Arkansas Industrial Stormwater General Permit (IGP) ARR000000 due dates and duties

Every duty in the Authorization to Discharge under the National Pollutant Discharge Elimination System and the Arkansas Water and Air Pollution Control Act, Facilities Discharging Stormwater Associated With Industrial Activity (Industrial Stormwater General Permit), with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 61duties, each cited
  • 9on a schedule
  • 52when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
ARR000000
In force
July 1, 2024 to June 30, 2029
Official page
adeq.state.ar.us
Rules last checked
November 27, 2026
Today
July 1, 2024 June 30, 2029
Notes on the permit's status and renewal

The permit was issued December 14, 2023 (cover page; digitally signed December 13, 2023), took effect July 1, 2024 and expires June 30, 2029. It replaced the 2019 permit (effective July 1, 2019, expired June 30, 2024). On November 27, 2026 it was current, not administratively continued: DEQ's stormwater page lists "Expires: June 30, 2029" and its permit database shows the permit approved November 20, 2023 with no modification date. No modification, draft or notice after the December 2023 response to comments was found. Part 7.4 continues the permit administratively if it is not reissued by expiration. The NOI deadline for 2019 permittees (the effective date) has passed and is not shown. A permit fee and an annual fee apply (APC&EC Rule No. 9). DEQ's page says industrial stormwater forms are submitted through SEEK; the permit names ePortal "or any successor system".

What does full permit coverage require?

Regular NOC: SWPPP first, then an NOI with the SWPPP and the permit fee; DEQ issues a Notice of Coverage.

Every quarter 1 duty

Inspect the facility once each calendar quarter

By the end of each calendar quarter.

Qualified personnel inspect, during normal operating hours, areas where industrial materials or activities are exposed, potential pollutant sources, areas with spills or leaks in the past three years, outfalls and control measures, at least once each calendar quarter, and document the findings with the SWPPP.

Further steps with their own deadlines:

  • At least one inspection during a stormwater discharge. The permit gives the timing in words, quoted below. Section 3.1.4.1, page 23
    "At least one routine inspection must be conducted during a period when a stormwater discharge is occurring."
  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 3.1.4.1, page 23
"The qualified personnel must conduct inspections at least quarterly (i.e., once each calendar quarter)."
Open the permit at this section

Every year 4 duties

Sample each outfall once each calendar year for the benchmark parameters

By December 31 each year.

Collect a grab sample from each outfall (or one of a set of approved similar outfalls) at least once each calendar year from a measurable storm event, within the first 30 minutes of discharge, and analyze it for pH and TSS (Table 2-2) plus the sub-sector parameters in Table 2-3.

  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 3.2.3, page 25
"The facility must monitor at least once within a calendar year unless the discharge is excluded from coverage under Part 1.2."
Open the permit at this section

Complete the Stormwater Annual Report (SWAR) by January 31 and add it to the SWPPP

By January 31, for the calendar year before.

Record every sample on DEQ's SWAR form covering the January to December calendar year, with corrective action plan status, signed under Part 7.9.4, and incorporate it into the SWPPP by January 31 of the following year. It is not sent to DEQ unless requested (or a limit was exceeded).

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 5.2, page 34
"the SWAR covers the previous 12 month ... calendar year and is to be incorporated as part of the SWPPP no later than the 31st day of January of the following year"
Open the permit at this section

Pay the annual permit fee when invoiced

No set date. DEQ invoices the annual fee; the permit sets no due date.

Pay the permit fees set by APC&EC Rule No. 9: the initial fee with the NOI and an annual fee invoiced every year the permit is active. A fee applies.

  • You file it in the agency's system (DEQ SEEK user dashboard).
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 7.20, page 46
"including annual permit fees following the initial permit fee that will be invoiced every year the permit is active"
Open the permit at this section

Train employees at least once a year

Within 1 year after the last training.

Train employees who work where industrial materials or activities are exposed to stormwater, or who carry out permit duties, including the stormwater pollution prevention team, at least annually (more often if turnover is high), and keep a log of training dates in the SWPPP.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 4.2.6.1.e. Check your copy of the permit.

Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 4.2.6.1.e, page 31
"Training shall be conducted at least annually (or more often if employee turnover is high)."
Open the permit at this section

One time 3 duties

Evaluate every outfall for unauthorized non-stormwater discharges

No set date. Part of the SWPPP; the permit sets no separate date or repeat interval.

As part of the SWPPP, inspect and document all outfalls for unauthorized non-stormwater discharges, recording the date, criteria, outfalls observed and any action taken, signed under Part 7.9. Eliminate any unauthorized discharge immediately or seek a permit for it.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 4.2.4.4, page 30
"Inspect and document all outfalls at the facility as part of the SWPPP."
Open the permit at this section

When DEQ reissues the permit, meet the new permit's conditions

No set date. The next permit will set its own deadlines; DEQ had not proposed one on 2026-11-27.

If the permit is not reissued by June 30, 2029, it is administratively continued for facilities covered before then. Once it is reissued or replaced, the facility must meet the new permit's conditions to stay authorized.

  • You file it in the agency's system (DEQ SEEK (seek.ee.arkansas.gov); the permit names ePortal or any successor system).
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 7.4.1, page 42
"Re-issuance or replacement of this permit, at which time the permittee must comply with the conditions of the new permit to maintain authorization to discharge;"
Open the permit at this section

Write the SWPPP before submitting the NOI

No set date. Before the NOI is submitted; the SWPPP is part of the NOI application package (Part 1.4.1, Table 1-3).

Develop a Stormwater Pollution Prevention Plan (SWPPP) under Part 4, or update an existing one, before submitting the Notice of Intent. Every required SWPPP section goes in with the application package, even if some parts are not final, and the SWPPP is certified under Part 7.9.4.

  • You file it in the agency's system (DEQ SEEK (seek.ee.arkansas.gov); the permit names ePortal or any successor system).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 1.4.1, page 11
"Develop a SWPPP or update an existing SWPPP per Part 4 prior to submitting a NOI for coverage under this permit, per Part 1.5 below;"
Open the permit at this section

When something happens 19 duties

Division determination on water quality: sample the benchmark parameters once each quarter

By the end of each calendar quarter.

If the Division determines that the discharge may cause, or contribute to, an excursion above a water quality standard, monitor the benchmark parameters, and any other pollutants named in the NOC, once per calendar quarter until the Division approves annual monitoring.

  • When: the Division makes a water quality determination.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 5.4.4, 5.4.4.1. Check your copy of the permit.

Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 5.4.4, 5.4.4.1, page 37
"If the Division determines that the stormwater discharge from the facility may cause, have reasonable potential to cause, or contribute to an excursion above any applicable water quality standard."
Open the permit at this section

ERW, NSW or ESW waters: sample the benchmark parameters once each quarter

By the end of each calendar quarter.

If the discharge enters an Extraordinary Resource Water, Natural and Scenic Waterway or Ecologically Sensitive Waterbody (APC&EC Rule 2), monitor the benchmark parameters, and any other pollutants named in the NOC, once per calendar quarter until the Division approves annual monitoring, and document extra measures in the SWPPP.

  • When: the facility discharges to an Extraordinary Resource Water, Natural and Scenic Waterway or Ecologically Sensitive Waterbody.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 5.4.3, 5.4.3.1. Check your copy of the permit.

Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 5.4.3, 5.4.3.1, page 36
"If the discharge enters a waterbody that is classified as an ERW, NSW, or ESW in the APC&EC Rule 2 ... shall monitor benchmark parameters once per quarter"
Open the permit at this section

After a benchmark or limit exceedance: start the corrective action plan within 30 days

Within 30 days after the exceedance.

If a sample exceeds a benchmark value or effluent limit, investigate the cause, review the SWPPP and document a Corrective Action Plan (review of results, actions, implementation schedule with milestone dates), starting within 30 calendar days of the exceedance, while taking reasonable steps at once to minimize the discharge.

  • When: a benchmark or effluent limit is exceeded.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 3.3.1. Check your copy of the permit.

Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 3.3.1, page 27
"Commence with the above process within thirty (30) calendar days of the exceedance"
Open the permit at this section

Change of owner or name: submit the Permit Transfer Form

No set date. The permit sets no number of days; the transfer needs notice to the Director (Part 7.10).

A covered facility that changes ownership or name submits a Permit Transfer Form to DEQ. The permit sets no number of days; Part 7.10 says the permit is not transferable except after notice to the Director.

  • When: the ownership or name changes.
  • You send it to the agency (DEQ Water Discharge Permits Section (Notice of Permit Transfer Form)).
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 1.8, page 13
"Facilities authorized under this permit that undergo a change in ownership or name must submit a Permit Transfer Form to the DEQ."
Open the permit at this section

Discharge causes a water quality standard exceedance: take, document and report corrective action

No set date. The permit sets no number of days.

If the facility becomes aware, or the Division determines, that its discharge causes or contributes to an exceedance of a water quality standard, take corrective action, document it and report it to the Division.

  • When: the discharge causes a water quality standard to be exceeded.
  • You send it to the agency (DEQ Office of Water Quality).
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.3, page 19
"the permittee must take corrective action as required, document the corrective actions as required, and report the corrective actions to the Division."
Open the permit at this section

Discharging to an MS4: notify the MS4 operator

At least 30 days before you start discharging.

A facility that discharges to a municipal separate storm sewer system sends a notification to the MS4 operator within the Table 1-3 deadlines, which for a new facility is at least 30 days before discharge begins.

  • When: the facility discharges to an MS4; you are starting a new discharge under this permit.
  • You send a copy to the operator of your storm sewer system (MS4).
  • Keep the records 3 years.

Inferred from section 1.6. Check your copy of the permit.

Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 1.6, page 13
"If a facility discharges to a MS4 system, a notification must be sent to the operator of the MS4 within the deadlines provided in Table 1-3."
Open the permit at this section

Division determination on water quality: respond as the Division requires

No set date. The permit sets no number of days; the Division's determination governs.

If the Division determines after authorization that the discharge may cause or contribute to an excursion above a water quality standard, it will require the permittee to develop a supplemental BMP action plan, submit data showing the receiving water meets standards, or stop the discharge and apply for an individual permit.

  • When: the Division makes a water quality determination.
  • You send it to the agency (DEQ Office of Water Quality).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 5.5, page 37
"If such a determination is made, the Division will require the permittee to:"
Open the permit at this section

Make permit records available within five business days of a request

Within 5 working days after the request.

Make the documentation used to meet the permit available to the Division, the MS4 operator receiving the discharge and U.S. Fish and Wildlife Service representatives at an inspection or within five business days of a request.

  • When: records are requested.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 5.3, page 35
"In this case, "immediately" is within five (5) business days of the request, unless another deadline is specified."
Open the permit at this section

New duly authorized representative: send the new authorization before or with the next report

No set date. Before or together with the next document the representative signs.

When a written authorization of a duly authorized representative is no longer accurate, submit a new one to the Director before or together with any report, information or application that representative signs.

  • When: the authorized representative changes.
  • You send it to the agency (DEQ Office of Water Quality).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 7.9.3, page 44
"a new authorization satisfying the requirements of Part 7.9.2 of this section must be submitted to the Director prior to or together with any reports, information, or applications to be signed by an authorized representative."
Open the permit at this section

New facility: submit the NOI at least 30 days before discharge begins

At least 30 days before you start discharging.

A new facility without coverage, or one moving from an individual or other general permit, submits a complete NOI with the SWPPP and the permit fee at least 30 days before its industrial stormwater discharge begins. DEQ issues a Notice of Coverage (NOC) with a tracking number starting with ARR00.

  • When: you are starting a new discharge under this permit.
  • You file it in the agency's system (DEQ SEEK (seek.ee.arkansas.gov); the permit names ePortal or any successor system).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 1.5, Table 1-3, page 12
"Facility's industrial activities that will commence discharging after June 30, 2024. At least thirty (30) days prior to commencement of discharge."
Open the permit at this section

Noncompliance that could discharge pollutants: notify DEQ immediately and report in writing within 30 days

Within 30 days after the noncompliance.

If the facility cannot meet a permit condition in a way that could discharge a significant amount of pollutants, act immediately to stop or correct it, notify the Division immediately, and send a detailed written report within 30 days unless the Division asks for it sooner.

Further steps with their own deadlines:

  • Notify the Division immediately. The permit gives the timing in words, quoted below. Section 7.22.2, page 47
    "Immediately notify the Division of the failure to comply; and"
  • When: noncompliance that could discharge pollutants happens.
  • You send it to the agency (DEQ Office of Water Quality).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 7.22.3. Check your copy of the permit.

Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 7.22.3, page 47
"Submit a detailed written containing the following within thirty (30) days to the Division, unless the Division requests an earlier submission."
Open the permit at this section

Outfall change: submit an Outfall Modification Request

No set date. The permit sets no deadline for an outfall change.

When an outfall changes, submit an Outfall Modification Request to DEQ electronically (or the Outfall Modification Form). The permit sets no deadline.

  • When: an outfall changes.
  • You file it in the agency's system (DEQ SEEK (seek.ee.arkansas.gov); the permit names ePortal or any successor system).
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 1.7.1, page 13
"An Outfall Modification Request through DEQ electronic portal (ePortal, or any successor system) to electronically prepare and submit to DEQ a complete and accurate Outfall Modification Request"
Open the permit at this section

Primary industrial activity change: send DEQ a letter

No set date. The permit sets no deadline for this letter.

When the primary industrial activity changes, send DEQ a letter describing the previous and current activity with a statement certifying that the SWPPP has been updated. The permit sets no deadline.

  • When: the primary industrial activity changes.
  • You send it to the agency (DEQ Office of Water Quality).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 1.7.2, page 13
"A letter stating a brief description of the previous and current primary industrial activity along with a statement certifying that the SWPPP has been updated."
Open the permit at this section

Repair or replace failed control measures the same day

When you discover the problem.

When a control measure needs repair or replacement, act immediately: on the day the need is found, take all reasonable steps to minimize or prevent the discharge of pollutants until a permanent solution is in place. If it is found too late in the work day, act the following work day morning.

  • When: a control measure needs repair or replacement.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.1.3, page 15
"If the control measures need to be replaced or repaired, the necessary repairs must be conducted immediately in order to minimize the discharge of pollutants."
Open the permit at this section

Report a reportable-quantity spill to the National Response Center as soon as known

No set date. As soon as the permittee knows of the discharge; the permit sets no number of hours.

When a leak, spill or other release of a hazardous substance or oil at or above a reportable quantity (40 CFR Parts 110, 117 or 302) occurs in a 24-hour period, notify the National Response Center as soon as the permittee knows of it.

  • When: a release of a reportable quantity happens.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.1.4, page 16
"occurs during a 24-hour period, the permittee must notify the national Response Center (NRC) at (800) 424-8802 ... as soon as the permittee have knowledge of the discharge."
Open the permit at this section

Review the SWPPP after a triggering event

No set date. The permit sets no number of days for the review.

Keep the SWPPP current, and at a minimum review it after an unauthorized non-stormwater discharge, an effluent limit exceedance, a control measure not installed or not working, visual signs of stormwater pollution, or a change that significantly changes the pollutants discharged.

  • When: something happens that requires a SWPPP review.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 4.3, page 33
"At a minimum, review the SWPPP when any of the following conditions occur:"
Open the permit at this section

Send the SWAR within five business days of a DEQ request

Within 5 working days after the request.

For benchmark monitoring the SWAR is not submitted unless DEQ asks; if asked, DEQ must receive it within five business days of the request unless DEQ sets another deadline.

  • When: DEQ asks for the SWAR.
  • You send it to the agency (DEQ Office of Water Quality).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 5.2.1, page 34
"If requested, the SWAR must be received by the Division within five (5) business days of the request, unless another deadline is specified."
Open the permit at this section

Submit a Notice of Termination when coverage should end

No set date. The permit sets no deadline for the NOT.

Submit a NOT electronically when operations have ceased, there is no more industrial stormwater discharge and erosion and sediment controls are in place, or when all discharges are covered by an individual or alternative general permit. The permit sets no deadline.

  • When: a condition for ending coverage is met.
  • You file it in the agency's system (DEQ SEEK (seek.ee.arkansas.gov); the permit names ePortal or any successor system).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 1.9.1, page 13
"To terminate permit coverage, use the DEQ's electronic portal (ePortal, or any successor system) to electronically prepare and submit a complete and accurate NOT unless a waiver described in Part 1.10 is granted."
Open the permit at this section

When DEQ requires it in writing: run acute toxicity tests once a year

Within 1 year after the last toxicity test.

A facility that DEQ notifies in writing must test its stormwater for acute whole effluent toxicity: 48-hour Daphnia pulex and fathead minnow tests at 100% effluent once per year, with full reports to the Division.

Further steps with their own deadlines:

  • Start each test within 36 hours of collecting the grab sample. Within 36 hours after the grab sample is collected. Section 6.2.2.1, page 40
    "The permittee must have initiated the toxicity test within 36 hours after the collection of the grab sample."
  • Report every test on the Division's Summary Reports. The permit gives the timing in words, quoted below. Section 6.2.4.2, page 41
    "All test results shall be reported on "Summary Reports" (provided by the Division) and submitted to the following email address"
  • When: DEQ requires toxicity testing.
  • You send it to the agency (Water-Permit-Application@adeq.state.ar.us).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section 6.2.1.5. Check your copy of the permit.

Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 6.2.1.5, page 40
"The permittee shall conduct the Fathead minnow and the Daphnia pulex toxicity tests at a frequency of once per year."
Open the permit at this section

Ongoing 2 duties

Keep permit records for three years after coverage ends

No set date. A standing duty; the period runs from the end of coverage.

Keep the SWPPP and its changes, corrective action documentation, all reports and certifications, monitoring data and NOI records for at least three years from the date coverage expires or is terminated.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 5.1, page 34
"for a period of at least three (3) years from the date that the coverage under this permit expires or is terminated."
Open the permit at this section

Keep the current SWPPP at the facility

No set date. A standing duty.

Keep a copy of the current SWPPP at the facility, immediately available to the Division, the MS4 operator receiving the discharge and U.S. Fish and Wildlife Service representatives at an inspection or on request.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 4.4, page 33
"Retain a copy of the current SWPPP at the facility, and it must be immediately available to the Division"
Open the permit at this section

Only if... 29 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Effluent guideline facilities: sample the limited parameters once each quarter

By the end of each calendar quarter.

Monitor the numeric effluent limits once per calendar quarter until the Division approves annual monitoring in writing.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 5.4.1.1. Check your copy of the permit.

Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 5.4.1.1, page 35
"New and existing permittees shall monitor numeric effluent limits once per quarter until a reduced frequency is approved by the Division."
Open the permit at this section

Impaired or TMDL waters: sample the impairment pollutants once each quarter

By the end of each calendar quarter.

If the discharge enters a water on the most recent 303(d) list or with a TMDL, monitor for the pollutants the water is impaired for, or that contribute to the impairment, once per calendar quarter until the Division approves annual monitoring; document consistency with the TMDL and any wasteload allocation.

  • Only if: your stormwater reaches an impaired water body, or a TMDL applies to your discharge.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 5.4.2.1. Check your copy of the permit.

Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 5.4.2.1, page 35
"New and existing permittees shall monitor for pollutant(s) for which the waterbody is impaired or that contribute to the impairment once per quarter until a reduced frequency is approved by the Division"
Open the permit at this section

Effluent limit exceeded during the year: submit the SWAR by January 31

By January 31, for the calendar year before.

For a year in which an effluent limit was exceeded, submit that year's SWAR to the DEQ Enforcement Branch no later than January 31 of the following year.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); an effluent limit was exceeded during the year.
  • You send it to the agency (DEQ Office of Water Quality, Enforcement Branch: water-enforcement-report@adeq.state.ar.us or mail).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 5.2.2, page 34
"For years with a limit exceedance, the SWAR is required to be submitted to the Division no later than the 31st day of January of the following year"
Open the permit at this section

Effluent guideline facilities: meet the Table 2-1 limits

No set date. The limits apply to every discharge; the sampling schedule is in the quarterly effluent limit monitoring duty.

A facility subject to a stormwater effluent limitations guideline in Table 2-1 (cement material storage piles, phosphate fertilizer, coal piles at steam electric plants, mine dewatering at crushed stone and sand and gravel mines, asphalt emulsion, airport urea deicing) meets those limits and documents in the SWPPP how it prevents exceeding them.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.2, page 17
"If the permittee is subject to one of the effluent limitations guidelines identified in Table 2-1 below, the permittee is subject to the requirements in Part 5.4.1."
Open the permit at this section

Inactive and unstaffed: inspect the facility once a year

Within 1 year after the last inspection.

A facility with the Inactive and Unstaffed Facility Waiver performs routine facility inspections on an annual basis instead of quarterly.

  • Only if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 3.1.5. Check your copy of the permit.

Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 3.1.5, page 24
"Facilities that acquired an "Inactive and Unstaffed Facility Waiver" will be eligible for a reduced requirement to perform routine facility inspections on an annual basis."
Open the permit at this section

Inactive and unstaffed: sign the certification and keep it with the SWPPP

No set date. The permit sets no date; the waiver covers an entire monitoring period.

A facility inactive and unstaffed for a whole monitoring period, with no pollutant generating activities, may use the Inactive and Unstaffed Facility Waiver: certify it, signed under Part 7.9, and keep the certification with the SWPPP.

  • Only if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 3.1.5, page 24
"The permittee must certify that the facility is inactive and unstaffed and the pollutant generating activities are not occurring."
Open the permit at this section

Sector A: benchmark parameters for timber products (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: A1 (COD, O&G, Total Zinc), A2 (COD, O&G, Total Arsenic, Total Copper), A3 (COD, O&G), A4 (COD, O&G), A5 (COD, O&G). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is A.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector AA: benchmark parameters for fabricated metal products (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: AA1 (O&G, Total Zinc, Nitrate plus Nitrite Nitrogen, Total Aluminum), AA2 (O&G, Total Zinc, Nitrate plus Nitrite Nitrogen). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is AA.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector AB: benchmark parameters for transportation equipment, industrial or commercial machinery (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: AB1 (O&G). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is AB.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector AD: benchmark parameters for non-classified facilities (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: AD1 (COD). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is AD.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector B: benchmark parameters for paper and allied products (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: B1 (COD), B2 (COD). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is B.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector C: benchmark parameters for chemicals and allied products (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: C1 (COD, Nitrate plus Nitrite Nitrogen, Total Lead, Total Zinc, Total Phosphorus), C2 (COD, Total Aluminum, Nitrate plus Nitrite Nitrogen), C3 (COD, Nitrate plus Nitrite Nitrogen, Total Zinc), C4 (COD, Total Zinc), C5 (COD). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is C.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector D: benchmark parameters for asphalt paving and roofing materials and lubricants (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: D1 (O&G), D2 (O&G). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is D.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector E: benchmark parameters for glass, clay, cement, concrete and gypsum products (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: E1 (Total Aluminum). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is E.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector F: benchmark parameters for primary metals (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: F1 (Total Aluminum, Total Zinc), F2 (Total Aluminum, Total Copper, Total Zinc), F3 (Total Copper, Total Zinc), F4 (Total Copper, Total Zinc). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is F.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector G: benchmark parameters for metal mining (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: G1 (Nitrate plus Nitrite Nitrogen), G2 (Total Antimony, Total Arsenic, Total Beryllium, Total Cadmium, Total Copper, Total Lead, Total Mercury, Total Nickel, Total Selenium, Total Silver, Total Zinc). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is G.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector H: benchmark parameters for coal mines and coal mining-related facilities (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: H1 (Total Aluminum). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is H.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector I: benchmark parameters for oil and gas extraction and refining (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: I1 (COD). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is I.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector J: benchmark parameters for mineral mining and dressing (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: J1 (Nitrate plus Nitrite Nitrogen). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is J.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector K: benchmark parameters for hazardous waste treatment, storage or disposal facilities (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: K1 (Ammonia, Total Arsenic, Total Cadmium, Total Cyanide, Total Lead, Total Mercury, Total Selenium, Total Silver). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is K.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector L: benchmark parameters for landfills, land application sites and open dumps (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: L1 (COD), L2 (COD). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is L.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector M: benchmark parameters for automobile salvage yards (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: M1 (COD, Total Aluminum, Total Lead). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector N: benchmark parameters for scrap recycling facilities (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: N1 (COD, O&G, Total Aluminum, Total Copper, Total Lead, Total Zinc), N2 (COD, O&G). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is N.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector P: benchmark parameters for land transportation and warehousing (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: P1 (COD, O&G). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is P.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector Q: benchmark parameters for water transportation (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: Q1 (COD, Total Aluminum, Total Lead, Total Zinc). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is Q.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector S: benchmark parameters for air transportation facilities (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: S1 (Ammonia). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is S.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector T: benchmark parameters for treatment works (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: T1 (COD). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is T.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector U: benchmark parameters for food and kindred products (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: U1 (COD, O&G), U2 (COD, O&G, Nitrate plus Nitrite Nitrogen), U3 (COD, O&G). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is U.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

Sector Y: benchmark parameters for rubber, miscellaneous plastic products and miscellaneous manufacturing (Table 2-3)

No set date. These are the values each sample is compared with; the sampling schedule is in the annual benchmark monitoring duty.

Sub-sector benchmark parameters from Table 2-3, sampled once a year at each outfall with pH and TSS: Y1 (Total Zinc). A benchmark exceedance is not a permit violation; it starts the corrective action process.

  • Only if: your permit sector is Y.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 2.4, page 19
"In addition to the parameters above, Industrial Sub-Sectors identified in Appendix A must also monitor each outfall as identified in Table 2-3, unless a no exposure exclusion has been approved."
Open the permit at this section

What does no-exposure certification require?

Conditional No Exposure Exclusion NOC: NOI, No Exposure Certification and the permit fee; exempt from the SWPPP, with a yearly SWAR kept on site (Part 5.7).

Every year 2 duties

No exposure: complete the SWAR once a year and keep it on site

By December 31 each year.

A facility with the no exposure exclusion completes the Stormwater Annual Report (SWAR) once per year, including its no exposure annual evaluation, and keeps it on site. It is sent to DEQ only on request.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 5.7. Check your copy of the permit.

Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 5.7, page 38
"If the facility qualifies for the no exposure exclusion, the permittee is required to complete the SWAR once per year and retain the SWAR on site."
Open the permit at this section

Pay the annual permit fee when invoiced

No set date. DEQ invoices the annual fee; the permit sets no due date.

Pay the permit fees set by APC&EC Rule No. 9: the initial fee with the NOI and an annual fee invoiced every year the permit is active. A fee applies.

  • You file it in the agency's system (DEQ SEEK user dashboard).
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 7.20, page 46
"including annual permit fees following the initial permit fee that will be invoiced every year the permit is active"
Open the permit at this section

When something happens 2 duties

No exposure ends: notify DEQ and apply to modify coverage

No set date. The permit says "at any time" and sets no number of days.

If the facility no longer qualifies for the no exposure exclusion, notify DEQ and either apply to modify the coverage or change the facility layout to qualify again. The permit sets no deadline.

  • When: the facility no longer qualifies for no exposure.
  • You file it in the agency's system (DEQ SEEK (seek.ee.arkansas.gov); the permit names ePortal or any successor system).
  • Keep the records 3 years.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 5.7, page 38
"If at any time, the facility no longer qualifies for no exposure exclusion, the permittee must notify the Division and submit an application to modify the coverage"
Open the permit at this section

No exposure, new facility: submit the NOI with the No Exposure Certification at least 30 days before discharge

At least 30 days before you start discharging.

A new facility that qualifies for the conditional no exposure exclusion under 40 CFR 122.26(g) submits a complete NOI and the permit fee, with a No Exposure Certification, at least 30 days before discharge begins. The exclusion is facility-wide only. Such a facility is exempt from Part 4 (SWPPP) but subject to Part 5.7.

  • When: you are starting a new discharge under this permit.
  • You file it in the agency's system (DEQ SEEK (seek.ee.arkansas.gov); the permit names ePortal or any successor system).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 1.5, Table 1-3, page 12
"and qualifies for conditional No Exposure Exclusion At least thirty (30) days prior to commencement of discharge."
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

Arkansas Industrial Stormwater General Permit (IGP) ARR000000 duties, topic by topic

How the Arkansas Industrial Stormwater General Permit (IGP) ARR000000 compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: