Florida Multi-Sector Generic Permit (MSGP) due dates and duties

Every duty in the Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 88duties, each cited
  • 6on a schedule
  • 82when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
FLR05 (Rule 62-621.300(5), F.A.C.)
In force
October 22, 2000 to no stated end
Official page
floridadep.gov
Rules last checked
November 27, 2026
Notes on the permit's status and renewal

Florida adopted EPA's 1995 Multi-Sector General Permit and its later corrections and modifications by reference in Rule 62-621.300(5)(a), F.A.C., and runs it as the Multi-Sector Generic Permit; FDEP's page says it was adopted and renamed in October 2000. "EPA" in the text means the Department and "Director" means the Secretary or a designee (Rule 62-621.300(5)(a)1. and 2.). The permit has no permit-wide expiration date: each facility's coverage takes effect two days after a complete Notice of Intent is submitted and lasts no more than five years (Rule 62-621.300(5)(f) and (g)). Rule 62-621.300 was last amended May 7, 2025 (changes to other generic permits) and reviewed September 14, 2026. FDEP's rulemaking page (updated July 24, 2026) shows a draft that would update the Construction Generic Permit and the Notice of Termination form used for the MSGP; it does not replace the MSGP and is not adopted. The dates printed as "[insert date ...]" placeholders in the 1995 text have no fixed meaning in Florida; this pack follows FDEP's reading of the monitoring years (years 2 and 4 of coverage) and shows no computed date where the text gives none.

What does full permit coverage require?

Coverage by Notice of Intent and the $500 fee; coverage starts two days after a complete NOI is submitted and lasts five years.

Every quarter 1 duty

Quarterly visual examination of a stormwater sample from each outfall

By the end of each calendar quarter.

Once in each calendar quarter, in daylight, collect a sample from each outfall within the first 30 minutes (no more than an hour) of a qualifying discharge, look at color, odor, clarity, solids, foam and sheen, and keep the report with the SWPPP. Nothing is sent to the Department.

  • Does not apply if: your permit sector is S.
  • If the facility is inactive and unstaffed: not required.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.B.5.c, page 51133
"Facilities shall perform and document a visual examination of a storm water discharge associated with industrial activity from each outfall, except discharges exempted below."
Open the permit at this section

Every year 1 duty

Comprehensive site compliance evaluation at least once a year

Within 1 year after the last comprehensive site compliance evaluation.

Qualified personnel evaluate the areas that drain industrial stormwater, the control measures and the spill equipment at least once a year, revise the plan within 2 weeks and put changes in place within 12 weeks, and keep a signed report for 3 years.

Further steps with their own deadlines:

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section XI.A.3.a.(4). Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.A.3.a.(4), page 51127
"shall conduct site compliance evaluations at appropriate intervals specified in the plan, but in no case less than once a year."
Open the permit at this section

Every few years 1 duty

Renew coverage every five years, at least 2 days before it expires

At least 2 days before your current coverage expires.

Coverage lasts no more than five years from its effective date. To continue, submit a new NOI and fee at least 2 days before the current coverage expires.

  • You file it in the agency's system (DEP Business Portal, or by mail).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: FDEP web page, Stormwater Discharges from Industrial Activity, section Permit Term
"Renew permit coverage every five years at least two (2) days before expiration of the current coverage following the instructions above."
Open the permit at this section

One time 2 duties

Certify that outfalls were tested for non-stormwater discharges, or notify the Department within 180 days of the NOI

Within 180 days after you submit the NOI.

The SWPPP carries a signed certification that the discharge was tested or evaluated for non-stormwater discharges. A facility that cannot certify notifies the Department within 180 days after submitting its NOI (270 days in Sector B), saying what was tested and why a full test was not feasible.

  • If your permit sector is B: Within 270 days after you submit the NOI.
  • You send it to the agency (FDEP NPDES Stormwater Notices Center (only when the certification cannot be made)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section XI.A.3.a.(3)(g)(iii). Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.A.3.a.(3)(g)(iii), page 51127
"180 days after submitting an NOI to be covered by this permit."
Open the permit at this section

Pay the $500 MSGP fee with the Notice of Intent

No set date. Paid with the Notice of Intent.

The NOI is not complete without the processing fee required by Rule 62-4.050, F.A.C., which FDEP lists as $500 for the MSGP. It is due again with each renewal NOI.

  • You file it in the agency's system (DEP Business Portal (electronic check or card), or a check mailed with the NOI).
  • Keep the records 3 years.
Source: FDEP web page, Stormwater Discharges from Industrial Activity, section Obtaining Permit Coverage
"Submit a MSGP Notice of Intent (NOI) and application fee of $500."
Open the permit at this section

When something happens 11 duties

Discharging through a large or medium MS4: send the MS4 operator a signed copy of the NOI

At least 2 days before industrial activity starts.

A facility that discharges through a municipal separate storm sewer system serving 100,000 or more people, or one the Department designates, sends a signed copy of its NOI to the MS4 operator by the same deadline as the NOI.

  • When: the facility discharges through a large or medium MS4.
  • You send a copy to the operator of your storm sewer system (MS4).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section II.D. Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section II.D, page 51114
"submit signed copies of the NOI to the operator of the municipal separate storm sewer through which they discharge in accordance with the deadlines in Part II.A."
Open the permit at this section

Enclose or cover salt storage piles

Ongoing, no set date.

Salt piles used for deicing or other commercial or industrial purposes whose runoff discharges to surface waters are enclosed or covered against precipitation, except while material is added or removed.

  • When: a salt storage pile has a discharge.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section IV.E.3, page 51118
"shall be enclosed or covered to prevent exposure to precipitation, except for exposure resulting from adding or removing materials from the pile."
Open the permit at this section

EPCRA Section 313 facilities: train staff who handle water priority chemicals at least once a year

Within 1 year after the last training.

Facilities subject to EPCRA Section 313 reporting for Section 313 water priority chemicals train employees and contractors who work where those chemicals are used or stored, at intervals in the plan but not less than once per year.

  • When: EPCRA 313 water priority chemicals are on site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section IV.E.2.b.(9). Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section IV.E.2.b.(9), page 51118
"Employee training shall be conducted at intervals specified in the plan, but not less than once per year."
Open the permit at this section

Facilities with numeric effluent limits: report a bypass (10 days ahead, or 24 hours and 5 days after)

Within 5 days after you become aware of an unanticipated bypass.

A facility subject to numeric effluent limitations gives notice of an anticipated bypass at least 10 days before, if possible. An unanticipated bypass is reported orally within 24 hours and in writing within 5 days of becoming aware of it.

Further steps with their own deadlines:

  • Anticipated bypass: prior notice. At least 10 days before the date of the anticipated bypass. Section VII.S.1.a, page 51122
    "he or she shall submit prior notice, if possible, at least 10 days before the date of the bypass"
  • Unanticipated bypass: oral report. The permit gives the timing in words, quoted below. Section VII.S.1.b, page 51122
    "Any information regarding the unanticipated bypass shall be provided orally within 24 hours from the time the permittee became aware of the circumstances."
  • When: a bypass happens at a facility with numeric effluent limits.
  • You send it to the agency (FDEP NPDES Stormwater Notices Center).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section VII.S.1, page 51122
"A written submission shall also be provided within 5 days of the time the permittee became aware of the circumstances."
Open the permit at this section

Hazardous substance or oil release over a reportable quantity: written description within 14 days

Within 14 days after you learn of the release.

For a release of a hazardous substance or oil at or above a reportable quantity in 24 hours, notify the National Response Center at once, modify the SWPPP within 14 calendar days, and send the Department a written description of the release within 14 calendar days.

Further steps with their own deadlines:

  • Notify the National Response Center. The permit gives the timing in words, quoted below. Section III.B.1.a, page 51114
    "in accordance with the requirements of 40 CFR Part 117 and 40 CFR Part 302 as soon as he or she has knowledge of the discharge"
  • Modify the SWPPP. Within 14 days after you learn of the release. Section III.B.1.b, page 51114
    "must be modified within 14 calendar days of knowledge of the release"
  • When: a release at or above a reportable quantity happens.
  • You send it to the agency (FDEP NPDES Stormwater Notices Center, 2600 Blair Stone Road, Tallahassee, FL 32399-2400).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section III.B.1.c, page 51115
"The permittee shall submit within 14 calendar days of knowledge of the release a written description of: the release (including the type and estimate of the amount of material released), the date that such release occurred"
Open the permit at this section

Make SWPPP changes the Department requires within 30 days and certify them

Within 30 days after the Department tells you the plan is deficient.

If the Department notifies the facility that its plan does not meet the permit, make the required changes within 30 days of the notice (or as the Department otherwise sets) and send a written certification that they were made.

  • When: the Department tells you the plan is deficient.
  • You send it to the agency (FDEP NPDES Stormwater Notices Center, 2600 Blair Stone Road, Tallahassee, FL 32399-2400).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section IV.B.3, page 51116
"Within 30 days of such notification from the Director, (or as otherwise provided by the Director), or authorized representative, the permittee shall make the required changes to the plan"
Open the permit at this section

New operator: submit a new Notice of Intent at least 2 days before the change

At least 2 days before the operator changes.

Coverage cannot be transferred. When the operator changes, the new operator submits its own NOI at least 2 days before the change and the previous operator terminates its coverage.

  • When: the operator changes.
  • You file it in the agency's system (DEP Business Portal, or by mail).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section II.A.4, page 51113
"the new operator of the facility must submit an NOI in accordance with the requirements of this part at least 2 days prior to the change."
Open the permit at this section

Prepare and implement the SWPPP before submitting the Notice of Intent

At least 2 days before industrial activity starts.

A new facility prepares and implements its stormwater pollution prevention plan, meeting Part IV and its sector sections of Part XI, before it submits the NOI, and certifies on the NOI that the plan exists. The plan is not sent with the NOI.

  • When: the facility is new.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section IV.A.2. Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section IV.A.2, page 51115
"shall prepare and implement the plan prior to submitting the Notice of Intent."
Open the permit at this section

Promptly submit facts missing from, or wrong in, the NOI or a report

No set date. Promptly; the permit gives no number of days. See the notes for the rule's 10 days.

On learning that a relevant fact was left out of, or was wrong in, the NOI or any report to the Department, promptly submit the facts or corrections.

  • When: you find an error in your NOI or a report.
  • You send it to the agency (FDEP NPDES Stormwater Notices Center).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section VII.F, page 51120
"he or she shall promptly submit such facts or information."
Open the permit at this section

Submit a Notice of Termination when discharges end or the operator changes

No set date. The permit and the rule set no number of days.

When all industrial stormwater discharges are eliminated, or the operator changes, file the NPDES Stormwater Notice of Termination (DEP Form 62-621.300(6)) to end coverage. The permit sets no number of days.

  • When: discharges are eliminated or the operator changes.
  • You file it in the agency's system (DEP Business Portal, or by mail to NPDES Stormwater Program, 2600 Blair Stone Road, MS 3585, Tallahassee, FL 32399-2400).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: FDEP web page, Stormwater Discharges from Industrial Activity, section Permit Term
"To discontinue permit coverage, submit a Notice of Termination"
Open the permit at this section

Submit the Notice of Intent at least 2 days before industrial activity starts

At least 2 days before industrial activity starts.

A facility that begins industrial activity submits a complete Notice of Intent (DEP Form 62-621.300(5)(b)) with the fee at least 2 days before the activity starts. Coverage takes effect 2 days after a complete NOI is submitted.

  • When: the facility is new.
  • You file it in the agency's system (DEP Business Portal, or by mail with a check to FDEP, PO Box 3070, Tallahassee, FL 32315).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section II.A.2, page 51113
"at least 2 days prior to the commencement of the industrial activity at the facility"
Open the permit at this section

Ongoing 2 duties

Keep monitoring records and reports for at least 3 years

Ongoing, no set date.

Keep records of all monitoring information, copies of all reports and the data used for the NOI for at least 3 years from the date of the sample, inspection, report or application, and the SWPPP until 3 years after its last amendment and at least 1 year after coverage ends.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section VII.P.2.a, page 51121
"for a period of at least three (3) years from the date of sample, measurement, evaluation or inspection, report, or application."
Open the permit at this section

Keep the SWPPP current and on site

Ongoing, no set date.

Keep the signed plan at the facility (the nearest office for an inactive facility), amend it whenever a change significantly affects the potential to discharge pollutants or it proves ineffective, and give it to the Department or the MS4 operator on request. New owners review it and make changes.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section IV.C, page 51116
"The permittee shall amend the plan whenever there is a change in design, construction, operation, or maintenance, that has a significant effect on the potential for the discharge of pollutants"
Open the permit at this section

Only if... 65 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Sector E glass, clay, cement, concrete and gypsum: sweep paved exposed areas at least once a week while cement, aggregate, kiln dust or fly ash are handled

By the end of each week.

Sweep (or use an equivalent measure on) paved areas exposed to storm water to keep spilled cement, aggregate, kiln dust, fly ash and settled dust out of runoff. The plan sets the frequency, but it must be at least once a week while those materials are handled or processed in the area.

  • Only if: your permit sector is E.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.E.3.a.(3)(a)(i), page 51146
"The plan shall indicate the frequency of sweeping or other measures. ... but shall not be less than once per week when cement, aggregate, kiln dust or fly ash are being handled or otherwise processed in the area."
Open the permit at this section

Sector I well drilling, oil, sand and shale mining areas: inspect all erosion controls at least once every 7 calendar days

By the end of each week.

Where the extra erosion control rules for well drilling, oil, sand and shale mining areas apply (areas not covered by the construction general permit), every erosion control on the site is inspected at least once every 7 calendar days.

  • Only if: your permit sector is I; the site has well drilling or oil sand or shale mining areas not under a construction permit.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.I.3.a.(3)(h)(iv), page 51169
"Procedures in a plan shall provide that all erosion controls on the site are inspected at least once every 7 calendar days."
Open the permit at this section

Sector L operating landfills, open dumps and land application sites: inspect at least once every 7 days

By the end of each week.

At operating landfills, open dumps and land application sites, qualified personnel inspect at least once every 7 days: areas not yet finally stabilized, active land application areas, exposed material and waste storage, stabilization and structural controls, leachate collection and treatment systems, and truck entrances and exits.

  • Only if: your permit sector is L.
  • Does not apply if: the site is an inactive landfill, open dump or land application site; the landfill is finally stabilized or land application is complete.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: Final modification of the MSGP, 63 FR 52430-52577 (September 30, 1998); permit changes at FR 52480-52489 and later, section XI.L.3.a.(3)(d)(i), page 52486
"For operating landfills, open dumps, and land application sites, inspections shall be conducted at least once every 7 days."
Open the permit at this section

Sector O steam electric facilities: visually inspect above-ground tanks, pipelines and pumps every week

By the end of each week.

The structural integrity of all above-ground tanks, pipelines, pumps and related equipment is visually inspected every week, and needed repairs are completed immediately.

  • Only if: your permit sector is O.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.O.3.a.(3)(a)(viii), page 51199
"At a minimum the structural integrity of all above ground tanks, pipelines, pumps and other related equipment shall be visually inspected on a weekly basis."
Open the permit at this section

Sector S air transportation: inspect deicing and anti-icing areas at least once a week during application periods

By the end of each week.

Qualified facility personnel inspect the designated equipment and areas named in the plan. Where deicing or anti-icing operations are conducted, the inspection is at least once a week while those chemicals are being applied; the plan sets the frequency for other areas and periods. Follow-up actions are tracked and inspection records are kept.

  • Only if: your permit sector is S; the airport does deicing or anti-icing.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.S.3.a.(3)(f), page 51217
"The inspection frequency shall be specified in the plan, but at a minimum be conducted once per week during deicing/anti-icing application periods for areas where deicing/anti-icing operations are being conducted."
Open the permit at this section

Sector A wet deck log storage: sample spray water discharge for debris and pH once a year

By November 30 each year.

Facilities that discharge log storage spray water take at least one grab sample a year at the wet deck discharge point, not during a storm, within the first 30 minutes of discharge, for debris and pH, and estimate the volume discharged.

  • Only if: your permit sector is A.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section XI.A.5.d. Check your copy of the permit.

Source: Final modification of the MSGP, 63 FR 52430-52577 (September 30, 1998); permit changes at FR 52480-52489 and later, section XI.A.5.d, page 52483
"Permittees with log storage area spray water discharges which are covered by this permit must monitor the discharge for the presence of debris and pH at least annually"
Open the permit at this section

Sector A wet deck log storage: submit the annual spray water DMR by November 30

By November 30 each year.

Report the annual debris and pH results for log storage spray water on a signed DMR, one per outfall per sampling event, by November 30 each year. Facilities discharging through a large or medium MS4 also send signed copies to the MS4 operator by the same date.

  • Only if: your permit sector is A.
  • You file it in the agency's system (EzDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Final modification of the MSGP, 63 FR 52430-52577 (September 30, 1998); permit changes at FR 52480-52489 and later, section XI.A.5.d.(2), page 52483
"Permittees with log storage area spray water discharges shall submit monitoring results ... postmarked no later than November 30 of each year following each annual monitoring period."
Open the permit at this section

Sector D asphalt paving and roofing materials: inspect storage, handling, maintenance and processing areas at least once a month

By the end of each month.

As part of the maintenance program, inspect material storage and handling areas, liquid storage tanks, hoppers or silos, vehicle and equipment maintenance, cleaning and fueling areas, material handling vehicles, equipment and processing areas at least once a month. Keep records and follow up.

  • Only if: your permit sector is D.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.D.3.a.(3)(d), page 51141
"Material storage and handling areas, liquid storage tanks, hoppers or silos, vehicle and equipment maintenance, cleaning, and fueling areas, material handling vehicles, equipment and processing areas shall be inspected at least once per month"
Open the permit at this section

Sector E glass, clay, cement, concrete and gypsum: inspect exposed operating areas at least once a month while operating

By the end of each month.

While the facility operates, qualified personnel inspect, during operation and at least monthly, the exposed material handling areas, above ground storage tanks, hoppers or silos, dust collection and containment systems, and truck wash down and equipment cleaning areas. Keep records and follow up.

  • Only if: your permit sector is E.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.E.3.a.(3)(d), page 51146
"The inspection frequency shall be specified in the plan based upon a consideration of the level of industrial activity at the facility, but shall be a minimum of once per month while the facility is in operation."
Open the permit at this section

Sector G active metal mines: inspect designated equipment and mine areas at least monthly

By the end of each month.

At active sites, qualified personnel inspect designated equipment and mine areas at least once a month, at any time in the month: all material handling areas, and erosion and sediment controls. Keep records and follow up.

  • Only if: your permit sector is G.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.G.3.a.(4)(d), page 51157
"Provisions for qualified personnel to inspect designated equipment and mine areas at least on a monthly basis for active sites. The monthly inspections can be done at any time during the month"
Open the permit at this section

Sector L finally stabilized landfill or open dump areas and completed land application areas: inspect at least once a month

By the end of each month.

Where landfill areas and open dumps have been finally stabilized and land application has been completed, inspections are done at least once every month instead of every 7 days.

  • Only if: your permit sector is L; the landfill is finally stabilized or land application is complete.
  • Does not apply if: the site is an inactive landfill, open dump or land application site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: Final modification of the MSGP, 63 FR 52430-52577 (September 30, 1998); permit changes at FR 52480-52489 and later, section XI.L.3.a.(3)(d)(i), page 52486
"Where landfill areas and open dumps have been finally stabilized and where land application has been completed, or during seasonal arid periods in arid areas ... inspections will be conducted at least once every month."
Open the permit at this section

Sector O steam electric facilities: inspect coal, ash, fuel, storage, switchyard and maintenance areas every month

By the end of each month.

Qualified facility personnel inspect each month the coal handling, loading and unloading, switchyard, fueling, bulk storage, ash handling and maintenance areas, areas next to disposal ponds and landfills, liquid storage tanks and material storage areas. Records stay on site for at least 3 years after each inspection.

  • Only if: your permit sector is O.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.O.3.a.(3)(d), page 51199
"qualified facility personnel shall be identified to inspect the following areas on a monthly basis: coal handling areas, loading/unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas"
Open the permit at this section

Sector Q water transportation: inspect designated equipment and areas every month

By the end of each month.

Qualified facility personnel inspect the designated equipment and areas every month, including pressure washing, blasting, sanding and painting areas, material storage, engine maintenance and repair, material handling, the drydock and the general yard. Follow-up actions are tracked and inspection records are kept.

  • Only if: your permit sector is Q.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.Q.3.a.(3)(d), page 51208
"Qualified facility personnel shall be identified to inspect designated equipment and areas of the facility on a monthly basis."
Open the permit at this section

Sector R ship and boat building or repairing yards: inspect designated equipment and areas every month

By the end of each month.

Qualified facility personnel inspect the designated equipment and areas every month, including pressure washing, blasting, sanding and painting areas, material storage, engine maintenance and repair, material handling, the drydock and the general yard. Follow-up actions are tracked and inspection records are kept.

  • Only if: your permit sector is R.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.R.3.a.(3)(d), page 51213
"Qualified facility personnel shall be identified to inspect designated equipment and areas of the facility on a monthly basis."
Open the permit at this section

Sector S air transportation: record the types and monthly quantities of deicing and anti-icing chemicals used

By the end of each month.

Facilities that deice or anti-ice keep a record of the types of chemicals used (with their Material Safety Data Sheets) and the quantity used each month. Tenants and fixed-base operators give this record to the airport authority for the airport-wide plan.

  • Only if: your permit sector is S; the airport does deicing or anti-icing.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section XI.S.3.a.(2)(e). Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.S.3.a.(2)(e), page 51216
"Facilities which conduct deicing/antiicing operations shall maintain a record of the types [including the Material Safety Data Sheets (MSDS)] and monthly quantities of deicing/anti-icing chemicals used."
Open the permit at this section

Sector V textile, apparel and leather product facilities: inspect designated equipment and areas every month

By the end of each month.

Qualified facility personnel inspect the designated equipment and areas every month, including all containment and storage areas, transfer and transmission lines, spill prevention, housekeeping, process waste management and all management practices. Follow-up actions are tracked and inspection records are kept.

  • Only if: your permit sector is V.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.V.3.a.(3)(d), page 51229
"Qualified facility personnel shall be identified to inspect designated equipment and areas of the facility at appropriate intervals specified in the plan. Inspection intervals are to occur on a monthly basis."
Open the permit at this section

Sector A timber products: visually inspect storm water BMPs every quarter

By the end of each calendar quarter.

Qualified facility personnel inspect the storm water BMPs each calendar quarter: discharge diversions, conveyances, sediment control and containment structures, erosion controls, and storage areas and other pollutant sources. Keep records and follow up on what the inspection finds.

  • Only if: your permit sector is A.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section XI.A.3.a.(3)(d). Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.A.3.a.(3)(d), page 51126
"Operators of facilities are required to conduct quarterly visual inspections of BMPs."
Open the permit at this section

Sector C chemical manufacturing: inspect the facility every quarter (wet weather in Q2 and Q3, dry weather in Q1 and Q4)

By the end of each calendar quarter.

Qualified personnel inspect all areas exposed to precipitation each quarter: during a rainfall event in April to June and July to September, and in dry weather in January to March and October to December. Document each inspection in the plan and make changes in a timely manner. A dry weather inspection satisfies the wet weather one when a seasonal dry period lasts more than 3 months.

  • Only if: your permit sector is C.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.C.4.a.(3)(a)(iv), page 51135
"Qualified personnel shall conduct quarterly inspections. A wet weather inspection (during a rainfall event) shall be conducted in the second (April to June) and third quarters (July to September) of each year."
Open the permit at this section

Sector C phosphate fertilizer manufacturing: sample contaminated runoff for phosphorus and fluoride once a year

By December 31 each year.

Facilities with contaminated storm water runoff from phosphate fertilizer manufacturing take at least one grab sample a year, from a storm over 0.1 inch at least 72 hours after the last measurable storm, within the first 30 minutes of discharge, for total phosphorus and fluoride, with storm and volume data.

  • Only if: your permit sector is C.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section XI.C.6.c. Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.C.6.c, page 51139
"permittees with contaminated storm water runoff from phosphate fertilizer manufacturing facilities must monitor their contaminated storm water discharges for the presence of phosphorus and fluoride at least annually (one time per year)."
Open the permit at this section

Sector D asphalt emulsion production: sample runoff for TSS, oil and grease, and pH once a year

By December 31 each year.

Facilities that produce asphalt paving or roofing emulsions take at least one grab sample a year of storm water from those activities, from a storm over 0.1 inch at least 72 hours after the last measurable storm, within the first 30 minutes of discharge, for TSS, oil and grease, and pH, with storm and volume data.

  • Only if: your permit sector is D.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section XI.D.5.d. Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.D.5.d, page 51144
"Permitters with facilities that produce asphalt paving or roofing emulsions must monitor their storm water discharges associated with these activities for the presence of TSS, oil and grease, and for pH at least annually (one time per year)."
Open the permit at this section

Sector E cement plants: sample material storage runoff for TSS and pH once a year

By December 31 each year.

Cement manufacturing facilities take at least one grab sample a year of runoff from material storage, from a storm over 0.1 inch at least 72 hours after the last measurable storm, within the first 30 minutes of discharge, for TSS and pH, with storm and volume data.

  • Only if: your permit sector is E; your SIC code starts with 3241.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section XI.E.5.d. Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.E.5.d, page 51149
"Permittees with cement manufacturing facilities must monitor runoff from material storage for the presence of TSS and pH at least annually (one time per year)."
Open the permit at this section

Sector F primary metals: inspect designated equipment and areas at least once each calendar quarter

By the end of each calendar quarter.

Qualified personnel inspect at least once in each of January to March, April to June, July to September and October to December: air pollution control equipment, process and material handling equipment, and material storage areas (coke, coal, scrap, slag, chemicals). Keep records and follow up.

  • Only if: your permit sector is F.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.F.3.a.(3)(e), page 51152
"Inspections shall be conducted on a quarterly basis and address, at a minimum, the following areas where applicable"
Open the permit at this section

Sector G active ore mines: sample storm water from waste rock and overburden piles twice a year

By the end of each half year (June 30 and December 31).

Operators of active ore mining and dressing facilities sample storm water from waste rock and overburden piles once between July 1 and December 31 and once between January 1 and June 30, from storms at least 3 months apart: Table G-2 parameters once, then twice a year for any above the benchmark, plus the Table G-3 parameters for the ore mined.

  • Only if: your permit sector is G.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Modification of the MSGP for Sector G (mine drainage), 63 FR 42534-42548 (August 7, 1998), section XI.G.5.d, page 42545
"The operator must conduct analytic monitoring as described below at least twice annually (once between July 1 and December 31, and once between January 1 and June 30) for the duration of this permit."
Open the permit at this section

Sector H active coal mining-related areas and inactive areas under SMCRA bond: inspect quarterly

By the end of each calendar quarter.

Facility personnel inspect the areas covered by the plan each quarter. These may be done with the quarterly SMCRA authority inspections. Keep the facility and SMCRA inspection records and follow up.

  • Only if: your permit sector is H.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section XI.H.3.a.(3)(d)(i). Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.H.3.a.(3)(d)(i), page 51163
"The plan shall require quarterly inspections by the facility personnel for areas of the facility covered by pollution prevention plan requirements."
Open the permit at this section

Sector H inactive coal mining-related areas not under SMCRA bond: inspect once a year

By December 31 each year.

The facility representative inspects inactive mining-related areas that are not under SMCRA bond once a year. Where the plan shows annual evaluations are impractical at a remote, inaccessible inactive site, at least once every 3 years.

  • Only if: your permit sector is H.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section XI.H.3.a.(3)(d)(ii). Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.H.3.a.(3)(d)(ii), page 51163
"Inactive Mining-Related Areas Not Under SMCRA Bond.-The plan shall require annual inspections by the facility representative"
Open the permit at this section

Sector I inactive, unstaffed, remote oil and gas extraction sites: do the plan inspections at least once a year

By December 31 each year.

At temporarily or permanently inactive oil and gas extraction facilities (SIC major group 13) that are remotely located and unstaffed, the equipment and area inspections are done at least once a year instead of every 6 months and every quarter.

  • Only if: your permit sector is I; your SIC code starts with 13; the site is an inactive, unstaffed, remote oil and gas extraction site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: Final modification of the MSGP, 63 FR 52430-52577 (September 30, 1998); permit changes at FR 52480-52489 and later, section XI.I.3.a.(3)(d), page 52485
"For temporarily or permanently inactive oil and gas extraction facilities which are remotely located and unstaffed (within major SIC group 13), the above inspections shall be performed at least annually."
Open the permit at this section

Sector I oil and gas extraction and refineries: inspect all equipment and areas in the plan at least every 6 months

By the end of each half year (June 30 and December 31).

Qualified facility or plant personnel named in the plan inspect all equipment and areas covered by the pollution prevention plan at intervals of no more than 6 months, use tracking or follow-up procedures so problems are acted on, and keep records of the inspections.

  • Only if: your permit sector is I.
  • Does not apply if: the site is an inactive, unstaffed, remote oil and gas extraction site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section XI.I.3.a.(3)(d). Check your copy of the permit.

Source: Final modification of the MSGP, 63 FR 52430-52577 (September 30, 1998); permit changes at FR 52480-52489 and later, section XI.I.3.a.(3)(d), page 52485
"All equipment and areas addressed in the pollution prevention plan shall be inspected at a minimum of 6-month intervals."
Open the permit at this section

Sector I oil and gas extraction and refineries: inspect equipment and vehicles that store, mix or transport hazardous materials at least quarterly

By the end of each calendar quarter.

Equipment and vehicles that store, mix or transport hazardous materials are inspected routinely, and at least once each quarter. Inspection records are kept with the plan.

  • Only if: your permit sector is I.
  • Does not apply if: the site is an inactive, unstaffed, remote oil and gas extraction site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: Final modification of the MSGP, 63 FR 52430-52577 (September 30, 1998); permit changes at FR 52480-52489 and later, section XI.I.3.a.(3)(d), page 52485
"Equipment and vehicles which store, mix, or transport hazardous materials will be inspected routinely, but not less than quarterly."
Open the permit at this section

Sector J active mineral mining facilities: inspect all BMPs once each calendar quarter

By the end of each calendar quarter.

Operators of active mines and processing facilities visually inspect all BMPs once in each calendar quarter, in daylight: discharge diversions, conveyances, sediment controls and containment, vegetative BMPs and slopes, and material handling and storage areas.

  • Only if: your permit sector is J.
  • Does not apply if: the mining operation is temporarily or permanently inactive.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.J.3.a.(3)(d), page 51172
"Operators of active facilities are required to conduct quarterly visual inspections of all BMPs."
Open the permit at this section

Sector J temporarily or permanently inactive mining operations: inspect once a year

By December 31 each year.

Temporarily and permanently inactive mining operations do the BMP inspection once a year instead of every quarter.

  • Only if: your permit sector is J; the mining operation is temporarily or permanently inactive.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.J.3.a.(3)(d), page 51172
"Temporarily and permanently inactive operations are required to perform annual inspections."
Open the permit at this section

Sector L inactive landfills, open dumps and land application sites: inspect at least quarterly

By the end of each calendar quarter.

At inactive landfills, open dumps and land application sites, qualified personnel inspect at least once a quarter: stabilization and structural erosion controls, leachate collection and treatment systems, and all closed land application areas.

  • Only if: your permit sector is L; the site is an inactive landfill, open dump or land application site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: Final modification of the MSGP, 63 FR 52430-52577 (September 30, 1998); permit changes at FR 52480-52489 and later, section XI.L.3.a.(3)(d)(ii), page 52486
"For inactive landfills, open dumps, and land application sites, inspections shall be conducted at least quarterly"
Open the permit at this section

Sector M automobile salvage yards: inspect BMPs once each calendar quarter and revise the plan within 2 weeks

By the end of each calendar quarter.

Qualified facility personnel visually inspect BMPs once in each calendar quarter: flow diversion and source minimization systems, dismantling areas, maintenance areas, cleaning and storage areas and other pollutant sources. Inspection reports are kept with the plan, the plan is revised within 2 weeks after each inspection, and changes are made within 12 weeks.

Further steps with their own deadlines:

  • Revise the plan after the inspection. Within 14 days after the inspection is finished. Section XI.M.2.a.(3)(d), page 51186
    "Based on the results of each inspection the plan must be revised as appropriate within 2 weeks after each inspection."
  • Put the changes in place. Within 84 days after the inspection is finished. Section XI.M.2.a.(3)(d), page 51186
    "Changes in the measures and controls must be implemented on the site in a timely manner, and never more than 12 weeks after completion of the inspection."
  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.M.2.a.(3)(d), page 51186
"Qualified facility personnel are required to conduct quarterly visual inspections of BMPs."
Open the permit at this section

Sector M automobile salvage yards: inspect fluid-containing equipment, outdoor fluid storage and liquid containers for leaks at least quarterly

By the end of each calendar quarter.

Equipment with oily parts, hydraulic fluids or other fluids, outdoor storage of fluids (brake and transmission fluid, radiator water, antifreeze) and all outdoor liquid storage containers such as tanks and drums are inspected for leaks at least once a quarter.

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.M.2.a.(3)(d), page 51186
"Any equipment containing oily parts, hydraulic fluids, or any other types of fluids shall be inspected at least quarterly (four times per year) for signs of leaks."
Open the permit at this section

Sector N liquid waste recycling facilities: quarterly visual inspection by the pollution prevention team

By the end of each calendar quarter.

At facilities that reclaim and recycle liquid wastes (used oil, antifreeze, mineral spirits, industrial solvents), members of the pollution prevention team visually inspect all designated areas and equipment once a quarter, looking for corroded or leaking containers, pipes, valves, pumps and hoses and failing containment, and track follow-up actions.

  • Only if: your permit sector is N; the facility recycles liquid recyclable waste.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by your pollution prevention team.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.N.3.a.(3)(b)(vi), page 51193
"Quarterly visual inspections shall be conducted by a member, or members, of the storm water pollution prevention team."
Open the permit at this section

Sector N scrap and waste recycling facilities (nonliquid, not source-separated): quarterly inspection by the pollution prevention team

By the end of each calendar quarter.

Members of the pollution prevention team inspect, once a quarter, all designated areas and equipment in the plan, including outdoor scrap processing, exposed loading and unloading areas, structural and erosion BMPs, outdoor maintenance and fueling areas and exposed waste areas, and track follow-up actions.

  • Only if: your permit sector is N; the facility recycles nonliquid scrap or waste that is not source-separated.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by your pollution prevention team.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.N.3.a.(3)(a)(x), page 51192
"A quarterly inspection shall include all designated areas of the facility and equipment identified in the plan. ... The inspections shall be conducted by members of the Storm Water Pollution Prevention team."
Open the permit at this section

Sector P ground and rail transportation: inspect designated equipment and areas every quarter

By the end of each calendar quarter.

Qualified facility personnel inspect the designated equipment and areas every quarter: vehicle and equipment storage awaiting maintenance, fueling areas, maintenance areas (indoors and outdoors), material storage, vehicle and equipment cleaning areas, and loading and unloading areas. Follow-up actions are tracked and inspection records are kept.

  • Only if: your permit sector is P.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.P.2.b.(3)(d), page 51204
"Qualified facility personnel shall be identified to inspect designated equipment and areas of the facility on a quarterly basis."
Open the permit at this section

Sector W furniture and fixtures: inspect diversions, conveyances, sediment controls, containment, vegetative BMPs and material areas every quarter

By the end of each calendar quarter.

Qualified facility personnel inspect storm water diversions, conveyance systems, sediment control and collection systems, containment structures, vegetative BMPs (for erosion) and material handling and storage areas once a quarter. Each record notes the date, time and inspector, and the plan is updated based on the results.

  • Only if: your permit sector is W.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section XI.W.3.a.(3)(d). Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.W.3.a.(3)(d), page 51232
"qualified facility personnel shall be identified to inspect the following on a quarterly basis: the integrity of storm water discharge diversions, conveyance systems, sediment control and collection systems, and containment structures"
Open the permit at this section

Sector X printing and publishing: inspect designated equipment and areas once a year

By December 31 each year.

Qualified facility personnel inspect designated equipment and areas once a year, including all containment and material storage areas, fueling areas, loading and unloading areas and equipment cleaning areas. Follow-up actions are tracked and inspection records kept.

  • Only if: your permit sector is X.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section XI.X.3.a.(3)(d). Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.X.3.a.(3)(d), page 51235
"Qualified facility personnel shall be identified to inspect designated equipment and areas of the facility on an annual basis."
Open the permit at this section

Sector Z leather tanning: inspect all BMPs once in each calendar quarter, in daylight

By the end of each calendar quarter.

Qualified personnel inspect all BMPs once in each of January to March, April to June, July to September and October to December, during daylight hours. The inspection assesses how well roofing and covers, dikes and curbs, diversions, sediment controls and other BMPs work and whether they need maintenance. Records are kept with the plan.

  • Only if: your permit sector is Z.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.Z.3.a.(3)(d), page 51243
"Qualified personnel are required to conduct quarterly inspections of all Best Management Practices (BMPs). ... Quarterly inspections must be made at least once in each of the following designated periods during daylight hours"
Open the permit at this section

Sector Z leather tanning: inspect designated equipment and areas at least once a quarter

By the end of each calendar quarter.

Qualified facility personnel inspect leather processing areas, chemical storage (including above ground tanks), fueling, vehicle and equipment maintenance, material storage, loading and unloading and waste management areas at least once a quarter. Follow-up actions are tracked, the plan is modified as needed, and records are kept with the plan.

  • Only if: your permit sector is Z.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section XI.Z.3.a.(3)(d). Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.Z.3.a.(3)(d), page 51243
"Qualified facility personnel shall be identified to inspect designated equipment and areas of the facility at least on a quarterly basis."
Open the permit at this section

Sectors G, P, Q, R and V: hold stormwater training at least once each calendar year

By December 31 each year.

The sector sections for metal mining (G), land transportation (P), water transportation (Q), ship and boat yards (R) and textile and leather products (V) require employee training at least once per calendar year, on the topics the plan lists.

  • Only if: your permit sector is G, P, Q, R, V.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.P.2.b.(3)(e), page 51204
"at a minimum, training must be held annually (once per calendar year)."
Open the permit at this section

Sector G active ore mines: submit waste rock and overburden pile results by March 31 after each calendar year

By March 31, for the calendar year before.

Report the waste rock and overburden pile results for each outfall (or a waiver or certification) on DMRs postmarked by March 31 following the calendar year the samples were collected.

  • Only if: your permit sector is G.
  • You file it in the agency's system (EzDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Modification of the MSGP for Sector G (mine drainage), 63 FR 42534-42548 (August 7, 1998), section XI.G.5.e, page 42546
"Permittees must submit such monitoring results on Discharge Monitoring Report (DMR) Form(s) postmarked no later than March 31 following the calendar year in which the samples were collected."
Open the permit at this section

Analytical (benchmark) monitoring each quarter in coverage years 2 and 4

By the end of each calendar quarter. Only in coverage years 2 and 4, counted from when your coverage began.

Facilities named in a sector's monitoring table sample each outfall once in each calendar quarter during years 2 and 4 of coverage and analyse the sample for the table's pollutants. If a pollutant's year 2 average is below its cut-off concentration, year 4 monitoring for it may be replaced by a certification.

  • Only if: your permit sector is A, H, J, K, L, M, N, O, Q, AA, or your permit sector is B and you run a paperboard mill (the permit: "Paperboard mills are required to monitor"), or your permit sector is C and you have an agricultural chemical, industrial inorganic chemical, soaps, detergents, cosmetics and perfumes, or plastics, synthetics and resins facility (the permit's Tables C-2 to C-5), or your permit sector is D and you manufacture asphalt paving or roofing materials, including at a portable plant (the permit: "Asphalt paving and roofing materials manufacturing facilities"), or your permit sector is E and your SIC code starts with 3251, 3253, 3255, 3259, 3261, 3262, 3263, 3264, 3269, 3297, 3271, 3272, 3273, 3274, 3275, 3295, 3241, or your permit sector is F and your SIC code starts with 331, 332, 335, 336, or your permit sector is G and you have an active copper ore mining and dressing facility (the permit: "Active copper ore mining and dressing facilities are required to monitor"), or your permit sector is U and you have a grain mill or fats and oils products facility (the permit: "Grain mill and fats and oils products facilities are required to monitor"), or your permit sector is Y and your SIC code starts with 301, 302, 305, 306.
  • Does not apply if: the facility is inactive and unstaffed.
  • You file it in the agency's system (EzDMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section XI.A.5.a. Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.A.5.a, page 51128
"must monitor their storm water discharges associated with industrial activity at least quarterly (4 times per year) during years 2 and 4"
Open the permit at this section

Sector A timber products: benchmark values for analytical monitoring and wet deck effluent limits

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

The monitoring cut-off concentrations a timber products facility compares its storm water samples with, by type of facility (Tables A-1 to A-4), and the effluent limits for wet deck storage spray water.

  • Only if: your permit sector is A.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.A.5.a, page 51128
"Timber product facilities are required to monitor their storm water discharges for the pollutants of concern listed in the appropriate table"
Open the permit at this section

Sector AA fabricated metal products: benchmark values (monitoring cut-off concentrations)

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

Metal fabricating facilities compare each quarterly sample with Table AA-1 (fabricated metal products except coating) or Table AA-2 (fabricated metal coating and engraving), whichever fits the facility. The zinc value in both tables is the corrected 0.117 mg/L from the February 9, 1996 notice.

  • Only if: your permit sector is AA.
  • You file it in the agency's system (EzDMR).
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.AA.5.a, page 51247
"Metal fabricating facilities are required to monitor their storm water discharges for the pollutants of concern listed in Tables AA-1 and AA-2 below."
Open the permit at this section

Sector B paperboard mills: benchmark value for analytical monitoring

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

The monitoring cut-off concentration a paperboard mill compares its storm water samples with (Table B-1).

  • Only if: your permit sector is B.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.B.5.a, page 51132
"Paperboard mills are required to monitor their storm water discharges for the pollutant of concern listed in Table B-1 below."
Open the permit at this section

Sector C chemical manufacturing: benchmark values for analytical monitoring and phosphate fertilizer effluent limits

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

The monitoring cut-off concentrations for agricultural chemical, industrial inorganic chemical, soap and cosmetic, and plastics and resin facilities (Tables C-2 to C-5), and the numeric effluent limits for contaminated runoff from phosphate fertilizer manufacturing (Table C-1).

  • Only if: your permit sector is C.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.C.6.a, page 51137
"are required to monitor their storm water discharges for the pollutants of concern listed in Tables C-2, C-3, C-4, and C-5 below."
Open the permit at this section

Sector D asphalt paving and roofing materials: benchmark value for analytical monitoring and emulsion area effluent limits

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

The monitoring cut-off concentration for asphalt paving and roofing materials facilities, including portable plants (Table D-1), and the numeric effluent limits for runoff from areas producing asphalt paving or roofing emulsions.

  • Only if: your permit sector is D.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.D.5.a, page 51142
"Asphalt paving and roofing materials manufacturing facilities are required to monitor their storm water discharges for the pollutant of concern listed in Table D-1 below."
Open the permit at this section

Sector E clay, concrete and gypsum products: benchmark values for analytical monitoring and cement storage runoff limits

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

The monitoring cut-off concentrations for clay product manufacturers (Table E-1) and concrete and gypsum product manufacturers (Table E-2), and the numeric effluent limits for runoff from material storage at cement plants.

  • Only if: your permit sector is E; your SIC code starts with 3251, 3253, 3255, 3259, 3261, 3262, 3263, 3264, 3269, 3297, 3271, 3272, 3273, 3274, 3275, 3295, 3241.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Final modification of the MSGP, 63 FR 52430-52577 (September 30, 1998); permit changes at FR 52480-52489 and later, section XI.E.5.a, page 52484
"Concrete and gypsum product manufacturers include concrete block and brick manufacturers (SIC 3271), concrete products manufacturers (SIC 3272), ready mix concrete manufacturers (SIC 3273), lime (3274)"
Open the permit at this section

Sector F primary metals: benchmark values for analytical monitoring

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

The monitoring cut-off concentrations for steel works and rolling mills (SIC 331, Table F-1), iron and steel foundries (SIC 332, Table F-2), nonferrous rolling, drawing and extruding (SIC 335, Table F-3) and nonferrous foundries (SIC 336, Table F-4).

  • Only if: your permit sector is F.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.F.5.a, page 51153
"Primary metals facilities are required to monitor their storm water discharges for the pollutants of concern listed in Tables F- 1, F-2, F-3, and F-4 below."
Open the permit at this section

Sector G metal mining: benchmark values for copper ore analytical monitoring and waste rock and overburden pile monitoring

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

The monitoring cut-off concentrations for active copper ore mining and dressing facilities (Table G-1), and the benchmark values for storm water from waste rock and overburden piles at active ore mining and dressing operations (Table G-2).

  • Only if: your permit sector is G.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.G.5.a, page 51160
"Active copper ore mining and dressing facilities are required to monitor their storm water discharges for the pollutants of concern listed in Table G1 below."
Open the permit at this section

Sector H coal mines and coal mining-related facilities: benchmark values for analytical monitoring

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

The monitoring cut-off concentrations coal mining facilities compare storm water samples with (Table H-1).

  • Only if: your permit sector is H.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.H.5.a, page 51164
"Coal mining facilities are required to monitor their storm water discharges for the pollutants of concern listed in Table H1 below."
Open the permit at this section

Sector J mineral mining and processing: monitoring cut-off concentrations (Table J-1)

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

Sand and gravel mines compare their samples with the nitrate plus nitrite nitrogen and TSS cut-offs; dimension and crushed stone and nonmetallic mineral (except fuels) mines compare with the TSS cut-off. Only these mining groups have analytical monitoring in Sector J.

  • Only if: your permit sector is J.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.J.5.a, page 51173
"permittees with dimension and crushed stone, and nonmetallic minerals (except fuels), and sand and gravel mining activities must monitor their storm water discharges associated with industrial activity at least quarterly"
Open the permit at this section

Sector K hazardous waste treatment, storage and disposal facilities: monitoring cut-off concentrations (Table K-1)

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

Hazardous waste treatment, storage or disposal facilities (TSDFs) compare each sample with the ten cut-off concentrations in Table K-1.

  • Only if: your permit sector is K.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.K.5.a, page 51178
"permittees with hazardous waste treatment, storage, or disposal facilities (TSDFs) must monitor their storm water discharges associated with industrial activity at least quarterly"
Open the permit at this section

Sector L landfills, open dumps and land application sites: monitoring cut-off concentrations (Table L-1)

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

Landfills, open dumps and land application sites compare samples with the TSS cut-off. All of them except MSWLF areas closed under 40 CFR 258.60 also compare with the total recoverable iron cut-off.

  • Only if: your permit sector is L.
  • Keep the records 3 years.
Source: Final modification of the MSGP, 63 FR 52430-52577 (September 30, 1998); permit changes at FR 52480-52489 and later, section XI.L.5.(a), page 52486
"Landfill/land application/open dump sites are required to monitor their storm water discharges for the pollutants of concern listed in Table L-1 below."
Open the permit at this section

Sector M automobile salvage yards: monitoring cut-off concentrations (Table M-1)

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

Automobile salvage yards compare each sample with the TSS, aluminum, iron and lead cut-off concentrations in Table M-1.

  • Only if: your permit sector is M.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.M.4.a, page 51187
"permittees operating automobile salvage yards must monitor their storm water discharges associated with industrial activity at least quarterly (4 times per year) during years 2 and 4"
Open the permit at this section

Sector N scrap and waste recycling facilities: monitoring cut-off concentrations (Table N-1)

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

Scrap recycling and waste recycling facilities compare each sample with the COD, TSS, aluminum, copper, iron and lead cut-offs in Table N-1 and the corrected zinc cut-off of 0.117 mg/L.

  • Only if: your permit sector is N.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.N.5.a, page 51195
"permittees with scrap recycling and waste recycling facilities must monitor their storm water discharges associated with industrial activity at least quarterly (4 times per year) during years 2 and 4"
Open the permit at this section

Sector O steam electric power generating facilities: iron cut-off concentration (Table O-1) and coal pile runoff limits

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

Steam electric power generating facilities compare each analytical sample with the total recoverable iron cut-off of 1.0 mg/L. Coal pile runoff must also meet the Part V.B limits (TSS 50 mg/L at any time, pH 6.0 to 9.0) from the start of coverage.

  • Only if: your permit sector is O.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.O.5.a, page 51200
"permittees with steam electric power generating facilities must monitor their storm water discharges associate with industrial activity at least quarterly (4 times per year) during years 2 and 4"
Open the permit at this section

Sector Q water transportation: monitoring cut-off concentrations (Table Q-1)

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

Water transportation facilities sample for aluminum, iron, lead and zinc (total recoverable) and compare results with the Table Q-1 cut-off concentrations. Zinc uses the corrected value of 0.117 mg/L from the February 9, 1996 notice.

  • Only if: your permit sector is Q.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.Q.5.a, page 51209
"Water transportation facilities are required to monitor their storm water discharges for the pollutants of concern listed in Table Q-1 below."
Open the permit at this section

Sector S airports with large deicing use: monitoring cut-off concentrations (Table S-1)

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

Airports that use more than 100,000 gallons of glycol-based deicing/anti-icing chemicals and/or 100 tons or more of urea on an average annual basis sample outfalls draining deicing areas for BOD5, COD, ammonia and pH and compare results with the Table S-1 cut-off concentrations.

  • Only if: your permit sector is S; the airport uses more than 100,000 gallons of glycol-based deicing chemicals or 100 tons or more of urea a year.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.S.5.b, page 51218
"Airports which are subject to these monitoring requirements must sample their storm water discharges for the parameters listed in Table S-1 below."
Open the permit at this section

Sector S airports with large deicing use: sample deicing outfalls four times in December to February of coverage years 2 and 4

No set date. Four samples during December, January and February in years 2 and 4 of coverage, while deicing is occurring. Only in coverage years 2 and 4, counted from when your coverage began.

Airports that use more than 100,000 gallons of glycol-based deicing or anti-icing chemicals, or 100 tons or more of urea, on an average annual basis sample the outfalls that drain deicing areas four times during December, January and February while deicing is occurring, in years 2 and 4 of coverage, with one grab and one flow-weighted composite sample each time.

  • Only if: your permit sector is S; the airport uses more than 100,000 gallons of glycol-based deicing chemicals or 100 tons or more of urea a year.
  • You file it in the agency's system (EzDMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section XI.S.5.b. Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.S.5.b, page 51219
"four times per year during the months of December, January, and February when deicing/anti-icing activities are occurring"
Open the permit at this section

Sector U grain mill and fats and oils facilities: monitoring cut-off concentrations (Tables U-1 and U-2)

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

Grain mill products facilities sample for total suspended solids (Table U-1). Fats and oils products facilities sample for BOD5, COD, nitrate plus nitrite nitrogen and total suspended solids (Table U-2). Results are compared with the cut-off concentrations.

  • Only if: your permit sector is U.
  • Keep the records 3 years.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.U.5.a, page 51225
"Grain mill and fats and oils products facilities are required to monitor their storm water discharges for the pollutants of concern listed in Table U-1 or U-2 below."
Open the permit at this section

Sector Y rubber products: zinc benchmark (monitoring cut-off concentration)

No set date. These are the values a sample is compared with. The sampling schedule is in the analytical monitoring duty.

Rubber product manufacturing facilities compare each quarterly sample with the Table Y-1 cut-off for total recoverable zinc. The 1995 table printed 0.065 mg/L; the February 9, 1996 correction set it to 0.117 mg/L, which is the value carried here.

  • Only if: your permit sector is Y; your SIC code starts with 301, 302, 305, 306.
  • You file it in the agency's system (EzDMR).
  • Keep the records 3 years.

Inferred from section XI.Y.5.a. Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.Y.5.a, page 51239
"Rubber product manufacturing facilities are required to monitor their storm water discharges for the pollutants of concern listed in Table Y-1 below."
Open the permit at this section

Sectors C, O, U and Z: hold stormwater training at least once a year

Within 1 year after the last training.

The sections for Sector C, chemical products; Sector O, steam electric plants; Sector U, food products; and Sector Z, leather tanning, require employee training at least once a year, at dates the plan identifies.

  • Only if: your permit sector is C, O, U, Z.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section XI.Z.3.a.(3)(e). Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.Z.3.a.(3)(e), page 51243
"in all cases, training must be held at least annually."
Open the permit at this section

Submit the analytical monitoring results in EzDMR by March 31 after each monitoring year

No set date. By March 31 after the end of coverage year 2 and of coverage year 4 (the permit says the 31st day of the following March). Only in coverage years 2 and 4, counted from when your coverage began.

Send the year 2 and year 4 results for each outfall (one report per storm event sampled), or the certifications that replace them, through EzDMR by the 31st day of the March after the monitoring year ends. EzDMR accepts the report once all four quarters are entered.

Further steps with their own deadlines:

  • Use EzDMR. The permit gives the timing in words, quoted below. Section EzDMR guide, page 1
    "submit their Discharge Monitoring Reports (DMRs) electronically using DEP's Electronic Discharge Monitoring Report System (EzDMR)."
  • Only if: your permit sector is A, H, J, K, L, M, N, O, Q, AA, or your permit sector is B and you run a paperboard mill (the permit: "Paperboard mills are required to monitor"), or your permit sector is C and you have an agricultural chemical, industrial inorganic chemical, soaps, detergents, cosmetics and perfumes, or plastics, synthetics and resins facility (the permit's Tables C-2 to C-5), or your permit sector is D and you manufacture asphalt paving or roofing materials, including at a portable plant (the permit: "Asphalt paving and roofing materials manufacturing facilities"), or your permit sector is E and your SIC code starts with 3251, 3253, 3255, 3259, 3261, 3262, 3263, 3264, 3269, 3297, 3271, 3272, 3273, 3274, 3275, 3295, 3241, or your permit sector is F and your SIC code starts with 331, 332, 335, 336, or your permit sector is G and you have an active copper ore mining and dressing facility (the permit: "Active copper ore mining and dressing facilities are required to monitor"), or your permit sector is S and the airport uses more than 100,000 gallons of glycol-based deicing chemicals or 100 tons or more of urea a year, or your permit sector is U and you have a grain mill or fats and oils products facility (the permit: "Grain mill and fats and oils products facilities are required to monitor"), or your permit sector is Y and your SIC code starts with 301, 302, 305, 306.
  • You file it in the agency's system (EzDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section XI.A.5.b. Check your copy of the permit.

Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.A.5.b, page 51129
"shall be submitted on Discharge Monitoring Report Form(s) postmarked no later than the 31st day of the following March."
Open the permit at this section

Where the permit is unclear 4 duties

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

Coal pile runoff: meet 50 mg/L TSS and pH 6 to 9, and sample at least once a year

No set date. Part VI.C.5 says coal pile runoff results are due "annually no later than the 28th day of [insert month following permit finalization]". What date does the Department apply in Florida?

Discharges containing coal pile runoff must not exceed 50 mg/L total suspended solids at any time and must stay within pH 6.0 to 9.0, without dilution. Sample them for pH and TSS at least once a year and report the results. The permit's report date is a blank placeholder.

Further steps with their own deadlines:

  • Sample coal pile runoff at least once a year. The timing is not settled: Part VI.C.5 says coal pile runoff results are due "annually no later than the 28th day of [insert month following permit finalization]". What date does the Department apply in Florida? Section VI.C, page 51119
    "shall monitor such storm water for: pH and TSS (mg/l) at least annually (1 time per year)."
  • Effluent limits for coal pile runoff. The timing is not settled: Part VI.C.5 says coal pile runoff results are due "annually no later than the 28th day of [insert month following permit finalization]". What date does the Department apply in Florida? Section V.B, page 51118
    "Any discharge composed of coal pile runoff shall not exceed a maximum concentration for any time of 50 mg/L total suspended solids."
  • When: the discharge contains coal pile runoff.
  • You file it in the agency's system (EzDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section VI.C.5, page 51119
"Permittees with discharges containing coal pile runoff shall submit monitoring results annually no later than the 28th day of [insert month following permit finalization]."
Open the permit at this section

Sector C phosphate fertilizer manufacturing: submit the annual phosphorus and fluoride DMR

No set date. Part XI.C.6 says phosphate fertilizer facilities submit their annual phosphorus and fluoride results "no later than the 31st day of the following [insert month after permit issuance date]". What date does the Department apply in Florida?

Report the annual phosphorus and fluoride results on a signed DMR, one per outfall per storm event sampled. Facilities discharging through a large or medium MS4 also send signed copies to the MS4 operator.

  • Only if: your permit sector is C.
  • You file it in the agency's system (EzDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.C.6.c.(2), page 51139
"Permittees with phosphate fertilizer manufacturing facilities shall submit monitoring results ... postmarked no later than the 31st day of the following [insert month after permit issuance date]."
Open the permit at this section

Sector D asphalt emulsion production: submit the annual TSS, oil and grease, and pH DMR

No set date. Part XI.D.5 says asphalt emulsion facilities submit their annual TSS, oil and grease and pH results "no later than the last day of the following [insert month after permit issuance date]". What date does the Department apply in Florida?

Report the annual emulsion area results on a DMR, one per outfall per storm event sampled. Facilities discharging through a large or medium MS4 also send signed copies to the MS4 operator.

  • Only if: your permit sector is D.
  • You file it in the agency's system (EzDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.D.5.d.(2), page 51144
"Permittees with asphalt paving or roofing emulsion production facilities shall submit monitoring results ... postmarked no later than the last day of the following [insert month after permit issuance date]."
Open the permit at this section

Sector E cement plants: submit the annual material storage runoff DMR

No set date. Part XI.E.5 says cement plants submit their annual material storage runoff results "no later than the 31st day of the following [insert month after permit issuance date]". What date does the Department apply in Florida?

Report the annual TSS and pH results on a signed DMR, one per outfall per storm event sampled. Facilities discharging through a large or medium MS4 also send signed copies to the MS4 operator.

  • Only if: your permit sector is E; your SIC code starts with 3241.
  • You file it in the agency's system (EzDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NPDES Storm Water Multi-Sector General Permit for Industrial Activities, 60 FR 50804-51319 (September 29, 1995); permit text at FR 51108-51255, section XI.E.5.d.(2), page 51150
"Permittees with material storage runoff from cement manufacturing facilities shall submit monitoring results ... postmarked no later than the 31st day of the following [insert month after permit issuance date]."
Open the permit at this section

What does no-exposure certification require?

Conditional No Exposure Exclusion (NEX): a certification and $200 fee that no industrial materials or activities are exposed to precipitation, renewed every five years.

Every few years 1 duty

No exposure exclusion: renew the NEX certification every five years

Within 5 years after your last no exposure certification.

A facility excluded under the conditional no exposure exclusion renews its certification, with the $200 fee, every five years on or before it expires. If exposure occurs or is expected, the exclusion ends and MSGP coverage must be applied for immediately.

  • You file it in the agency's system (DEP Business Portal, or by mail with a check to FDEP, PO Box 3070, Tallahassee, FL 32315).
  • Signed or certified by a responsible official or duly authorized representative.
Source: FDEP web page, Conditional No Exposure Exclusion (NEX), section NEX
"Renew certification for the NEX every five years on or before the expiration."
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

Florida Multi-Sector Generic Permit (MSGP) duties, topic by topic

How the Florida Multi-Sector Generic Permit (MSGP) compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: