Guides / Texas MSGP renewal 2026

Texas MSGP renewal 2026: the December 28 deadline

Facilities covered under the 2021 Texas Multi-Sector General Permit (TXR050000) must renew under the 2026 permit by Monday, December 28, 2026. Here is who renews, why the date moved, the steps in STEERS, and what to update in your SWP3 afterwards.

  • Deadline: Monday, December 28, 2026
  • Renewals opened: August 14, 2026, the day the 2026 permit took effect
  • Where: STEERS/ePermits, TCEQ's online system

Get my Texas permit calendar

Free, no account. Answer yes to "covered under 2021 permit" and the renewal date is on your calendar file.

Next: choose your coverage. You get every Texas MSGP duty with its next date and permit section.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

Who has to renew?

Existing permittees: facilities covered under the 2021 permit. The renewal applies to full permit coverage and no-exposure certification.

  • Automatic authorization: For certain industrial activities that meet the conditions in II.B.14; no NOI, NEC or NOT. No renewal duty applies to it.

A new facility that was never covered under the 2021 permit does not renew: it files a first notice of intent before industrial activity starts. See every duty in the Texas MSGP.

Why the deadline moved from November 12

The 2026 permit took effect on August 14, 2026. Its original deadline for existing permittees to renew was November 12, 2026. STEERS had an outage during the renewal period, and TCEQ's Executive Director extended the deadline.

"The Executive Director agrees and, therefore, grants the request for extension of the MSGP renewal deadline. The deadline is extended until Monday, December 28, 2026."

Some notices written before the extension still say November 12. The date that counts is the one in the extension letter and on TCEQ's industrial stormwater page.

How to renew in STEERS, step by step

  1. Sign in to STEERS. Renewals are filed online in STEERS / ePermits (NOI, NEC, NOC, NOT, delegation of signatory).
  2. Pick the right renewal form and pay the fee. Existing permittees submit a renewal NOI (INOI-R) or renewal NEC (INEC-R) in STEERS/ePermits with the $100 electronic application fee. Coverage of facilities that do not renew expires.
  3. Have the right person sign. Signed or certified by a responsible official per 30 TAC 305.44. If signing authority for reports is delegated, a Delegation of Signatory form also goes in through STEERS (listed below).
  4. Send a copy to your storm sewer operator. Facilities discharging to any MS4 give the MS4 operator a copy of each completed NOI, NEC, NOC and NOT.
  5. Keep your confirmation for 3 years with your SWP3.

Source for the deadline: MSGP TXR050000 Renewal Deadline Extension (letter, October 28, 2026), page 1. Forms and fee: TCEQ industrial stormwater page.

Update your SWP3 for the 2026 permit

Renewing restarts some duties under the new permit. These come from the 2026 permit text, each with its section in the list below.

  • Keep the SWP3 current, dated and available. Develop and implement the SWP3 before the NOI, keep it at the site or readily available, modify it as often as necessary, date every revision, and keep prior versions (or a revision log) for three years.
  • Evaluate and certify non-stormwater discharges within 180 days of the NOI. Survey potential non-stormwater sources, test or inspect the storm sewer system (for example dry-weather screening), eliminate unpermitted flows, update the SWP3 and sign a certification within 180 days after filing the NOI or renewal NOI.
  • Complete a new hazardous-metals waiver form before the first sample of this permit term. A facility claiming a waiver from hazardous-metals monitoring (metal not used, never exposed, or not detected at the MAL) completes a new TCEQ certification form during each permit term, before the first sampling event it wants to waive, keeps it on site and names the criteria in the SWP3.

What if the date is missed?

The permit says one thing: coverage of a facility that does not renew expires. We have no record of a later deadline after Monday, December 28, 2026. If your facility missed it, contact TCEQ before you take any other step; they decide what applies to your site.

The renewal and what follows, from the permit

Each duty in the permit's own words, with the section it comes from. Rules checked November 25, 2026.

One time 1 duty

Renew coverage under the 2026 permit by December 28, 2026

By December 28, 2026.

Existing permittees submit a renewal NOI (INOI-R) or renewal NEC (INEC-R) in STEERS/ePermits with the $100 electronic application fee. Coverage of facilities that do not renew expires.

  • You file it in the agency's system (STEERS/ePermits).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.44.
Source: MSGP TXR050000 Renewal Deadline Extension (letter, October 28, 2026), page 1
"The Executive Director agrees and, therefore, grants the request for extension of the MSGP renewal deadline. The deadline is extended until Monday, December 28, 2026."
Open the letter

When something happens 4 duties

Complete a new hazardous-metals waiver form before the first sample of this permit term

Before the first hazardous metals sampling event of permit term.

A facility claiming a waiver from hazardous-metals monitoring (metal not used, never exposed, or not detected at the MAL) completes a new TCEQ certification form during each permit term, before the first sampling event it wants to waive, keeps it on site and names the criteria in the SWP3.

  • When: claiming hazardous metals waiver.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.128.
Source: 2026 Multi-Sector General Permit TXR050000, section III.C.1(c), page 58
"A new form must be completed during each permit term, no later than prior to the first sampling event that the permittee is seeking to waive."
Open the permit at this section

Evaluate and certify non-stormwater discharges within 180 days of the NOI

Within 180 days after the NOI filing date.

Survey potential non-stormwater sources, test or inspect the storm sewer system (for example dry-weather screening), eliminate unpermitted flows, update the SWP3 and sign a certification within 180 days after filing the NOI or renewal NOI.

  • When: the NOI or renewal NOI filed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.128.
Source: 2026 Multi-Sector General Permit TXR050000, section III.B.1(b)-(c), page 50
"Within 180 days of filing an NOI for coverage (or a renewal NOI) the permittee shall conduct a survey of potential non-stormwater sources and shall provide the certification required"
Open the permit at this section

File a Delegation of Signatory form when signing authority is delegated or changes

No set date. No deadline stated; the delegation must be on file before a delegate signs reports (30 TAC 305.128).

If an authorized representative delegates signatory authority for reports, submit a Delegation of Signatory form in STEERS, keep a copy in the SWP3, and submit a new form whenever the delegation moves to another person or position.

  • When: the signatory delegation made or changed.
  • You file it in the agency's system (STEERS).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.128.
Source: 2026 Multi-Sector General Permit TXR050000, section II.C.6(f), page 36
"A new Delegation of Signatory form must be submitted if the delegation changes to another individual or position."
Open the permit at this section

Send copies of NOI, NEC, NOC and NOT to the MS4 operator

No set date. No deadline stated; send with each filing.

Facilities discharging to any MS4 give the MS4 operator a copy of each completed NOI, NEC, NOC and NOT.

  • When: the discharges to MS4.
  • You send a copy to the operator of your storm sewer system (MS4).
  • Keep the records 3 years.
Source: 2026 Multi-Sector General Permit TXR050000, section II.C.9, page 38
"Industrial facilities that contribute stormwater discharges to any MS4 must provide a copy of the completed NOI, NEC, NOC, and NOT to the operator of the system"
Open the permit at this section

Ongoing 1 duty

Keep the SWP3 current, dated and available

Ongoing, no set date.

Develop and implement the SWP3 before the NOI, keep it at the site or readily available, modify it as often as necessary, date every revision, and keep prior versions (or a revision log) for three years.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.128.
Source: 2026 Multi-Sector General Permit TXR050000, section III.A.6, page 49
"The SWP3 must be modified by the permittee as often as necessary. Each revision must be dated, and all revisions must be retained according to Part III, Section D.5."
Open the permit at this section

After you renew: your calendar

Once you are covered under the 2026 permit, the recurring duties start: inspections, visual checks, reports and, for some sectors, sampling. StormDue lists each one from the permit, puts its dates on a calendar for the next 12 months with reminders before each, and keeps a dated record of what was done.

Start with the free lookup for Texas. You file with TCEQ as you do today.

Questions people ask

When is the Texas MSGP renewal deadline?

Monday, December 28, 2026. TCEQ extended the original November 12, 2026 deadline because of an outage in STEERS, its online filing system. The extension is in TCEQ's letter of October 28, 2026.

I read that the deadline was November 12. Did I miss it?

Not if you renew by Monday, December 28, 2026. Some notices published before the extension still give November 12. TCEQ's industrial stormwater page and the extension letter give December 28, 2026.

Do I renew if my facility has a no exposure certification?

Yes. The renewal covers full permit coverage and no-exposure certification. Existing permittees submit a renewal NOI (INOI-R) or renewal NEC (INEC-R) in STEERS/ePermits with the $100 electronic application fee. Coverage of facilities that do not renew expires.

What happens if I do not renew in time?

Under the permit, coverage of a facility that does not renew expires. We have found no later deadline. Contact TCEQ directly about your facility.

Does StormDue file the renewal for me?

No. You file in STEERS yourself, and the person the permit names signs it. StormDue puts the permit dates that follow on your calendar and reminds you before each one.