Get my permit calendar

Guides / Sampling and qualifying storms

Stormwater sampling requirements and qualifying storm events

Each permit says which storm a sample has to come from and how often to sample. The sampling every facility under the permit does:

  • California Industrial General Permit (IGP): Sample qualifying storm events, July 1 to December 31 (every half year); Sample qualifying storm events, January 1 to June 30 (every half year).
  • Texas MSGP: Annual hazardous-metals sample (unless waived) (every year).
  • Washington ISGP: Sample each designated discharge point every quarter (every quarter).
  • EPA 2021 MSGP: None on a fixed schedule. Sampling depends on your sector, coverage year or receiving water.

Get my permit calendar

Free, no account. Pick your state and coverage and see the next date for each duty.

Next: answer a few questions about your site. You get your dates, the permit section for each, and a calendar file.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

Compared here: California Industrial General Permit (IGP), rules checked November 25, 2026; Texas MSGP, rules checked November 25, 2026; Washington ISGP, rules checked November 25, 2026; EPA 2021 MSGP, rules checked November 26, 2026. Duties for other states are not listed until their rules are checked: find your state.

What counts as a qualifying storm event?

Each permit defines the storm a sample has to come from. These are the definitions as the permit states them, with the section.

Storm event definitions by permit
PermitTermDefinition
California Industrial General Permit (IGP) Qualifying storm event Qualifying Storm Event: a precipitation event that produces a discharge from at least one drainage area and is preceded by 48 hours with no discharge from any drainage area (XI.B.1).
Texas MSGP Qualifying storm event An event that results in a discharge, at least 72 hours after the previous measurable storm event unless a shorter interval is documented as representative (III.D.1(a)).
Washington ISGP First fall storm event The first time on or after September 1 each year that precipitation causes a stormwater discharge from the facility (S4.B.1.b; Appendix 2).
EPA 2021 MSGP Measurable storm event A storm event that results in an actual discharge and follows the previous measurable storm event by at least 72 hours, unless a shorter interval is documented as representative (4.1.3).

How often each permit asks for a sample

Sampling duties by permit and frequency
Permit Every quarterEvery half yearEvery yearWhen something happensOnly if...
California Industrial General Permit (IGP) - 2 - 1 -
Texas MSGP - - 1 1 2
Washington ISGP 1 - - 1 2
EPA 2021 MSGP - - - 1 9

"Only if..." duties apply to some sectors, receiving waters or coverage years. Each one names its condition below.

Example: sampling windows in 2027

Sampling windows ending in 2027
Window endsPermitDutySamples
March 31, 2027 Texas MSGP Annual ELG monitoring and DMR by March 31 (only in some situations)
for calendar year 2026
1
March 31, 2027 Texas MSGP Annual monitoring for the pollutant of concern in impaired waters (only in some situations)
for calendar year 2026
1
March 31, 2027 Washington ISGP Sample each designated discharge point every quarter
Q1 2027
1
June 30, 2027 California Industrial General Permit (IGP) Sample qualifying storm events, January 1 to June 30
January 1, 2027 to June 30, 2027
2
June 30, 2027 Washington ISGP Sample each designated discharge point every quarter
Q2 2027
1
September 30, 2027 Washington ISGP Sample each designated discharge point every quarter
Q3 2027
1
December 31, 2027 California Industrial General Permit (IGP) Sample qualifying storm events, July 1 to December 31
July 1, 2027 to December 31, 2027
2
December 31, 2027 Washington ISGP Sample each designated discharge point every quarter
Q4 2027
1

Worked example: if it happens on September 14, 2027

Some deadlines count from something that happens at the site. If that event fell on September 14, 2027, the permit's rule puts the deadline here. Your own dates come from your own events.

Deadlines counted from an event on September 14, 2027
PermitDutyCounts fromDue
California Industrial General Permit (IGP) Collect each storm sample within 4 hours start of discharge or start of operations September 14, 2027
Washington ISGP Sample the first fall storm on or after September 1 first discharge on or after sep 1 September 14, 2027
EPA 2021 MSGP After an effluent-limit exceedance, flag it and re-sample within 30 days of the fix corrective action implemented October 14, 2027

The deadline calculator works out the same dates from your own event date.

California Industrial General Permit (IGP)

General Permit for Storm Water Discharges Associated with Industrial Activities, run by State Water Resources Control Board (with the nine Regional Water Quality Control Boards). Rules checked November 25, 2026. Every duty in this permit · California permit facts · Official permit page

Every half year 2 duties

Sample qualifying storm events, July 1 to December 31

Between July 1 and December 31, 2 times.

Collect and analyze samples from two Qualifying Storm Events (QSEs) between July 1 and December 31, at every discharge location (unless a representative-sampling reduction applies), within 4 hours of the start of discharge or of the start of operations if the QSE began in the previous 12 hours. Analyze TSS, oil and grease, pH, Table 1 parameters for the SIC code, and any facility-specific, impaired-water, TMDL, Regional Board and ELG parameters.

  • Does not apply if: inactive mining certification in effect.
  • If you are in a compliance group: once.
  • If you have certified a sampling frequency reduction: once.
  • If you are in a compliance group and you have certified a sampling frequency reduction: once per reporting year.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XI.B.2; XI.B.4-6, page 43
"The Discharger shall collect and analyze storm water samples from two (2) QSEs within the first half of each reporting year (July 1 to December 31)"
Open the permit at this section

Sample qualifying storm events, January 1 to June 30

Between January 1 and June 30, 2 times.

Same as the first-half sampling, for the January 1 to June 30 half of the reporting year.

  • Does not apply if: inactive mining certification in effect.
  • If you are in a compliance group: once.
  • If you have certified a sampling frequency reduction: once.
  • If you are in a compliance group and you have certified a sampling frequency reduction: not required.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XI.B.2, page 43
"and two (2) QSEs within the second half of each reporting year (January 1 to June 30)."
Open the permit at this section

When something happens 1 duty

Collect each storm sample within 4 hours

Within 4 hours of start of discharge or start of operations.

For each QSE sampled, collect samples within 4 hours of the start of discharge, or of the start of facility operations if the QSE occurred in the previous 12 hours.

  • When: qse discharge.
  • Does not apply if: inactive mining certification in effect.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XI.B.5, page 44
"Samples from each discharge location shall be collected within four (4) hours of: a. The start of the discharge; or,"
Open the permit at this section

Texas MSGP

TPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, run by Texas Commission on Environmental Quality (TCEQ). Rules checked November 25, 2026. Every duty in this permit · Texas permit facts · Official permit page

Every year 1 duty

Annual hazardous-metals sample (unless waived)

No set date. Is "prior to December 31" (III.C.1(b)(1)) meant to exclude December 31 itself?

Collect one grab sample per year at the final outfall (or designated sampling point) for the 12 Table 1 metals not waived, before December 31. Keep the DMR on site by March 31. Exceedances of the daily maximum limits are violations and must be filed in NetDMR by March 31.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.128.
Source: 2026 Multi-Sector General Permit TXR050000, section III.C.1, page 56
"All permittees are required to monitor for hazardous metals, unless they qualify for a waiver as described in item (c) below."
Open the permit at this section

When something happens 1 duty

Benchmark sampling once every six months (2027 through 2030)

No set date. IV.B.1(b) limits benchmark sampling to "up to a total of four (4) years, or eight (8) semiannual monitoring periods", but IV.B.1(a) says it continues "during the remaining permit term". TCEQ to confirm whether a renewing facility samples 2027-2030 only or also January-June 2031.

Sectors with Part V benchmarks sample once in each January-June and July-December period for four years; no sampling in the 2026 renewal year. Waiver for years three and four by NOC if the first two years' annual averages are all below benchmarks.

  • When: sector has part v benchmarks.
  • Does not apply if: the facility is inactive and unstaffed.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.128.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: 2026 Multi-Sector General Permit TXR050000, section IV.B.1, page 75
"Benchmark monitoring must be conducted once every six months for four (4) years following permit issuance."
Open the permit at this section

Only if... 2 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Annual ELG monitoring and DMR by March 31

By March 31, for the calendar year before.

Facilities with Table 3 regulated discharges (wet log decks, phosphate fertilizer, asphalt emulsion, cement storage piles, mine dewatering, coal piles, airport urea deicing) sample before December 31 and submit results in NetDMR by March 31; a no-discharge DMR if no discharge.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.128.
Source: 2026 Multi-Sector General Permit TXR050000, section III.C.2(b)(2), page 61
"Monitoring must be conducted prior to December 31 for each annual monitoring period and the results must be submitted to TCEQ by March 31 of the following year"
Open the permit at this section

Annual monitoring for the pollutant of concern in impaired waters

By March 31, for the calendar year before.

Outfalls discharging a pollutant of concern at a level of concern to an impaired water (II.B.8) are sampled once a year (E. coli/enterococci for bacteria, BOD5/COD for dissolved oxygen, phosphorus/nitrogen for nutrients, the listed metal) and reported in NetDMR by March 31. Stop for the rest of the term if below the level of concern or not detected.

  • Only if: your stormwater reaches an impaired water body.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.128.
Source: 2026 Multi-Sector General Permit TXR050000, section III.B.4(e), page 54
"The permittee shall report the results of sampling for this section to TCEQ by March 31 following the calendar year in which the samples were collected."
Open the permit at this section

Washington ISGP

Industrial Stormwater General Permit (NPDES and State Waste Discharge General Permit), run by Washington State Department of Ecology, Water Quality Program. Rules checked November 25, 2026. Every duty in this permit · Washington permit facts · Official permit page

Every quarter 1 duty

Sample each designated discharge point every quarter

By the end of each calendar quarter.

Sample each designated sampling location at least once per quarter for Table 2 parameters (turbidity, pH, oil sheen, copper, zinc) and any Table 3 sector parameters. Collect within the first 12 hours of a discharge event; if that is not possible, sample as soon as practicable afterwards and record why. Sampling is not required outside regular business hours, in unsafe conditions or in quarters with no discharge, but a DMR is still due. Record sample details and keep lab reports from an accredited lab (pH and turbidity exempt).

  • You file it in the agency's system (WQWebPortal DMR).
  • Keep the records 5 years.
  • The permit says this is done by an accredited laboratory.
Source: 2026 Industrial Stormwater General Permit Modification (issued Dec 2, 2024, modified Oct 21, 2026), section S4.B.1.a, page 27
"The Permittee shall sample the discharge from each designated location at least once per quarter:"
Open the permit at this section

When something happens 1 duty

Sample the first fall storm on or after September 1

Within 12 hours of first discharge on or after sep 1.

Sample the stormwater discharge from the first storm event on or after September 1 each year that produces a discharge, within the first 12 hours where possible.

  • When: first fall storm discharge.
  • You file it in the agency's system (WQWebPortal DMR (third or fourth quarter)).
  • Keep the records 5 years.
Source: 2026 Industrial Stormwater General Permit Modification (issued Dec 2, 2024, modified Oct 21, 2026), section S4.B.1.b, page 27
"Permittees shall sample the stormwater discharge from the first fall storm event each year."
Open the permit at this section

Only if... 2 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Table 6 sampling and effluent limits for discharges to 303(d)-listed waters

By the end of each calendar quarter.

Facilities discharging directly or indirectly to a 303(d)-listed (Category 5) waterbody sample each such discharge point quarterly for the parameters the water is listed for (Table 6) and meet the numeric effluent limits; exceeding a limit is a permit violation, not a benchmark exceedance.

  • Only if: your stormwater reaches an impaired water body.
  • You file it in the agency's system (WQWebPortal DMR).
  • Keep the records 5 years.
  • The permit says this is done by an accredited laboratory.
Source: 2026 Industrial Stormwater General Permit Modification (issued Dec 2, 2024, modified Oct 21, 2026), section S6.C.1, page 44
"Permittees discharging to a 303(d)-listed waterbody (Category 5), either directly or indirectly through a stormwater drainage system, shall comply with the applicable sampling requirements and numeric effluent limits in Table 6."
Open the permit at this section

6PPD-quinone sampling (from January 1, 2028)

By the end of each calendar quarter, starting January 1, 2028.

Transportation, warehousing, petroleum bulk, waste management (562xxx) and hazardous waste treatment, storage and disposal facilities in Table 3 sample 6PPD-quinone (report only) quarterly from January 1, 2028; small businesses (50 or fewer employees) may sample once a year.

  • Only if: your NAICS code starts with 482, 485, 488210, 488490, 487110, 484, 491, 483, 487210, 4883, 532411, 481, 487990, 4247, 493, 531130, 562, or hazardous waste tsdf or dangerous waste recycler.
  • If you are a small business as the permit defines it: a different schedule.
  • You file it in the agency's system (WQWebPortal DMR).
  • Keep the records 5 years.
  • The permit says this is done by an accredited laboratory.
Source: 2026 Industrial Stormwater General Permit Modification (issued Dec 2, 2024, modified Oct 21, 2026), section S5.B.3, page 34
"The 6PPD-quinone (6PPDQ) sampling requirements in Table 3 go into effect on January 1, 2028."
Open the permit at this section

EPA 2021 MSGP

NPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, run by U.S. Environmental Protection Agency (EPA Regions 1-10). Rules checked November 26, 2026. Every duty in this permit · Official permit page

When something happens 1 duty

State or tribal monitoring required by Part 9

No set date. Frequency set by Part 9 for each state or tribe; once per year when Part 9 sets none.

Follow any Part 9 monitoring requirement for the facility's location; once per year if Part 9 sets no frequency. The New Mexico PFAS and Massachusetts conditions are separate duties below.

  • When: part9 monitoring applies.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 4.2.4, page 42
"If a monitoring frequency is not specified foran applicable requirement in Part 9, you must monitor once per year for the duration of your permit coverage."
Open the permit at this section

Only if... 9 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Quarterly indicator monitoring for pH, TSS and COD (report only)

By the end of each calendar quarter.

Sample each quarter for pH, TSS and COD and report in NetDMR; no threshold applies.

  • Only if: your permit subsector is B2, C5, D2, E3, F5, I1, J3, L2, N2, O1, P1, R1, T1, U3, V1, W1, X1, Y2, Z1, AB1, AC1, AD1.
  • Does not apply if: the facility is inactive and unstaffed.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 4.2.1.1.a, page 36
"You must conduct indicator monitoring of stormwater discharges for pH, TSS, and COD each quarter, beginning in your first full quarter of permit coverage as identified in Part 4.1.7."
Open the permit at this section

(Massachusetts) Sectors Q and R add copper (and for R aluminum and lead) benchmarks, and every quarterly sample must meet them

No set date. Part 9.1.2.5 adds copper (Sector Q) and aluminum, lead and copper (Sector R) "with a benchmark monitoring concentration as is included in the MSGP 2020 Table 1 of Appendix J", but the 2021 Appendix J Table 1 covers only hardness-dependent metals. EPA or MassDEP must say which values apply, and whether year 4 applies during the continuance (q1).. Only in coverage years 1 and 4, counted from when your coverage began.

Water transportation (Sector Q) facilities in Massachusetts add copper to benchmark monitoring; ship and boat yards (Sector R) add aluminum, lead and copper. For both sectors, benchmark monitoring stops only when all four quarterly samples meet the benchmark, not their average. Which benchmark values apply and the year-4 schedule are unclear (see the open question).

  • Only if: the facility is in Massachusetts; your permit sector is Q, R.
  • Does not apply if: the facility is inactive and unstaffed.
  • If your permit sector is R: a different schedule.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Part 9 Conditions Applicable to States, Indian Country Lands, or Territories (as modified), section 9.1.2.5, page 210
"Modify the monitoring requirements for Sectors Q and R such that all four of the quarterly monitoring samples must meet the benchmarks rather than the average of the four"
Open the permit at this section

(New Mexico) Compare benchmark results with the most restrictive of the MSGP and New Mexico values

No set date. Part 9.6.2 says "Most restrictive value (highlighted below) must be chosen" between a column headed "2020 proposed MSGP Benchmark" and the New Mexico values; several 2020 proposed values differ from the final 2021 Table 4-2 (copper 14 against 5.19 ug/L). EPA or NMED must say which MSGP value New Mexico facilities compare with.

Facilities in New Mexico (NMR050000) that do benchmark monitoring must use the most restrictive of the MSGP benchmark and the New Mexico benchmark for each pollutant. New Mexico sets its own values for pH, antimony, arsenic, chromium (VI), cyanide, lead, mercury and selenium, and hardness-dependent dissolved values for cadmium, chromium (III), copper, nickel, silver and zinc. Which MSGP values are the comparison is unclear (see the open question).

  • Only if: the facility is in New Mexico; your permit subsector is A1, A2, A3, A4, B1, C1, C2, C3, C4, D1, E1, E2, F1, F2, F3, F4, G1, G2, H1, J1, J2, K1, L1, M1, N1, Q1, S1, U1, U2, Y1, AA1, AA2.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: 2021 MSGP Part 9 Conditions Applicable to States, Indian Country Lands, or Territories (as modified), section 9.6.2, page 218
"Most restrictive value (highlighted below) must be chosen"
Open the permit at this section

(New Mexico) PFAS monitoring, then annually while above the screening level

No set date. Once in the first year of coverage, then annually only while PFOA plus PFOS exceed 0.070 ug/L; no due date within the year is stated.

New Mexico facilities in NAICS codes listed in EPA's December 4, 2019 TRI PFAS advance notice sample once in the first year of coverage for all 18 PFAS analytes (EPA Method 537.1) by an accredited lab, and annually after that if PFOA plus PFOS exceed 0.070 ug/L; send the results to NMED's Surface Water Quality Bureau.

  • Only if: the facility is in New Mexico; naics listed in 2019 tri pfas advance notice.
  • If pfoa plus pfos above nm screening level: a different schedule.
  • You send it to the agency (NMED Surface Water Quality Bureau, Point Source Program Manager).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
Source: 2021 MSGP Part 9 Conditions Applicable to States, Indian Country Lands, or Territories (as modified), section 9.6.2.1, page 216
"covered under this MSGP shall monitor and report PFAS in effluent once during the first"
Open the permit at this section

After an effluent-limit exceedance, flag it and re-sample within 30 days of the fix

Within 30 days after corrective action implemented.

Indicate the exceedance on a Change NOI, do corrective action, then follow-up sample within 30 calendar days of implementing it (or at the next measurable storm). If the follow-up still exceeds, submit an Exceedance Report within 30 days of the lab results and keep monitoring at least quarterly until results meet the limit.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); elg exceedance.
  • You file it in the agency's system (NeT-MSGP Change NOI; NetDMR; EPA Regional Office (Part 7.8) for the Exceedance Report).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 4.2.3.3; 7.5, page 41
"you must conduct follow-up monitoring within 30 calendar days (or during the next measurable storm event, should none occur within 30 days) of implementing corrective action(s) taken per Part 5.1."
Open the permit at this section

Annual effluent limitation monitoring for ELG-regulated discharges

Once each year of your coverage, counted from when it began.

Once per year, sample each discharge point carrying a Table 4-3 regulated discharge (e.g. cement storage piles, hazardous and non-hazardous landfills, coal piles, airport urea deicing, mine dewatering, asphalt emulsion, phosphate fertilizer, wet log decks) for the Part 8 limits.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 4.2.3.1, page 41
"you must monitor once per year at each stormwater discharge point containing the discharges identified in Table 4-3 for the parameters specified in the sector-specific section of Part 8."
Open the permit at this section

Annual impaired-waters monitoring in coverage years 1 and 4

Once each year of your coverage, counted from when it began. Only in coverage years 1 and 4, counted from when your coverage began.

If the first receiving water is impaired without a TMDL, sample each discharge point once in year 1 for all impairment pollutants (TSS for sediment/turbidity), and once in year 4 for those associated with the activity or benchmark list; keep monitoring annually while detected. With a TMDL, monitor only if EPA says so.

  • Only if: your stormwater reaches an impaired water body.
  • Does not apply if: the facility is inactive and unstaffed.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 4.2.5.1.a, page 42
"Monitoring is required annually in the first year of permit coverage and again in the fourth year of permit coverage as follows, unless you detect a pollutant causing an impairment, in which case annual monitoring must continue."
Open the permit at this section

PAH indicator monitoring twice a year in coverage years 1 and 4

Once each year of your coverage, counted from when it began, 2 times.

Sample twice a year for the 16 priority PAHs in coverage years 1 and 4 if paved areas are (re)sealed with coal-tar sealcoat during coverage, or for the listed sectors (A with creosote, C SIC 2911, D, F, H, I, M, O, P SIC 4011/4013/5171, Q SIC 4493, R, S).

  • Only if: coal tar sealcoat during coverage, or your permit sector is D, F, H, I, M, O, R, S, or your SIC code starts with 2911, 4011, 4013, 5171, 4493, or sector a creosote.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 4.2.1.1.b, page 36
"You must conduct indicator monitoring of stormwater discharges for PAHs bi-annually (i.e., sample twice per year) in the first and fourth years of permit coverage."
Open the permit at this section

Quarterly benchmark monitoring in coverage years 1 and 4

No set date. Part 4.2.2.3.b skips year-4 benchmarks "unless the first quarter of your fourth year of permit coverage occurs on or after the date this permit expires", but Part 4.2 says monitoring continues "at their original frequency during any continuance". EPA must say whether year-4 benchmarks apply when year 4 starts after February 28, 2026.. Only in coverage years 1 and 4, counted from when your coverage began.

For the benchmark parameters of the facility's subsectors (primary and co-located), sample every quarter in coverage year 1 and year 4. Stop a parameter for the next eight quarters (or for good after year 4) if its four-quarter average is at or below the benchmark; keep sampling quarterly and follow AIM if it exceeds. Whether year 4 applies when it starts during the administrative continuance is an open question.

  • Only if: your permit subsector is A1, A2, A3, A4, B1, C1, C2, C3, C4, D1, E1, E2, F1, F2, F3, F4, G1, G2, H1, J1, J2, K1, L1, M1, N1, Q1, S1, U1, U2, Y1, AA1, AA2.
  • Does not apply if: the facility is inactive and unstaffed.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 4.2.2.3, page 39
"Benchmark monitoring of stormwater discharges is required quarterly, as identified in Part 4.1.7, in the first and fourth year of permit coverage"
Open the permit at this section

Try it with your own numbers

The free tools use the same permit data as this page. No account.

Compare a lab result with my permit

Questions people ask

What is a qualifying storm event?

It is the storm a permit accepts a sample from. Each permit defines it in its own words. California Industrial General Permit (IGP) (qualifying storm event): Qualifying Storm Event: a precipitation event that produces a discharge from at least one drainage area and is preceded by 48 hours with no discharge from any drainage area (XI.B.1). Texas MSGP (qualifying storm event): An event that results in a discharge, at least 72 hours after the previous measurable storm event unless a shorter interval is documented as representative (III.D.1(a)). Washington ISGP (first fall storm event): The first time on or after September 1 each year that precipitation causes a stormwater discharge from the facility (S4.B.1.b; Appendix 2). EPA 2021 MSGP (measurable storm event): A storm event that results in an actual discharge and follows the previous measurable storm event by at least 72 hours, unless a shorter interval is documented as representative (4.1.3).

How fast do I have to collect a storm sample?

California Industrial General Permit (IGP): Collect each storm sample within 4 hours. When: Within 4 hours of start of discharge or start of operations. Washington ISGP: Sample the first fall storm on or after September 1. When: Within 12 hours of first discharge on or after sep 1. Where a permit sets no time limit, the duty below says so.

Can StormDue check my lab results?

The free benchmark comparison tool compares a result with the value in your permit and shows the section it comes from. It never calls a result a violation: it says whether the result is above the permit's benchmark or action level.

More permit duty guides

See the dates for your own permit

Pick your state and coverage. You get each duty's next date and the section it comes from, free.