Iowa NPDES General Permit No. 1 due dates and duties

Every duty in the NPDES General Permit No. 1 for Storm Water Discharge Associated with Industrial Activity, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 47duties, each cited
  • 4on a schedule
  • 43when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
General Permit No. 1
In force
March 1, 2023 to February 29, 2028
Official page
iowadnr.gov
Rules last checked
November 27, 2026
Today
March 1, 2023 February 29, 2028
Notes on the permit's status and renewal

The cover page reads "NPDES General Permit No. 1, Effective Dates March 1, 2023 through February 29, 2028, for Storm Water Discharge Associated with Industrial Activity". DNR's Stormwater Permits, Guidance & Forms page, read November 27, 2026, links this document as "NPDES General Permit #1", so it is the current version; on that date it was in force and not administratively continued. Iowa general permits are adopted by rule. Part VI.C says an expired general permit continues in effect until a new one is adopted. Renewal: DNR posted redline and clean drafts of a renewed General Permit No. 1 for March 1, 2028 through February 28, 2033 for an April 14, 2026 stakeholder meeting, and Regulatory Analysis RA 26-313 (Iowa Administrative Bulletin, September 30, 2026, public hearing October 23, 2026) proposes renewing General Permits 1, 2 and 3 with those dates. The draft is not in force; this pack follows the 2023 permit. Asphalt plants, concrete batch plants, rock crushing plants and sand or gravel operations are not covered unless they report Section 313 water priority chemicals (Part I.B.2.d); DNR covers them under General Permit No. 3. Construction activity is not covered (Part I.B.2.c); DNR covers it under General Permit No. 2. DNR's page also offers a No-Exposure Certification form (542-1544), which this permit does not mention; this pack does not model it. Fees are set by 567 IAC 64.16; no amounts are shown here.

What does full permit coverage require?

Permit coverage: SWPPP first, then a complete NOI (DNR Form 542-1415, fees and proof of a newspaper public notice); no discharge until DNR issues the authorization.

Every year 1 duty

Have qualified personnel inspect the site at least once a year

Within 1 year after the last inspection.

Qualified personnel inspect material handling areas and other pollutant sources, structural and erosion controls and spill response equipment at the intervals the SWPPP sets, and never less than once a year. Revise the SWPPP within two weeks and carry out the revised measures within twelve weeks, and keep a signed report with the SWPPP for at least three years.

Further steps with their own deadlines:

  • Revise the SWPPP within two weeks of the inspection. Within 14 days after the inspection. Section III.C.4.c.(2), page 6
    "the description of potential pollutant sources and the pollution prevention measures identified in the SWPPP shall be revised as appropriate within two weeks of the inspection."
  • Fully carry out the revised measures within twelve weeks of the inspection. Within 84 days after the inspection. Section III.C.4.c.(2), page 6
    "The revised pollution prevention measures shall be fully implemented within twelve weeks of the inspection."
  • Sign the inspection report and keep it with the SWPPP for three years. The permit gives the timing in words, quoted below. Section III.C.4.c.(3), page 6
    "A report shall be made and retained as part of the SWPPP for at least three years."
  • Does not apply if: the annual inspection is impractical because no employee is stationed at or routinely visits the site; the annual inspection is impractical because the site is inactive.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.

Inferred from section III.C.4.c. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.c, page 6
"Qualified personnel shall inspect designated equipment and plant area at appropriate intervals specified in the SWPPP, but, in no case less than once a year, except as provided in Parts III.C.4.c.(4). and (5) of this permit."
Open the permit at this section

One time 3 duties

Certify in the SWPPP that outfalls were tested for non-storm water

No set date. Part of the SWPPP; Part V.A allows 180 days from the discharge authorization date before the failure-to-certify description is needed.

Include in the SWPPP a certification that the discharge was tested or evaluated for non-storm water discharges, with the results, the method, the test date and the drainage points observed. Allowed non-storm water sources (Part III.A) that mix with the discharge are identified in the SWPPP with their controls.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.b.(10), page 6
"The SWPPP shall include a certification that the discharge has been tested or evaluated for the presence of non-storm water discharges."
Open the permit at this section

Resubmit the NOI before the authorization expires

Before the authorization expires.

Before the facility's authorization under this permit expires, resubmit an NOI to DNR for coverage under the new general permit. No new public notice is needed. If the new permit has not been adopted before this one expires, this permit and its coverage continue until it is replaced.

  • You file it in the agency's system (Iowa DNR Stormwater General Permits database).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section II.E, page 3
"Prior to the expiration of an authorization issued under this general permit, the permittee is required to resubmit a NOI (no additional public notice is required) with the Department for coverage under the new general permit."
Open the permit at this section

Write and sign the SWPPP before submitting the NOI

No set date. Before the NOI is submitted (III.C.1).

Prepare a Storm Water Pollution Prevention Plan (SWPPP) under Part III.C, in accordance with good engineering practices, before the Notice of Intent is submitted, sign it under Part VI.H and keep it on site. Implement it with operations (for a new facility, from the start of operations).

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.1, page 4
"The SWPPP shall be completed before a NOI is submitted to the Department."
Open the permit at this section

When something happens 40 duties

Airports using urea deicer: sample for ammonia each month from September through May

By September 30 (September), October 31 (October), November 30 (November), December 31 (December), January 31 (January), February 28 (February), March 31 (March), April 30 (April) and May 31 (May).

An airport with 1,000 or more annual non-propeller aircraft departures that used urea deicer in the current deicing season takes a grab sample of undiluted runoff from the areas where it was used once each month from September through May and measures ammonia as nitrogen, which may not exceed the daily maximum in the table.

  • When: the airport has 1,000 or more non-propeller aircraft departures a year; urea deicer is used on the airfield.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section V.B.8.b. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.8.b, page 14
"Sampling shall be conducted at least monthly (1 time per month) from September through May, inclusive"
Open the permit at this section

Airports with 1,000 or more jet departures: certify each year that no urea deicer is used

Within 1 year after the last certification.

An airport with 1,000 or more annual non-propeller aircraft departures that does not sample for urea certifies each year that airfield deicing products containing urea are not used, and keeps the certification with the SWPPP. Storm water containing urea may not be discharged.

  • When: the airport has 1,000 or more non-propeller aircraft departures a year.
  • Does not apply if: urea deicer is used on the airfield.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.

Inferred from section III.D. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.D, page 10
"All airports with 1,000 annual non-propeller aircraft departures or more must either certify annually that airfield deicing products using urea are not used"
Open the permit at this section

Airports with over 50,000 flight operations a year: sample during a deicing event once a year

Within 1 year after the last sample.

Airports with over 50,000 flight operations a year sample storm water from runways and aircraft deicing areas at least once a year during a deicing event for oil and grease, BOD5, COD, TSS, TKN, total phosphorus, pH and ethylene glycol, recording the storm data Part V.B.7 lists.

  • When: the airport has more than 50,000 flight operations a year.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section V.B.7. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.7, page 14
"deicing at airports with over 50,000 flight operations per year are subject to the following monitoring requirements during a deicing event ... Sampling shall be conducted at least annually (1 time per year) during a deicing"
Open the permit at this section

Amend the SWPPP when a change affects pollutant discharge or the plan is not working

No set date. The permit sets no deadline for an amendment (III.C.3).

Amend the SWPPP whenever a change in design, construction, operation or maintenance significantly affects the potential to discharge pollutants, or when the SWPPP proves ineffective at controlling pollutants in storm water discharges.

  • When: there is a significant change or the SWPPP is found not to work.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.3, page 4
"The permittee shall amend the SWPPP whenever there is a change in design, construction, operation, or maintenance, which has a significant effect on the potential for the discharge of pollutants to waters of the U.S."
Open the permit at this section

Ask DNR's field office in writing at least 10 days before a planned bypass

At least 10 days before the expected date of the bypass.

Before any planned bypass of a treatment facility, get DNR's written permission: send the written request to the DNR regional field office at least ten days before the expected date, with the reason, start date and time, expected duration, estimated amount, location, affected surface water and planned mitigation.

  • When: a bypass is expected.
  • You send it to the agency (DNR regional field office).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section VI.P.2.a.(1), page 20
"The request for a bypass shall be submitted to the appropriate regional field office of the Department at least ten days prior to the expected date of the event."
Open the permit at this section

Cannot certify for non-storm water: write the failure-to-certify description within 180 days

Within 180 days after your discharge is authorized.

A facility that cannot provide the non-storm water certification within 180 days of its discharge authorization date writes a description of the tests or observations made, their results, the possible non-storm water sources and why adequate tests were not feasible, keeps it on site and shows it to DNR on request.

  • When: you cannot certify that outfalls are free of non-stormwater.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.

Inferred from section V.A. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.A, page 10
"Any facility that is unable to provide the certification required under Part III.C.4.(B).(10). of this permit (testing for non-storm water discharges) within 180 days of the discharge authorization date must prepare a written description"
Open the permit at this section

Coal handling sites at coal-fired power plants: sample once a year

Within 1 year after the last sample.

Coal-fired steam electric power plants sample storm water from coal handling sites other than coal piles at least once a year for oil and grease, TSS, copper, nickel, zinc and pH, recording the storm data Part V.B.11 lists.

  • When: a coal-fired power plant has coal handling sites other than coal piles.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section V.B.11. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.11, page 15
"coal handling sites other than coal piles at coal fired steam electric power generating facilities are subject to the following monitoring requirements ... Sampling shall be conducted at least annually (1 time per year)"
Open the permit at this section

Coal pile runoff: meet the TSS and pH limits

No set date. These are the limits each sample is compared with; the sampling schedule is in the coal pile runoff monitoring duty.

Storm water made up in part or in whole of coal pile runoff may not exceed the total suspended solids maximum at any time, and its pH stays within the range in the table. Untreated overflow from facilities built and run to treat the runoff from a 10-year, 24-hour rainfall event is not subject to these limits.

  • When: the facility discharges coal pile runoff.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section Part IV, page 10
"Any storm water composed in part or in whole of coal pile runoff shall not exceed a maximum concentration at any time of 50.0 milligrams per liter (mg/l) of total suspended solids."
Open the permit at this section

Coal pile runoff: sample once a year

Within 1 year after the last sample.

Facilities with coal pile runoff sample it at least once a year for oil and grease, pH, TSS, total copper, nickel and zinc, recording the storm and drainage area data Part V.B.6 lists, and compare the TSS and pH results with the Part IV limits.

  • When: the facility discharges coal pile runoff.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section V.B.6. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.6, page 13
"storm water discharge associated with industrial activity from coal pile runoff are subject to the following monitoring requirements ... Sampling shall be conducted at least annually (1 time per year)"
Open the permit at this section

Coal pile runoff: send the Discharge Monitoring Report within 30 days after sampling

Within 30 days after the sampling.

Permittees subject to the Part IV limits (coal pile runoff) send DNR signed copies of their monitoring results on Discharge Monitoring Report forms within 30 days after the sample was taken.

  • When: the facility discharges coal pile runoff.
  • You send it to the agency (Discharge Monitoring Report forms, by email to npdes.mail@dnr.iowa.gov or by mail (Part V.F)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.D.1, page 17
"Permittees which are subject to the monitoring requirements of Part IV of this permit are required to submit signed copies of discharge monitoring results on Discharge Monitoring Report Forms(s) within 30 days after the sampling occurred."
Open the permit at this section

Discharging through a municipal storm sewer: follow the city's storm water program

No set date. Standing duty; the municipal program sets its own requirements (III.C.4.d).

A facility discharging through a municipal separate storm sewer system follows the applicable requirements of that system's storm water management program, and sends the system's operator its monitoring reports or results when asked (V.D.3).

  • When: the facility discharges through a municipal separate storm sewer system.
  • You send a copy to the operator of your storm sewer system (MS4).
  • Keep the records 3 years.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.d, page 6
"Facilities covered by this permit must comply with applicable requirements in municipal storm water management programs developed under NPDES permits issued for the discharge from the municipal separate storm sewer system that receives the facility's discharge."
Open the permit at this section

Facilities without monitoring: report noncompliance to DNR at least once a year

Within 1 year after the last noncompliance report.

A permittee that has no monitoring duty under the permit reports all incidents of noncompliance to DNR at least once a year.

  • When: the facility has no monitoring duty under Part V.B.
  • You send it to the agency (By email to npdes.mail@dnr.iowa.gov or by mail to the Storm Water Coordinator (Part V.F)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.

Inferred from section V.C. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.C, page 16
"Permittees that are not required to monitor must report all incidents of non-compliance to the Department at least annually."
Open the permit at this section

Get DNR's authorization before discharging

No set date. Before discharge begins; DNR must issue the authorization first (II.A). The permit sets no lead time.

Submit a complete Notice of Intent to DNR, online in the Stormwater General Permits database or by mail: DNR Form 542-1415 signed under Parts VI.H and VI.I, the fees set by 567 IAC 64.16, and proof that the public notice was published. A facility may not discharge storm water associated with industrial activity until DNR issues an authorization.

  • When: a new facility is seeking coverage.
  • You file it in the agency's system (Iowa DNR Stormwater General Permits database, or by mail to the Storm Water Coordinator).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section II.A, page 2
"Facilities which begin discharging storm water associated with industrial activity after October 1, 1992 are not allowed to discharge storm water associated with industrial activity until an authorization has been issued for the facility by the Department."
Open the permit at this section

If DNR asks: apply for an individual permit by DNR's deadline

No set date. DNR sets the deadline in its notice, no longer than one year (I.C.1).

DNR may require a covered facility to apply for an individual NPDES permit and sets a deadline of no more than one year. If the application is not submitted by then, coverage under this permit ends at the end of that day.

  • When: the Department requires an individual permit application.
  • You send it to the agency (Forms 1, 2F and 5 with fees, under 567 IAC 64.3(4)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section I.C.1, page 2
"When the Department notifies a discharger to apply for an individual permit a deadline, not longer than one year, will be established for submitting the application."
Open the permit at this section

Inactive site: inspect within two years of going inactive, then at least every five years

Within 5 years after the last inspection.

Where the annual site inspection is impractical because industrial activity has stopped at the site, inspect at least once within two years after the site becomes inactive, and then at least once every five years.

Further steps with their own deadlines:

  • First inspection within two years after the site becomes inactive. Within 2 years after the site becomes inactive. Section III.C.4.c.(5), page 6
    "After a site becomes inactive, at least one site inspection shall occur within two years."
  • When: the annual inspection is impractical because the site is inactive.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.

Inferred from section III.C.4.c.(5). Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.c.(5), page 6
"When the annual site inspections in the SWPPP are impractical for inactive sites (sites where industrial activity is no longer conducted), then site inspections shall occur at least once every five years."
Open the permit at this section

Keep salt storage piles enclosed or covered

No set date. Standing duty (III.C.4.g).

Salt piles used for deicing or other commercial or industrial purposes at a covered facility are enclosed or covered so precipitation does not reach them.

  • When: the facility has salt storage piles.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.g, page 9
"Salt storage piles ... used for deicing or other commercial or industrial purposes shall be enclosed or covered to prevent exposure to precipitation."
Open the permit at this section

Landfills, land application sites, open dumps and hazardous waste incinerators: sample once a year

Within 1 year after the last sample.

Active or inactive landfills, land application sites and open dumps that received industrial wastes (other than construction debris only) and have no stabilized final cover, and hazardous waste incinerators under RCRA Subtitle C, sample at least once a year for the 24 parameters in Part V.B.3.a, recording the storm data it lists.

  • When: the site is a landfill, land application site, open dump or hazardous waste incinerator listed in Part V.B.3.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section V.B.3. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.3, page 11
"storm water discharge associated with industrial activity from any active or inactive landfill, land application site, or open dump that received any industrial wastes ... Sampling shall be conducted at least annually (1 time per year)"
Open the permit at this section

Lead acid battery reclaimers: sample once a year

Within 1 year after the last sample.

Facilities that reclaim lead acid batteries sample storm water at least once a year for oil and grease, BOD5, COD, TSS, TKN, total phosphorus, pH and lead, recording the storm data Part V.B.10 lists.

  • When: the facility reclaims lead-acid batteries.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section V.B.10. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.10, page 15
"facilities that reclaim lead acid batteries are subject to the following monitoring requirements ... Sampling shall be conducted at least annually (1 time per year)"
Open the permit at this section

Make the SWPPP available within three hours of a request

Within 3 hours after the request.

Make the SWPPP available within three hours when DNR asks for it, or when the operator of an NPDES-permitted municipal separate storm sewer system that receives the discharge asks for it.

  • When: the SWPPP is requested.
  • Keep the records 3 years.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.2.b, page 4
"shall make SWPPPs available within three hours of being requested by the Department"
Open the permit at this section

Make the SWPPP changes DNR asks for within 30 days

Within 30 days after the notification.

If DNR notifies the permittee that the SWPPP does not meet the permit's minimum requirements, make the changes within 30 days of the notice (unless DNR sets another time) and send DNR a written certification that they were made. The same applies to SWPPP amendments DNR reviews.

Further steps with their own deadlines:

  • Send DNR a written certification that the changes were made. The permit gives the timing in words, quoted below. Section III.C.2.c, page 4
    "the permittee shall make changes to the SWPPP and shall submit to the Department a written certification that the requested changes have been made."
  • When: the Department tells you the SWPPP is deficient.
  • You send it to the agency (Certification by email to npdes.mail@dnr.iowa.gov or by mail (Part V.F)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.2.c, page 4
"Unless otherwise provided by the Department, the permittee shall have 30 days after such notification to make the necessary changes."
Open the permit at this section

Meat and poultry packing, animal fats and pet food plants: sample once a year

Within 1 year after the last sample.

Meat packing and poultry packing plants, facilities that make animal and marine fats and oils, and facilities that make dog and cat food from meat sample storm water from exposed animal handling, manure and production waste areas at least once a year for oil and grease, BOD5, COD, TSS, TKN, total phosphorus, pH and fecal coliform, recording the storm data Part V.B.9 lists.

  • When: the facility is a meat or poultry packing, animal fats or pet food plant with exposed animal handling or waste areas.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section V.B.9. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.9, page 14
"facilities that manufacture dog and cat food from meat are subject to the following monitoring requirements ... Sampling shall be conducted at least annually (1 time per year)"
Open the permit at this section

Notify DNR before transferring the permit

No set date. Before the transfer; the permit sets no lead time (VI.M).

The permit coverage cannot be transferred to anyone except after notice to DNR. DNR may require the operator to apply for an individual permit.

  • When: the owner or operator changes.
  • You send it to the agency (By email to npdes.mail@dnr.iowa.gov or by mail (Part V.F)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section VI.M, page 19
"This permit is not transferable to any person except after notice to the Department."
Open the permit at this section

Other listed facilities (Part V.B.12): sample once a year

Within 1 year after the last sample.

Sample at least once a year for oil and grease, BOD5, COD, TSS, TKN, total phosphorus, pH and any pollutant limited in an applicable effluent guideline, recording the storm data Part V.B.12 lists, if the facility has: exposed storage piles of solid raw material chemicals at an SIC 28 or SIC 30 facility; an automobile junkyard with over 250 units; sludge storage, handling, incinerators or digesters at a POTW serving over 100,000; exposed lime storage piles at a lime plant; oil handling sites at an oil-fired power plant; asphalt paving mixture or block manufacturing; cement manufacturing or a cement kiln; ready-mixed concrete; or ship building and repair.

  • When: the facility is a type listed in Part V.B.12.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section V.B.12. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.12, page 15
"storage piles for solid chemicals used as raw materials ... are subject to the following monitoring requirements ... Sampling shall be conducted at least annually (1 time per year)"
Open the permit at this section

Phone DNR's field office within 24 hours of an unplanned bypass or upset

Within 24 hours after the bypass begins or you discover it.

When a bypass or upset happens without prior notice, or from mechanical failure or causes beyond the owner's control, telephone the DNR field office as soon as possible and within 24 hours after it starts or is discovered, then send a written description within five days of becoming aware of it.

Further steps with their own deadlines:

  • Send a written description of the bypass within five days. Within 5 days after you become aware of the bypass. Section VI.P.2.b.(2), page 20
    "A written submission describing the bypass shall also be provided within five days of the time the permittee becomes aware of the bypass."
  • When: an unanticipated bypass or upset happens.
  • You send it to the agency (DNR field office, by telephone).
  • Keep the records 3 years.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section VI.P.2.b, page 20
"the permittee shall notify the Department by telephone as soon as possible but not later than 24 hours after the onset or discovery."
Open the permit at this section

Promptly send DNR facts that were missing or wrong in the NOI or a report

No set date. The permit says "promptly" and sets no date (VI.G).

When the permittee learns it left out relevant facts or gave incorrect information in the NOI or any report to DNR, it promptly sends the correct facts or information.

  • When: you find missing or incorrect information in the NOI or a report.
  • You send it to the agency (By email to npdes.mail@dnr.iowa.gov or by mail (Part V.F)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section VI.G, page 18
"he or she failed to submit any relevant facts, or submitted incorrect information in the NOI or in any other report to the Department, he or she shall promptly submit such facts or information."
Open the permit at this section

Publish the public notice in the local newspaper before the NOI

No set date. Part of a complete NOI (II.C.3); the permit sets no separate date.

Publish the public notice required by 567 IAC 64.6(1)"c"(1) at least one day in the newspaper with the largest circulation where the facility is located, and include proof of publication with the NOI.

  • When: a new facility is seeking coverage.
  • You file it in the agency's system (With the NOI).
  • Keep the records 3 years.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section II.C.3, page 3
"A demonstration that the public notice requirements in 567 IAC 64.6(1)"c"(1) was published at least one day in the newspaper with the largest circulation in the area in which the facility is located"
Open the permit at this section

Report a hazardous condition to DNR and the sheriff within six hours

Within 6 hours after the hazardous condition begins.

When a hazardous condition occurs (an actual, imminent or probable spill, leak or release of a hazardous substance that creates a danger to public health or the environment), notify DNR and the local sheriff's office, or the sheriff of the affected county, as soon as possible and no more than six hours after it begins (Iowa Code 455B.386).

  • When: a hazardous condition happens.
  • You send it to the agency (DNR and the county sheriff's office, by telephone).
  • Keep the records 3 years.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.B, page 3
"Iowa law requires that as soon as possible but not more than six hours after the onset of a ... the Department and local sheriff's office or the office of the sheriff of the affected county be notified."
Open the permit at this section

Sample missed because of dangerous or impossible weather: write down why

No set date. The permit sets no date for the explanation (V.B.14).

When adverse climatic conditions (flooding, high winds, tornadoes, electrical storms, drought or extended frozen conditions) prevent a required sample, explain in writing why the sample could not be collected, with available documentation of the event, and keep the explanation.

  • When: a sample is missed because of adverse climatic conditions.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.14, page 16
"When a discharger is unable to collect samples due to adverse climatic conditions, the discharger must explain, in writing, why samples could not be collected, including available documentation of the event"
Open the permit at this section

Section 313 alternative plan: integrity-test storage tanks at least every five years

Within 5 years after the last tank integrity test.

Where the facility uses a spill contingency and integrity testing plan instead of the containment structures, test storage tanks for integrity at least once every five years.

  • When: the facility reports Section 313 water priority chemicals; the facility uses the alternative spill contingency and integrity testing plan.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section III.C.4.f.(2).iii. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.f.(2).iii, page 7
"provide for conducting integrity testing of storage tanks at least once every five years"
Open the permit at this section

Section 313 alternative plan: test valves and piping every year

Within 1 year after the last valve and piping test.

Where the facility uses a spill contingency and integrity testing plan instead of the containment structures, test valves and piping for integrity and leaks at least every year.

  • When: the facility reports Section 313 water priority chemicals; the facility uses the alternative spill contingency and integrity testing plan.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section III.C.4.f.(2).iii. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.f.(2).iii, page 7
"conducting integrity and leak testing of valves and piping a minimum of every year"
Open the permit at this section

Section 313 facilities: act at once on a leak that could reach the drainage system

When you discover the condition.

Inspect all areas at the intervals in the SWPPP. When a leak or other condition is found that may cause a significant release of Section 313 water priority chemicals to the drainage system, take corrective action immediately or shut the unit or process down until it can be taken, and promptly remove contaminated soil and debris.

  • When: the facility reports Section 313 water priority chemicals; a leak may release Section 313 chemicals to the drainage system.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.f.(3).vii, page 9
"corrective action shall be immediately taken or the unit or process shut down until corrective action can be taken."
Open the permit at this section

Section 313 facilities: record discharges from containment areas

No set date. Standing record (III.C.4.f.(3).v.(d)).

Keep records of how often containment areas are emptied and the estimated volume, in gallons, of each discharge from them.

  • When: the facility reports Section 313 water priority chemicals.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.f.(3).v.(d), page 9
"Records shall be kept of the frequency and estimated volume (in gallons) of discharges from containment areas."
Open the permit at this section

Section 313 facilities: sample storm water from chemical storage and loading areas once a year

Within 1 year after the last sample.

Facilities that report Section 313 water priority chemicals sample, at least once a year, storm water that contacts equipment, tanks or containers storing those chemicals or truck and rail loading areas where they are handled, for oil and grease, BOD5, COD, TSS, TKN, total phosphorus, pH and each reported water priority chemical, recording the storm data Part V.B.1 lists.

  • When: the facility reports Section 313 water priority chemicals.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section V.B.1. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.1, page 10
"Section 313 water priority chemicals are subject to the following monitoring requirements ... Sampling shall be conducted at least annually (1 time per year)"
Open the permit at this section

Section 313 facilities: train employees and contractors at least once a year

Within 1 year after the last training.

Train facility employees and contractor personnel using the facility in pollution control laws and regulations, the SWPPP and the facility's features that prevent discharges of Section 313 water priority chemicals, at the intervals in the SWPPP and at least once a year.

  • When: the facility reports Section 313 water priority chemicals.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section III.C.4.f.(3).ix. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.f.(3).ix, page 9
"Employee training shall be conducted at intervals specified in the SWPPP, but not less than once per year"
Open the permit at this section

Section 313 water priority chemicals: add the containment and spill measures to the SWPPP

No set date. Part of the SWPPP (III.C.4.f).

Facilities that report Section 313 water priority chemicals under SARA Title III add to the SWPPP a discussion of containment, drainage control or diversion where those chemicals are handled, liquid storage and loading areas, valves on containment drainage, site runoff, inspections, security and training (III.C.4.f), or an alternative spill contingency and integrity testing plan where the structures are not economically achievable.

  • When: the facility reports Section 313 water priority chemicals.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.f, page 7
"In areas where Section 313 water priority chemicals are stored, processed or otherwise handled, appropriate containment, drainage control and/or diversionary structures shall be provided."
Open the permit at this section

Send the Notice of Discontinuation within 30 days after discharge stops

Within 30 days after the discharge stops for good.

When the discharge covered by the permit stops, send DNR a written Notice of Discontinuation within 30 days, with the owner or operator's name, the permit and authorization numbers, the date the discharge stopped and the signed certification in Part II.F.2.d.

  • When: the discharge stops for good.
  • You send it to the agency (DNR Form 542-8115, online, by email to npdes.mail@dnr.iowa.gov or by mail to the Storm Water Coordinator).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section II.F.1, page 3
"A notice to discontinue the activity covered by this NPDES general permit must be made in writing to the Department within 30 days of the discontinuance of the discharge."
Open the permit at this section

Unstaffed site: inspect at least once every three years

Within 3 years after the last inspection.

Where the annual site inspection is impractical because no employee is stationed at the site or routinely visits it, site inspections take place at least once every three years.

  • When: the annual inspection is impractical because no employee is stationed at or routinely visits the site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.

Inferred from section III.C.4.c.(4). Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.c.(4), page 6
"When the annual site inspections in the SWPPP are impractical because an employee is not stationed on site or does not routinely visit the site, then site inspections shall occur at least once every three years."
Open the permit at this section

Update the SWPPP within 7 days after a release

Within 7 days after you learn of the release.

After a release, modify the SWPPP within 7 calendar days of knowing about it: describe the release and its circumstances, and set out and carry out steps to prevent it from happening again and to respond to such releases.

  • When: a hazardous condition happens.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 567 IAC 64.3 8.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.B, page 4
"The SWPPP described in Part III.C. of this permit must be modified within 7 calendar days of knowledge of the release"
Open the permit at this section

Wood treatment with arsenic or chromium preservatives: sample once a year

Within 1 year after the last sample.

Wood preserving facilities that currently use inorganic preservatives containing arsenic or chromium sample storm water from treatment and treated wood storage areas at least once a year for oil and grease, pH, BOD5, COD, TSS, total phosphorus, TKN, nitrate plus nitrite nitrogen, total arsenic, chromium and copper, recording the storm and drainage area data Part V.B.5 lists.

  • When: wood is treated with arsenic or chromium preservatives.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section V.B.5. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.5, page 13
"wood preserving facilities that currently use inorganic preservatives containing arsenic or chromium are subject to the following monitoring requirements ... Sampling shall be conducted at least annually (1 time per year)"
Open the permit at this section

Wood treatment with chlorophenolic or creosote formulations: sample once a year

Within 1 year after the last sample.

Wood preserving or wood surface facilities that currently use chlorophenolic or creosote formulations sample storm water from treatment, application and treated wood storage areas at least once a year for oil and grease, pH, BOD5, COD, TSS, total phosphorus, TKN, nitrate plus nitrite nitrogen and pentachlorophenol, recording the storm and drainage area data Part V.B.4 lists.

  • When: wood is treated with chlorophenolic or creosote formulations.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section V.B.4. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.4, page 12
"wood preserving or wood surface facilities that currently use chlorophenolic formulations and/or creosote formulation are subject to the following monitoring requirements ... Sampling shall be conducted at least annually (1 time per year)"
Open the permit at this section

Ongoing 2 duties

Keep the SWPPP, monitoring records, reports and NOI records for three years

No set date. Standing duty (V.E.1, VI.O.2).

Keep the SWPPP, all monitoring information (including calibration and maintenance records and original strip charts), copies of all reports the permit requires and all records used for the NOI, for the life of the permit or at least three years from the document's date, whichever is later.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.E.1, page 17
"the permittee shall retain a copy of the SWPPP, records of all monitoring information, copies of all reports required by this permit, and all records used to complete the NOI."
Open the permit at this section

Train employees on the dates set in the SWPPP

No set date. The permit leaves the training dates to the SWPPP (III.C.4.b.(8)).

Run an employee training program that tells personnel at all levels about the SWPPP's parts and goals (for example spill response, good housekeeping and material management), on periodic dates the SWPPP names.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section III.C.4.b.(8), page 6
"The SWPPP shall identify periodic dates for such training."
Open the permit at this section

Only if... 1 duty

These apply only in the situation named on each one. Answer the questions to sort them.

Primary metal industries (SIC 33): sample storm water once a year

Within 1 year after the last sample.

Facilities in SIC 33 sample their storm water discharges at least once a year for oil and grease, BOD5, COD, TSS, TKN, nitrate plus nitrite nitrogen, total phosphorus, pH, total lead, cadmium, copper, arsenic and chromium, and any pollutant limited in an effluent guideline that applies, recording the storm and drainage area data Part V.B.2 lists.

  • Only if: your SIC code starts with 33.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section V.B.2. Check your copy of the permit.

Source: NPDES General Permit No. 1, Storm Water Discharge Associated with Industrial Activity (March 1, 2023 through February 29, 2028), section V.B.2, page 11
"facilities classified as SIC 33 (Primary Metal Industry) are subject to the following monitoring requirements ... Sampling shall be conducted at least annually (1 time per year)"
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

Iowa NPDES General Permit No. 1 duties, topic by topic

How the Iowa NPDES General Permit No. 1 compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: