Kentucky KYR00 Multi-Sector General Permit due dates and duties

Every duty in the KPDES Multi-Sector General Permit for stormwater discharges associated with industrial activity, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 31duties, each cited
  • 1on a schedule
  • 30when something happens

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
KYR000000
In force
August 1, 2023 to July 31, 2028
Official page
eec.ky.gov
Rules last checked
November 26, 2026
Today
August 1, 2023 July 31, 2028
Notes on the permit's status and renewal

Signed July 31, 2023; effective August 1, 2023; a minor modification took effect October 27, 2023; expires at midnight on July 31, 2028 (permit page 1). The posted permit is the modified text. The fact sheet dated October 26, 2023 says the modification took fabricated wood containers (SIC 2449) and logging storage without wet decks (SIC 2411) out of the Timber Products Category and replaced the Oil and Grease monthly average limit in Table 2 with "Report"; Table 2 in the pack reads that way. The Division of Water's permit table (read November 26, 2026) lists KYR00 as effective 8/1/2023 and expiring 7/31/2028. Its public notice page, a search of the Department's pending approvals for the general permits' agency interest number (35050) and a web search on November 26, 2026 showed no later modification, extension, notice or draft replacement of KYR00. If the permit expires before it is reissued, its conditions continue until the Division reissues it, but no new or expanded coverage can be authorized (section 5.6).

What does full permit coverage require?

Coverage under KYR00 by electronic Notice of Intent (eNOI-KYR00); the Division of Water issues a coverage letter that lists the outfalls.

Every quarter 1 duty

Inspect the facility at least quarterly

By the end of each calendar quarter.

The Stormwater Pollution Prevention Team inspects the facility on the schedule in the SWPPP, at least once a quarter, to see whether the control measures and BMPs work, find maintenance and repair needs and spot possible permit violations. Write a report for each inspection (date and time, type, inspector names and signatures, weather and discharges, problems found and corrective action needed) and keep it with the SWPPP.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by your pollution prevention team.

Inferred from section 4.10. Check your copy of the permit.

Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 4.10, page 25
"The operator shall include in the SWPPP a schedule for conducting inspections ... but not less than quarterly."
Open the permit at this section

When something happens 21 duties

Highway Maintenance Garages category: sample each outfall every quarter

By the end of each calendar quarter.

State, county and local government highway maintenance garages take one grab sample at each outfall every quarter and test it for pH, total suspended solids, oil and grease, chlorides and surfactants; calculate flow. Chlorides are sampled all year if bulk road salt is stored or handled at the facility at any time of the year. Chemical oxygen demand is sampled twice a year (see the separate duty). Analyses are done by a laboratory certified by the Energy and Environment Cabinet.

  • When: the coverage is in the highway maintenance garages category.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section 2.4, Table 4. Check your copy of the permit.

Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 2.4, Table 4, page 14
"The following effluent limitations and monitoring requirements apply to the discharges from Highway Maintenance Garage facilities."
Open the permit at this section

Non-Contact Cooling Waters category: sample each outfall every quarter

By the end of each calendar quarter.

Facilities that discharge stormwater together with non-contact cooling water take one grab sample at each outfall every quarter and test it for pH, total suspended solids, oil and grease, temperature and total residual chlorine; calculate flow. Chemical oxygen demand is sampled twice a year (see the separate duty). Analyses are done by a laboratory certified by the Energy and Environment Cabinet.

  • When: the coverage is in the non contact cooling waters category.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section 2.3, Table 3. Check your copy of the permit.

Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 2.3, Table 3, page 13
"The following effluent limitations and monitoring requirements apply to the discharges receiving stormwater runoff and non-contact cooling waters."
Open the permit at this section

Stormwater Only category: sample each outfall twice a year

By the end of each half year (June 30 and December 31).

Take one grab sample at each outfall on the coverage letter in each half of the year (January to June and July to December), during a discharge from a measurable storm event, and test it for pH, total suspended solids, oil and grease, chemical oxygen demand and surfactants; calculate flow. Surfactants are reported with NODI Code 9 if washwaters with detergents are not used or go to a POTW. Analyses are done by a laboratory certified by the Energy and Environment Cabinet.

  • When: the coverage is in the stormwater only category.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section 2.1, Table 1. Check your copy of the permit.

Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 2.1, Table 1, page 11
"The following effluent limitations and monitoring requirements apply to discharges of only stormwater runoff associated with industrial activity and authorized non-stormwater discharges."
Open the permit at this section

Timber Products category: sample each outfall every quarter

By the end of each calendar quarter.

Sawmills and wet deck log storage sites take one grab sample at each outfall every quarter, during a discharge from a measurable storm event, and test it for pH, total suspended solids and oil and grease, plus hardness and total recoverable zinc when a sawmill is on site; calculate flow. Chemical oxygen demand is sampled twice a year (see the separate duty). Analyses are done by a laboratory certified by the Energy and Environment Cabinet.

  • When: the coverage is in the timber products category.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section 2.2, Table 2. Check your copy of the permit.

Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 2.2, Table 2, page 12
"The following effluent limitations and monitoring requirements apply to facilities that process and/or store timber products that receive discharge from stormwater runoff and spray-down or intentional wetting of the logs"
Open the permit at this section

Stormwater Only category: submit the DMR by July 28 and January 28

By July 28 (January to June) and January 28 (July to December).

Submit the Discharge Monitoring Report for each outfall in NetDMR by July 28 for January to June and by January 28 for July to December, no later than midnight. If a sample could not be collected, report the matching No Data Indicator (NODI) code and give the reason in the Comments section.

  • When: the coverage is in the stormwater only category.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 2.1, Table 1, footnote 2, page 11
"Discharge Monitoring Report (DMR) data shall be submitted by July 28th and by January 28th."
Open the permit at this section

Timber, cooling water and garage categories: submit the DMR by the 28th after each quarter

By April 28 (Q1), July 28 (Q2), October 28 (Q3) and January 28 (Q4).

In the Timber Products, Non-Contact Cooling Waters and Highway Maintenance Garages categories, submit the Discharge Monitoring Report for each outfall in NetDMR no later than midnight on the 28th day of the month after each quarter: April 28, July 28, October 28 and January 28. If a sample could not be collected, report the matching NODI code and give the reason in the Comments section.

  • When: the coverage is in the timber products category, or the coverage is in the non contact cooling waters category, or the coverage is in the highway maintenance garages category.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 2.10. Check your copy of the permit.

Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 2.10, page 16
"The completed DMR for each monitoring period must be submitted to the DOW approved electronic system no later than midnight on the 28th day of the month following the monitoring period for which monitoring results were obtained."
Open the permit at this section

Evaluate your BMPs after two reporting periods in a row above 100 mg/L TSS

No set date. No number of days is stated: changes to the plan "shall be implemented as soon as possible" (section 4.13).

If the daily maximum total suspended solids result is above 100 mg/L for two consecutive reporting periods, start an evaluation of the BMPs in use, write the corrective action reports, and put any changes to the plan in place as soon as possible. The 100 mg/L value is a trigger, not an effluent limit.

  • When: the tss above 100 mg l for two consecutive reporting periods.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by your pollution prevention team.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 4.13, page 26
"The daily maximum discharge concentrations for TSS of 100 mg/l is a trigger that once exceeded for two (2) consecutive reporting periods, requires the permittee to initiate an evaluation of currently employed BMPs."
Open the permit at this section

Give notice at least 10 days before an anticipated bypass, if possible

At least 10 days before the date of the bypass.

If you know in advance that a bypass of a treatment facility will be needed, submit prior notice, if possible at least 10 days before the date of the bypass. An unanticipated bypass is reported under the 24-hour reporting condition.

  • When: the anticipated bypass.
  • You send it to the agency (Director, Division of Water).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 7.13.3, page 38
"If the permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten (10) days before the date of the bypass."
Open the permit at this section

Give notice to the Director before transferring the permit coverage

No set date. Before the transfer; the permit states no number of days (section 7.12.3).

Coverage cannot pass to another person until the Director has been given notice. The Director may require the coverage to be modified or revoked and reissued to change the permittee's name.

  • When: the transfer of the facility to another person.
  • You send it to the agency (Director, Division of Water (Transfer of Permit Request form)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 7.12.3, page 36
"This permit is not transferable to any person except after notice to the Director."
Open the permit at this section

Inspect after a storm larger than the 2-year, 24-hour event

No set date. The permit states no number of days after the storm.

After a storm event in excess of a 2-year, 24-hour event, the Stormwater Pollution Prevention Team inspects the site to verify that the installed control measures and BMPs are stable, and writes an inspection report marked as a response to that event.

  • When: the storm event in excess of a 2 year 24 hour event.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by your pollution prevention team.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 4.10, page 25
"the Stormwater Pollution Prevention Team shall conduct an annual site assessment and inspections in response to storm events in excess of a 2-year, 24-hour event to verify the stability of the installed control measures and BMPs."
Open the permit at this section

Modify the SWPPP whenever a corrective action requires it

No set date. No number of days is stated: "whenever necessary" (section 4.8); the Corrective Actions section sets no fixed deadline.

Modify the SWPPP whenever needed to reflect a corrective action, and sign the change as the permit's signatory rules require. The comprehensive Corrective Action Report records the date the plan changes are to be finished.

  • When: the corrective action taken.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 4.8, page 25
"The SWPPP shall be modified whenever necessary to address any corrective action taken and within the specified deadlines as required in the Corrective Actions Section of this permit"
Open the permit at this section

Notify the Director of toxic pollutants above the notification levels

No set date. No number of days is stated: "as soon as they know or have reason to believe" (section 5.5).

Notify the Director as soon as you know or have reason to believe that a toxic pollutant not limited in the permit has been or will be discharged above the highest of the notification levels in the table of section 5.5 (page 29), which gives separate levels for routine or frequent and for non-routine or infrequent discharges.

  • When: the toxic pollutant discharged above a notification level.
  • You send it to the agency (Director, Division of Water).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 5.5, page 29
"notify the Director as soon as they know or have reason to believe that toxic pollutants not limited in the permit have been or shall be discharged"
Open the permit at this section

Promptly send facts left out of, or wrong in, an application or report

No set date. No number of days is stated: "promptly" (section 7.12.8).

If you learn that a permit application or a report to the Director left out relevant facts or contained incorrect information, promptly submit the missing or corrected facts.

  • When: the omitted or incorrect information discovered.
  • You send it to the agency (Director, Division of Water).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 7.12.8, page 37
"it shall promptly submit such facts or information."
Open the permit at this section

Report noncompliance that may endanger health or the environment within 24 hours

Within 24 hours of the time the permittee becomes aware.

Report any noncompliance that may endanger health or the environment to the Division of Water Regional Office orally within 24 hours of becoming aware of it, then in writing within five days: what happened and why, the period with exact dates and times, how long it is expected to continue, and the steps taken or planned to stop it recurring. If the event may present an imminent or substantial danger, notify the Regional Field Office immediately.

Further steps with their own deadlines:

  • Written report within five days. Within 5 days after the time the permittee becomes aware. Section 7.12.6, page 37
    "A written submission shall also be provided within five (5) days of the time the permittee becomes aware of the circumstances."
  • Immediate notice for an imminent or substantial danger. The permit gives the timing in words, quoted below. Section 7.12.6, item 4, page 37
    "The permittee shall immediately notify their local Regional Field Office"
  • When: the noncompliance that may endanger health or the environment.
  • You send it to the agency (Division of Water Regional Office (by telephone first)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 7.12.6, page 37
"Any information shall be provided orally within twenty-four (24) hours from the time the permittee becomes aware of the circumstances."
Open the permit at this section

Report other noncompliance with the next monitoring report

No set date. Due when the next monitoring report (DMR) is submitted; no separate date is stated (section 7.12.7).

Report every instance of noncompliance that was not already reported under the planned changes, compliance schedule or 24-hour reporting conditions when the monitoring reports are submitted, with the same information as the 24-hour written report.

  • When: the other noncompliance.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 7.12.7, page 37
"The permittee shall report all instances of noncompliance not reported under Sub-Sections 1, 4, 5 and 6 of this Section, at the time monitoring reports are submitted."
Open the permit at this section

Review and update the plans before construction at the facility

No set date. Before construction starts; the permit states no number of days (section 4.14).

Runoff from construction to expand or modify the facility (clearing, grading, excavating) is covered by this permit on one condition: evaluate the BMP plan and SWPPP before any construction stormwater is discharged, and make the needed plan changes and put them in place before construction starts.

  • When: the construction to expand or modify the facility.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 4.14, page 26
"Necessary modifications to the plan and implementation shall occur prior to commencement of construction."
Open the permit at this section

Submit an updated eNOI at least 15 days before modifying the facility

At least 15 days before the modification of the facility.

To change existing coverage for a facility modification, submit an updated eNOI-KYR00 at least 15 days before the facility is modified, marked "Expansion of Existing Coverage".

  • When: the facility modification planned.
  • You file it in the agency's system (DEP eForms (eNOI-KYR00)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 6.1.1 eNOI Submission Deadlines, page 32
"Operators seeking modification of an existing coverage to address facility modifications shall electronically submit an updated eNOI-KYR00 a minimum of 15 days prior to the modification of the facility."
Open the permit at this section

Submit the eNOI at least 15 days before a new facility starts discharging

At least 15 days before the commencement of discharge.

An operator that wants first-time coverage for a new facility submits the electronic Notice of Intent (eNOI-KYR00) at least 15 days before discharge begins, marked "New Coverage". The Division of Water does not process an NOI that is incomplete, inaccurate or in the wrong format.

  • When: the new facility seeking coverage.
  • You file it in the agency's system (DEP eForms (eNOI-KYR00)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 6.1.1 eNOI Submission Deadlines, page 32
"Operators seeking initial coverage for a new facility shall electronically submit the eNOI-KYR00 a minimum of 15 days prior to commencement of discharge."
Open the permit at this section

Take samples within the first 30 minutes of a discharge

No set date. Within the first 30 minutes of a discharge; if that is not possible, as soon as possible afterwards (section 2.7).

Collect each sample within the first 30 minutes of a discharge from a measurable storm event (one that follows the previous storm event by at least 72 hours). If that is not possible, sample as soon as possible afterwards and keep a note in the SWPPP explaining why. Sample at the compliance point only. For snowmelt, monitor when a measurable discharge occurs.

  • When: the sampled storm discharge.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 2.7, page 15
"Samples must be collected within the first 30 minutes of a discharge associated with a measurable storm event."
Open the permit at this section

Tell the Director as soon as possible about planned physical changes

No set date. No number of days is stated: "as soon as possible" (section 7.12.1).

Give notice to the Director as soon as possible of a planned physical alteration or addition to the facility when it may make the facility a new source, could significantly change the nature or increase the quantity of pollutants discharged, or significantly changes sludge use or disposal. Give advance notice of any planned change that may result in noncompliance.

  • When: the planned physical alteration or addition.
  • You send it to the agency (Director, Division of Water).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 7.12.1, page 36
"The permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility."
Open the permit at this section

Write Corrective Action Reports as soon as practicable after a triggering condition

No set date. No number of days is stated: "As soon as practicable after the discovery" (section 4.11).

Review and, as needed, revise the control measures and BMPs after any of these: an unauthorized discharge or release; an inspection or evaluation that finds controls not properly operated or maintained or not meeting the permit; a facility change that significantly alters or increases the pollutants discharged; two consecutive results above the 100 mg/L TSS trigger; or a discharge of stormwater from construction activity. As soon as practicable after discovery, the team writes an initial Corrective Action Report (the trigger, the problem, the date found) and a comprehensive one (actions, start and finish dates, SWPPP changes and their date).

  • When: the corrective action condition discovered.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by your pollution prevention team.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 4.11, page 26
"As soon as practicable after the discovery of any of the preceding conditions, the Stormwater Pollution Prevention Team shall document in an initial Corrective Action Report the following:"
Open the permit at this section

Ongoing 5 duties

Develop, follow and keep current a Stormwater Pollution Prevention Plan

No set date. Standing duty with no date.

Develop and implement a Stormwater Pollution Prevention Plan (SWPPP, also called a Best Management Practices Plan) with the seven sections the permit lists: pollution prevention team, site description, potential pollutant sources, control measures, schedules and procedures, additional documentation and signature. Keep the current plan where every team member can reach it at once, and hand it over on request during an on-site inspection.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 4, page 22
"The operator of a facility authorized to discharge stormwater runoff by this general permit shall develop and implement a SWPPP for the control and management of stormwater runoff from exposed areas associated with industrial activity."
Open the permit at this section

Keep a daily precipitation log with the SWPPP

No set date. Standing record with no date.

Keep a daily precipitation log as an addendum to the SWPPP. It supports NODI Code C (no discharge) on a DMR and shows when a storm larger than the 2-year, 24-hour event occurred.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 4.6, item 4, page 24
"The following documents shall be retained as addendums to the SWPPP ... The daily precipitation log;"
Open the permit at this section

Keep monitoring records and reports for at least three years

No set date. Standing duty with no date.

Keep all monitoring information, calibration and maintenance records, copies of every report the permit requires and the data used for the application for at least three years from the date of the sample, measurement, report or application. The Director may extend the period.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 7.10, item 2, page 35
"for a period of at least three (3) years from the date of the sample, measurement, report or application."
Open the permit at this section

Place and maintain a permanent marker at each monitoring location

No set date. Standing duty with no date.

Place and maintain a permanent marker at each monitoring location, showing the KPDES permit number and the outfall number from the coverage letter. Discharges to the Ohio River follow ORSANCO's permanent marker requirements instead.

Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 5.7, page 29
"the permittee shall place and maintain a permanent marker at each of the monitoring locations to better document and clarify these locations."
Open the permit at this section

Train employees who work where industrial materials or activities are exposed

No set date. The permit sets no frequency; the SWPPP must include "a schedule for all necessary employee training" (section 4.5).

Train every employee who works in areas where industrial materials or activities are exposed to stormwater, including pollution prevention team members, inspectors and maintenance staff, on the control measures and on the permit's monitoring, inspection, planning, reporting and documentation requirements. The SWPPP holds the training schedule; keep records of dates, names and subject matter.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 3.7, page 20
"The operator shall train all employees who work in areas where industrial materials or activities are exposed to stormwater, including all members of your Stormwater Pollution Prevention Team, inspectors, maintenance personnel, etc."
Open the permit at this section

Where the permit is unclear 3 duties

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

Carry out an annual site assessment

No set date. Section 4.10 requires "an annual site assessment" without defining the year. Is it once per calendar year, once per year of coverage, or within 12 months of the previous assessment, and is a written report due by a set date?

In addition to the regular inspections, the Stormwater Pollution Prevention Team carries out an annual site assessment. The permit does not say whether the year is the calendar year, a year of coverage or 12 months from the last assessment.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by your pollution prevention team.

Inferred from section 4.10. Check your copy of the permit.

Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 4.10, page 25
"the Stormwater Pollution Prevention Team shall conduct an annual site assessment and inspections in response to storm events in excess of a 2-year, 24-hour event to verify the stability of the installed control measures and BMPs."
Open the permit at this section

Submit a renewal eNOI when KYR00 is reissued

No set date. Section 7.2 says a renewal NOI is due "by the date specified in" the new general permit, while section 6.2 continues the permit past July 31, 2028 only if a "timely and complete eNOI" is submitted under 401 KAR 5:060, Section 2(4). In 2023 the date was 90 days after the effective date, and the Division's FAQ said 90 days from the solicitation letter. By what date must a covered facility submit its renewal eNOI for the 2028 reissuance?

To stay covered after the permit expires on July 31, 2028, apply under the reissued permit once the Division of Water issues it, by the date that permit sets. The current permit does not state that date.

  • You file it in the agency's system (DEP eForms (eNOI-KYR00)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 7.2. Check your copy of the permit.

Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 7.2, page 34
"Permittees that are eligible and choose to be covered by a new general permit must submit a NOI by the date specified in that permit."
Open the permit at this section

Timber, cooling water and garage categories: sample chemical oxygen demand twice a year

No set date. Tables 2, 3 and 4 set chemical oxygen demand at "2/Year" while every other row is "1/Quarter", and unlike Table 1 they carry no footnote with DMR dates. Are the two samples one in January to June and one in July to December, and on which quarterly DMRs are they reported?

In the Timber Products, Non-Contact Cooling Waters and Highway Maintenance Garages categories, chemical oxygen demand is sampled twice a year by grab sample and reported with no limit, while the other parameters are sampled every quarter. Tables 2, 3 and 4 do not say which periods the two samples belong to.

  • When: the coverage is in the timber products category, or the coverage is in the non contact cooling waters category, or the coverage is in the highway maintenance garages category.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section 2.4, Table 4 (the same row is in Tables 2 and 3). Check your copy of the permit.

Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 2.4, Table 4 (the same row is in Tables 2 and 3), page 14
"Chemical Oxygen Demand ... mg/L ... 2/Year Grab"
Open the permit at this section

What does no-exposure certification require?

Conditional exclusion by electronic No Exposure Certification, for the whole facility only; it is resubmitted each time KYR00 is reissued.

When something happens 2 duties

Promptly send facts left out of, or wrong in, an application or report

No set date. No number of days is stated: "promptly" (section 7.12.8).

If you learn that a permit application or a report to the Director left out relevant facts or contained incorrect information, promptly submit the missing or corrected facts.

  • When: the omitted or incorrect information discovered.
  • You send it to the agency (Director, Division of Water).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 7.12.8, page 37
"it shall promptly submit such facts or information."
Open the permit at this section

Submit the eNOI at least 15 days before a new facility starts discharging

At least 15 days before the commencement of discharge.

An operator that wants first-time coverage for a new facility submits the electronic Notice of Intent (eNOI-KYR00) at least 15 days before discharge begins, marked "New Coverage". The Division of Water does not process an NOI that is incomplete, inaccurate or in the wrong format.

  • When: the new facility seeking coverage.
  • You file it in the agency's system (DEP eForms (eNOI-KYR00)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 6.1.1 eNOI Submission Deadlines, page 32
"Operators seeking initial coverage for a new facility shall electronically submit the eNOI-KYR00 a minimum of 15 days prior to commencement of discharge."
Open the permit at this section

Where the permit is unclear 1 duty

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

Resubmit the No Exposure Certification each time KYR00 is reissued

No set date. Section 6.3 says the No Exposure Certification "must be resubmitted upon each reissuance of the KYR00". How many days after a reissuance does a facility have, and does the exclusion continue between the expiration date and the reissuance?

A facility that relies on the no exposure exclusion submits the electronic No Exposure Certification (eNE form) and submits it again each time KYR00 is reissued, to keep the exclusion for the next permit term. The current permit expires July 31, 2028. The permit gives no date by which the certification must be resubmitted after a reissuance.

  • You file it in the agency's system (DEP eForms (No Exposure Certification)).
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 6.3. Check your copy of the permit.

Source: KPDES Multi-Sector General Permit KYR000000 (with the October 27, 2023 minor modification), section 6.3, page 32
"This certification must be resubmitted upon each reissuance of the KYR00 to continue the exclusion for the next permit term."
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

KYR00 Multi-Sector General Permit duties, topic by topic

How the KYR00 Multi-Sector General Permit compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: