation of every drainage area. May 31, 2027: Do the monthly visual observation of every drainage area. June 30, 2027: Do the monthly visual observation of every drainage area. June 30, 2027: Do the Annual Comprehensive Facility Compliance Evaluation. July 31, 2027: Do the monthly visual observation of every drainage area. August 31, 2027: Do the monthly visual observation of every drainage area. September 30, 2027: Do the monthly visual observation of every drainage area. October 31, 2027: Do the monthly visual observation of every drainage area. November 30, 2027: Do the monthly visual observation of every drainage area. December 31, 2027: Do the monthly visual observation of every drainage area.
Texas MSGP March 31, 2027: Quarterly visual examination of each outfall's discharge. March 31, 2027: Routine facility inspection every quarter (monthly for Sector E). June 30, 2027: Quarterly visual examination of each outfall's discharge. June 30, 2027: Routine facility inspection every quarter (monthly for Sector E). September 30, 2027: Quarterly visual examination of each outfall's discharge. September 30, 2027: Routine facility inspection every quarter (monthly for Sector E). December 31, 2027: Quarterly visual examination of each outfall's discharge. December 31, 2027: Routine facility inspection every quarter (monthly for Sector E).
Washington ISGP January 31, 2027: Monthly site inspection, at least a week apart, signed by two people. February 28, 2027: Monthly site inspection, at least a week apart, signed by two people. March 31, 2027: Monthly site inspection, at least a week apart, signed by two people. April 30, 2027: Monthly site inspection, at least a week apart, signed by two people. May 31, 2027: Monthly site inspection, at least a week apart, signed by two people. June 30, 2027: Monthly site inspection, at least a week apart, signed by two people. July 31, 2027: Monthly site inspection, at least a week apart, signed by two people. August 31, 2027: Monthly site inspection, at least a week apart, signed by two people. September 30, 2027: Monthly site inspection, at least a week apart, signed by two people. October 31, 2027: Monthly site inspection, at least a week apart, signed by two people. November 30, 2027: Monthly site inspection, at least a week apart, signed by two people. December 31, 2027: Monthly site inspection, at least a week apart, signed by two people. December 31, 2027: Inspect dumpsters for holes or defects once a year.
EPA 2021 MSGP March 31, 2027: Quarterly visual assessment of a stormwater sample from each discharge point. March 31, 2027: Routine facility inspection every calendar quarter. June 30, 2027: Quarterly visual assessment of a stormwater sample from each discharge point. June 30, 2027: Routine facility inspection every calendar quarter. September 30, 2027: Quarterly visual assessment of a stormwater sample from each discharge point. September 30, 2027: Routine facility inspection every calendar quarter. December 31, 2027: Quarterly visual assessment of a stormwater sample from each discharge point. December 31, 2027: Routine facility inspection every calendar quarter.
Each dot is a due date in 2027, worked out from the permit's rule.

Worked example: if it happens on March 3, 2027

Some deadlines count from something that happens at the site. If that event fell on March 3, 2027, the permit's rule puts the deadline here. Your own dates come from your own events.

Deadlines counted from an event on March 3, 2027
PermitDutyCounts fromDue
California Industrial General Permit (IGP) Observe the discharge whenever a sample is taken sampling event March 3, 2027

The deadline calculator works out the same dates from your own event date.

California Industrial General Permit (IGP)

General Permit for Storm Water Discharges Associated with Industrial Activities, run by State Water Resources Control Board (with the nine Regional Water Quality Control Boards). Rules checked November 25, 2026. Every duty in this permit · California permit facts · Official permit page

Every month 1 duty

Do the monthly visual observation of every drainage area

By the end of each month.

Once each calendar month, during daylight, during scheduled operating hours and on a day without precipitation, observe each drainage area for unauthorized non-storm water discharges, authorized ones and their BMPs, and outdoor equipment, storage and activity areas. Record date, time, locations, findings, observer and responses.

  • Does not apply if: inactive mining certification in effect.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XI.A.1, page 42
"At least once per calendar month, the Discharger shall visually observe each drainage area for the following:"
Open the permit at this section

Every year 1 duty

Do the Annual Comprehensive Facility Compliance Evaluation

By the end of each reporting year (it starts July 1).

Once per reporting year, review all records from the previous reporting year, inspect all industrial areas, no-exposure areas, BMP equipment and BMPs, and assess BMP effectiveness. Revise and implement SWPPP changes within 90 days.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XV, page 64
"The Discharger shall conduct one Annual Evaluation for each reporting year (July 1 to June 30)."
Open the permit at this section

When something happens 1 duty

Observe the discharge whenever a sample is taken

At the time of sampling event.

At each discharge location sampled, observe and record floating and suspended materials, oil and grease, discoloration, turbidity, odors, trash and likely sources, at the time of sampling.

  • When: sampling event.
  • Does not apply if: inactive mining certification in effect.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XI.A.2, page 42
"Sampling event visual observations shall be conducted at the same time sampling occurs at a discharge location."
Open the permit at this section

Texas MSGP

TPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, run by Texas Commission on Environmental Quality (TCEQ). Rules checked November 25, 2026. Every duty in this permit · Texas permit facts · Official permit page

Every quarter 2 duties

Quarterly visual examination of each outfall's discharge

By the end of each calendar quarter.

Each quarter during operating hours, collect a sample from each outfall in a clear container (within the first 30 minutes of discharge where practicable, and within the first hour) and record color, clarity, solids, foam, oil sheen, odor and other signs; the team reviews results and updates the SWP3.

  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 2026 Multi-Sector General Permit TXR050000, section III.B.3, page 52
"Stormwater discharges from each outfall authorized by this general permit must be visually examined on a quarterly basis."
Open the permit at this section

Routine facility inspection every quarter (monthly for Sector E)

By the end of each calendar quarter.

Qualified personnel with at least one pollution prevention team member inspect the controls each quarter (one per calendar year during a discharge, if feasible) using a checklist; sign and keep on site. Some sectors must inspect monthly or weekly (Part V).

  • Does not apply if: the facility is inactive and unstaffed.
  • If your permit sector is E: By the end of each month.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official per 30 TAC 305.128.
Source: 2026 Multi-Sector General Permit TXR050000, section III.B.2(a), page 51
"Inspections must be conducted at least once per quarter unless otherwise specified in Part V of this permit."
Open the permit at this section

Every year 1 duty

Annual Comprehensive Site Compliance Inspection

No set date. III.B.5(a) requires the inspection "at least once each permit year" but "permit year" is not defined, and III.D.3(c) says annual inspections "must be conducted before December 31st of each calendar year". TCEQ to say which period applies and when it starts for a renewal NOI.

At least once each permit year, qualified staff (including a pollution prevention team member) inspect exposed-material areas, controls, spill areas from the last 3 years, downstream of each outfall, tracking and dust, and review the past year's monitoring.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: 2026 Multi-Sector General Permit TXR050000, section III.B.5(a), page 54
"The comprehensive site compliance inspection must be conducted at least once each permit year by one or more qualified employees or designated representatives"
Open the permit at this section

Washington ISGP

Industrial Stormwater General Permit (NPDES and State Waste Discharge General Permit), run by Washington State Department of Ecology, Water Quality Program. Rules checked November 25, 2026. Every duty in this permit · Washington permit facts · Official permit page

Every month 1 duty

Monthly site inspection, at least a week apart, signed by two people

By the end of each month; at least 7 days apart.

Each month, qualified personnel inspect sampling locations and discharge points, look for sheen, discoloration, turbidity, odor and illicit discharges, verify the pollutant source list and site map, and assess BMPs. The report states compliance or noncompliance and is signed by the inspector and by the G2 signatory (or duly authorized representative).

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by the inspector and the permit signatory (G2).
Source: 2026 Industrial Stormwater General Permit Modification (issued Dec 2, 2024, modified Oct 21, 2026), section S7.A-C, page 51
"The Permittee shall conduct and document visual inspections of the site each month with at least one week between inspections."
Open the permit at this section

Every year 1 duty

Inspect dumpsters for holes or defects once a year

By December 31 each year.

As part of the inspections, check dumpsters annually for holes or defects that could leak.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: 2026 Industrial Stormwater General Permit Modification (issued Dec 2, 2024, modified Oct 21, 2026), section S7.B.3, page 51
"Permittees shall inspect dumpsters annually for holes or defects to identify and control leakage."
Open the permit at this section

When something happens 1 duty

Inspect and maintain baghouses every month

By the end of each month.

Inspect and maintain baghouses monthly to prevent dust escaping, and immediately remove accumulated dust at the base of exterior baghouses.

  • When: baghouses on site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: 2026 Industrial Stormwater General Permit Modification (issued Dec 2, 2024, modified Oct 21, 2026), section S3.B.4.b.i.2).c), page 19
"Inspect and maintain bag houses monthly to prevent the escape of dust from the system."
Open the permit at this section

Only if... 1 duty

These apply only in the situation named on each one. Answer the questions to sort them.

Annual dry-weather inspection for sewer cross-connections (bacteria-listed waters)

By December 31 each year.

Facilities discharging to waters 303(d)-listed for bacteria do at least one dry-weather inspection of the stormwater system each year to find and eliminate sanitary sewer cross-connections, and keep the other mandatory bacteria BMPs in the SWPPP.

  • Only if: your stormwater reaches an impaired water body; receiving water listed for bacteria.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: 2026 Industrial Stormwater General Permit Modification (issued Dec 2, 2024, modified Oct 21, 2026), section S6.C.1 Table 6 footnote h.2, page 45
"Perform at least one annual dry weather inspection of the stormwater system to identify and eliminate sanitary sewer cross-connections;"
Open the permit at this section

EPA 2021 MSGP

NPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, run by U.S. Environmental Protection Agency (EPA Regions 1-10). Rules checked November 26, 2026. Every duty in this permit · Official permit page

Every quarter 2 duties

Quarterly visual assessment of a stormwater sample from each discharge point

By the end of each calendar quarter.

Each quarter, collect a sample from each discharge point (substantially identical points may rotate) within the first 30 minutes of discharge from a storm at least 72 hours after the previous discharge, and inspect it in a clear container for color, odor, clarity, solids, foam and oil sheen. Document and sign.

  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 3.2.1-3.2.3, page 29
"Once each quarter for your entire permit coverage, you must collect a stormwater sample from each discharge point (except as noted in Part 3.2.4) and conduct a visual assessment of each of these samples."
Open the permit at this section

Routine facility inspection every calendar quarter

By the end of each calendar quarter.

Qualified personnel (with at least one pollution prevention team member if a contractor) inspect exposed areas, potential pollutant sources, spill areas from the last three years, discharge points and control measures, during operating hours. At least one inspection per calendar year must be during a discharge. Document findings with a signed statement.

  • Does not apply if: the facility is inactive and unstaffed.
  • If the facility is inactive and unstaffed: a different schedule.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 3.1.1-3.1.6, page 27
"The qualified personnel must conduct inspections at least quarterly (i.e., once each calendar quarter), or in some instances more frequently"
Open the permit at this section

Only if... 3 duties

These apply only in the situation named on each one. Answer the questions to sort them.

(Sector A) Inspect wood preservation areas every month

By the end of each month.

Timber products facilities that do wood surface protection and preservation inspect processing areas, transport areas and treated wood storage areas monthly, to check that treatment chemicals are kept off unprotected soils and away from stormwater.

  • Only if: your permit sector is A; wood surface protection and preservation.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 2021 MSGP Part 8 Sector-Specific Requirements (as modified), section 8.A.5, page 72
"inspect processing areas, transport areas, and treated wood storage areas monthly"
Open the permit at this section

(Sector S) Inspect the airport every month of the deicing season

By the end of each month.

Air transportation facilities inspect at least monthly during the deicing season (for example October through April at most mid-latitude airports), and in every other month when deicing chemicals may be used.

  • Only if: your permit sector is S; deicing season month.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Part 8 Sector-Specific Requirements (as modified), section 8.S.6, page 184
"you must conduct facility inspections at least monthly during the deicing season"
Open the permit at this section

(New Hampshire) Inspect on-site infiltration BMPs at least once a year

No set date. At least annually under the SWPPP's inspection procedures; the permit does not say whether this means each calendar year or every 12 months.

Facilities in New Hampshire with on-site infiltration best management practices inspect them at least annually under procedures written in the SWPPP, including checks that infiltrated stormwater is not exposed to industrial pollutants and drains properly, and keep records of maintenance, inspections and corrective actions.

  • Only if: the facility is in New Hampshire; onsite infiltration bmp installed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by your pollution prevention team.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: 2021 MSGP Part 9 Conditions Applicable to States, Indian Country Lands, or Territories (as modified), section 9.1.4.2.c, page 211
"The inspection procedures that will be followed at least annually."
Open the permit at this section

Try it with your own numbers

The free tools use the same permit data as this page. No account.

See my next 12 months of inspection dates

Questions people ask

How often do I have to inspect my facility for stormwater?

California Industrial General Permit (IGP): Do the monthly visual observation of every drainage area (every month); Do the Annual Comprehensive Facility Compliance Evaluation (every year). Texas MSGP: Quarterly visual examination of each outfall's discharge (every quarter); Routine facility inspection every quarter (monthly for Sector E) (every quarter); Annual Comprehensive Site Compliance Inspection (every year). Washington ISGP: Monthly site inspection, at least a week apart, signed by two people (every month); Inspect dumpsters for holes or defects once a year (every year). EPA 2021 MSGP: Quarterly visual assessment of a stormwater sample from each discharge point (every quarter); Routine facility inspection every calendar quarter (every quarter).

Do I send inspection records to the agency?

15 of the 15 inspection and observation duties on this page are records you keep at the facility, not reports you file. Keep them where an inspector can see them.

What does StormDue do for inspections?

It puts each inspection window from your permit on your calendar, emails you before the window closes, and keeps a dated record when you mark it done. You still walk the site and sign the record your permit asks for.

More permit duty guides

See the dates for your own permit

Pick your state and coverage. You get each duty's next date and the section it comes from, free.