Every duty in the General Permit for the Discharge of Stormwater Associated with Industrial Activities, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 54duties, each cited
  • 9on a schedule
  • 45when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
CTR050000
In force
November 1, 2025 to September 30, 2030
Official page
portal.ct.gov
Rules last checked
November 26, 2026
Today
November 1, 2025 September 30, 2030
Notes on the permit's status and renewal

The 2025 permit was issued October 1, 2025, took effect November 1, 2025 and expires September 30, 2030 (cover page and Section 2.6). It replaced the permit issued October 1, 2021. Sites covered under the 2021 permit kept their authorization only if a complete registration with the SWPPP was filed in ezFile by April 1, 2026 (Sections 2.7.2 and 3.1.4); DEEP's March 2026 questions and answers say that deadline stood for all re-registrants. DEEP's permit page (last updated May 15, 2026) and its compliance assistance page (last updated July 22, 2026), read on November 26, 2026, show no modification, extension or amendment of the 2025 permit. Monitoring under the 2025 permit began with the period that started January 1, 2026, and DEEP's compliance page says the first Annual Report is due in April 2027. The permit text has drafting slips that this pack works around and notes where they matter: many cross-references name "Section 6" or "Section 10" where the sector requirements are in Section 8, and one certification clause still reads "effective TBD".

What does full permit coverage require?

Coverage by registration filed in ezFile with the SWPPP, the fee and a signed NetDMR Subscriber Agreement. DEEP approves, rejects or denies registrations in writing and sends a Notice of Coverage.

Every month 1 duty

Routine site inspection every month

By the end of each month.

Qualified personnel inspect, during normal operating hours and at least monthly, the areas where industrial materials or activities are exposed to stormwater, potential pollutant sources named in the SWPPP, places where spills and leaks occurred in the past three years, discharge points and control measures. Write a report with the date, time, weather, findings and the inspector's printed name, signature and date, and keep it with the SWPPP.

  • If the facility is inactive and unstaffed: No set date. Once a year for an inactive and unstaffed site; the permit does not say whether that year is the calendar year (Section 4.4.5.4).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 4.4.1.2. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.4.1.2, page 44
"Routine inspections must be conducted at least monthly."
Open the permit at this section

Every quarter 1 duty

Quarterly visual assessment of a stormwater sample from each monitored discharge point

By the end of each calendar quarter.

Once each quarter, collect a stormwater sample at every discharge point that is subject to monitoring, within the first 30 minutes of discharge from a qualifying storm at least 72 hours after the previous discharge, and examine it in a clean, colorless container in a well-lit area for color, odor, clarity, floating, settled and suspended solids, foam, oil sheen and other signs of pollution. Record the result with the SWPPP.

  • If the facility is inactive and unstaffed: not required.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.4.2.2, page 45
"The permittee must conduct visual assessments once each quarter for the entire permit term."
Open the permit at this section

Every half year 3 duties

Comprehensive site inspection twice a year

By the end of each half year (June 30 and December 31).

At least semiannually, and during rainfall if possible, inspect all areas covered by the permit and named in the SWPPP: drainage areas, buildings and impervious areas, structural and non-structural control measures, stormwater management and treatment systems, infiltration practices, discharge points including substantially identical ones, exposed materials and activities, spill response and resilience measures. Review the SWPPP records and the monitoring results, and write a signed report kept with the SWPPP.

  • If the facility is inactive and unstaffed: not required.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 4.4.3.2. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.4.3.2, page 46
"Comprehensive inspections must be conducted at least semiannually and during a rainfall event if possible."
Open the permit at this section

Semi-annual benchmark sampling for the sector's parameters

By the end of each half year (June 30 and December 31), once; at least 30 days apart.

In each semi-annual period, January to June and July to December, take a grab sample at each discharge point from a qualifying storm event, within the first 30 minutes of discharge where possible, and have it analyzed for the benchmark parameters of the facility's sector, primary and co-located. Report the results on the DMR. The two samples must be at least 30 days apart. A benchmark is not a limit; a four-sample average above it starts corrective action.

  • If the facility is inactive and unstaffed: not required.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.5.1.1, page 51
"Stormwater outfall monitoring for benchmark thresholds shall be conducted semiannually"
Open the permit at this section

Submit the semi-annual DMR by July 30 and January 30

By July 30 (January to June) and January 30 (July to December).

Submit the discharge monitoring report for each semi-annual period no later than 30 days after it ends: by July 30 for January to June and by January 30 for July to December. File it even when there was no discharge, with the no-data code. Use NetDMR once the Notice of Coverage has arrived; until then email the paper DMR to DEEP.

  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.7.2.2.b, page 79
"For samples collected from January 1st to June 30th, DMRs are due July 30th."
Open the permit at this section

Every year 3 duties

Do one routine inspection each calendar year while stormwater is discharging

By December 31 each year.

At least once each calendar year, carry out the routine inspection during a period when a stormwater discharge is occurring, and observe the discharge points and the control measures used to meet effluent limits. If the discharge locations cannot be reached, inspect nearby downstream locations.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.4.1.3, page 44
"At least once each calendar year, the routine inspection must be conducted during a period when a stormwater discharge is occurring."
Open the permit at this section

Submit the Annual Report by April 15

By April 15, for the calendar year before.

Email the Annual Report for the past calendar year to DEEP by April 15, on the Commissioner's template: a summary of the year's monitoring data, routine and comprehensive inspections, visual assessments and corrective actions, any noncompliance, and a signed certification. DEEP says the first Annual Report is due in April 2027. The permit and DEEP's compliance page say April 15; DEEP's fact sheet for the permit says April 1, and the permit governs.

  • You send it to the agency (DEEP.StormwaterIndustrial@ct.gov).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.7.3.1, page 81
"The permittee must submit an Annual Report (AR) by April 15th after each calendar year to the Commissioner electronically"
Open the permit at this section

Train employees within 90 days of hire, then at least once a year

No set date. Once a year after each employee's first training; the permit does not tie the year to the calendar.

Train every employee who works where industrial materials or activities are exposed to stormwater, who carries out permit duties or whose work may affect stormwater quality, including the whole pollution prevention team: within 90 days of employment and at least once a year after that. Keep a written record in the SWPPP with dates, employee names, responsibilities and the agenda.

Further steps with their own deadlines:

  • Train each new employee. Within 90 days after the employee starts. Section 4.2.13, page 24
    "receive training within ninety (90) days of employment"
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by pollution prevention team member or other qualified person.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.2.13, page 24
"receive training within ninety (90) days of employment and at least once a year thereafter."
Open the permit at this section

One time 1 duty

One acute aquatic toxicity test within a year of authorization

Within 1 year after you are authorized to discharge.

Every permittee runs one acute toxicity test on each discharge point, as part of a regularly scheduled semi-annual sample: 48 hours with Daphnia pulex for freshwater discharges or Mysidopsis bahia for saline discharges to saltwater. Report the LC50 in NetDMR and keep the results in the SWPPP. There is no limit, and no exemption, including for inactive and unstaffed sites.

  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 4.5.4.1. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.5.4.1, page 61
"All permittees must monitor for aquatic toxicity during the year following the date of authorization under Section 2.7 of this permit and the results shall be submitted in NetDMR."
Open the permit at this section

When something happens 22 duties

Sector AG composting sites: inspect at least once every seven days

By the end of each week.

Small-scale composting facilities inspect at least once every seven days: feedstock transfer, storage and processing areas, fresh piles and windrows, material storage with structural controls, signs of leachate or drained liquid, leachate collection and treatment systems, and truck entrances and exits. Areas with mature piles or blended final product are inspected at least once a month. Inactive or unstaffed sites get no exemption and keep inspecting quarterly.

  • When: the facility is a small-scale composting facility in Sector AG.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.33.6. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.33.6, page 267
"Permittees must inspect composting sites at least once every seven (7) days."
Open the permit at this section

Sector K hazardous waste facilities: inspect operating disposal areas at least once every seven days

By the end of each week.

Inspect operating landfills, open dumps, land application sites and other solid waste disposal areas at least once every seven days: areas not yet finally stabilized, active land application areas, exposed material and waste storage, stabilization and structural controls, leachate collection and treatment systems, and truck entrances and exits. Stabilized sites and completed, vegetated land application areas are inspected at least once a month, and inactive or unstaffed sites at least quarterly.

  • When: the facility is a hazardous waste treatment, storage or disposal facility in Sector K.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.11.6.a. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.11.6.a, page 145
"The permittee must inspect operating landfills, open dumps, land application site, and other solid waste disposal areas at least once every seven (7) days."
Open the permit at this section

Sector L landfills, land application sites and open dumps: inspect operating disposal areas at least once every seven days

By the end of each week.

Inspect operating landfills, open dumps, land application sites and other solid waste disposal areas at least once every seven days: areas not yet finally stabilized, active land application areas, exposed material and waste storage, stabilization and structural controls, leachate collection and treatment systems, and truck entrances and exits. Stabilized sites and completed, vegetated land application areas are inspected at least once a month, and inactive or unstaffed sites at least quarterly.

  • When: the site is a landfill, land application site or open dump in Sector L.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.12.6.a. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.12.6.a, page 155
"The permittee must inspect operating landfills, open dumps, land application site, and other solid waste disposal areas at least once every seven (7) days."
Open the permit at this section

Inspect and maintain baghouses at least quarterly

By the end of each calendar quarter.

Inspect and maintain baghouses at least quarterly to prevent the escape of dust, and immediately remove dust that has built up at the base of the exterior baghouse and around it.

  • When: the facility has baghouses.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section 4.2.5.3. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.2.5.3, page 19
"The permittee must inspect and maintain baghouses at least quarterly to prevent the escape of dust from the system"
Open the permit at this section

Amend the SWPPP within 120 days of a change or a finding that it falls short

Within 120 days after you became aware of the condition.

Amend the SWPPP, and complete every action it then requires, within 120 days of the date the permittee becomes aware, or should have become aware, of a change at the site that affects the potential for pollution, a failure of the plan's actions, a request from the Commissioner, an impaired water or TMDL notice, pollution sources found by inspection, monitoring results that call for it, or corrective actions under way.

  • When: something happens that requires a SWPPP amendment.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified professional.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.3.5, page 43
"The SWPPP must be amended, and all actions required by the SWPPP must be completed, within one hundred twenty (120) days"
Open the permit at this section

Correct inaccurate or omitted information within 15 days

Within 15 days after you became aware of it.

Within 15 days after becoming aware that information submitted under the permit has changed, is inaccurate or misleading, or left out something relevant, correct it or supply it in writing to the Commissioner, certified as the permit requires.

  • When: information you submitted changes or is found to be inaccurate.
  • You send it to the agency (DEEP.StormwaterIndustrial@ct.gov).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 5.24. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 5.24, page 90
"Within fifteen (15) days after the date a permittee becomes aware of a change in any of the information submitted pursuant to this general permit"
Open the permit at this section

Corrective action Level 3: set the schedule in 14 days and install structural controls in 90

Within 90 days after results show the same trigger a third time.

When the same trigger occurs a third time, set the schedule for installing structural source controls or treatment controls within 14 days and install them within 90 days, or within 120 days if 90 is not feasible and the reason is documented in the SWPPP. Design changes to the drainage system need certification by a Connecticut professional engineer.

Further steps with their own deadlines:

  • Set the installation schedule. Within 14 days after results show the same trigger a third time. Section 4.6.2.3.c, page 69
    "The permittee must identify the schedule for installing the appropriate structural source and/or stormwater treatment control measures within 14 days"
  • Latest installation when 90 days is not feasible. Within 120 days after results show the same trigger a third time. Section 4.6.2.3.c, page 69
    "the permittee may take up to one hundred and twenty (120) days to install such measures"
  • When: the same corrective action trigger happens a third time.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by a licensed professional engineer.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 4.6.2.3.c. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.6.2.3.c, page 69
"The permittee must identify the schedule for installing the appropriate structural source and/or stormwater treatment control measures within 14 days and install such measures within ninety (90) days."
Open the permit at this section

Corrective action: act the same day, finish within 14 days (60 at most without an extension)

Within 14 days after you discover the corrective action condition.

When a triggering condition is found (a four-sample benchmark average above the threshold, an effluent limit exceedance, an unauthorized release, a control measure missing or not working, a change that adds pollutants, visible pollution in a discharge, or a notice from DEEP), take all reasonable steps the same day, complete the corrective action before the next storm if possible and within 14 calendar days of discovery, and document it on the Appendix G form in the SWPPP.

Further steps with their own deadlines:

  • Immediate steps the same day. The permit gives the timing in words, quoted below. Section 4.6.1.1, page 67
    "the initiation of corrective action must begin no later than the following workday."
  • Document the condition in the SWPPP. Within 24 hours after you become aware of the condition. Section 4.6.5, page 78
    "The permittee must document the existence of any of the conditions listed in Table 9 within 24 hours of becoming aware of such conditions."
  • Latest completion when 14 days is infeasible. Within 60 days after you discover the corrective action condition. Section 4.6.1.2, page 67
    "which must be done as soon as practicable after the 14-day timeframe but no longer than sixty (60) days after discovery."
  • Update the SWPPP after the work is done. Within 14 days after the corrective action work is finished. Section 4.6.1.3, page 67
    "the permittee must modify the SWPPP accordingly within fourteen (14) calendar days of completing corrective action work"
  • Collect the follow-up sample. Within 30 days after the corrective measure is in place. Section 4.6.1.4, page 67
    "permittees are granted an additional thirty (30) calendar days ... after implementing CAM Level 1, 2, or 3 to collect the follow-up sample."
  • Email the follow-up results to DEEP. Within 30 days after you receive the follow-up sampling results. Section 4.6.1.4, page 67
    "the permittees must report results by email to DEEP.StormwaterIndustrial@ct.gov within thirty (30) days."
  • When: a corrective action condition happens.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.6.1.2, page 67
"before the next storm event, if possible, and within fourteen (14) calendar days from the time of discovery of the corrective action condition."
Open the permit at this section

Document the antidegradation review 30 days before a new or increased discharge to High Quality Waters

At least 30 days before the new or increased discharge starts.

On or before 30 days prior to starting a new or increased discharge to High Quality Waters, document how the discharge meets the Connecticut Anti-Degradation Implementation Policy and identify in the SWPPP the control measures that will keep the Water Quality Volume out of the surface water body.

  • When: there is a new or increased discharge to high quality waters.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 2.2.13, page 3
"On or before thirty (30) days prior to the commencement of a new or increased discharge to High Quality Waters from its industrial activity"
Open the permit at this section

Email a Notice of Termination within 30 days when coverage should end

Within 30 days after a condition for ending coverage was met.

Email a Notice of Termination (Appendix K) within 30 days after a new owner or operator is authorized, a No Exposure Certification is approved, all stormwater is retained on site, operations and industrial stormwater discharges have ceased with nothing left exposed, a Sector J site has met its termination requirements, or an individual or other general permit covers all discharges.

  • When: a condition for ending coverage is met.
  • You send it to the agency (DEEP.StormwaterIndustrial@ct.gov).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 3.9.2. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 3.9.2, page 12
"The permittee must submit a Notice of Termination ("NOT") within thirty (30) days after one or more of the following conditions have been met:"
Open the permit at this section

Email DEEP at least 30 days before a planned physical alteration or addition

At least 30 days before the alteration or addition starts.

Give notice to DEEP by email no fewer than 30 days before making planned physical alterations or additions to the facility that qualify it as a new source or that could significantly change the nature or significantly increase the quantity of pollutants discharged. Record the notice in the SWPPP.

  • When: a physical alteration or addition is planned.
  • You send it to the agency (DEEP.StormwaterIndustrial@ct.gov).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.8.2.3.a, page 84
"no fewer than 30 days prior to making any planned physical alterations or additions to the permitted facility"
Open the permit at this section

Email DEEP when a site becomes inactive and unstaffed, or active again

No set date. Before relying on the exception, and immediately when the site becomes active again: the permit sets no number of days.

To stop inspections and benchmark, additional and impaired waters monitoring at a site that is inactive and unstaffed with no industrial materials or activities exposed to stormwater, email DEEP, sign and certify the Appendix F statement, and keep it with the SWPPP. If materials become exposed or the site becomes active or staffed, resume the duties immediately and email DEEP.

  • When: the facility becomes inactive and unstaffed, or active again.
  • You send it to the agency (DEEP.StormwaterIndustrial@ct.gov).
  • Keep the records 5 years.
  • The permit says this is done by qualified professional.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.5.7.2.c, page 64
"then the permittee must notify the Commissioner of this change by email at DEEP.StormwaterIndustrial@ct.gov"
Open the permit at this section

Get DEEP approval before changing a discharge point; register again for larger changes

No set date. Before the change starts: the permit sets no number of days, only that DEEP must approve first.

Submit a Notice of Change on DEEP's form for a change in contact information or the addition or removal of a discharge point, and get the Commissioner's affirmative determination before starting the change. An expansion or change in the industrial activity, a new pollutant source with sector monitoring, a moved discharge or a discharge subject to effluent guidelines needs a Notice of Termination and a new registration instead.

  • When: your contact information or discharge points change.
  • You file it in the agency's system (ezFile).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per igp 5.21.1.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 3.9.1.3, page 12
"An affirmative determination from the Commissioner must be obtained prior to initiating the change to the industrial activity on the site."
Open the permit at this section

New owner or operator registers within 30 days; the previous permittee files a Notice of Termination

Within 30 days after the transfer.

The permit cannot be transferred. When a covered site changes owner or operator, the new owner or operator submits a new registration on or before 30 days following the date of transfer, and the existing permittee emails a Notice of Termination on or before 30 days of the change of ownership.

Further steps with their own deadlines:

  • Existing permittee emails the Notice of Termination. Within 30 days after the ownership changes. Section 3.1.3, page 7
    "The existing permittee must submit a Notice of Termination form to the Commissioner on a prescribed form on or before thirty (30) days of the change of ownership"
  • When: the owner or operator changes.
  • You file it in the agency's system (ezFile).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per igp 5.21.1.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 3.1.3, page 7
"The new owner or operator must submit a new registration to the Commissioner on or before thirty (30) days following the date of transfer."
Open the permit at this section

New sites: register at least 90 days before the industrial activity starts

At least 90 days before industrial activity starts.

A site without existing discharge authorization files a registration in ezFile, with the SWPPP, the fee and a signed NetDMR Subscriber Agreement, on or before 90 days prior to the date the industrial activity is initiated. The SWPPP must be prepared before the registration is filed. DEEP approves, rejects or denies registrations in writing and sets the authorization date in its Notice of Coverage.

  • When: a new or existing site does not have discharge authorization.
  • You file it in the agency's system (ezFile).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per igp 5.21.1.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 3.1.2, page 7
"Any other discharge, on or before 90 days prior to the date the industrial activity is initiated for that facility, must submit a registration for this general permit."
Open the permit at this section

Newly approved sites: post the permit coverage sign within 60 days of approval

Within 60 days after you are approved to discharge.

Within 60 days of the Commissioner's approval to discharge, post a sign of permit coverage at each site entrance: at least two feet by three feet, weatherproof, in English and Spanish, visible and legible from the public road, with the contents listed in Section 4.2.16.3.

  • When: you are newly approved to discharge.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.2.16.1, page 26
"Within 60 days of the Commissioner's approval to discharge, the Permittee shall post a sign of permit coverage"
Open the permit at this section

Notify DEEP within 72 hours, and in writing within 30 days, of a toxic substance above the notification level

Within 3 days after you know or have reason to believe it.

Notify the Commissioner within 72 hours, and in writing within 30 days, on knowing or having reason to believe that the concentration in the discharge of any substance listed in the application, or any toxic substance listed in Appendix B or D of Section 22a-430-4 of the state regulations, has exceeded or will exceed the highest of the listed levels, starting at one hundred micrograms per liter.

Further steps with their own deadlines:

  • Written follow-up report. Within 30 days after you know or have reason to believe it. Section 4.8.2, page 83
    "in writing within 30 days when he or she knows or has reason to believe"
  • When: a toxic substance concentration is above the notification level.
  • You file it in the agency's system (DEEP online Noncompliance Follow-up Report Form).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.8.2, page 83
"the Permittee shall notify the Commissioner within seventy-two (72) hours and in writing within 30 days when he or she knows or has reason to believe"
Open the permit at this section

Reapply when DEEP reissues the general permit

No set date. The deadline will be set by the reissued permit, which DEEP has not issued.

The permit runs for a fixed term of no more than five years and expires September 30, 2030. The reissued general permit will say how and when to reapply. If the permit is administratively continued, every term, including monitoring and reports at their original frequency, stays in force.

  • When: a new general permit is issued.
  • You file it in the agency's system (ezFile).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per igp 5.21.1.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 5.27, page 90
"The general permit will provide instructions on how and when to reapply."
Open the permit at this section

Report listed noncompliance within two hours, other violations within 24 hours, then a five-day report

Within 2 hours after you become aware of the circumstances.

Notify the Commissioner through the online Noncompliance Notification Form within two hours of becoming aware of: a result more than twice an effluent limit, any excursion beyond a daily limit or range, a condition that may endanger human health or the environment, a monitoring equipment failure, a bypass, or an alteration made to correct or avoid a violation. Report every other actual or anticipated violation within 24 hours. Send the follow-up report within five days.

Further steps with their own deadlines:

  • Report any other violation. Within 24 hours after you become aware of the circumstances. Section 4.8.1, page 81
    "All other actual or anticipated violations of the permit shall be reported to the Commissioner within 24 hours of becoming aware of the circumstances"
  • Submit the five-day follow-up report. Within 5 days after the notification. Section 4.8.1.h, page 82
    "Within five (5) days of any notification of noncompliance in accordance with Section 5.2.1 of this permit, the Permittee shall submit a follow-up report"
  • When: noncompliance happens or is expected.
  • You file it in the agency's system (DEEP online Noncompliance Notification Form).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.8.1, page 81
"within two hours of becoming aware of the circumstances. All other actual or anticipated violations of the permit shall be reported to the Commissioner within 24 hours of becoming aware of the circumstances"
Open the permit at this section

Send a copy of the registration to the owner and operator of the municipal storm sewer

No set date. Due at the same time as the registration itself.

Where the discharge goes through a municipal separate storm sewer system, send a copy of the registration to the owner and operator of that system at the same time it is submitted to DEEP.

  • When: the facility discharges through a municipal separate storm sewer system.
  • You send a copy to the operator of your storm sewer system (MS4).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per igp 5.21.1.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 3.7, page 11
"a copy of the registration shall also be submitted to the owner and operator of that system at the same time the registration is submitted to the Commissioner."
Open the permit at this section

Sites covered under the 2021 permit: post the permit coverage sign by March 30, 2026

By March 30, 2026.

Existing permittees post a sign of permit coverage at each site entrance, at least two feet by three feet, weatherproof, in English and Spanish, visible and legible from the public road, with the permittee name, site address, a contact name, email and phone, the website where the registration and SWPPP are posted, and DEEP's report-pollution statement.

  • When: you are covered under the 2021 permit.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section 4.2.16.2. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.2.16.2, page 26
"Within 180 days of the issuance date of this permit, existing permittees, shall post a sign of permit coverage at a safe, publicly accessible location in close proximity to the industrial site"
Open the permit at this section

Sites covered under the 2021 permit: register under the 2025 permit by April 1, 2026

By April 1, 2026.

Sites that were authorized under the general permit issued October 1, 2021 file a complete new registration in ezFile, with the updated and certified SWPPP, the fee and a signed NetDMR Subscriber Agreement, by April 1, 2026. Authorization continued in the meantime only if that registration was complete and on time.

  • When: you are covered under the 2021 permit.
  • You file it in the agency's system (ezFile).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per igp 5.21.1.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 3.1.4, page 7
"must submit a complete registration under this general permit 180 days after the issuance of this general permit - April 1, 2026."
Open the permit at this section

Ongoing 2 duties

Keep permit records for five years after coverage ends

No set date. Standing duty; the five years run from the end of coverage.

Keep the registration, the SWPPP with all its changes, corrective action documentation, every report and certification, monitoring data and the data used for the registration for at least five years from the date coverage expires or is terminated. Keep the current SWPPP and a copy of the permit at the facility.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.8.3, page 84
"for a period of at least five (5) years from the date that coverage under this permit expires or is terminated."
Open the permit at this section

Keep the registration posted on the permittee website

No set date. Standing duty while covered.

Make the registration available electronically on the permittee's official website for public review, and give the registration and the SWPPP immediately on request to the municipal storm sewer operator and, in a public drinking water supply watershed or aquifer protection area, to the water company.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 3.12.1.1, page 13
"The Permittee shall make available the registration electronically on the Permittee's official website for public review."
Open the permit at this section

Only if... 20 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Sector AE: inspect around de-icing material storage piles and sweep the site every week

By the end of each week.

Bulk solid de-icing material storage facilities inspect the areas around storage piles at least weekly, checking that covers have no tears or holes and that hay bales and catch basin inserts work as specified, and sweep the site at least weekly. Facilities that can store 30,000 tons or more also check perimeter protection, wheel wash stations and cover anchoring, and sweep entrances, exits and access roads at least twice a week.

  • Only if: your SIC code starts with 4226, 5169.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.31.6.a. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.31.6.a, page 252
"Permittees must inspect areas around storage piles at least weekly, with particular emphasis on minimizing the exposure of exposed de-icing materials to stormwater."
Open the permit at this section

Sector D: inspect dust collection systems and sweep the facility every week

By the end of each week.

Asphalt paving, roofing materials and lubricant manufacturers inspect dust collection systems such as baghouses and knock-out boxes at least weekly, fix maintenance issues immediately, remove dust built up at the base of the systems and around screw conveyors, and sweep the facility weekly.

  • Only if: your SIC code starts with 2951, 2952, 2992, 2999.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.4.6. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.4.6, page 112
"must also inspect dust collection systems at least weekly."
Open the permit at this section

Sector E: inspect concrete washout containment every week, and sweep weekly where cement or dust is handled

By the end of each week.

Glass, clay, cement, concrete and gypsum facilities inspect the lined impoundment, or any other containment for concrete washout wastewater, at least weekly; wash water must not overflow or leave the containment area. Paved surfaces exposed to stormwater are swept or vacuumed at least once a week where cement, aggregate, kiln dust, fly ash or settled dust are handled or processed.

  • Only if: your SIC code starts with 3211, 3221, 3229, 3231, 3241, 3251, 3253, 3255, 3259, 3261, 3262, 3263, 3264, 3269, 3271, 3272, 3273, 3274, 3275, 3281, 3291, 3292, 3295, 3296, 3297, 3299; the facility has concrete washout containment or handles cement, aggregate or dust.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.5.6. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.5.6, page 119
"Permittees must inspect the lined impoundment, or any other containment strategy for concrete washout wastewater, at least weekly."
Open the permit at this section

Sector J during mining activities: site inspection at least once every 7 calendar days

By the end of each week.

During mining activities at non-metallic mineral mining and dressing sites, a qualified professional inspects disturbed areas, stormwater controls, stabilized areas, storage and maintenance areas, flow paths and points of discharge at least once every 7 calendar days, and completes a signed report within 24 hours of each inspection. These inspections take the place of the general inspection schedule during mining activities.

Further steps with their own deadlines:

  • Complete the inspection report. Within 24 hours after the inspection. Section 8.10.6.e, page 137
    "Within 24 hours of an inspection, complete a report that includes:"
  • Only if: your SIC code starts with 1411, 1422, 1423, 1429, 1442, 1446, 1455, 1459, 1474, 1475, 1479, 1481, 1499; mining activities are under way.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified professional.

Inferred from section 8.10.6.a. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.10.6.a, page 136
"A qualified professional must inspect the site at least once every 7 calendar days."
Open the permit at this section

Sector M: inspect fluid-containing equipment weekly and stored vehicles and fluids quarterly

By the end of each week.

Automobile salvage yards inspect arriving vehicles for leaks immediately or as soon as feasible; inspect weekly, for signs of leakage, all equipment containing oily parts, hydraulic fluids, other fluids or mercury switches; and inspect quarterly all vehicles and the areas where hazardous materials and automotive fluids are stored.

Further steps with their own deadlines:

  • Quarterly inspection of vehicles and fluid storage areas. By the end of each calendar quarter. Section 8.13.6.b, page 161
    "The permittee must inspect quarterly for signs of leakage all vehicles and areas where hazardous materials and general automotive fluids are stored"
  • Only if: your SIC code starts with 5015.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.13.6.a. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.13.6.a, page 161
"Inspect weekly for signs of leakage all equipment containing oily parts, hydraulic fluids, any other types of fluids, or mercury switches."
Open the permit at this section

Sector A wood surface protection, preservation or coloring: inspect processing and storage areas monthly

By the end of each month.

Timber products facilities that perform wood surface protection, preservation or coloring inspect processing areas, transport areas and treated or colored wood storage areas every month, to check the practices that keep treatment or coloring chemicals off unprotected soils and out of areas that contact stormwater.

  • Only if: your SIC code starts with 2411, 2421, 2426, 2429, 2431, 2435, 2436, 2439, 2441, 2448, 2449, 2451, 2452, 2491, 2493, 2499, 2611, 2621, 2631, 5099; the facility does wood surface protection, preservation or coloring.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.1.6, page 100
"inspect processing areas, transport areas, and treated or colored wood storage areas monthly"
Open the permit at this section

Sector Q marinas, yacht clubs and boat dealers: inspect work areas monthly and stormwater devices quarterly

By the end of each month.

Inspect every month the pressure washing area, blasting, sanding and painting areas, material storage areas, engine maintenance and repair areas, material handling areas, the drydock area and the general yard. At least quarterly, and more often as needed, inspect stormwater management devices such as oil and water separators, sediment traps and pressure wash collection systems, and inspect or test equipment and systems whose failure could discharge pollutants.

Further steps with their own deadlines:

  • Quarterly inspection of stormwater management devices and equipment. By the end of each calendar quarter. Section 8.17.6, page 190
    "perform inspection of stormwater management devices (e.g., oil and water separators, sediment traps or chambers, pressure wash collection systems)"
  • Only if: your SIC code starts with 4412, 4424, 4432, 4449, 4481, 4482, 4489, 4491, 4492, 4493, 4499, 5551, 7997.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.17.6. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.17.6, page 190
"The permittee must also inspect the following areas of the site monthly: pressure washing area; blasting, sanding, and painting areas; material storage areas; engine maintenance and repair areas; material handling areas; drydock area; and general yard area."
Open the permit at this section

Sector R ship and boat building and repair yards: inspect work areas monthly and stormwater devices quarterly

By the end of each month.

Inspect every month the pressure washing area, blasting, sanding and painting areas, material storage areas, engine maintenance and repair areas, material handling areas, the drydock area and the general yard. At least quarterly, and more often as needed, inspect stormwater management devices such as oil and water separators, sediment traps and pressure wash collection systems, and inspect or test equipment and systems whose failure could discharge pollutants.

Further steps with their own deadlines:

  • Quarterly inspection of stormwater management devices and equipment. By the end of each calendar quarter. Section 8.18.6, page 196
    "perform inspection of stormwater management devices (e.g., oil and water separators, sediment traps or chambers, pressure wash collection systems)"
  • Only if: your SIC code starts with 3731, 3732.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.18.6. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.18.6, page 196
"The permittee must inspect the following areas of the site monthly: pressure washing area; blasting, sanding, and painting areas; material storage areas; engine maintenance and repair areas; material handling areas; drydock area; and general yard area."
Open the permit at this section

Annual effluent limit monitoring for regulated discharges

By December 31 each year.

At least once a year, sample every discharge point that carries a discharge subject to a federal effluent limitation guideline: wet deck log spray (Sector A), asphalt emulsion runoff (D), cement storage pile runoff (E), mine dewatering (J), hazardous and non-hazardous landfill runoff (K, L), coal pile runoff (O) and airport urea de-icing runoff (S). Report on the DMR. Exceeding a limit is a permit violation.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.5.3.1, page 58
"The monitoring is only required to be conducted at least annually."
Open the permit at this section

Annual monitoring for discharges to impaired waters

By December 31 each year.

A facility that discharges to an impaired water, or to a water with a TMDL or a DEEP pollution control strategy, samples once a year for the indicator pollutants of the impairment and reports the results on the DMR. Impairment status and parameters are settled during registration from DEEP's Water Quality Plans and Assessment Map.

  • Only if: your stormwater reaches an impaired water body.
  • If the facility is inactive and unstaffed: not required.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 4.5.5.1.a. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.5.5.1.a, page 62
"If the permittee discharges to an impaired water without an established TMDL, they are required to monitor annually"
Open the permit at this section

Listed sectors: PAH sampling in the first and second year of the permit term (report only)

By the end of each half year (June 30 and December 31), once.

Facilities in the listed sectors sample for the 16 polycyclic aromatic hydrocarbons (EPA Method 625.1, or 610 or Standard Method 6440B) semiannually in the first and second year of the permit term and report the results. No threshold applies and no exemption can be earned.

  • Only if: your SIC code starts with 2911, 2951, 2952, 2992, 2999, 3312, 3313, 3315, 3316, 3317, 3321, 3322, 3324, 3325, 3331, 3334, 3339, 3341, 3351, 3353, 3354, 3355, 3356, 3357, 3363, 3364, 3365, 3366, 3369, 3398, 3399, 4011, 4013, 5171, 4412, 4424, 4432, 4449, 4481, 4482, 4489, 4491, 4492, 4493, 4499, 5551, 7997, 3731, 3732, 4512, 4513, 4522, 4581, or the facility is a steam electric power generating facility in Sector O, or the facility is a Sector A facility with creosote or creosote-treated wood exposed to precipitation.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 8.6.7 Table F. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.6.7 Table F, page 125
"Semiannually in the 1st and 2nd year of permit term"
Open the permit at this section

Sector J sites that blast: annual sampling for perchlorate and ammonia (report only)

By December 31 each year.

Non-metallic mineral mining and dressing sites that conduct blasting sample for perchlorate and ammonia once a year for the whole permit term and report the results. No threshold applies.

  • Only if: your SIC code starts with 1411, 1422, 1423, 1429, 1442, 1446, 1455, 1459, 1474, 1475, 1479, 1481, 1499; the site does blasting.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.10.7 Table J-1, page 139
"Applies only to Sector J that conduct blasting ... Annually for permit term"
Open the permit at this section

Sectors D, M and N: semi-annual sampling for semivolatile hydrocarbons, and PCBs in Sector N (report only)

By the end of each half year (June 30 and December 31), once.

Asphalt paving, roofing and lubricant manufacturers (Sector D), automobile salvage yards (Sector M) and scrap and waste recycling facilities (Sector N) sample for semivolatile hydrocarbons (EPA Method 625) in each semi-annual period for the whole permit term. Sector N also samples for polychlorinated biphenyls. Results are reported; no threshold applies and no exemption can be earned.

  • Only if: your SIC code starts with 2951, 2952, 2992, 2999, 5015, 5093.
  • If the facility is inactive and unstaffed: not required.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.13.7 Table M, page 162
"Semiannually for permit term"
Open the permit at this section

Sectors E and J: total arsenic sampling in the first and second year of the permit term (report only)

By December 31 each year.

Glass, clay, cement, concrete and gypsum facilities (Sector E) and non-metallic mineral mining and dressing facilities (Sector J) sample for total arsenic annually in the first and second year of the permit term and report the results. No threshold applies.

  • Only if: your SIC code starts with 3211, 3221, 3229, 3231, 3241, 3251, 3253, 3255, 3259, 3261, 3262, 3263, 3264, 3269, 3271, 3272, 3273, 3274, 3275, 3281, 3291, 3292, 3295, 3296, 3297, 3299, 1411, 1422, 1423, 1429, 1442, 1446, 1455, 1459, 1474, 1475, 1479, 1481, 1499.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 8.5.7 Table E-1. Check your copy of the permit.

Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.5.7 Table E-1, page 120
"Annually in 1st and 2nd Year of Permit Term"
Open the permit at this section

Sectors M, N and O: quarterly benchmark sampling for iron, mercury and aluminum

By the end of each calendar quarter, once.

Automobile salvage yards (Sector M) and scrap and waste recycling facilities (Sector N) sample each discharge point every quarter for total iron, mercury and aluminum; steam electric generating facilities (Sector O) sample every quarter for total iron. Results go on the quarterly DMR. This runs until the benchmark monitoring exemption for the parameter is earned.

  • Only if: your SIC code starts with 5015, 5093, or the facility is a steam electric power generating facility in Sector O.
  • If the facility is inactive and unstaffed: not required.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.5 Table 2, footnote 2, page 50
"Sector M (Automobile Salvage Yards) and Sector N (Scrap Recycling and Waste Recycling Facilities) have quarterly benchmark monitoring schedules for the parameters iron, mercury, and aluminum."
Open the permit at this section

Sectors M, N and O: submit the quarterly DMR by April 30, July 30, October 30 and January 30

By April 30 (Q1), July 30 (Q2), October 30 (Q3) and January 30 (Q4).

Facilities with quarterly benchmark monitoring submit a discharge monitoring report within 30 days after each quarter ends: by April 30, July 30, October 30 and January 30. File it even when there was no discharge.

  • Only if: your SIC code starts with 5015, 5093, or the facility is a steam electric power generating facility in Sector O.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.7.2.2.a, page 79
"For samples collected from July 1st to September 30th, DMRs are due October 30th."
Open the permit at this section

Submit the annual DMR by January 30 for annual monitoring

By January 30, for the calendar year before.

Results of monitoring done once a year, such as effluent limit monitoring and impaired waters monitoring, are reported on a discharge monitoring report by January 30 after the calendar year.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs), or your stormwater reaches an impaired water body.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.7.2.2.c, page 79
"For samples collected from January 1st to December 31st, DMRs are due January 30th."
Open the permit at this section

Effluent limit exceeded: notify DEEP within two hours, report within five days, sample at least quarterly

Within 2 hours after you become aware of the exceedance.

If any result exceeds a numeric effluent limit, notify the Commissioner through the online Notification of Noncompliance within two hours of becoming aware of it, or at the start of the next business day if that is outside normal business hours. Send the follow-up report within five days, take corrective action, and sample the discharge at least quarterly until it is back within the limit.

Further steps with their own deadlines:

  • Submit the written follow-up report. Within 5 days after the two-hour notification. Section 4.6.3.2.c.ii, page 72
    "The permittee must submit a written report to the director within five (5) days thereafter"
  • Follow-up sampling at least quarterly until the limit is met. The permit gives the timing in words, quoted below. Section 4.6.3.2.b, page 72
    "The permittee must conduct follow-up monitoring after the exceedance of an effluent limit at least quarterly."
  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); a numeric effluent limit is exceeded.
  • You file it in the agency's system (DEEP online Notification of Noncompliance).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 4.6.3.2.c.i, page 72
"The permittee must, within two (2) hours of becoming aware of the exceedance or at the start of the next business day"
Open the permit at this section

Sector S airports that de-ice: inspect de-icing areas monthly in season and weekly while de-icing

No set date. Monthly through the de-icing season and weekly while de-icing is under way; the permit gives the season only by example (October through April).

Air transportation facilities that conduct aircraft de-icing inspect the areas used for de-icing at least monthly during the de-icing season and at least weekly during periods when de-icing is actively occurring. If de-icing happens outside the usual season, the monthly inspections extend to every month in which de-icing chemicals may be used.

  • Only if: your SIC code starts with 4512, 4513, 4522, 4581; the facility does aircraft deicing.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.19.6, page 203
"at least monthly during the deicing season (e.g., October through April) and at least weekly during periods when de-icing is actively occurring."
Open the permit at this section

Sectors S, AE and AF: annual de-icing season sampling (report only)

No set date. Once a year while de-icing materials are stored or used; the permit describes the season only by example.

Once a year during the de-icing season, for the whole permit term: bulk solid de-icing material storage facilities (Sector AE) and government fleet facilities with incidental de-icing material storage (Sector AF) sample for chloride and cyanide; airports that de-ice aircraft (Sector S) sample for ammonia where urea is used, ethylene glycol and propylene glycol where each is used. Sample only the discharge points that drain the storage or de-icing areas. Results are reported; no threshold applies.

  • Only if: your SIC code starts with 4226, 5169, or the facility is a Sector S facility that deices aircraft, or the facility is a Sector AF fleet facility with incidental deicing material storage.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 8.31.7 Table AE, page 253
"Annually for permit term during de-icing season"
Open the permit at this section

What does no-exposure certification require?

No Exposure Certification filed in ezFile with a fee of $312.50, for eligible SIC groups whose industrial materials and activities are completely sheltered by a storm-resistant structure. The permit states no inspection, reporting or renewal schedule for certified sites.

Where the permit is unclear 1 duty

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

No Exposure sites: file the No Exposure Certification in ezFile

No set date. The 2025 permit does not say when a No Exposure Certification must be filed, whether one accepted under the 2021 permit had to be filed again, or how often it must be renewed. Federal rule 40 CFR 122.26(g) uses five years. What does DEEP require?

A site in an eligible SIC group whose industrial materials and activities are all completely sheltered by a storm-resistant structure files the No Exposure Certification form in ezFile with a fee of $312.50 instead of a registration.

  • You file it in the agency's system (ezFile).
  • Signed or certified by a responsible official per igp 5.21.1.
Source: NPDES General Permit for the Discharge of Stormwater Associated with Industrial Activities, CTR050000 (DEEP-WPED-GP-014), Parts 1 to 8, October 2025, section 2.4, page 4
"shall submit to the Commissioner a completed No Exposure Certification form if the facility meets the criteria for no exposure to stormwater."
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

Industrial Stormwater General Permit (IGP) duties, topic by topic

How the Industrial Stormwater General Permit (IGP) compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: