The reports every facility under the permit files on a fixed date:

  • California Industrial General Permit (IGP): Submit the Annual Report by July 15 (every year).
  • Texas MSGP: None on a fixed date for every facility. Its reports start from sampling, an inspection or an exceedance.
  • Washington ISGP: Submit the quarterly DMR (even with no discharge) (every quarter); Submit the Annual Report by May 15 (every year).
  • EPA 2021 MSGP: Submit the Annual Report by January 30 (every year).

Get my permit calendar

Free, no account. Pick your state and coverage and see the next date for each duty.

Next: answer a few questions about your site. You get your dates, the permit section for each, and a calendar file.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

Compared here: California Industrial General Permit (IGP), rules checked November 25, 2026; Texas MSGP, rules checked November 25, 2026; Washington ISGP, rules checked November 25, 2026; EPA 2021 MSGP, rules checked November 26, 2026. Duties for other states are not listed until their rules are checked: find your state.

Stormwater report calendar for 2027

Every report with a fixed due date, placed on one year. Each date is worked out from the permit's rule for that report.

Permit JanFebMarAprMayJunJulAugSepOctNovDec
California Industrial General Permit (IGP) July 15, 2027: Submit the Annual Report by July 15. July 15, 2027: PE-prepared volume and mass calculations for petroleum refining and asphalt facilities (only in some situations). July 15, 2027: Submit the representative flow estimate with the Annual Report (Los Penasquitos Lagoon TMDL) (only in some situations). July 15, 2027: Update (or certify no change to) the Level 2 Technical Report with each Annual Report (only in some situations).
Texas MSGP March 31, 2027: Report hazardous-metal limit exceedances in NetDMR by March 31 (only in some situations). March 31, 2027: Report other noncompliance found in the annual inspection by March 31 (only in some situations).
Washington ISGP February 15, 2027: Submit the quarterly DMR (even with no discharge). May 15, 2027: Submit the quarterly DMR (even with no discharge). May 15, 2027: Submit the Annual Report by May 15. August 15, 2027: Submit the quarterly DMR (even with no discharge). November 15, 2027: Submit the quarterly DMR (even with no discharge).
EPA 2021 MSGP January 30, 2027: Submit the Annual Report by January 30.
Each dot is a due date in 2027, worked out from the permit's rule. A hollow dot applies only in some situations, such as a sector or an exceedance.
Report due dates in 2027
DuePermitReportFiled in
January 30, 2027 EPA 2021 MSGP Submit the Annual Report by January 30
for calendar year 2026
NeT-MSGP
February 15, 2027 Washington ISGP Submit the quarterly DMR (even with no discharge)
Q4 2026
WQWebPortal DMR application
March 31, 2027 Texas MSGP Report hazardous-metal limit exceedances in NetDMR by March 31
for calendar year 2026, only in some situations
NetDMR
March 31, 2027 Texas MSGP Report other noncompliance found in the annual inspection by March 31
for calendar year 2026, only in some situations
TCEQ Enforcement Division (MC-224) or reporting form if provided
May 15, 2027 Washington ISGP Submit the quarterly DMR (even with no discharge)
Q1 2027
WQWebPortal DMR application
May 15, 2027 Washington ISGP Submit the Annual Report by May 15
for calendar year 2026
WQWebPortal Permit Submittals
July 15, 2027 California Industrial General Permit (IGP) Submit the Annual Report by July 15
for the reporting year July 1, 2026 to June 30, 2027
SMARTS
July 15, 2027 California Industrial General Permit (IGP) PE-prepared volume and mass calculations for petroleum refining and asphalt facilities
for the reporting year July 1, 2026 to June 30, 2027, only in some situations
SMARTS
July 15, 2027 California Industrial General Permit (IGP) Submit the representative flow estimate with the Annual Report (Los Penasquitos Lagoon TMDL)
for the reporting year July 1, 2026 to June 30, 2027, only in some situations
SMARTS (PDF attachment to the Annual Report)
July 15, 2027 California Industrial General Permit (IGP) Update (or certify no change to) the Level 2 Technical Report with each Annual Report
for the reporting year July 1, 2026 to June 30, 2027, only in some situations
SMARTS
August 15, 2027 Washington ISGP Submit the quarterly DMR (even with no discharge)
Q2 2027
WQWebPortal DMR application
November 15, 2027 Washington ISGP Submit the quarterly DMR (even with no discharge)
Q3 2027
WQWebPortal DMR application

Worked example: if it happens on March 3, 2027

Some deadlines count from something that happens at the site. If that event fell on March 3, 2027, the permit's rule puts the deadline here. Your own dates come from your own events.

Deadlines counted from an event on March 3, 2027
PermitDutyCounts fromDue
California Industrial General Permit (IGP) Upload lab results within 30 days all results obtained for sampling event April 2, 2027
California Industrial General Permit (IGP) Submit the Level 1 ERA Report by January 1 level 1 start January 1, 2028
California Industrial General Permit (IGP) Submit the Level 2 ERA Action Plan by January 1 end of reporting year with level 2 exceedance January 1, 2028
Texas MSGP Write the annual inspection report within 30 days annual inspection date April 2, 2027
EPA 2021 MSGP Report monitoring results in NetDMR within 30 days of complete lab results complete lab results received April 2, 2027

The deadline calculator works out the same dates from your own event date.

California Industrial General Permit (IGP)

General Permit for Storm Water Discharges Associated with Industrial Activities, run by State Water Resources Control Board (with the nine Regional Water Quality Control Boards). Rules checked November 25, 2026. Every duty in this permit · California permit facts · Official permit page

Every year 1 duty

Submit the Annual Report by July 15

By July 15, after each reporting year ends.

Certify and submit the Annual Report in SMARTS with the compliance checklist, explanations of any noncompliance (including missed observations and samples), SWPPP revisions made during the year, and the date of the Annual Evaluation.

  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XVI.A, page 64
"The Discharger shall certify and submit via SMARTS an Annual Report no later than July 15th following each reporting year using the standardized format and checklists in SMARTS."
Open the permit at this section

When something happens 1 duty

Upload lab results within 30 days

Within 30 days after all results obtained for sampling event.

Submit all sampling and analytical results for each sampling event in SMARTS within 30 days of obtaining all results.

  • When: lab results received.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS (Ad Hoc monitoring report)).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XI.B.11.a, page 45
"The Discharger shall submit all sampling and analytical results for all individual or Qualified Combined Samples via SMARTS within 30 days of obtaining all results for each sampling event."
Open the permit at this section

Only if... 6 duties

These apply only in the situation named on each one. Answer the questions to sort them.

PE-prepared volume and mass calculations for petroleum refining and asphalt facilities

By July 15, after each reporting year ends.

Facilities subject to 40 CFR 419 or 443 estimate discharge volumes and pollutant mass per drainage area; a California licensed PE must complete them; include them in the Annual Report.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); your SIC code starts with 2911, 2951, 2952, 3996.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • The permit says this is done by a California licensed professional engineer.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XI.D.1-2; II.D.2.a, page 53
"Ensure that the volume/mass estimates or calculations required in subsection b are completed by a California licensed professional engineer."
Open the permit at this section

Submit the representative flow estimate with the Annual Report (Los Penasquitos Lagoon TMDL)

By July 15, after each reporting year ends.

Responsible Dischargers under the Los Penasquitos Lagoon Sediment TMDL estimate the representative flow rate from the facility for one QSE each reporting year and submit it as a PDF attachment to the Annual Report in SMARTS.

  • Only if: a TMDL applies to your discharge; responsible discharger los penasquitos sediment tmdl.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS (PDF attachment to the Annual Report)).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.
Source: Attachment E, List of Existing TMDLs Applicable to Industrial Storm Water Discharges, section Los Penasquitos Lagoon Sediment TMDL, page 124
"The Responsible Discharger shall submit the representative flow estimate as a PDF attachment to the Annual Report"
Open the permit at this section

Update (or certify no change to) the Level 2 Technical Report with each Annual Report

By July 15, after each reporting year ends.

While in Level 2, have the QISP update the Level 2 ERA Technical Report for new exceedances of the same parameter and drainage area, operational or source changes, or new information, and submit it with each Annual Report; if nothing changed, certify that in the Annual Report.

  • Only if: a parameter is at level 2; level 2 technical report submitted.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • The permit says this is done by a Qualified Industrial Storm Water Practitioner (QISP).
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XII.D.3.c, page 59
"The Level 2 ERA Technical Report shall be prepared by a QISP and be certified and submitted via SMARTS by the Discharger with each Annual Report."
Open the permit at this section

Submit the Level 1 ERA Report by January 1

By January 1 after the status begins (after level 1 start).

Revise the SWPPP and implement the additional BMPs, then certify and submit a Level 1 ERA Report prepared by a QISP (evaluation summary and BMP/SWPPP changes per parameter) plus the QISP's ID number, name, phone and email.

  • Only if: a parameter is at level 1.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • The permit says this is done by a Qualified Industrial Storm Water Practitioner (QISP).
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XII.C.2.a, page 55
"as soon as practicable but no later than January 1 following commencement of Level 1 status:"
Open the permit at this section

Submit the Level 2 ERA Action Plan by January 1

By January 1, after each reporting year ends (after end of reporting year with level 2 exceedance).

Certify and submit a Level 2 ERA Action Plan prepared by a QISP for each new Level 2 exceedance, choosing the demonstration(s) to perform (industrial BMPs, non-industrial source, natural background), with a schedule and task list. Update QISP details if changed.

  • Only if: a parameter is at level 2.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • The permit says this is done by a Qualified Industrial Storm Water Practitioner (QISP).
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XII.D.1.a, page 56
"shall certify and submit via SMARTS a Level 2 ERA Action Plan prepared by a QISP that addresses each new Level 2 NAL/TNAL exceedance by January 1 following the reporting year during which the NAL/TNAL exceedance(s) occurred."
Open the permit at this section

Submit the Level 2 ERA Technical Report

No set date. XII.D.2: "On January 1 of the reporting year following the submittal of the Level 2 ERA Action Plan"; SMARTS guide: "by January 1 following the submission". Which date applies to Action Plans filed July to December?

Certify and submit a Level 2 ERA Technical Report prepared by a QISP containing one or more of the demonstrations (industrial activity BMPs, non-industrial source, natural background).

  • Only if: a parameter is at level 2.
  • Does not apply if: inactive mining certification in effect.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • The permit says this is done by a Qualified Industrial Storm Water Practitioner (QISP).
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XII.D.2; XII.D.3.a; XII.D.5, page 57
"On January 1 of the reporting year following the submittal of the Level 2 ERA Action Plan, a Discharger with Level 2 status shall certify and submit a Level 2 ERA Technical Report prepared by a QISP"
Open the permit at this section

Texas MSGP

TPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, run by Texas Commission on Environmental Quality (TCEQ). Rules checked November 25, 2026. Every duty in this permit · Texas permit facts · Official permit page

When something happens 4 duties

Report hazardous-metal limit exceedances in NetDMR by March 31

By March 31, for the calendar year before.

Submit results that exceed a Table 1 limit in NetDMR by March 31 following the annual monitoring period; also report exceedances over 40% in writing within 5 working days (see tx-msgp.noncompliance-24h).

  • When: hazardous metal limit exceeded.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.128.
Source: 2026 Multi-Sector General Permit TXR050000, section III.C.1(b)(4), page 58
"Results that exceed one or more of the numeric limitations listed above in Table 1, must be reported by March 31 following the annual monitoring period in which the violation(s) occurred."
Open the permit at this section

Report other noncompliance found in the annual inspection by March 31

By March 31, for the calendar year before.

Report noncompliance identified in the annual comprehensive inspection to TCEQ by March 31 after the calendar year, e.g. by sending the annual inspection report or a narrative.

  • When: noncompliance found in annual inspection.
  • You send it to the agency (TCEQ Enforcement Division (MC-224) or reporting form if provided).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.128.
Source: 2026 Multi-Sector General Permit TXR050000, section III.E.6(b)(3), page 71
"must be reported to TCEQ by March 31 following the calendar year in which the non-compliance(s) occurred."
Open the permit at this section

Submit benchmark results in NetDMR before March 31

Before March 31 (the permit says "before", so by the day before), for the calendar year before.

Report the average yearly result per pollutant per SIC code for the previous calendar year's benchmark samples in NetDMR before March 31 (not required for waived years three and four). The first report is for 2027 samples.

  • When: sector has part v benchmarks.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.128.
Source: 2026 Multi-Sector General Permit TXR050000, section IV.B.2(a), page 76
"Results of analyses for sampling during benchmark monitoring years one through four, must be submitted to TCEQ before March 31 of each year following sample collection."
Open the permit at this section

Write the annual inspection report within 30 days

Within 30 days after annual inspection date.

Prepare a signed report within 30 days of the annual inspection (personnel, dates, findings, control observations, SWP3 revisions, noncompliance or a compliance certification). Complete remedies for noncompliance and revise and implement the SWP3 within 12 weeks of the report.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.128.
Source: 2026 Multi-Sector General Permit TXR050000, section III.B.5(b)-(c), page 55
"Within 30 days of performing the annual site compliance inspection, the permittee shall prepare a report that includes a narrative discussion of compliance with the current SWP3."
Open the permit at this section

Washington ISGP

Industrial Stormwater General Permit (NPDES and State Waste Discharge General Permit), run by Washington State Department of Ecology, Water Quality Program. Rules checked November 25, 2026. Every duty in this permit · Washington permit facts · Official permit page

Every quarter 1 duty

Submit the quarterly DMR (even with no discharge)

By May 15 (Q1), August 15 (Q2), November 15 (Q3) and February 15 (Q4).

Submit a Discharge Monitoring Report for each quarter by May 15 (Q1), August 15 (Q2), November 15 (Q3) and February 15 (Q4), starting with the first full quarter of coverage; report "no discharge" or "no sample obtained" with an explanation when applicable.

  • You file it in the agency's system (WQWebPortal DMR application).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2026 Industrial Stormwater General Permit Modification (issued Dec 2, 2024, modified Oct 21, 2026), section S9.B.2 Table 10; S9.B.4, page 58
"Upon permit coverage, the Permittee shall ensure that DMRs are submitted to Ecology by the DMR due dates below:"
Open the permit at this section

Every year 1 duty

Submit the Annual Report by May 15

By May 15, for the calendar year before.

Submit the Annual Report through WQWebPortal with corrective action documentation (triggers, problems, dates, Level 1-3 actions completed, status of open Level 2/3 actions). Not required if there was no coverage in the previous calendar year. Keep a copy on site.

  • You file it in the agency's system (WQWebPortal Permit Submittals).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2026 Industrial Stormwater General Permit Modification (issued Dec 2, 2024, modified Oct 21, 2026), section S9.C.1, page 59
"The Permittee shall submit a complete and accurate Annual Report to the Department of Ecology no later than May 15th of each year"
Open the permit at this section

EPA 2021 MSGP

NPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, run by U.S. Environmental Protection Agency (EPA Regions 1-10). Rules checked November 26, 2026. Every duty in this permit · Official permit page

Every year 1 duty

Submit the Annual Report by January 30

By January 30, for the calendar year before.

Submit the Annual Report in NeT-MSGP summarizing the past calendar year's routine inspections, visual assessments, corrective actions and AIM responses (with status of any open items) and any noncompliance, with a signed certification.

  • You file it in the agency's system (NeT-MSGP).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 7.4, page 67
"You must submit an Annual Report to EPA via NeT-MSGP, per Part 7.2, by January 30th for each year of permit coverage containing information generated from the past calendar year."
Open the permit at this section

When something happens 2 duties

Report any other noncompliance when you submit monitoring reports

No set date. At the time monitoring reports (DMRs) are submitted (7.6.7).

Report every instance of noncompliance not already reported in the Annual Report, a compliance-schedule report or a 24-hour report, at the time monitoring reports are submitted.

  • When: unreported noncompliance.
  • You send it to the agency (EPA Regional Office (Part 7.8) and MS4 operator).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 7.6.7, page 68
"You must report all instances of noncompliance not reported in your Annual Report, compliance schedule report, or 24-hour report at the time monitoring reports are submitted;"
Open the permit at this section

Report monitoring results in NetDMR within 30 days of complete lab results

Within 30 days after complete lab results received.

Submit indicator, benchmark, ELG, impaired-waters and other monitoring data in NetDMR no later than 30 days after receiving complete lab results for all monitored discharge points for the period; if a monitored point had no discharge, report "no discharge" within 30 days after the period ends.

  • When: monitoring required this period.
  • If no discharge in period: Within 30 days after end of monitoring period.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 7.3.1; 7.3.4, page 65
"no later than 30 days after you have received your complete laboratory results for all monitoring discharge points for the reporting period."
Open the permit at this section

Only if... 2 duties

These apply only in the situation named on each one. Answer the questions to sort them.

(Guam) Send Guam EPA a copy of every report and monitoring result you send EPA, at the same time

No set date. Concurrently with the EPA submission (9.9.4.1.n, condition A14).

Facilities in Guam send DMRs, follow-up monitoring reports, Exceedance Reports and other reports and monitoring data to Guam EPA at the same time they go to EPA, by mail and email to the addresses in condition A7, identified with WQC Order 2020-10 and the permit number.

  • Only if: the facility is in Guam; report submitted to epa.
  • You send it to the agency (Guam EPA, 401 Federal Permit Manager (condition A7: mail and email)).
  • Keep the records 3 years.
Source: 2021 MSGP Part 9 Conditions Applicable to States, Indian Country Lands, or Territories (as modified), section 9.9.4.1.n, page 230
"submitted to EPA shall be concurrently submitted to Guam EPA, consistent with condition A7."
Open the permit at this section

(Massachusetts) Send results showing a limit or benchmark exceedance to MassDEP

No set date. No deadline stated in 9.1.2.4.

Facilities in Massachusetts send monitoring results that show a violation of an effluent limit or a benchmark exceedance, plus any follow-up monitoring and the corrective actions taken, to the MassDEP regional office (Bureau of Air and Waste).

  • Only if: the facility is in Massachusetts; limit or benchmark exceeded.
  • You send it to the agency (MassDEP regional office, attention Bureau of Air and Waste).
  • Keep the records 3 years.
Source: 2021 MSGP Part 9 Conditions Applicable to States, Indian Country Lands, or Territories (as modified), section 9.1.2.4, page 210
"shall be sent to the appropriate Regional Office of MassDEP (attention: Bureau of Air and Waste)."
Open the permit at this section

Try it with your own numbers

The free tools use the same permit data as this page. No account.

Work out my report dates

Questions people ask

When is the stormwater annual report due?

California Industrial General Permit (IGP): Submit the Annual Report by July 15. When: By July 15, after each reporting year ends. Texas MSGP: no annual report for every facility in the duties we list. Washington ISGP: Submit the Annual Report by May 15. When: By May 15, for the calendar year before. EPA 2021 MSGP: Submit the Annual Report by January 30. When: By January 30, for the calendar year before.

Where do I file stormwater reports?

California Industrial General Permit (IGP): SMARTS (Storm Water Multiple Application and Report Tracking System). Texas MSGP: STEERS / ePermits (NOI, NEC, NOC, NOT, delegation of signatory); NetDMR (benchmark, hazardous-metal exceedances, ELG and impaired-water results). Washington ISGP: Water Quality Permitting Portal (WQWebPortal), via Secure Access Washington (SAW). EPA 2021 MSGP: NeT-MSGP (NPDES eReporting Tool) for NOI, Change NOI, NEC, NOT and Annual Report; NetDMR for discharge monitoring reports.

Which reports apply only after an event or in some situations?

California Industrial General Permit (IGP): Upload lab results within 30 days; PE-prepared volume and mass calculations for petroleum refining and asphalt facilities; Submit the representative flow estimate with the Annual Report (Los Penasquitos Lagoon TMDL); Update (or certify no change to) the Level 2 Technical Report with each Annual Report; Submit the Level 1 ERA Report by January 1; Submit the Level 2 ERA Action Plan by January 1; Submit the Level 2 ERA Technical Report. Texas MSGP: Report hazardous-metal limit exceedances in NetDMR by March 31; Report other noncompliance found in the annual inspection by March 31; Submit benchmark results in NetDMR before March 31; Write the annual inspection report within 30 days. Washington ISGP: none in the duties we list. EPA 2021 MSGP: Report any other noncompliance when you submit monitoring reports; Report monitoring results in NetDMR within 30 days of complete lab results; (Guam) Send Guam EPA a copy of every report and monitoring result you send EPA, at the same time; (Massachusetts) Send results showing a limit or benchmark exceedance to MassDEP.

More permit duty guides

See the dates for your own permit

Pick your state and coverage. You get each duty's next date and the section it comes from, free.