Inspect the facility once each calendar quarter
By the end of each calendar quarter.
Qualified personnel inspect, during normal operating hours, areas where industrial materials or activities are exposed, potential pollutant sources, areas with spills or leaks in the past three years, outfalls and control measures, at least once each calendar quarter, and document the findings with the SWPPP.
Further steps with their own deadlines:
-
At least one inspection during a stormwater discharge.
The permit gives the timing in words, quoted below.
Section 3.1.4.1, page 23
"At least one routine inspection must be conducted during a period when a stormwater discharge is occurring."
- Does not apply if: the facility is inactive and unstaffed.
- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
- Signed or certified by a responsible official or duly authorized representative.
Source: Industrial Stormwater General Permit ARR000000 (2024 renewal), 51 pages, section 3.1.4.1, page 23
"The qualified personnel must conduct inspections at least quarterly (i.e., once each calendar quarter)."Open the permit at this section