Get my permit calendar

Guides / No exposure certification

No exposure certification: the questions, renewals and duties

A facility with no industrial materials or activities exposed to stormwater can certify no exposure instead of taking full permit coverage. The federal test is 11 yes-or-no questions. How often each permit makes you renew:

  • California Industrial General Permit (IGP): Recertify no exposure (or apply for full coverage) by October 1. Every year.
  • Texas MSGP: No renewal date in the duties we list. Its duties start when something changes at the site.
  • Washington ISGP: Renew the Conditional No Exposure certification every five years.
  • EPA 2021 MSGP: Renew the No Exposure Certification every five years.

Get my permit calendar

Free, no account. Pick your state and coverage and see the next date for each duty.

Next: answer a few questions about your site. You get your dates, the permit section for each, and a calendar file.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

Compared here: California Industrial General Permit (IGP), rules checked November 25, 2026; Texas MSGP, rules checked November 25, 2026; Washington ISGP, rules checked November 25, 2026; EPA 2021 MSGP, rules checked November 26, 2026. Duties for other states are not listed until their rules are checked: find your state.

The 11 no exposure questions

Are any of the following materials or activities exposed to precipitation, now or in the foreseeable future? EPA's form says: "If you answer "Yes" to any of these questions, you are not eligible for the no exposure exclusion." The questions come from 40 CFR 122.26(g) and EPA's No Exposure Certification form.

  1. Using, storing or cleaning industrial machinery or equipment, and areas where residuals from using, storing or cleaning industrial machinery or equipment remain and are exposed to storm water
  2. Materials or residuals on the ground or in storm water inlets from spills/leaks
  3. Materials or products from past industrial activity
  4. Material handling equipment (except adequately maintained vehicles)
  5. Materials or products during loading/unloading or transporting activities
  6. Materials or products stored outdoors (except final products intended for outside use, e.g., new cars, where exposure to storm water does not result in the discharge of pollutants)
  7. Materials contained in open, deteriorated or leaking storage drums, barrels, tanks, and similar containers
  8. Materials or products handled/stored on roads or railways owned or maintained by the discharger
  9. Waste material (except waste in covered, non-leaking containers, e.g., dumpsters)
  10. Application or disposal of process wastewater (unless otherwise permitted)
  11. Particulate matter or visible deposits of residuals from roof stacks/vents not otherwise regulated, i.e., under an air quality control permit, and evident in the storm water outflow

Answer them in the free checklist to see which items show exposure at your site.

How often you renew, over ten years

  • California Industrial General Permit (IGP) Every year
  • Texas MSGP No renewal date listed
  • Washington ISGP Every 5 years
  • EPA 2021 MSGP Every 5 years

A filled square is a renewal year. In California the fee schedule for fiscal year 2026-27 lists $200 for a first no exposure certification and $75 for each renewal (State Water Board fee schedule).

Worked example: if it happens on March 3, 2027

Some deadlines count from something that happens at the site. If that event fell on March 3, 2027, the permit's rule puts the deadline here. Your own dates come from your own events.

Deadlines counted from an event on March 3, 2027
PermitDutyCounts fromDue
California Industrial General Permit (IGP) Register for no-exposure coverage before starting industrial activity start of industrial activity By February 24, 2027
California Industrial General Permit (IGP) Switch from no exposure to full coverage before materials become exposed anticipated exposure date By February 24, 2027
Texas MSGP Switch from no exposure to an NOI before anything becomes exposed date of change causing exposure By March 3, 2027
EPA 2021 MSGP Renew the No Exposure Certification every five years last nec submission date March 3, 2032

The deadline calculator works out the same dates from your own event date.

California Industrial General Permit (IGP)

General Permit for Storm Water Discharges Associated with Industrial Activities, run by State Water Resources Control Board (with the nine Regional Water Quality Control Boards). Rules checked November 25, 2026. Every duty in this permit · California permit facts · Official permit page

Every year 2 duties

Inspect and evaluate the no-exposure facility each year

By the end of each reporting year (it starts July 1).

Inspect and evaluate the facility once a year to confirm that no storm water exposed to industrial materials or equipment has been or will be discharged. Keep the records 5 years.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XVII.C.2; II.B.2.b, page 66
"Inspect and evaluate the facility annually to determine that storm water exposed to industrial materials or equipment has not and will not be discharged to waters of the United States."
Open the permit at this section

Recertify no exposure (or apply for full coverage) by October 1

By October 1 each reporting year.

Each reporting year, certify and submit an NEC in SMARTS showing the facility was evaluated and nothing listed in XVII.F.2 is exposed, or apply for NOI coverage. The $75 renewal fee (CCR tit. 23 §2200.5) is invoiced and mailed separately; no payment is made in SMARTS at recertification (SMARTS NEC recertification guide, p.4).

  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XVII.G, page 68
"By October 1 of each reporting year beginning in 2015, any Discharger who has previously registered for NEC coverage shall either submit and certify an NEC demonstrating that the facility has been evaluated"
Open the permit at this section

When something happens 2 duties

Register for no-exposure coverage before starting industrial activity

At least 7 days before start of industrial activity.

Certify and submit the NEC Permit Registration Documents in SMARTS at least 7 days before industrial activity starts, and pay the NEC fee.

  • When: new facility.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section II.B.5.b, page 20
"New Dischargers registering for NEC coverage shall electronically certify and submit PRDs via SMARTS by October 1, 2015, or at least seven (7) days prior to commencement of industrial activities, whichever is later."
Open the permit at this section

Switch from no exposure to full coverage before materials become exposed

At least 7 days before anticipated exposure date.

If changes will expose industrial materials or activities, register for NOI coverage at least 7 days before the exposure.

  • When: anticipated exposure, or unplanned exposure.
  • If unplanned exposure: Within 7 days after unplanned exposure date.
  • You file it in the agency's system (SMARTS).
  • Keep the records 5 years.
  • Signed or certified by the Legally Responsible Person.
Source: Industrial General Permit Order (conformed, as amended 2015 and 2018), section XVII.E.2, page 67
"A Discharger with NEC coverage that anticipates changes in circumstances should register for NOI coverage at least seven (7) days before anticipated exposure."
Open the permit at this section

Texas MSGP

TPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, run by Texas Commission on Environmental Quality (TCEQ). Rules checked November 25, 2026. Every duty in this permit · Texas permit facts · Official permit page

When something happens 1 duty

Switch from no exposure to an NOI before anything becomes exposed

Before date of change causing exposure.

A facility under an NEC that will expose industrial materials or activities prepares a SWP3 and submits an NOI (or applies for an individual permit) before making the change, then submits a NOT to end the NEC.

  • When: anticipated exposure.
  • You file it in the agency's system (STEERS/ePermits).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 30 TAC 305.44.
Source: 2026 Multi-Sector General Permit TXR050000, section II.C.1(c)(2), page 32
"shall prepare a SWP3 and submit an NOI to apply for coverage under the MSGP or shall apply for an individual water quality permit (as applicable) to discharge stormwater from the facility before making any changes"
Open the permit at this section

Washington ISGP

Industrial Stormwater General Permit (NPDES and State Waste Discharge General Permit), run by Washington State Department of Ecology, Water Quality Program. Rules checked November 25, 2026. Every duty in this permit · Washington permit facts · Official permit page

Every few years 1 duty

Renew the Conditional No Exposure certification every five years

No set date. S1.F.3.c requires a new No Exposure Certification application "once every five years". Does the five years run from Ecology's written approval of the exemption or from the date the previous application was submitted? Ecology must confirm before StormDue shows a renewal date.

Facilities granted a No Exposure exemption submit a new electronic No Exposure Certification application every five years; if anything becomes exposed, apply for and obtain a permit immediately.

  • You file it in the agency's system (WQWebPortal (SAW)).
  • Signed or certified by a responsible official per isgp G2A.

Inferred: the permit implies this but does not state it in one place. Check it against the section cited.

Source: 2026 Industrial Stormwater General Permit Modification (issued Dec 2, 2024, modified Oct 21, 2026), section S1.F.3.c, page 10
"Facilities which are granted a No Exposure exemption must submit an electronic No Exposure Certification application to Ecology once every five years."
Open the permit at this section

EPA 2021 MSGP

NPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, run by U.S. Environmental Protection Agency (EPA Regions 1-10). Rules checked November 26, 2026. Every duty in this permit · Official permit page

Every few years 1 duty

Renew the No Exposure Certification every five years

Within 5 years after last nec submission date.

Facilities excluded under no exposure submit a new NEC to EPA in NeT-MSGP once every five years.

  • You file it in the agency's system (NeT-MSGP).
  • Signed or certified by a responsible official per MSGP Appendix B 11.A.
Source: 2021 MSGP Permit Parts 1-7 (as modified September 2021), section 1.5, page 17
"You must submit a NEC form to EPA once every five years."
Open the permit at this section

Try it with your own numbers

The free tools use the same permit data as this page. No account.

Run the no exposure checklist

Questions people ask

How often do I renew a no exposure certification?

California Industrial General Permit (IGP): Recertify no exposure (or apply for full coverage) by October 1. By October 1 each reporting year. Texas MSGP: no renewal date in the duties we list. Washington ISGP: Renew the Conditional No Exposure certification every five years. No set date. S1.F.3.c requires a new No Exposure Certification application "once every five years". Does the five years run from Ecology's written approval of the exemption or from the date the previous application was submitted? Ecology must confirm before StormDue shows a renewal date. EPA 2021 MSGP: Renew the No Exposure Certification every five years. Within 5 years after last nec submission date.

What are the no exposure questions?

The federal rule (40 CFR 122.26(g)) and EPA's form ask 11 questions about materials and activities exposed to stormwater. EPA's form says: "If you answer "Yes" to any of these questions, you are not eligible for the no exposure exclusion."

Does StormDue decide whether my site qualifies?

No. The free checklist shows which of the federal items show exposure at your site. Your agency decides whether the certification is accepted.

More permit duty guides

See the dates for your own permit

Pick your state and coverage. You get each duty's next date and the section it comes from, free.