Get my permit calendar

States / Alabama

Alabama ALG060000 Lumber, Wood and Paper Products General Permit due dates and duties

Every duty in the General NPDES Permit No. ALG060000: Discharges Associated with Lumber, Wood, and Paper Products Industry (not including wood preserving operations), with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 46duties, each cited
  • 8on a schedule
  • 38when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
ALG060000
In force
July 1, 2022 to June 30, 2027
Official page
adem.alabama.gov
Rules last checked
November 28, 2026
Today
July 1, 2022 June 30, 2027
Notes on the permit's status and renewal

Cover page (text layer): issued June 2, 2022, effective July 1, 2022, expires June 30, 2027. ADEM's NPDES permits page, read November 28, 2026, lists "ALG060000 (Lumber & Wood)" expiring 06/30/2027 with NOI form 396. The permit expires within a year: no draft renewal, modification or amendment of ALG060000 was on that page or in ADEM's public notices on November 28, 2026 (the November 18, 2026 statewide NPDES notice names individual permits only). A permittee that wants to keep discharging after June 30, 2027 must file a reissuance NOI at least 90 days before then, April 1, 2027 (II.F.1); missing it voids the automatic continuation. This pack must be rechecked when the renewal is noticed or issued. Receiving waters: all waters of the state except Outstanding National Resource Water and Outstanding Alabama Water. The permit names no SIC or NAICS code; it covers the lumber, wood and paper products industry in words, with outfalls DSN001 (storm water from lumber and wood products), DSN002 (wet decking water), DSN003 (non-contact cooling water, condensate, blowdown and demineralizer wastewater), DSN007 (storm water from petroleum storage and fueling areas), DSN009 (vehicle and equipment exterior washing without solvents), DSN011 (uncontaminated storm water from fueling, petroleum storage and maintenance areas) and DSN012 (storm water from paper products, fiber box, composite can and tube industries). No permit fee amount is in this pack (ADEM Admin. Code Division 1, Fee Schedule D).

What does full permit coverage require?

Coverage under ALG060000 by a Notice of Intent and the Director's acknowledgement and approval before any discharge. The permit offers no exclusion for no exposure.

Every month 1 duty

DSN002, DSN003 and DSN009: sample each month

By the end of each month.

Sample each month, starting the first full month after coverage, wet decking water (DSN002) for pH and BOD; cooling water, condensate, blowdown and demineralizer wastewater (DSN003) for flow, pH and temperature, plus chlorides and TDS when demineralizer wastewater is discharged or blowdown exceeds 5,000 gal/day; and exterior vehicle and equipment wash water without solvents (DSN009) for pH, oil and grease, total phosphorus and TSS; and meet the limits.

  • Does not apply if: your coverage includes none of outfalls DSN002 (wet decking), DSN003 (cooling water) and DSN009 (vehicle and equipment washing).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.C.1.a, page 10
"MONITORING REQUIRED MONTHLY AND MORE FREQUENTLY THAN MONTHLY shall be conducted during the first full month following the effective date of initial coverage under this permit and every month thereafter."
Open the permit at this section

Every quarter 1 duty

DSN007 petroleum storage and fueling area storm water: sample each calendar quarter

By the end of each calendar quarter.

Sample each DSN007 outfall once each calendar quarter, by grab sample from a storm over 0.1 inch at least 72 hours after the previous one, for pH, benzene, ethylbenzene, toluene, xylene, oil and grease and MTBE (and naphthalene where aviation, jet or diesel fuel is handled), record rainfall, and meet the limits.

  • Does not apply if: your coverage does not include outfall DSN007 (storm water from petroleum storage and fueling areas).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.C.1.a, page 10
"QUARTERLY MONITORING shall be conducted at least once during each calendar quarter."
Open the permit at this section

Every half year 3 duties

DSN001 lumber and wood storm water: sample once each half year

By the end of each half year (June 30 and December 31).

Sample each DSN001 storm water outfall once from January to June and once from July to December, by grab sample from a storm over 0.1 inch at least 72 hours after the previous one, for pH, oil and grease and TSS, with at least one sampling point showing runoff from any sawdust, chip or wood refuse piles, record rainfall, and meet the oil and grease limit.

  • Does not apply if: your coverage does not include outfall DSN001 (storm water from lumber and wood products).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.C.1.a, page 10
"SEMIANNUAL MONITORING shall be conducted at least once during the period of January through June and"
Open the permit at this section

DSN012 paper products storm water: sample once each half year

By the end of each half year (June 30 and December 31).

Sample each DSN012 storm water outfall from paper products, fiber box, composite can and tube operations once from January to June and once from July to December, by grab sample from a storm over 0.1 inch at least 72 hours after the previous one, for pH, BOD, COD, oil and grease and TSS, record rainfall, and meet the oil and grease limit.

  • Does not apply if: your coverage does not include outfall DSN012 (storm water from paper products, fiber box, composite can and tube operations).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.C.1.a, page 10
"The permittee shall conduct the semiannual monitoring during the first complete six-month period following the effective date of initial coverage and each six-month period thereafter."
Open the permit at this section

Submit the semiannual DMRs by July 28 and January 28

By July 28 (January to June) and January 28 (July to December).

Submit the DMRs with every result for the six months before, so that ADEM receives them no later than July 28 (January to June) and January 28 (July to December), through ADEM's web-based system.

  • You file it in the agency's system (ADEM's web-based system (AEPACS)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.C.1.b, page 10
"The semiannual reports shall be submitted so that they are received by the Department no later than the 28th day of July and the 28th day of January, unless otherwise directed by the Department."
Open the permit at this section

Every year 1 duty

DSN011: submit the Annual Certification DMR by January 28

By January 28, for the calendar year before.

Submit an Annual Certification DMR, between January 1 and January 28 each year, reporting whether all DSN011 discharges in the calendar year before met the permit (marked 0 if so, 1 if not, and then contact ADEM).

  • Does not apply if: your coverage does not include outfall DSN011 (uncontaminated storm water from fueling, petroleum storage and maintenance areas).
  • You file it in the agency's system (ADEM's web-based system (AEPACS)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section Part I.A, DSN011.7, page 6
"The permittee shall submit an Annual Certification DMR by January 28th of each year (but no earlier than January 1st)"
Open the permit at this section

One time 2 duties

File the reissuance NOI at least 90 days before the permit expires

By April 1, 2027.

To keep discharging after the permit expires on June 30, 2027, submit an NOI for coverage under the reissued permit through ADEM's web-based system at least 90 days before, by April 1, 2027. Missing it voids the automatic continuation of coverage.

  • Does not apply if: every discharge under the permit will have stopped before the permit expires.
  • You file it in the agency's system (ADEM's web-based system (AEPACS)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section II.F.1.a, page 18
"Such NOI shall be submitted at least 90 days prior to the expiration date of this General Permit."
Open the permit at this section

Train personnel who carry out the BMP Plan before implementation is required

No set date. Before the date the BMP Plan must be implemented (IV.A.4.c), which is the date coverage is granted (IV.A.2).

Train personnel who carry out the BMP Plan before the date implementation is required, and keep the training records at the facility.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section IV.A.4.c, page 26
"Training shall be performed prior to the date that implementation of the BMP is required."
Open the permit at this section

When something happens 29 duties

Cooling water intake: send the intake information with the reissuance NOI

By April 1, 2027.

A facility that takes cooling water through its own intake structure submits, with its permit NOI, the intake design flow, cooling use, flow reduction estimate, through-screen velocity, impingement and entrainment data and any changes, and keeps documentation of steps to minimize impingement and entrainment.

  • When: the facility takes cooling water through its own intake structure.
  • You file it in the agency's system (ADEM's web-based system (AEPACS), with the NOI).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.

Inferred from section IV.D.1.b. Check your copy of the permit.

Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section IV.D.1.b, page 28
"The permittee shall submit, if available or applicable, the following information with the permit NOI within 90"
Open the permit at this section

Amend the BMP Plan when a change materially increases the pollution potential

No set date. When the change happens (IV.A.4.d); no number of days.

Amend the BMP Plan whenever a change in the facility or its operation materially increases the potential for ancillary activities to discharge significant amounts of pollutants.

  • When: a change in the facility or its operation materially increases the potential to discharge significant amounts of pollutants.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section IV.A.4.d, page 26
"The permittee shall amend the BMP plan whenever there is a change in the facility or change in operation of the facility which materially increases the potential for the ancillary activities to result in"
Open the permit at this section

Ask ADEM for a temporary electronic reporting waiver if needed

No set date. No deadline set (I.C.1.c(2)).

A permittee that cannot report electronically may request a temporary electronic reporting waiver for DMRs (permit number, names, address, contact, reasons and duration); with an approved waiver, hard copy DMRs with original signatures go to ADEM's Office of Water Services.

  • When: you need a waiver from electronic DMR reporting.
  • You send it to the agency (ADEM Water Division, Office of Water Services, P.O. Box 301463, Montgomery, AL 36130-1463).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.C.1.c(2), page 11
"The permittee may submit a request to the Department for a temporary electronic reporting waiver for DMR submittals."
Open the permit at this section

Ask ADEM to authorize an anticipated bypass at least 10 days before

At least 10 days before the anticipated bypass.

For a bypass that will not meet the limits (unavoidable to prevent loss of life, injury or severe property damage, with no feasible alternative), submit a written request for authorization to the Director at least 10 days before the anticipated bypass if possible, and follow any conditions set.

  • When: you know in advance that a bypass that will not meet the limits is needed.
  • You file it in the agency's system (ADEM Water Division, electronically).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section II.D.1.c(3), page 17
"The permittee submits a written request for authorization to bypass to the Director at least ten (10) days prior to the anticipated bypass (if possible)"
Open the permit at this section

Calibrate flow measurement devices at least once every 12 months

Within 365 days after the last calibration.

Calibrate flow measurement devices used for the permit at least once every 12 months, and keep monitoring equipment installed, maintained and calibrated to the manufacturer's instructions.

  • When: flow measurement devices are used.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section I.B.5. Check your copy of the permit.

Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.B.5, page 10
"At a minimum, flow measurement devices shall be calibrated at least once every 12 months."
Open the permit at this section

Correct a BMP Plan deficiency within 30 days of ADEM's notice

Within 30 days after you receive the deficiency notice.

Correct any BMP Plan deficiency the Director identifies within 30 days of receiving the notice, and certify to ADEM that the correction has been made and implemented.

  • When: ADEM notifies you that the BMP Plan is deficient.
  • You file it in the agency's system (ADEM Water Division).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section IV.A.3.c, page 25
"The permittee shall correct any BMP deficiency identified by the Director or his designee within 30 days of receipt of notification"
Open the permit at this section

DSN003 cooling water: sample total residual chlorine every two weeks

Within 14 days after the last total residual chlorine sample.

Sample DSN003 discharges for total residual chlorine once every two weeks, including during shock chlorination; otherwise code it *9 on the DMR where the permit allows.

  • Does not apply if: your coverage does not include outfall DSN003 (non-contact cooling water, condensate, blowdown or demineralizer wastewater).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from Part I.A, DSN003. Check your copy of the permit.

Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section Part I.A, DSN003, page 3
"Total Residual Chlorine 4 5 6 7 mg/l - 0.019 / 0.0138 0.011 / 0.00758 1/2 weeks Grab"
Open the permit at this section

DSN009 vehicle and equipment washing: measure flow each week

Within 7 days after the last flow measurement.

Measure (or, for intermittent flows, estimate) the DSN009 wash water flow once a week; pH, oil and grease, total phosphorus and TSS are sampled monthly against the limits.

  • Does not apply if: your coverage does not include outfall DSN009 (vehicle and equipment exterior washing without solvents).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from Part I.A, DSN009. Check your copy of the permit.

Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section Part I.A, DSN009, page 5
"Flow gal/day - Monitor 1/week Instantaneous 2"
Open the permit at this section

DSN011 fueling and maintenance areas: inspect twice a week

Within 3 days after the last fueling area inspection.

Inspect the fueling, petroleum storage and handling, equipment storage and maintenance areas twice a week and remove any leaked petroleum product; clean up spills immediately using dry methods.

  • Does not apply if: your coverage does not include outfall DSN011 (uncontaminated storm water from fueling, petroleum storage and maintenance areas).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from Part I.A, DSN011.2. Check your copy of the permit.

Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section Part I.A, DSN011.2, page 6
"Twice per week inspections of the area and removal of any leaked petroleum product;"
Open the permit at this section

Enter DMR data within five days after ADEM's system comes back

Within 5 days after ADEM's web-based system resumes operation.

If ADEM's web-based system is down on the 28th or for an extended period when a DMR is due, submit the data by fax, email, mail or hand delivery so it arrives by the due date, then enter it in the system within five calendar days after the system resumes.

  • When: ADEM's web-based system is down when a DMR is due.
  • You file it in the agency's system (ADEM's web-based system (AEPACS)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.C.1.c(1), page 11
"Within five calendar days of the Department’s web-based system resuming operation, the permittee shall enter the data into the Department’s web-based system"
Open the permit at this section

File a Notice of Intent at least 30 days before coverage is wanted

At least 30 days before the date coverage is wanted.

Submit a Notice of Intent through ADEM's web-based system at least 30 days before the date coverage is wanted. No discharge may begin until the Director acknowledges the NOI and approves coverage.

  • When: a facility is seeking coverage.
  • You file it in the agency's system (ADEM's web-based system (AEPACS)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section II.A.1.a, page 15
"to be covered by this General Permit at least 30 days prior to the date of desired coverage."
Open the permit at this section

Give ADEM 90 days notice of changes that add pollutants, raise a discharge or add an outfall

At least 90 days before the planned change.

At least 90 days before any expansion, production increase, process change or other action that could discharge additional pollutants, increase a discharge beyond the limits or add a discharge point, notify the Director. No new or increased discharge may start until ADEM authorizes it.

  • When: an expansion, production increase or process change that could add pollutants, raise a discharge over the limits or add an outfall is planned.
  • You send it to the agency (ADEM Water Division).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section II.F.2.a, page 18
"The permittee shall give notice to the Director at least 90 days in advance of any facility expansion, production increase, process change, or other action that could result in:"
Open the permit at this section

Give ADEM requested information within a reasonable time

No set date. Within a reasonable time (I.D.4); no number of days.

Furnish any information the Director requests to decide on suspension, revocation, modification or compliance, within a reasonable time.

  • When: ADEM asks for information.
  • You send it to the agency (ADEM Water Division).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.D.4.a, page 13
"Any permittee shall furnish to the Director, within a reasonable time, any information which the Director or his designee may request"
Open the permit at this section

Give ADEM written notice before planned changes that may cause noncompliance

No set date. In advance (I.D.1); no number of days.

Give the Director written advance notice, electronically, of any planned change or other circumstance at the facility that may cause noncompliance.

  • When: a planned change or other circumstance may cause noncompliance.
  • You file it in the agency's system (ADEM Water Division, electronically).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.D.1, page 12
"The permittee shall give the Director written advance notice of any planned changes or other circumstances regarding a facility, which may result in noncompliance with permit requirements."
Open the permit at this section

Inspect storm water controls and the facility at least twice a week on workdays

Within 3 days after the last BMP inspection.

Inspect, at least twice a week on workdays, every structure that prevents storm water pollution or removes pollutants, and the facility in general, to see that the BMP Plan is carried out and works.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section IV.A.1.h. Check your copy of the permit.

Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section IV.A.1.h, page 25
"Provide for, at a minimum, two inspections per week on workdays, of any structures that function to prevent"
Open the permit at this section

Keep a Spill Prevention, Control and Countermeasures Plan if 40 CFR 112 requires one

No set date. Standing duty (II.B.2.b).

Prepare, implement and maintain an SPCC Plan under 40 CFR Part 112 if that rule requires one, and provide containment for 110 percent of the largest tank.

  • When: 40 CFR Part 112 requires an SPCC Plan.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section II.B.2.b, page 15
"The permittee shall prepare, implement, and maintain a Spill Prevention, Control and Countermeasures (SPCC) Plan in accordance with 40 CFR Part 112 if required thereby."
Open the permit at this section

Notify ADEM 60 days before using a new cooling or boiler water additive

At least 60 days before you start using the additive.

At least 60 days before starting to use a biocide, corrosion inhibitor or chemical additive not named in the NOI in a cooling or boiler system that discharges under the permit, notify the Director in writing with its composition, toxicity data, quantities, frequency, maximum discharge concentration and EPA registration number.

  • When: you plan to use a cooling or boiler water additive not named in the NOI.
  • You send it to the agency (ADEM Water Division).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.D.6.a, page 13
"The permittee shall notify the Director in writing not later than sixty (60) days prior to instituting the use of any biocide corrosion inhibitor or chemical additive in a cooling or boiler system"
Open the permit at this section

Notify ADEM as soon as an unlimited toxic pollutant may exceed the notification levels

No set date. As soon as it is known or suspected (II.F.2.b); no number of days.

Notify the Director as soon as it is known or suspected that an activity will discharge a toxic pollutant not limited in the permit above the notification levels (routine discharges 100 ug/l or five times the NOI value; non-routine 500 ug/l or ten times the NOI value; special values for acrolein, acrylonitrile, dinitrophenols and antimony).

  • When: an activity may discharge a toxic pollutant not limited in the permit above the notification levels.
  • You send it to the agency (ADEM Water Division).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section II.F.2.b, page 18
"The permittee shall notify the Director as soon as it is known or there is reason to believe:"
Open the permit at this section

Notify ADEM in writing of any increase in pollution potential

No set date. No number of days set (I.D.5).

Notify the Director in writing if the pollution potential of the facility's discharges increases.

  • When: the pollution potential of the discharges increases.
  • You send it to the agency (ADEM Water Division).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.D.5, page 13
"If there is an increase in pollution potential of the discharges from the permittee’s facility the permittee must notify the Director in writing."
Open the permit at this section

Report a new address, phone or facility contact within 10 days

Within 10 days after the mailing address, phone number or facility contact changes.

Tell the Director in writing of any change in the mailing address, telephone number or designated facility contact no later than 10 days after the change.

  • When: the mailing address, phone number or facility contact changes.
  • You send it to the agency (ADEM Water Division, P.O. Box 301463, Montgomery, AL 36130-1463).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.D.3.a, page 13
"in writing, no later than ten (10) days after such change."
Open the permit at this section

Report any other limit violation with the next DMR

No set date. With the next DMR due after you become aware (I.C.2.b).

For any discharge that does not meet a limit of the permit, submit a written Noncompliance Notification Form with the next DMR due after becoming aware of it.

  • When: a discharge does not meet a permit limit.
  • You file it in the agency's system (ADEM's web-based system (AEPACS), with the DMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.C.2.b, page 12
"such report shall be submitted with the next Discharge Monitoring Report required to be submitted by Provision I. C. 1. of this permit after becoming aware of the occurrence of such noncompliance."
Open the permit at this section

Report on the compliance schedule within 14 days if ADEM requires it

Within 14 days after coverage takes effect.

If required, within 14 calendar days after a date in the schedule of compliance (compliance on the effective date of coverage), submit a progress report or a written notice of compliance or noncompliance, electronically.

  • When: ADEM requires a compliance schedule report.
  • You file it in the agency's system (ADEM Water Division, electronically).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.E.2, page 14
"If required, no later than 14 calendar days following a date identified in the above schedule of compliance"
Open the permit at this section

Report serious noncompliance orally within 24 hours and in writing within 5 days

Within 24 hours after you become aware of the discharge.

For a discharge that violates a daily limit marked (X), threatens health, aquatic life or water quality standards, breaks a toxic standard, contains a harmful quantity of a hazardous substance, exceeds a limit from an unanticipated bypass or upset, or is unpermitted, report orally to the Director within 24 hours after becoming aware, and submit a Noncompliance Notification Form within 5 days.

Further steps with their own deadlines:

  • Written report within 5 days. Within 5 days after you become aware of the discharge. Section I.C.2.a, page 12
    "no later than five (5) days after becoming aware of the occurrence of such discharge."
  • When: a discharge violates a daily limit marked (X), threatens health or water quality, breaks a toxic standard, carries a harmful hazardous substance, exceeds a limit from an unanticipated bypass or upset, or is unpermitted.
  • You send it to the agency (ADEM Water Division (oral report, then electronic Noncompliance Notification Form)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.C.2.a, page 12
"the permittee shall orally report the occurrence and circumstances of such discharge to the Director within 24-hours after the permittee becomes aware of the occurrence of such discharge."
Open the permit at this section

Request a permit transfer at least 30 days before a change in ownership or control

At least 30 days before the change in ownership or control.

For a change in ownership or control of the premises only, submit a transfer request through ADEM's web-based system at least 30 days before the change; if effluent characteristics will also change, submit a complete NOI at least 90 days before.

Further steps with their own deadlines:

  • Complete NOI 90 days before if effluent characteristics also change. At least 90 days before the change in ownership or control. Section II.F.3.b, page 19
    "a complete NOI is required to be submitted to the Director electronically through the Department’s web-based system at least 90 days prior to the change."
  • When: ownership or control of the premises will change.
  • You file it in the agency's system (ADEM's web-based system (AEPACS)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section II.F.3.a, page 19
"a request for permit transfer must be submitted electronically through the Department’s web-based system at least 30 days prior to the change."
Open the permit at this section

Request a permittee or facility name change at least 30 days before

At least 30 days before the name change.

For a change in permittee name or facility name only, submit a name change request through ADEM's web-based system at least 30 days before the change.

  • When: the permittee or facility name will change.
  • You file it in the agency's system (ADEM's web-based system (AEPACS)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section II.F.3.c, page 19
"a request for permit name change must be submitted electronically through the Department’s web-based system at least 30 days prior to the change."
Open the permit at this section

Request termination when discharges permanently stop

No set date. When the discharges have permanently ceased (I.D.2); no number of days.

When every point source discharge under the permit has permanently ceased, submit a permit termination request through ADEM's web-based system.

  • When: every discharge under the permit has permanently stopped.
  • You file it in the agency's system (ADEM's web-based system (AEPACS)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.D.2, page 12
"by submitting a permit termination request electronically through the Department’s web-based system."
Open the permit at this section

Send missing or corrected NOI and report facts promptly

No set date. Promptly (I.D.3.b); no number of days.

On finding that the NOI or a report left out relevant facts or was wrong, promptly submit the facts with a written explanation, electronically.

  • When: you find that the NOI or a report left out facts or was wrong.
  • You file it in the agency's system (ADEM Water Division, electronically).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.D.3.b, page 13
"it shall promptly submit such facts or information with a written explanation for the mistake and/or omission."
Open the permit at this section

Tell the municipality by letter of a discharge to its sewer

No set date. No number of days set (II.A.1.c).

If the facility discharges to a municipal storm sewer, sanitary sewer or combination sewer, notify the municipality by letter of the discharge.

  • When: the facility discharges to a municipal storm sewer, sanitary sewer or combination sewer.
  • You send a copy to the operator of your storm sewer system (MS4).
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section II.A.1.c, page 15
"Any person discharging to a municipal storm sewer, sanitary sewer or combination sewer must notify the municipality by letter of the discharge."
Open the permit at this section

To claim an upset, report it within 24 hours and give evidence within 5 days

Within 24 hours after you become aware of the upset.

To have an upset excuse a limit, report it orally to the Director within 24 hours after becoming aware, and within 5 days give evidence (signed operating logs) that it happened, its cause, that the facility was properly operated and that all reasonable steps were taken.

Further steps with their own deadlines:

  • Evidence of the upset within 5 days. Within 5 days after you become aware of the upset. Section II.D.2.a(2), page 17
    "No later than five (5) days after becoming aware of the occurrence of the upset, the permittee furnishes the Director with evidence"
  • When: an upset happens and you want it to excuse a limit.
  • You send it to the agency (ADEM Water Division (oral report)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section II.D.2.a(1), page 17
"No later than 24-hours after becoming aware of the occurrence of the upset, the permittee orally reports the occurrence and circumstances of the upset to the Director or his designee"
Open the permit at this section

Ongoing 7 duties

DSN002 wet decking water: meet the pH and BOD limits

No set date. Sampled each month under al-alg060000.monthly-sampling.

Wet decking water discharged under DSN002 is sampled monthly by grab sample (al-alg060000.monthly-sampling) and must stay within pH 6.0 to 8.5 and BOD 30 mg/l, with no debris.

  • Does not apply if: your coverage does not include outfall DSN002 (wet decking water).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section Part I.A, DSN002, page 2
"Biochemical Oxygen Demand mg/l - 30 Monitor 1/month Grab"
Open the permit at this section

DSN011: keep the inspection, cleanup and spill log

No set date. Standing duty (DSN011.3).

Keep a log of each inspection (date and time), cleanup done and its start and finish times, the signature of the inspector, and every spill during petroleum handling (date, time, estimated volume, who saw it, when and by whom it was cleaned up).

  • Does not apply if: your coverage does not include outfall DSN011 (uncontaminated storm water from fueling, petroleum storage and maintenance areas).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section Part I.A, DSN011.3, page 6
"Records shall be maintained in the form of a log and shall contain the following information, at a minimum:"
Open the permit at this section

DSN011: skim oil before draining a diked area and log the drainage

No set date. At each drainage (DSN011.4, .5).

Immediately before draining a diked area, remove oil and grease shown by a sheen with an oil skimmer or absorbent, and log the date and time, estimated volume and the initials of the person who inspected and authorized the discharge.

  • Does not apply if: your coverage does not include outfall DSN011 (uncontaminated storm water from fueling, petroleum storage and maintenance areas).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section Part I.A, DSN011.5, page 6
"Monitoring records for dike drainage shall be maintained in the form of a log and shall contain the following information, as a minimum:"
Open the permit at this section

Keep a signed log of the twice-weekly inspections

No set date. Standing duty (IV.A.4.b).

Keep at the facility a log of every twice-weekly inspection and corrective action for the last three years, each entry signed by the person who did the inspection.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section IV.A.4.b, page 26
"The log shall contain records of all inspections performed and any corrective actions taken for the last three years, and each entry shall be signed by the person performing the inspection."
Open the permit at this section

Prepare and carry out the Best Management Practices Plan

No set date. In place no later than the date coverage is granted (IV.A.2); standing duty after that.

Prepare and fully implement a BMP Plan no later than the date coverage is granted that controls particles and erosion, prevents spills of fluids, oil and fuel, keeps storm water from washdown water, other pollutants and sawdust, chips, bark and wood refuse, keeps those piles 100 feet from waters and drainage courses unless controlled, names the responsible person, sets twice-weekly inspections, includes a site diagram, and bears the signature of the plant manager or a corporate official.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by plant manager or corporate official.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section IV.A.2, page 25
"The permittee shall prepare and fully implement the BMP no later than the date coverage is granted."
Open the permit at this section

Record the date and rainfall of every storm sampled

No set date. At each storm sampled (IV.B.1).

For each storm sampled (DSN001, DSN007, DSN012), record the date, the rainfall in inches (a rain gauge may be used) and that at least 72 hours passed since the end of the previous storm over 0.1 inch, and keep the record with the sampling records.

  • Does not apply if: your coverage includes none of the storm water outfalls DSN001, DSN007 and DSN012.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section IV.B.1.b, page 26
"The storm water event must be monitored, including the date and rainfall (in inches) for the storm event(s) sampled."
Open the permit at this section

Record the details of every sample and keep records three years

No set date. Standing duty (I.B.3, I.B.4).

For each sample or measurement, record the facility, outfall, date, time and place, who sampled, when and by whom it was analyzed, the method and the results; keep all monitoring records, calibration records, reports and NOI data at least three years at the facility (or an approved Alabama location).

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section I.B.4.a, page 10
"for a period of at least three years from the date of the sample measurement, report or NOI."
Open the permit at this section

Only if... 2 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Impaired waters: document BMPs for the pollutant of concern

Within 181 days after the 303(d) list or TMDL is approved or established by EPA.

A facility whose discharge contains a pollutant for which its receiving water is on Alabama's 303(d) list documents in its BMP plan how BMPs will control that pollutant with no increase, with a monitoring plan, and submits the new or revised BMP plan to ADEM for review, by April 30 of the year after the list or TMDL is approved or within 6 months of approval, whichever is longer.

  • Only if: your stormwater reaches an impaired water body.
  • You send it to the agency (ADEM Water Division).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.

Inferred from section IV.C.1.b. Check your copy of the permit.

Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section IV.C.1.b, page 26
"must by April 30th of the following year or within 6 months of such approval of the 303(d) list or applicable TMDL or establishment of TMDL by EPA (whichever is longer)"
Open the permit at this section

TMDL waters: assess allocations and add targeted BMPs

Within 181 days after the 303(d) list or TMDL is approved or established by EPA.

Where an EPA-approved or established TMDL covers a pollutant likely in the discharges, determine whether it sets an allocation for the facility, assess whether existing controls meet it, document controls, a schedule and calculations, add targeted BMPs and a monitoring plan, and submit the revised BMP plan to ADEM.

  • Only if: a TMDL applies to your discharge.
  • You send it to the agency (ADEM Water Division).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per adem 335 6 6 09.

Inferred from section IV.C.3. Check your copy of the permit.

Source: General NPDES Permit No. ALG060000, Lumber and Wood (cover page, two contents pages and printed pages 1 to 28; 31 PDF pages, text layer on every page), section IV.C.3, page 27
"must be submitted to the Department for review by April 30th of the year following EPA approval of the 303(d) list or EPA"
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

Alabama ALG060000 Lumber, Wood and Paper Products General Permit duties, topic by topic

How the Alabama ALG060000 Lumber, Wood and Paper Products General Permit compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: