Alaska Multi-Sector General Permit (MSGP) AKR060000 due dates and duties

Every duty in the Alaska Pollutant Discharge Elimination System (APDES) Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 83duties, each cited
  • 9on a schedule
  • 74when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
AKR060000
In force
June 1, 2026 to May 31, 2031
Official page
dec.alaska.gov
Rules last checked
November 28, 2026
Today
June 1, 2026 May 31, 2031
Notes on the permit's status and renewal

Cover page: "This permit becomes effective on June 1, 2026" and "This permit and the authorization to discharge expire at midnight, May 31, 2031", signed April 28, 2026 by the Program Manager. It replaces the 2020 MSGP; on November 28, 2026 it was current. Existing dischargers under the 2020 MSGP had to submit a new NOI and SWPPP within 120 days after June 1, 2026 (by September 29, 2026); that date has passed and is not shown, and their 2020 coverage continues until DEC grants coverage under this permit (Table 2-1). If not reissued in time the permit is administratively continued under 18 AAC 83.155 (2.5.1). The permit itself covers metal, coal, oil and gas and mineral mining (Sectors G to J). Fees apply under 18 AAC 72; amounts are left out.

What does full permit coverage require?

Authorization under the MSGP: an NOI and SWPPP through EDMS with the fee; discharge is authorized from the date in DEC’s authorization letter.

Every year 5 duties

Comprehensive site inspection each calendar year

By December 31 each year.

Once in each inspection period (June 1 to December 31, 2026, then each calendar year to 2030), qualified personnel with at least one pollution prevention team member inspect every area the permit covers, including no exposure areas, and review the monitoring data. Document the findings in a signed report and in the Annual Report.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 6.3.1, page 46
"A permittee must conduct annual comprehensive site inspections while covered under this permit."
Open the permit at this section

Submit the Annual Report by February 15

By February 15, for the calendar year before.

Submit the Annual Report through EDMS by February 15 after each calendar year, with the comprehensive site inspection findings, the corrective action documentation (or the dates the Corrective Action Reports were sent), the status of open corrective actions, and the facility, operator and lead inspector details.

  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from Schedule of Submissions; 9.2. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Schedule of Submissions; 9.2, page 11
"Annual Report Annually By Feb 15th of the year following the reporting year"
Open the permit at this section

Pay the authorization fee and the annual fee

No set date. The permit gives no date; DEC bills the annual fee by invoice (Table 2-1).

Pay the general permit authorization fee under 18 AAC 72 when applying, and the annual fee on DEC’s invoice. Existing permittees renewing coverage do not pay two authorization fees in one calendar year. Amounts are set by regulation and are not shown here.

  • You file it in the agency's system (DEC EDMS, or as invoiced).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 2.1.6, page 18
"Pay the general permit authorization fee in accordance with 18 AAC 72."
Open the permit at this section

Review the SWPPP once a year

Within 1 year after the last SWPPP review.

Review the SWPPP every year. If no changes are needed, an entry in the SWPPP modification log records the review.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 5.6.6. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 5.6.6, page 38
"The SWPPP must be reviewed annually. If no changes are determined to be necessary, an entry in the log per Permit Part 5.6.5 will satisfy this requirement."
Open the permit at this section

Train employees at least once a year

Within 1 year after the last training.

Train all employees who work where industrial materials or activities are exposed to stormwater, or who carry out permit duties (inspectors, maintenance staff, the pollution prevention team), on the control measures and on monitoring, inspection, reporting and documentation, at least once a year and more often with high turnover. Log the dates in the SWPPP.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 4.2.9. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 4.2.9, page 28
"Training shall be conducted at least annually (or more often if employee turnover is high) and documented in the SWPPP"
Open the permit at this section

One time 2 duties

Reapply at least 180 days before the permit expires

By December 2, 2030.

To keep discharging after the permit expires on May 31, 2031, apply for and obtain a new permit. Appendix A, Part 1.3 asks for a new application at least 180 days before expiry, which is December 2, 2030, unless DEC allows a later date.

  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Appendix A, 1.3
"a permittee with a currently effective permit shall reapply by submitting a new application at least 180 days before the existing permit expires,"
Open the permit at this section

Write the SWPPP before submitting the NOI

No set date. Before the NOI is submitted (Part 5.0); the permit gives no number of days.

Prepare a Storm Water Pollution Prevention Plan (SWPPP) for the facility before submitting the Notice of Intent, and submit a copy to DEC through EDMS with the NOI. A SWPPP written for the 2020 permit must be reviewed and updated to this permit first. Sign and date it (Appendix A, Part 1.12).

  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 5.0, page 30
"A permittee must prepare a SWPPP for their facility before submitting their Notice of Intent (NOI) for permit coverage."
Open the permit at this section

When something happens 24 duties

Amend the SWPPP within 30 days after a significant change

Within 30 days after the change.

Amend the SWPPP within 30 calendar days after a change in design, construction, operation or maintenance that significantly affects the potential to discharge pollutants, or when the SWPPP proves ineffective. Also update it for corrective actions, inspection findings and changed law, and log every significant change.

  • When: a change in design, construction, operation or maintenance significantly affects the potential to discharge pollutants, or the SWPPP proves ineffective.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 5.6.4, page 38
"A permittee must amend the SWPPP within thirty (30) calendar days whenever there is a change in design, construction, operation, or maintenance, which has a significant effect on the potential for the discharge of pollutants,"
Open the permit at this section

Benchmark exceeded: inspect within 30 days, then the Corrective Action Report within 30 days

Within 30 days after you receive the lab results showing the exceedance.

When the four-quarter average for a parameter exceeds its benchmark, or fewer than four samples already exceed four times the benchmark, do a routine facility inspection of the contributing areas within 30 days of receiving the lab results, review and revise the controls, and submit a Corrective Action Report through EDMS within 30 days of the inspection. Keep monitoring that parameter for at least four more quarters.

Further steps with their own deadlines:

  • Submit the Corrective Action Report within 30 days of the inspection. Within 30 days after the follow-up inspection. Section 8.3.3, page 55
    "the permittee must submit a Corrective Action Report (per Part 8.5) within 30 days of the subsequent inspection (Section 8.3.2.1), in addition to the usual documentation."
  • When: the four-quarter average for a parameter exceeds its benchmark, or fewer samples already exceed four times it.
  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 8.4.3, page 56
"the permittee must conduct a routine facility inspection within 30 days of receiving lab results, and follow it with a Corrective Action Report within 30 days of such inspection."
Open the permit at this section

Compliance schedule reports within 14 days of each schedule date

Within 14 days after each date in the compliance schedule.

If DEC sets a compliance schedule, report compliance, noncompliance or progress on each interim and final requirement no later than 14 days after its scheduled date.

  • When: DEC sets a compliance schedule for the facility.
  • You send it to the agency (DEC Compliance and Enforcement Program, dec-wqreporting@alaska.gov or 555 Cordova Street, Anchorage (Appendix A, Part 1.1.2)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Appendix A, 2.4.1
"A permittee must submit progress or compliance reports on interim and final requirements in any compliance schedule of a permit no later than 14 days following the scheduled date of each requirement."
Open the permit at this section

Corrective action: document the condition within 24 hours

Within 24 hours after you discover the condition.

When a corrective action condition is found (a change that may increase pollutants, an unauthorized release, an effluent limit violation, controls not stringent enough for water quality standards, an official finding, or controls not properly installed or maintained), document it within 24 hours, review and revise the control measures, and make the changes before the next storm event if possible.

Further steps with their own deadlines:

  • Make the control measure changes before the next storm event if possible. The permit gives the timing in words, quoted below. Section 8.4.2, page 56
    "any modifications to their control measures must be made before the next storm event if possible, or as soon as practicable following that storm event."
  • When: you find a condition that needs corrective action.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 8.4.1, page 56
"A permittee must document their discovery of any of the conditions listed in Parts 8.1, 8.2, or 8.3 within 24 hours of making such discovery."
Open the permit at this section

Discharging without coverage: submit the NOI immediately

No set date. Immediately (Table 2-1); the permit gives no number of days.

A facility that was operating before June 1, 2026 but was not covered by the 2020 MSGP or another permit submits its NOI immediately; its discharges stay unauthorized until DEC’s authorization letter.

  • When: the facility discharges industrial stormwater without coverage under this or another permit.
  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 2.3, Table 2-1, page 20
"Immediately, to minimize the time discharges from the facility will continue to be unauthorized."
Open the permit at this section

Get engineering plan approval before building a stormwater treatment device

No set date. Before construction (Part 4.4); the permit gives no number of days.

A new facility that will build, install or operate any part of a nondomestic wastewater treatment works, including any permanent stormwater treatment device (design life over two years), submits the engineering plans to DEC with the plan review fee and gets approval before construction.

  • When: the facility will build or install a nondomestic wastewater treatment works or a permanent stormwater treatment device.
  • You send it to the agency (DEC Wastewater Discharge Authorization Program, 555 Cordova Street, Anchorage (Appendix A, Part 1.1.1)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 4.4, page 30
"Engineering plan approval must be obtained from DEC prior to construction."
Open the permit at this section

Give notice at least 10 days before an anticipated bypass

At least 10 days before the bypass.

For an anticipated bypass of treatment facilities, submit written notice at least 10 days before the bypass. An unanticipated bypass needs the 24-hour report.

  • When: you know in advance that a bypass of a treatment facility is needed.
  • You send it to the agency (DEC Compliance and Enforcement Program, dec-wqreporting@alaska.gov or 555 Cordova Street, Anchorage (Appendix A, Part 1.1.2)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Appendix A, 2.6.2.1
"For an anticipated bypass, the permittee submits notice at least 10 days before the date of the bypass."
Open the permit at this section

Give seven days notice of a planned change that may cause noncompliance

At least 7 days before the planned change starts.

Give DEC written notice at least seven days before starting any planned change in the facility or activity that may result in noncompliance.

  • When: a planned change may cause noncompliance.
  • You send it to the agency (DEC Compliance and Enforcement Program, dec-wqreporting@alaska.gov or 555 Cordova Street, Anchorage (Appendix A, Part 1.1.2)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Appendix A, 2.2.1
"A permittee shall give seven days’ notice to the Department before commencing any planned change in the permitted facility or activity that may result in noncompliance with permit requirements."
Open the permit at this section

New discharger: submit the NOI at least 30 days before discharge begins

At least 30 days before discharge begins.

A new discharger or new source submits a complete NOI with the SWPPP through EDMS, and pays the authorization fee, at least 30 calendar days before discharge begins. Discharge is authorized only from the date in DEC’s authorization letter.

  • When: the facility will start a new industrial stormwater discharge.
  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 2.3, Table 2-1, page 20
"A minimum of thirty (30) calendar days prior to commencing discharge."
Open the permit at this section

New operator: submit an NOI within 30 days after taking over

Within 30 days after the change in operator.

When a new operator takes over operational control of a covered facility, the new operator submits its own NOI no later than 30 calendar days after the change. No second authorization fee is due for a year already paid.

  • When: a new operator takes over operational control of the facility.
  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 2.7.2, page 22
"the new operator shall submit an NOI no later than thirty (30) calendar days after a change in operator."
Open the permit at this section

Notify DEC as soon as possible of planned physical changes

No set date. As soon as possible (Appendix A, 2.1.1); the permit gives no number of days.

Notify DEC in writing as soon as possible of any planned physical alteration or addition that may make the facility a new source or significantly change or increase pollutants not covered by limits. If the change needs plan review, submit the plans at least 30 days before implementing it.

Further steps with their own deadlines:

  • If plan review applies: submit the plans at least 30 days before the change. At least 30 days before the change is put in place. Section Appendix A, 2.1.2
    "If the proposed changes are subject to plan review, then the plans must be submitted at least 30 days before implementation of changes"
  • When: a physical alteration or addition to the facility is planned that may make it a new source or significantly change its pollutants.
  • You send it to the agency (DEC Wastewater Discharge Authorization Program, 555 Cordova Street, Anchorage (Appendix A, Part 1.1.1)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Appendix A, 2.1.1
"The permittee shall give notice to the Department as soon as possible of any planned physical alteration or addition to the permitted facility if:"
Open the permit at this section

Notify DEC of a new toxic pollutant discharge as soon as you know

No set date. As soon as the discharger knows or has reason to believe it (Appendix A, 2.8.1).

An existing manufacturing, commercial, mining or silvicultural discharger notifies DEC as soon as it knows or has reason to believe that a toxic pollutant not limited in the permit has been or will be discharged above the Appendix A, Part 2.8 notification levels.

  • When: a toxic pollutant not limited in the permit has been or will be discharged above the Appendix A notification levels.
  • You send it to the agency (DEC Wastewater Discharge Authorization Program, 555 Cordova Street, Anchorage (Appendix A, Part 1.1.1)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Appendix A, 2.8.1
"shall notify the Department as soon as that discharger knows or has reason to believe that any activity has occurred or will occur that would result in:"
Open the permit at this section

Notify DEC through EDMS before you stop monitoring a parameter

No set date. The permit gives no number of days; notify before stopping.

When the average of four consecutive samples for a benchmark parameter does not exceed the benchmark, monitoring for it ends for the permit term; notify DEC through EDMS that you intend to stop.

  • When: the average of four consecutive samples for a parameter does not exceed its benchmark.
  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 7.2.1.3, page 51
"they may cease monitoring for that parameter and must notify DEC of their intention to do so via EDMS"
Open the permit at this section

Notify the public water system of potential contamination immediately

When you identify the potential contamination.

Where the facility intersects a public water system drinking water protection area, notify the system’s contact, restrict activities that could change drainage or groundwater gradients there, and notify the system immediately of any potential contamination such as a reportable spill or excess erosion reaching the protection area.

  • When: a reportable spill, excess erosion or other potential contamination reaches a public water system drinking water protection area.
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 4.5.3, page 30
"Immediately notify the nearby PWS of any identified potential contamination, such as reportable spills or excess erosion that intersects their PWS drinking water protection area."
Open the permit at this section

Previous operator: submit a NOT within 30 days after DEC authorizes the new operator

Within 30 days after DEC authorizes the new operator.

After a change in operator, the previous operator submits a Notice of Termination no later than 30 calendar days after DEC authorizes the new operator.

  • When: a new operator takes over operational control of the facility.
  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 2.7.2, page 22
"The previous operator must submit a NOT no later than thirty (30) calendar days after DEC authorization of the new operator."
Open the permit at this section

Promptly correct missing or wrong information

No set date. Promptly (Appendix A, 2.5.1); the permit gives no number of days.

If you learn that the NOI or any report left out a relevant fact or gave incorrect information, promptly submit the fact or the correction.

  • When: you learn that the NOI or a report left out relevant facts or gave incorrect information.
  • You send it to the agency (DEC Wastewater Discharge Authorization Program, 555 Cordova Street, Anchorage (Appendix A, Part 1.1.1)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Appendix A, 2.5.1
"the permittee shall promptly submit the relevant fact or the correct information."
Open the permit at this section

Repair or replace failed control measures within 14 days

Within 14 days after you find that the control measure needs repair.

When control measures need replacement or repair, make the repairs or modifications within 14 days, or as fast as practicable, and record the dates of discovery and of return to full function.

  • When: a control measure needs replacement or repair.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 4.2.3, page 27
"the permittee must make the necessary repairs or modifications within 14 days or as expeditiously as practicable."
Open the permit at this section

Report a reportable quantity spill as soon as you know of it

When you learn of the release.

For a leak, spill or other release of a hazardous substance or oil at or above a reportable quantity, notify the National Response Center and DEC (the Response Team line or the online spill reporter) as soon as you know of it, then give DEC a description, the circumstances and the date, and act to prevent a recurrence.

  • When: a release reaches a reportable quantity of a hazardous substance or oil.
  • You file it in the agency's system (National Response Center and the DEC spill line or online spill reporter).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 9.4.2.3, page 59
"as soon as they have knowledge of a leak, spill, or other release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity."
Open the permit at this section

Report monitoring results in NetDMR by the 15th of the month after the lab results arrive

Within 15 days after you receive the complete lab results for all monitored outfalls.

Submit all benchmark, effluent limit and impaired waters monitoring data in EPA NetDMR no later than the 15th day of the month after you receive the complete lab results for all monitored outfalls for the period. Report no discharge for a benchmark period without one, and any failure to monitor with the reason.

  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 9.1. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 9.1, page 57
"no later than the 15th day of the following month after the permittee has received the complete laboratory results for all monitored outfalls for the reporting period."
Open the permit at this section

Report noncompliance that may endanger health or the environment within 24 hours

Within 24 hours after you become aware of the circumstances.

Report any noncompliance that may endanger health or the environment, including an unanticipated bypass or upset that exceeds an effluent limit, orally within 24 hours after becoming aware of it, and in writing (the Noncompliance Notification Form, which may be emailed as a signed PDF) within five days.

Further steps with their own deadlines:

  • Written report within five days. Within 5 days after you become aware of the circumstances. Section Appendix A, 3.4.1.2
    "In writing within five days after the permittee becomes aware of the circumstances."
  • When: noncompliance may endanger health or the environment.
  • You send it to the agency (DEC Compliance and Enforcement Program, dec-wqreporting@alaska.gov or 555 Cordova Street, Anchorage (Appendix A, Part 1.1.2)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Appendix A, 3.4.1
"Orally within 24 hours after the permittee becomes aware of the circumstances, and"
Open the permit at this section

Report other noncompliance with the monitoring reports

No set date. With the next monitoring report (Appendix A, 3.5; Part 9.4.3.5).

Report every instance of noncompliance not already reported as a 24-hour report, compliance schedule report or extra monitoring, at the time monitoring reports are submitted, with the Appendix A, Part 3.4.2 details.

  • When: other noncompliance occurs.
  • You send it to the agency (DEC Compliance and Enforcement Program, dec-wqreporting@alaska.gov or 555 Cordova Street, Anchorage (Appendix A, Part 1.1.2)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Appendix A, 3.5
"at the time the permittee submits monitoring reports under Appendix A, Part 3.2 (Reporting of Monitoring Results)."
Open the permit at this section

Send a new signatory authorization before the next signed report

No set date. Before or with the next signed submission (Appendix A, 1.12.4).

If the written authorization of a duly authorized representative no longer fits because someone else now runs the facility, submit a new authorization before or with the next report, information or application that representative signs.

  • When: the written authorization of your duly authorized representative is no longer accurate.
  • You send it to the agency (DEC Wastewater Discharge Authorization Program, 555 Cordova Street, Anchorage (Appendix A, Part 1.1.1)).
  • Keep the records 3 years.
  • Signed or certified by the Legally Responsible Person.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Appendix A, 1.12.4
"a new authorization satisfying the requirements of Appendix A, Part 1.12.3 must be submitted to the Department before or together with any report, information, or application to be signed by an authorized representative."
Open the permit at this section

Submit a NOT within 30 days after a termination condition is met

Within 30 days after the termination condition is met.

Submit a complete Notice of Termination through EDMS within 30 calendar days after a new operator takes over, operations cease with no more industrial stormwater and erosion controls in place, a Sector G, H or J site meets its termination conditions, or another permit covers all discharges. All reports, including the Annual Report and DMRs, must be in first.

  • When: a new operator takes over, the facility stops industrial discharges, a Sector G, H or J site meets its termination conditions, or another permit covers all discharges.
  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 10.1.2, page 61
"A permittee must submit a NOT within 30 calendar days after one or more of the following conditions have been met:"
Open the permit at this section

Submit an NOI Modification within 30 days after NOI information changes

Within 30 days after the change.

When any information on the NOI changes, such as the receiving water, the exposed industrial acreage, the industrial sectors or the facility contacts, submit an NOI Modification form within 30 calendar days after the change.

  • When: information on the NOI changes, such as the receiving water, exposed acreage, sectors or facility contacts.
  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 2.7.1, page 21
"the permittee must submit an NOI Modification form within thirty (30) calendar days after the change."
Open the permit at this section

Ongoing 2 duties

Keep records for three years after coverage ends

No set date. A standing duty; the three years run from the end of coverage.

Keep the SWPPP and its changes, the Part 5.8 records, all reports and certifications, monitoring data and the NOI records for at least three years from the date coverage expires or is terminated.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 5.9, page 40
"for a period of at least three years from the date that coverage under this permit expires or is terminated."
Open the permit at this section

Keep the current SWPPP at the facility

No set date. A standing duty while covered.

Keep a copy of the current complete SWPPP, with the Part 5.8 records (NOI and DEC letters, permit copy, spills, training, maintenance, inspections, corrective actions, benchmark responses), at the facility and immediately available to DEC or EPA. An electronic copy is allowed if it meets Part 5.7.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 5.7, page 38
"A permittee must retain a copy of the current complete SWPPP required by this permit at the facility, and it must be immediately available to DEC or EPA at the time of an onsite inspection or upon request."
Open the permit at this section

Only if... 48 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Sector E: sweep at least weekly where cement, aggregate or dust is handled

By the end of each week.

On paved exposed areas, sweep (or use an equivalent measure) at a frequency set in the SWPPP, and at least once a week when cement, aggregate, kiln dust, fly ash or settled dust is handled or processed.

  • Only if: your permit sector is E; cement, aggregate, kiln dust, fly ash or settled dust is handled or processed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 11.E.2.1. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.E.2.1, page 72
"it must be performed at least once a week if cement, aggregate, kiln dust, fly ash, or settled dust are being handled or processed."
Open the permit at this section

Sector A: inspect wood treatment areas monthly

By the end of each month.

Where wood surface protection or preservation is done, inspect processing areas, transport areas and treated wood storage areas each month for treatment chemicals reaching unprotected soil or areas that contact stormwater.

  • Only if: your permit sector is A; the facility protects or preserves wood surfaces.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 11.A.5. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.A.5, page 63
"inspect processing areas, transport areas, and treated wood storage areas monthly to assess the usefulness of practices to minimize the deposit of treatment chemicals on unprotected soils"
Open the permit at this section

Sector O: inspect coal, ash, fuel and storage areas monthly

By the end of each month.

Each month inspect coal handling, loading and unloading areas, switchyards, fueling areas, bulk storage, ash handling, areas next to disposal ponds and landfills, maintenance areas, liquid storage tanks and material storage areas.

  • Only if: your permit sector is O.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 11.O.6.1. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.O.6.1, page 158
"As part of the permittees inspection, inspect the following areas monthly:"
Open the permit at this section

Sector S: record deicing chemical types and monthly quantities

By the end of each month.

If deicing chemicals are used, keep a record of the types used (with their safety data sheets) and the quantities each month, measured or estimated.

  • Only if: your permit sector is S; the airport uses deicing chemicals.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 11.S.5.2. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.S.5.2, page 177
"they must maintain a record of the types (including the Material Safety Data Sheets [MSDS]) used and the monthly quantities,"
Open the permit at this section

Sector S: routine inspections monthly during the deicing season

By the end of each month.

Conduct routine facility inspections at least monthly during the deicing season (for example October through April), and in every other month deicing chemicals may be used.

  • Only if: your permit sector is S; it is the deicing season, or a month in which deicing chemicals may be used.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 11.S.6.1. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.S.6.1, page 178
"At a minimum, conduct routine facility inspections at least monthly during the deicing season (e.g., October through April for most airports)."
Open the permit at this section

Sector V: inspect transfer lines and controls monthly

By the end of each month.

At least monthly inspect transfer and transmission lines, spill prevention, housekeeping, process waste management and all structural and nonstructural controls.

  • Only if: your permit sector is V.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 11.V.5. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.V.5, page 185
"Inspect, at least monthly, the following activities and areas (at a minimum):"
Open the permit at this section

Sectors G, J: inspect monthly when discharging to outstanding or sediment or nitrogen impaired waters

By the end of each month.

Active mining sites that discharge to waters designated as outstanding, or impaired for sediment or nitrogen, are inspected each month instead of each quarter.

  • Only if: your permit sector is G, J; the site discharges to outstanding waters or waters impaired for sediment or nitrogen.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 11.G.7. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.G.7, page 93
"Sites which discharge to waters designated as outstanding waters or waters which are impaired for sediment or nitrogen must be inspected monthly."
Open the permit at this section

Benchmark monitoring each quarter for the first four full quarters

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins.

Facilities in a subsector with benchmarks take a grab sample from each outfall (or one of each group of substantially identical outfalls) in each of the first four full calendar quarters of coverage, within the first 30 minutes of a discharge from a measurable storm event, and analyze it for the Part 11 benchmarks of every sector at the site. If the four-sample average of a parameter is at or below its benchmark, monitoring for that parameter ends for the permit term.

  • Only if: your permit subsector is A1, A2, A3, A4, B1, C1, C2, C3, C4, D1, E1, E2, E3, F1, F2, F3, F4, G1, G2, H1, I1, J1, J2, K1, L1, L2, M1, N1, O1, P1, Q1, R1, S1, U1, U2, U3, Y1, AA1, AA2, AB1; the facility is not inactive and unstaffed.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 7.2.1.2, page 50
"Benchmark monitoring must be conducted quarterly, as identified in Part 7.1.7, for the permittees first four full consecutive quarters of permit coverage commencing no earlier than the effective date of this permit."
Open the permit at this section

Discharges to impaired waters: monitor once a year for the impairment pollutants

By December 31 each year, starting with the calendar year that includes the first full quarter after your coverage begins.

A facility discharging to an impaired water without an EPA approved or established TMDL monitors each outfall (except substantially identical ones) once a year for every pollutant causing the impairment that has a standard method (TSS and turbidity for sediment). Monitoring may stop after the first year if the pollutant is not found above natural background, with documentation. Where a TMDL exists, monitoring is required only if DEC says so.

  • Only if: your stormwater reaches an impaired water body.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.

Inferred from section 7.2.3.1. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 7.2.3.1, page 52
"If a permittee discharges to an impaired water, the permittee must monitor for all pollutants for which the waterbody is impaired and for which a standard analytical method exists"
Open the permit at this section

Effluent limit monitoring once a year at each regulated outfall

By December 31 each year, starting with the calendar year that includes the first full quarter after your coverage begins.

Outfalls with discharges subject to an effluent limitations guideline (Table 4-1) are each sampled once a year, starting in the first full quarter after the later of June 1, 2026 and authorization, for the parameters in the sector’s Part 11 limits table. Every such outfall is sampled; substantially identical outfalls do not apply.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.

Inferred from section 7.2.2.1. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 7.2.2.1, page 52
"Beginning in the first full quarter following the effective date of this permit or the permittees date of discharge authorization, whichever date comes later, the permittee must monitor once per year at each outfall"
Open the permit at this section

Quarterly visual assessment of each outfall

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins.

Once each calendar quarter, starting the quarter after authorization, collect a sample from each outfall within the first 30 minutes of a discharge from a measurable storm event and check it in a clear container for color, odor, clarity, solids, foam, oil sheen and other signs of pollution. Photograph it, document and sign the result, and report no discharge for a quarter without one.

  • Only if: the facility is not inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 6.2.1.1, page 43
"Once each calendar quarter for the entire permit term, beginning the quarter after the date of discharge authorization, the permittee must collect a storm water sample from each outfall (except as noted in Part 6.2.2)"
Open the permit at this section

Routine facility inspection each calendar quarter

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins.

During operating hours, qualified personnel, with at least one member of the pollution prevention team taking part in person or by video call, inspect exposed areas, pollutant sources, areas of spills in the past three years, discharge points and control measures at least once each quarter, starting the quarter after authorization. At least one routine inspection must be during a discharge. Document and sign each one.

  • Only if: the facility is not inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 6.1.1.2. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 6.1.1.2, page 41
"Inspections must be conducted at least quarterly (i.e., once each permit quarter beginning the quarter after the date of discharge authorization,),"
Open the permit at this section

Sector L: inspect inactive landfills each quarter

By the end of each calendar quarter.

Qualified personnel inspect inactive landfills, open dumps and land application sites at least once a quarter, including stabilization and erosion controls, leachate systems and closed land application areas.

  • Only if: your permit sector is L; the landfill, open dump or land application site is inactive.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 11.L.7.2. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.L.7.2, page 145
"Inspect inactive landfills, open dumps, and land application sites at least quarterly."
Open the permit at this section

Sector M: inspect equipment and fluid storage for leaks each quarter

By the end of each calendar quarter.

Each quarter, inspect all equipment containing oily parts, hydraulic or other fluids, or mercury switches, and all vessels and areas storing hazardous materials and automotive fluids, for signs of leakage.

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 11.M.4. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.M.4, page 149
"Inspect quarterly for signs of leakage of all equipment containing oily parts, hydraulic fluids, any other types of fluids, or mercury switches."
Open the permit at this section

(Sector A) Timber products: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Sawmills (A1), wood preserving (A2), log storage (A3) and other wood products (A4) each have their own benchmarks. Wet deck log spray down must also meet the Table 11.A.7-1 limits, sampled once a year.

  • Only if: your permit sector is A.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.A.6, page 63
"Table 11.A.6-1 identifies benchmarks that apply to the specific subsectors of Sector A."
Open the permit at this section

(Sector AA) Fabricated metal products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Fabricated metal products except coating (AA1) monitor aluminum, zinc and nitrate plus nitrite; metal coating and engraving (AA2) monitor zinc and nitrate plus nitrite.

  • Only if: your permit sector is AA.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Table 11.AA.5-1, page 195
"Table 11.AA.5-1: Sector - Specific Benchmarks - Sector AA"
Open the permit at this section

(Sector AB) Transportation equipment and industrial machinery: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Transportation equipment and industrial or commercial machinery facilities (AB1) monitor the Table 11.AB.5-1 benchmarks.

  • Only if: your permit sector is AB.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.AB.3, page 196
"Table 11.AB.5-1 identifies benchmarks that apply to the specific subsectors of Sector AB."
Open the permit at this section

(Sector B) Paperboard mills: benchmark value

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Paperboard mills (B1) monitor COD on the benchmark schedule.

  • Only if: your permit sector is B.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Table 11.B.2-1, page 66
"Table 11.B.2-1: Sector - Specific Benchmarks - Sector B"
Open the permit at this section

(Sector C) Chemicals: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Agricultural chemicals (C1), industrial inorganic chemicals (C2), soaps and cosmetics (C3) and plastics and resins (C4) each have their own benchmarks. Phosphate fertilizer runoff (SIC 2874) must also meet the Table 11.C.4-1 limits, sampled once a year.

  • Only if: your permit sector is C.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.C.3, page 67
"Table 11.C.3-1 identifies benchmarks that apply to the specific subsectors of Sector C."
Open the permit at this section

(Sector D) Asphalt paving and roofing: benchmark value and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Asphalt paving and roofing materials (D1) monitor TSS. Asphalt emulsion facilities must also meet the Table 11.D.4-1 limits, sampled once a year.

  • Only if: your permit sector is D.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.D.3, page 70
"Table 11.D.3-1 identifies benchmarks that apply to the specific subsectors of Sector D."
Open the permit at this section

(Sector E) Glass, clay, cement, concrete and gypsum: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Clay products (E1) monitor aluminum, concrete and gypsum products (E2) TSS, and other glass, clay, cement, concrete and gypsum products (E3) TSS and pH. Material storage piles at cement plants must also meet the Table 11.E.5-1 limits, sampled once a year.

  • Only if: your permit sector is E.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.E.4, page 72
"Table 11.E.4-1 identifies benchmarks that apply to the specific subsectors of Sector E."
Open the permit at this section

(Sector F) Primary metals: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Steel works (F1), iron and steel foundries (F2), nonferrous rolling and drawing (F3) and nonferrous foundries (F4) each have their own benchmarks.

  • Only if: your permit sector is F.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Table 11.F.5-1, page 76
"Table 11.F.5-1: Sector - Specific Benchmarks -Sector F"
Open the permit at this section

(Sector G) Metal mining: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Active copper ore mines (G1) monitor TSS, nitrate plus nitrite and COD on the quarterly schedule. Waste rock and overburden piles at active metal mines (G2) monitor the Table 11.G.8-2 parameters on their own schedule.

  • Only if: your permit sector is G.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.G.8, page 94
"Active copper ore mining and dressing facilities, the permittee must sample and analyze storm water discharges for the pollutants listed in Table 11.G.8-1."
Open the permit at this section

(Sector H) Coal mines: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Coal mines and related areas (H1) monitor aluminum and TSS.

  • Only if: your permit sector is H.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Table 11.H.8-1, page 114
"Table 11.H.8-1: Sector - Specific Benchmarks - Sector H"
Open the permit at this section

(Sector I) Oil and gas extraction: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Oil and gas extraction (I1) monitors TSS, pH, ammonia, nitrate and nitrite, nickel, lead and zinc.

  • Only if: your permit sector is I.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Table 11.I.6-1, page 120
"Table 11.I.6-1: Sector - Specific Benchmarks - Sector I"
Open the permit at this section

(Sector J) Non-metallic mineral mining: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Sand and gravel mining (J1) monitors nitrate plus nitrite and TSS; dimension and crushed stone (J2) monitors TSS. Mine dewatering at crushed stone, sand and gravel and industrial sand mines must also meet the Table 11.J.9-1 limits, sampled once a year.

  • Only if: your permit sector is J.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.J.8, page 136
"Table 11.J.8-1 identifies benchmarks that apply to the specific subsectors of Sector J."
Open the permit at this section

(Sector K) Hazardous waste treatment, storage or disposal: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Hazardous waste facilities (K1) monitor the Table 11.K.5-1 benchmarks where their discharges are not subject to 40 CFR Part 445 Subpart A. Hazardous waste landfills subject to it must meet the Table 11.K.6-1 limits, sampled once a year.

  • Only if: your permit sector is K.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.K.5, page 140
"Table 11.K.5-1 identifies benchmarks that apply to the specific subsectors of Sector K."
Open the permit at this section

(Sector L) Landfills and land application sites: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

All landfills, land application sites and open dumps (L1) monitor TSS; all except municipal solid waste landfill areas closed under 40 CFR 258.60 (L2) monitor the longer L2 list. Non-hazardous waste landfills subject to 40 CFR Part 445 Subpart B must also meet the Table 11.L.10-1 limits, sampled once a year.

  • Only if: your permit sector is L.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.L.9, page 145
"Table 11.L.9-1 identifies benchmarks that apply to the specific subsectors of Sector L."
Open the permit at this section

(Sector M) Automobile salvage yards: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Automobile salvage yards (M1) monitor TSS, aluminum, iron and lead.

  • Only if: your permit sector is M.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Table 11.M.5-1, page 149
"Table 11.M.5-1: Sector - Specific Benchmarks - Sector M"
Open the permit at this section

(Sector N) Scrap and waste recycling: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Scrap and waste recycling facilities except source-separated recycling (N1) monitor COD, TSS, aluminum, copper, iron, lead and zinc.

  • Only if: your permit sector is N.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Table 11.N.6-1, page 155
"Table 11.N.6-1: Sector - Specific Benchmarks - Sector N"
Open the permit at this section

(Sector O) Steam electric generating facilities: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Steam electric generating facilities (O1) monitor the Table 11.O.7-1 benchmarks. Coal storage pile runoff must also meet the Table 11.O.8-1 limits, sampled once a year.

  • Only if: your permit sector is O.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.O.7, page 158
"Table 11.O.7-1 identifies benchmarks that apply to the specific subsectors of Sector O."
Open the permit at this section

(Sector P) Land transportation and warehousing: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Land transportation and warehousing (P1) monitors TSS, pH, antimony, arsenic, cadmium, copper, mercury and zinc.

  • Only if: your permit sector is P.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Table 11.P.6-1, page 164
"Table 11.P.6-1: Sector - Specific Benchmarks - Sector P"
Open the permit at this section

(Sector Q) Water transportation: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Water transportation facilities (Q1) monitor aluminum, lead and zinc.

  • Only if: your permit sector is Q.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Table 11.Q.6-1, page 168
"Table 11.Q.6-1: Sector - Specific Benchmarks - Sector Q"
Open the permit at this section

(Sector R) Ship and boat building and repair: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Ship and boat building and repair yards (R1) monitor the Table 11.R.6-1 benchmarks.

  • Only if: your permit sector is R.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.R.6, page 171
"Table 11.R.6-1 identifies benchmarks that apply to the specific subsectors of Sector R."
Open the permit at this section

(Sector S) Air transportation: deicing benchmarks and the ammonia limit

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Airports where the permittees together use more than 100,000 gallons of pure glycol or 100 tons or more of urea a year monitor BOD5, COD, ammonia and pH at deicing outfalls while deicing occurs. Existing primary airports with 1,000 or more annual non-propeller departures that use urea deicers must meet the Table 11.S.8-1 ammonia limit, sampled twice a deicing season.

  • Only if: your permit sector is S.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.S.7, page 178
"Monitor per the requirements in Table 11.S.7-1."
Open the permit at this section

(Sector U) Food and kindred products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Grain mills (U1) monitor TSS; fats and oils (U2) monitor BOD5, COD, nitrate plus nitrite and TSS; other food products (U3) monitor pH, COD and TSS.

  • Only if: your permit sector is U.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Table 11.U.6-1, page 183
"Table 11.U.6-1: Sector - Specific Benchmarks - Sector U"
Open the permit at this section

(Sector Y) Rubber products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Rubber products manufacturers (Y1) monitor zinc.

  • Only if: your permit sector is Y.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section Table 11.Y.4-1, page 190
"Table 11.Y.4-1: Sector - Specific Benchmarks - Sector Y"
Open the permit at this section

Effluent limit exceeded: follow-up sample within 30 days of the corrective action

Within 30 days after you implement the corrective action.

After a discharge exceeds a numeric effluent limit, take corrective action (Part 8) and sample again for the pollutant within 30 calendar days of implementing it, or at the next qualifying runoff event if none occurs. If the follow-up also exceeds, submit a Noncompliance Notification Form and monitor at least quarterly until the discharge meets the limit or DEC waives it.

Further steps with their own deadlines:

  • If the follow-up sample exceeds: Noncompliance Notification Form by the 15th of the next month. Within 15 days after you receive the follow-up lab results. Section 9.3, page 58
    "no later than the 15th day of the following month after they have received all their lab results."
  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); a discharge exceeds a numeric effluent limit.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 7.2.2.3, page 52
"The permittee must follow-up monitoring within 30 calendar days (or during the next qualifying runoff event, should none occur within 30 days) of implementing corrective action(s)"
Open the permit at this section

Hardness-dependent benchmarks: send the receiving water hardness with the first benchmark report

No set date. With the first benchmark monitoring report (Part 7.2.1.1, Appendix E.2), which is due as in the monitoring report duty.

Facilities with a hardness-dependent benchmark (cadmium, copper, lead, nickel, silver or zinc in fresh water) determine the receiving water hardness by their own grab sample, a group of dischargers or third-party data under 10 years old (40 CFR Part 136 methods), document the method, and send the value with the first benchmark report.

  • Only if: your permit subsector is A1, A2, C1, C3, C4, F1, F2, F3, F4, G2, I1, K1, L2, M1, N1, O1, P1, Q1, R1, Y1, AA1, AA2, AB1.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 7.2.1.1, page 50
"the permittee is required to submit to DEC with their first benchmark report a hardness value, established consistent with the procedures in Appendix E, which is representative of the receiving water."
Open the permit at this section

Sector AD: get DEC's written permission before submitting the NOI

No set date. Before the NOI is submitted; the permit gives no number of days.

A discharge DEC has designated as needing a permit (Sector AD) needs DEC’s written permission to use this permit before the NOI. DEC sets any added monitoring and reporting before authorizing it.

  • Only if: your permit sector is AD.
  • You send it to the agency (DEC Wastewater Discharge Authorization Program, 555 Cordova Street, Anchorage (Appendix A, Part 1.1.1)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.AD.1.1, page 199
"the permittee must obtain the Department’s written permission to use this permit prior to submitting an NOI."
Open the permit at this section

Sector G: waste rock and overburden piles, benchmark monitoring once in the first year, then twice a year

Once each year of your coverage, counted from when it began.

Discharges from waste rock and overburden piles at active metal mines are sampled once in the first year for the Table 11.G.8-2 parameters, then twice a year in later years for any parameter that exceeded its benchmark. Ore-specific parameters (Table 11.G.8-3) follow the quarterly schedule.

  • Only if: your permit subsector is G2; the site has discharges from waste rock or overburden piles at an active metal mine.
  • You file it in the agency's system (EPA NetDMR).
  • Keep the records 3 years.

Inferred from section 11.G.8.2. Check your copy of the permit.

Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.G.8.2, page 94
"perform benchmark monitoring once in the first year for the parameters listed in Table 11.G.8-2, and twice annually in all subsequent years of coverage under this permit for any parameters for which the benchmark has been exceeded."
Open the permit at this section

Sector I: inspect erosion and sediment controls every 7 days

Within 7 days after the last inspection.

Inspect all erosion and sedimentation control measures every 7 days, or once every 14 calendar days and within 24 hours of a storm event.

  • Only if: your permit sector is I.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.I.5.1, page 119
"All erosion and sedimentation control measures must be inspected either: 1) every 7 days; or 2) once every 14 calendar days and within 24 hours of a storm event."
Open the permit at this section

Sector L: inspect operating landfills every 7 days

Within 7 days after the last inspection.

Inspect operating landfills, open dumps and land application sites at least once every 7 days, focusing on unstabilized areas, exposed storage, controls, leachate systems and truck entrances. Stabilized sites, completed land application areas and arid or semi-arid sites are inspected monthly.

  • Only if: your permit sector is L; the landfill, open dump or land application site is operating.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.L.7.1, page 145
"Except in arid and semi-arid climates, inspect operating landfills, open dumps, and land application sites at least once every seven (7) days."
Open the permit at this section

Sector M: inspect arriving vehicles for leaks immediately

When a vehicle arrives at the site.

Inspect each vehicle arriving at the salvage yard for leaks immediately, or as soon after as feasible, and inspect the area used to drain and collect automotive fluids.

  • Only if: your permit sector is M; a vehicle arrives at the salvage yard.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.M.4, page 149
"Immediately (or as soon thereafter as feasible) inspect vehicles arriving at the site for leaks and inspect area designated for the draining and collecting of automotive fluids."
Open the permit at this section

Sector S: certify each year that no urea deicers are used, or meet the ammonia limit

No set date. The permit says annually but gives no date (Part 11.S.8).

An existing airport with 1,000 or more annual non-propeller departures either certifies each year that it uses no urea-containing airfield deicers, kept signed in the SWPPP, or meets the Table 11.S.8-1 ammonia limit at every deicing discharge point. A certification also removes the ammonia benchmark.

  • Only if: your permit sector is S; the airport is an existing primary airport with 1,000 or more annual non-propeller aircraft departures.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.S.8, page 179
"any existing point source must certify annually that it does not use airfield deicing products that contain urea"
Open the permit at this section

Sectors G, H, J: inspect clearing, grading and excavation areas every 7 days

Within 7 days after the last inspection.

During the exploration and construction phase, inspect disturbed areas, exposed storage areas, erosion and sediment controls, discharge points and vehicle exits at least once every 7 calendar days (or every 14 days and within 24 hours after a discharge-producing storm; monthly when the whole site is temporarily stabilized). Write the chosen schedule in the SWPPP.

  • Only if: your permit sector is G, H, J; clearing, grading or excavation is under way in the exploration or construction phase.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.G.4.14.1, page 89
"Inspections must be conducted at one of the following: at least once every 7 calendar days; or at least once every 14 calendar days and within 24 hours of the end of a storm event"
Open the permit at this section

Sectors G, H, J: request approval 14 days before using cationic treatment chemicals

At least 14 days before the first use of the chemicals.

Before adding cationic treatment chemicals to stormwater during exploration or construction, submit a request to DEC 14 calendar days in advance with the operator and site details, a site map, a schematic and a description of the treatment system, and follow DEC’s conditions.

  • Only if: your permit sector is G, H, J; you plan to add cationic treatment chemicals to stormwater.
  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.G.4.5.7, page 85
"they must submit a request to the Department fourteen (14) calendar days in advance of proposed usage per Part 9.6."
Open the permit at this section

Sectors G, H: submit the construction phase SWPPP 45 days before initial construction

At least 45 days before initial construction starts.

For a new mining facility, submit the construction phase SWPPP to DEC at least 45 calendar days before initial construction starts, and meet DEC with the prime site contractor in a pre-construction conference at least 20 calendar days before.

Further steps with their own deadlines:

  • Hold the pre-construction conference with DEC at least 20 days before. At least 20 days before initial construction starts. Section 11.G.6.8, page 93
    "At least 20 calendar days before the start of initial construction for a new facility, representatives of the permittee and the prime site construction contractor shall meet with DEC in a pre-construction conference"
  • Only if: your permit sector is G, H; initial construction of a new facility is planned.
  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 11.G.6.7, page 93
"At least 45 calendar days prior to the start of initial construction of a new facility the permittee shall submit the construction phase SWPPP to DEC."
Open the permit at this section

What does no-exposure certification require?

Conditional Exclusion for No Exposure: a No Exposure Certification through EDMS instead of permit coverage, resubmitted every five years.

Every few years 1 duty

Resubmit the No Exposure Certification every five years

Within 5 years after the date the No Exposure Certification was first filed.

Submit the No Exposure Certification to DEC again once every five years, counted from the date it was first filed.

  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 1.3, page 17
"The permittee must submit a No Exposure Certification to DEC once every five years from the initial date of filing."
Open the permit at this section

One time 1 duty

No exposure: file the No Exposure Certification

No set date. The permit sets no date for a first certification.

A covered facility that becomes eligible for the no exposure exclusion (40 CFR 122.26(g)) may file a No Exposure Certification through EDMS and must then submit a NOT to end permit coverage. The certification covers the whole facility, not single outfalls or sectors.

  • You file it in the agency's system (DEC EDMS (Environmental Data Management System)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: APDES Multi-Sector General Permit AKR060000, final (2026-2031), 232 pages, section 1.3, page 17
"If the permittee is covered by this permit and becomes eligible for a no exposure exclusion from permitting under 40 CFR 122.26(g), the permittee may file a No Exposure Certification."
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.