Get my permit calendar

States / North Dakota

North Dakota Industrial Stormwater General Permit NDR05-0000 due dates and duties

Every duty in the Authorization to Discharge under the North Dakota Pollutant Discharge Elimination System, general permit for stormwater discharges associated with industrial activity, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 62duties, each cited
  • 4on a schedule
  • 58when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
NDR05-0000
In force
April 1, 2025 to March 31, 2030
Official page
deq.nd.gov
Rules last checked
November 28, 2026
Today
April 1, 2025 March 31, 2030
Notes on the permit's status and renewal

Cover page: "Permit No: NDR05-0000, Effective Date: April 1, 2025, Expiration Date: March 31, 2030" and "This permit and the authorization to discharge shall expire at midnight, March 31, 2030." DEQ's stormwater page, read November 28, 2026, links this file as the industrial stormwater permit, so it is current; on that date it was in force and no modification was posted. It replaced the 2020 permit. Existing 2020 permittees had to submit a new NOI by March 31, 2025 (Part I.E.1) and existing SWPPPs had to take in this permit's changes within 180 days of April 1, 2025 (Part II.C.8.c); both dates have passed and are not shown. Coal mining, oil and gas operations with a reportable spill or a water quality violation, nonmetallic mineral mining, highway material plants (SIC 1611, 2951, 327) and construction are covered by other permits, mostly NDR32-0000 for mining, extraction and paving material preparation (Part I.B.9). The permit does not say when a renewal NOI is due before March 31, 2030; it says only that it is the permittee's duty to reapply (Part I.E.1).

What does full permit coverage require?

Permit coverage: a SWPPP first, then a complete NOI to DEQ; coverage starts seven days after DEQ receives the completed NOI unless DEQ says otherwise.

Every quarter 1 duty

Inspect the facility once each calendar quarter

By the end of each calendar quarter.

An active facility performs a comprehensive inspection at least once in each three-month period: January to March, April to June, July to September and October to December.

  • Does not apply if: the facility is inactive.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section III.A.1.a, page 15
"Active facilities shall be inspected at least once during each three-month period."
Open the permit at this section

Every year 1 duty

Train employees at least once a year

Within 1 year after the last training.

Train every employee who works where industrial materials or activities are exposed to stormwater, or who carries out the permit's duties (including the pollution prevention team), at least once a year, when new employees are hired and as needed. Keep a log of the dates employees were trained.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section II.C.4.e. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section II.C.4.e, page 12
"Training shall be provided at least annually, as new employees are hired, and as necessary to maintain compliance with this permit."
Open the permit at this section

One time 1 duty

Write the SWPPP before submitting the NOI and put it in place before discharge

No set date. Before the NOI is submitted (II.C); the permit gives no number of days.

Develop a Stormwater Pollution Prevention Plan (SWPPP) meeting Part II.C before submitting the Notice of Intent, sign it, keep it on site and put it in place before stormwater associated with industrial activity is discharged.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section II.C, page 9
"All permittees shall develop a SWPPP prior to submitting an NOI. The SWPPP shall be implemented prior to the discharge of stormwater associated with industrial activities."
Open the permit at this section

When something happens 34 duties

Airports and air bases: inspect monthly during deicing operations

By the end of each month.

Airports and U.S. air bases conduct an inspection each month in which deicing operations take place, including a check for dry weather discharges of deicing chemicals.

  • When: the facility is an airport or U.S. air base that conducts deicing or anti-icing; deicing operations are under way that month.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section III.A.1.b. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section III.A.1.b, page 15
"Airports and U.S. air bases shall conduct monthly inspections during deicing operations."
Open the permit at this section

Airports not certifying urea-free: monitor ammonia monthly during deicing

By the end of each month.

A primary commercial airport with at least 1,000 annual non-propeller aircraft departures that does not certify urea-free deicing monitors every airfield pavement discharge point each month during deicing activities. Ammonia as nitrogen may not exceed the daily maximum in the table before any dilution or mixing with non-deicing discharges.

  • When: the facility is a primary commercial airport with at least 1,000 non-propeller aircraft departures a year; the airport monitors ammonia instead of certifying that it uses no urea deicer; deicing operations are under way that month.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 M. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 M, page 35
"Applicability: Primary Commercial Airports with at least 1,000 annual non-propeller aircraft departures ... Sample Frequency: 1/month during deicing activities"
Open the permit at this section

Primary commercial airports and air bases: sample monthly during deicing

By the end of each month.

Primary commercial service airports and U.S. air bases with deicing operations take a grab sample each month from the first through the last month of deicing activities and analyze it for the parameters in the table.

  • When: the facility is a "Primary Commercial Service Airport" (Bismarck, Fargo, Grand Forks, Minot or Williston) or the Grand Forks or Minot Air Base; deicing operations are under way that month.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 M. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 M, page 35
"PRIMARY COMMERCIAL SERVICE AIRPORTS AND U.S. AIR BASES with deicing operations shall conduct monthly sampling beginning with the first month of deicing activities through the final month of deicing activities."
Open the permit at this section

Coal pile runoff: sample once a year and meet the TSS and pH limits

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event from discharges of coal storage pile runoff once in each April to March monitoring period. Total suspended solids may not exceed the daily maximum and pH must stay within the range in the limits table; oil and grease is a benchmark. Untreated overflow from facilities built and run to treat the runoff from a 10-year, 24-hour storm is not subject to the TSS limit.

  • When: the facility discharges runoff from coal storage piles.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 L. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 L, page 34
"Applicability: Any facility with discharges from coal storage piles ... Sample Frequency: 1/year"
Open the permit at this section

Facilities DEQ directs to sample: sample the baseline parameters once a year

By the end of each reporting year (it starts April 1).

A facility not listed in Appendix 1 A to O that DEQ directs in writing to sample takes a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyzes it for the baseline parameters in the table.

  • When: the Department has directed the facility in writing to sample.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 P. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 P, page 36
"Applicability: facilities directed to sample by the department, but not listed in Items A-O above ... Sample Frequency: 1/year"
Open the permit at this section

Hazardous waste treatment, storage and disposal (activity code HZ): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • When: the facility treats, stores or disposes of hazardous waste (industrial activity code "HZ").
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 G. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 G, page 32
"Applicability: Industrial Activity Code "HZ" ... Sample Frequency: 1/year"
Open the permit at this section

Landfills, land application sites and open dumps (activity code LF): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table. Water that has touched landfill wastes or leachate may not be discharged under this permit.

  • When: the site is a landfill, land application site or open dump (industrial activity code "LF").
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 H. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 H, page 33
"Applicability: All Landfill, Land Application Sites and Open Dumps (Industrial Activity Code "LF") ... Sample Frequency: 1/year"
Open the permit at this section

Municipal solid waste landfill areas closed under 40 CFR 258.60: sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • When: the site has municipal solid waste landfill areas closed under 40 CFR 258.60.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 H. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 H, page 33
"Applicability: Municipal Solid Waste Landfill (MSWLF) Areas Closed in Accordance with 40 CFR 258.60 ... Sample Frequency: 1/year"
Open the permit at this section

Steam electric generating facilities (activity code SE): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • When: the facility is a steam electric generating facility (industrial activity code "SE").
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 K. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 K, page 34
"Applicability: Steam Electric Generating Facilities (Industrial Activity Code "SE") ... Sample Frequency: 1/year"
Open the permit at this section

Airports and air bases with deicing: submit a DMR every six months

By October 31 (April to September) and April 30 (October to March).

Airports and U.S. air bases that deice or anti-ice submit a DMR for April 1 to September 30 by October 31 and for October 1 to March 31 by April 30, with a summary of the amounts and types of deicing materials used in the six months.

  • When: the facility is an airport or U.S. air base that conducts deicing or anti-icing.
  • You file it in the agency's system (CERIS-ND).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section III.D.1.a, page 18
"Airports and U.S. Air Bases that conduct deicing or anti-icing shall submit a DMR once every six months. ... month period (i.e., April 1 to September 30, due October 31; and October 1 to March 31, due April 30)."
Open the permit at this section

Portable thermal desorption units: submit the location record by April 30

By April 30, after each reporting year ends.

Operators of portable thermal desorption units keep a record of where the unit operated, with the permit number, owner or operator, each site's name, location, county, receiving stream, status and start and end dates, covering April 1 to March 31, and submit it by April 30.

  • When: the facility operates portable thermal desorption units.
  • You file it in the agency's system (CERIS-ND).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section III.D.2, page 18
"The location record shall cover a period from April 1 to March 31 and be submitted to the department by April 30."
Open the permit at this section

Submit the annual DMR by April 30

By April 30, after each reporting year ends.

A facility that must sample submits a Discharge Monitoring Report covering April 1 to March 31 by April 30, summarizing that period's results, "no discharge" if there was none, and whether a sample was missed because the facility was inactive or unstaffed or the discharge was outside business hours.

  • When: the facility must sample under Part III(B), as an Appendix 1 industry or at the Department's direction.
  • Does not apply if: the facility is an airport or U.S. air base that conducts deicing or anti-icing.
  • You file it in the agency's system (CERIS-ND).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section III.D.1.b, page 18
"For all other facilities, the DMRs shall cover a period from April 1 to March 31 and be submitted to the department by April 30."
Open the permit at this section

After a benchmark exceedance: revise the SWPPP

No set date. The permit sets no number of days (Appendix 1).

When a sample is above an Appendix 1 benchmark value, revise the SWPPP to name the likely sources of the high concentration and the methods to reduce future concentrations.

  • When: a sample is above a benchmark value.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1, page 29
"If samples exceed the benchmark value, the SWPPP shall be revised to include possible sources of the high concentration and methods to reduce future concentrations."
Open the permit at this section

Airports with 1,000 or more jet departures: certify each year that no urea deicer is used

Within 1 year after the last certification.

A primary commercial airport with at least 1,000 annual non-propeller aircraft departures submits a statement each year certifying that it does not use airfield deicing products containing urea, unless it instead meets the ammonia limit and monitors for it. Airfield pavement deicers containing urea may not be discharged.

  • When: the facility is a primary commercial airport with at least 1,000 non-propeller aircraft departures a year.
  • Does not apply if: the airport monitors ammonia instead of certifying that it uses no urea deicer.
  • You file it in the agency's system (CERIS-ND).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section III.D.3. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section III.D.3, page 18
"shall submit an annual statement certifying that the facility does not use airfield deicing products that contain urea"
Open the permit at this section

Airports with deicing: keep a runoff management program in the SWPPP

No set date. Part of the SWPPP (Appendix 1 M).

Where deicing operations occur, put in place a program to manage contaminated runoff and keep pollutants leaving the site to a minimum, and include it in the SWPPP. There may be no dry weather discharge of deicing chemicals.

  • When: the facility is an airport or U.S. air base that conducts deicing or anti-icing.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 M, page 35
"Where deicing operations occur, implement a program to manage contaminated runoff to minimize the amount of pollutants being discharged from the site. Include this program in the SWPPP."
Open the permit at this section

Amend the SWPPP after a significant change or when it is not working

No set date. The permit sets no number of days (II.C.8.b).

Amend the SWPPP whenever a change in design, construction, operation or maintenance significantly affects the potential to discharge pollutants, and whenever it is found not to control the pollutants in stormwater.

  • When: there is a significant change or the SWPPP is found not to control pollutants.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section II.C.8.b, page 14
"The permittee shall amend the SWPPP whenever there is a change in design, construction, operation, or maintenance, which has a significant effect on the potential for the discharge of pollutants to the waters of the state."
Open the permit at this section

Contact DEQ before disposing of sludges removed in treatment

No set date. Before the disposal (V.J); the permit gives no number of days.

Contact DEQ before disposing of any sludges removed in the course of treatment; DEQ may then set limits or monitoring. Screenings, grit, solids and sludges are disposed of so no pollutant reaches waters of the state.

  • When: you plan to dispose of sludges removed in treatment.
  • You send it to the agency (DEQ Division of Water Quality).
  • Keep the records 3 years.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section V.J, page 23
"The permit issuing authority shall be contacted prior to the disposal of any sludges."
Open the permit at this section

Correct deficiencies found in an inspection as soon as feasible

No set date. As soon as feasible (III.A.5); the permit gives no number of days.

When an inspection finds a deficiency, perform the corrective action as soon as feasible and keep a record of corrective and maintenance work with the dates, who did it and any photos or recordings.

  • When: an inspection finds a deficiency.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section III.A.5, page 16
"When deficiencies are noted during an inspection, corrective actions shall be performed as soon as feasible."
Open the permit at this section

Discharge point near an impaired water: name the water and impairment in the SWPPP

No set date. Part of the SWPPP (II.C.1.d).

A facility with a discharge point within 2,000 feet of, and flowing to, a water listed as impaired under section 303(d) identifies that water and its impairment in the SWPPP.

  • When: a discharge point is within 2,000 feet of, and flows to, an impaired water.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section II.C.1.d, page 10
"Facilities that have a discharge point within 2000 feet of, and flow to, a water body listed as impaired under section 303(d) of the Federal Clean Water Act shall identify the water body and impairment in the SWPPP."
Open the permit at this section

File the written transfer agreement at least 30 days before the transfer

At least 30 days before the proposed transfer date.

Coverage can be transferred only by filing with DEQ a written agreement between the current and new permittee, with a specific transfer date, at least thirty days before that date, and with DEQ's approval. The current permittee tells the new owner or operator about the permit.

  • When: the permit coverage is to be transferred.
  • You file it in the agency's system (CERIS-ND).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section VI.C, page 24
"The written agreement shall be filed with the department at least thirty days in advance of the proposed transfer date."
Open the permit at this section

Give notice at least 10 days before a planned bypass

At least 10 days before the date of the bypass.

If the permittee knows in advance that a bypass of a treatment facility will exceed limits, it submits prior notice, if possible at least ten days before the bypass.

  • When: a bypass that exceeds limits is expected.
  • You file it in the agency's system (CERIS-ND).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section V.G.2.a, page 22
"If the permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten (10) days before the date of bypass."
Open the permit at this section

Inactive facilities: inspect at least once a year

Within 1 year after the last inspection.

An inactive facility is inspected at least once a year.

  • When: the facility is inactive.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section III.A.1.c. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section III.A.1.c, page 15
"Inactive facilities shall be inspected at least annually."
Open the permit at this section

Keep salt storage piles enclosed or covered

No set date. Standing duty (II.D.1).

Salt storage piles used for deicing or other industrial or commercial purposes are kept enclosed or covered, except while material is added or taken and when drainage from the pile is contained on site.

  • When: the facility has salt storage piles.
  • Nothing is filed; keep the record at the facility.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section II.D.1, page 14
"Salt storage piles used for deicing or other industrial or commercial purposes shall be enclosed or covered."
Open the permit at this section

Promptly send DEQ facts that were missing or wrong in an application or report

No set date. Promptly (V.D); the permit gives no number of days.

When the permittee learns it left out relevant facts or gave incorrect information in a permit application or any report, it promptly submits the facts or correct information.

  • When: you find missing or incorrect information in an application or report.
  • You file it in the agency's system (CERIS-ND).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section V.D, page 21
"When a permittee becomes aware that it failed to submit any relevant facts or submitted incorrect information in a permit application or any report, it shall promptly submit such facts or information."
Open the permit at this section

Regional commercial airports: sample once in the month after the deicing season

Within 30 days after the deicing season ends.

Regional commercial service airports (Devils Lake, Dickinson and Jamestown) take one grab sample a year, in the first month after the deicing season ends, and analyze it for the parameters in the table.

  • When: the facility is a "Regional Commercial Service Airport" (Devils Lake, Dickinson or Jamestown).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 M. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 M, page 35
"Sample Frequency (Regional Commercial Airports): 1/year during the first month following the deicing season"
Open the permit at this section

Report a release above a reportable quantity to DEQ within 24 hours

Within 24 hours after you become aware of the release.

Any release that meets a reporting requirement of 40 CFR 110, 117 or 302 or NDAC 33.1-16-02.1 is also reported to DEQ under Part V.F: orally within 24 hours of becoming aware of it, then in writing within five days.

  • When: a release meets a reporting requirement.
  • You send it to the agency (DEQ Division of Water Quality by telephone, 701.328.5210).
  • Keep the records 3 years.

Inferred from section II.B. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section II.B, page 9
"Any release which meets any reporting requirement shall be reported to the department in accordance with Part V(F)."
Open the permit at this section

Report noncompliance that may endanger health or the environment by phone within 24 hours

Within 24 hours after you become aware of the noncompliance.

Report any noncompliance that may endanger health or the environment to DEQ orally (701.328.5210) as soon as possible and within 24 hours of becoming aware of it, including any unanticipated bypass or upset that exceeds a limit and any violation of a daily maximum or instantaneous limit. Follow with a written submission within five days unless DEQ waives it.

Further steps with their own deadlines:

  • Send the written submission within five days. Within 5 days after you become aware of the noncompliance. Section V.F.2, page 22
    "A written submission shall also be provided within five days of the time that the permittee became aware of the circumstances."
  • When: noncompliance may endanger health or the environment.
  • You send it to the agency (DEQ Division of Water Quality by telephone, 701.328.5210).
  • Keep the records 3 years.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section V.F.1, page 21
"Any information shall be provided orally as soon as possible, but no later than twenty-four (24) hours from the time the permittee first became aware of the circumstances."
Open the permit at this section

Report other noncompliance with the next DMR

No set date. By the next DMR submittal (V.F); the date depends on the facility's DMR schedule.

Report every other instance of noncompliance no later than the next Discharge Monitoring Report, with its description and cause, its dates and times, how long it is expected to continue and the steps to prevent it.

  • When: other noncompliance happens.
  • You file it in the agency's system (CERIS-ND).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section V.F, page 22
"All other instances of noncompliance shall be reported no later than at the time of the next Discharge Monitoring Report submittal."
Open the permit at this section

Sample missed because of impractical or adverse conditions: explain why on the DMR

No set date. Reported on the next DMR (Appendix 2 B).

When a sample cannot be collected because of impractical or adverse climatic conditions (non-working hours, nightfall, dangerous weather, drought, extended frozen periods, an inactive or unstaffed facility), describe on the DMR why it could not be collected.

  • When: a sample cannot be collected because of impractical or adverse conditions.
  • You file it in the agency's system (CERIS-ND (on the DMR)).
  • Keep the records 3 years.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 2 B, page 38
"When a permittee is unable to collect samples due to impractical or adverse climatic conditions, the permittee must describe in the DMR why samples could not be collected."
Open the permit at this section

Sample when a spill or discharge that may break a limit reaches an outfall

No set date. As soon as the spill or discharge reaches the outfall (IV.A); the permit gives no number of hours.

When a discharge happens that may reasonably be expected to cause or contribute to a violation a routine sample would not catch, collect additional samples at the outfall as soon as the spill or discharge reaches it, analyze them for the parameters likely to be affected and report them on the DMR.

  • When: a spill or discharge that may cause a limit violation reaches an outfall.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section IV.A, page 19
"The permittee must collect such additional samples as soon as the spill or discharge reaches the outfall."
Open the permit at this section

Submit a Notice of Termination when coverage is no longer needed

No set date. The permit sets no date; compliance is required until the NOT is submitted (I.F.1).

To end coverage, submit a Notice of Termination with the owner or operator, the facility, the permit number and why coverage is no longer needed, once all industrial stormwater discharges have ended or the facility has another NDPDES permit. The permit's conditions apply until the NOT is submitted.

  • When: you want to end permit coverage.
  • You file it in the agency's system (CERIS-ND).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section I.F.1, page 8
"Permittees wishing to terminate coverage under this permit must submit a Notice of Termination (NOT) form or electronic NOT"
Open the permit at this section

Submit the NOI at least 7 days before operation starts

At least 7 days before operation starts.

A new applicant submits a complete Notice of Intent to DEQ through CERIS-ND seven days before operation starts. Coverage begins seven days after DEQ receives the completed NOI, unless DEQ says otherwise. Facilities that must sample add the number of outfalls, the number of substantially identical outfalls to be sampled and their Appendix 1 sampling sector.

  • When: a new facility is seeking coverage.
  • You file it in the agency's system (CERIS-ND).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per ndr05 V.E.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Permit Submittals Summary, page 5
"New Applicants ... Notice of Intent ... 7 days prior to start of operation"
Open the permit at this section

Tell DEQ in advance about planned changes

No set date. In advance (V.C); the permit gives no number of days.

Give DEQ advance notice of any planned change at the facility, or activity, that may result in noncompliance, and report as soon as possible any expansion, production increase or process change that may bring new, different or increased discharges of pollutants.

  • When: a change is planned that may affect compliance or discharges.
  • You file it in the agency's system (CERIS-ND).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section V.C, page 21
"The department shall be given advance notice of any planned changes at the permitted facility or of an activity which may result in permit noncompliance."
Open the permit at this section

Write an inspection record for each inspection

No set date. The permit sets no number of days (III.A.4).

Make a record of each inspection summarizing its scope, major observations about the SWPPP and corrective actions taken, with the date, the inspector's name and signature (or other verification), whether it followed a stormwater discharge, signs of pollution, findings and recommendations, and whether the SWPPP was amended.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section III.A.4, page 16
"A record shall be made summarizing the scope of the inspection, major observations relating to the SWPPP, and any corrective actions taken."
Open the permit at this section

Ongoing 1 duty

Keep records for at least three years (five for airfield deicing)

No set date. Standing duty (II.E, IV.F).

Keep all records the permit requires, including calibration and maintenance, for at least three years from the date they were made, and records and certifications on airfield pavement deicing for five years, longer if DEQ or EPA asks. Keep the NOI, coverage letter, SWPPP, inspection records, the permit, sample results, chain-of-custody sheets and DMRs at the facility (electronic copies are acceptable).

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section IV.F, page 20
"All records and information (including calibration and maintenance) required by this permit shall be kept for at least three years from the date of generation or longer if requested by the department or EPA."
Open the permit at this section

Only if... 23 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Agricultural chemicals (SIC 2873-2879): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table, and for any parameter limited by an effluent guideline that applies.

  • Only if: your SIC code starts with 2873, 2874, 2875, 2876, 2877, 2878, 2879.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 B. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 B, page 30
"Applicability: Agricultural Chemicals, SIC codes 2873-2879 ... Sample Frequency: 1/year"
Open the permit at this section

Asphalt felts and roofing materials (SIC 2952): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 2952.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 C. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 C, page 30
"C. Asphalt Paving and Roofing Materials ... Applicability: SIC code 2952 ... Sample Frequency: 1/year"
Open the permit at this section

Automobile salvage yards (SIC 5015): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 5015.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 I. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 I, page 33
"I. Automobile Salvage Yards ... Applicability: SIC code 5015 ... Sample Frequency: 1/year"
Open the permit at this section

Fabricated metal coating and engraving (SIC 3479): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 3479.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 O. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 O, page 36
"Applicability: Fabricated Metal Coating and Engraving, SIC code 3479 ... Sample Frequency: 1/year"
Open the permit at this section

Fabricated metal products (SIC 3411-3499 except 3479, 3911-3915): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 341, 342, 343, 344, 345, 346, 3470, 3471, 3472, 3473, 3474, 3475, 3476, 3477, 3478, 348, 349, 3911, 3912, 3913, 3914, 3915.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 O. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 O, page 36
"Applicability: Fabricated Metal Products, SIC codes 3411-3499, 3911-3915 ... Sample Frequency: 1/year"
Open the permit at this section

Fats and oils products (SIC 2074-2079): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 2074, 2075, 2076, 2077, 2078, 2079.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 N. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 N, page 36
"Applicability: Fats and Oils Products, SIC codes 2074-2079 ... Sample Frequency: 1/year"
Open the permit at this section

Grain mill products (SIC 2041-2048): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 2041, 2042, 2043, 2044, 2045, 2046, 2047, 2048.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 N. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 N, page 36
"Applicability: Grain Mill Products, SIC codes 2041-2048 ... Sample Frequency: 1/year"
Open the permit at this section

Hardwood mills, millwork, plywood, pallets and other wood products (SIC 2426, 2431-2439 except 2434, 2451, 2452, 2493, 2499): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 2426, 2431, 2432, 2433, 2435, 2436, 2437, 2438, 2439, 2451, 2452, 2493, 2499.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 A. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 A, page 29
"Wood Products Facilities not elsewhere classified, SIC codes 2426, 2431-2439 except 2434, 2451, 2452, 2493, 2499 ... Sample Frequency: 1/year"
Open the permit at this section

Industrial inorganic chemicals (SIC 2812-2819): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 2812, 2813, 2814, 2815, 2816, 2817, 2818, 2819.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 B. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 B, page 30
"Applicability: Industrial Inorganic Chemicals, SIC codes 2812-2819 ... Sample Frequency: 1/year"
Open the permit at this section

Iron and steel foundries (SIC 3321-3325): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 3321, 3322, 3323, 3324, 3325.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 E. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 E, page 31
"Applicability: Iron and Steel Foundries, SIC codes 3321-3325 ... Sample Frequency: 1/year"
Open the permit at this section

Miscellaneous metal ores (SIC 1094): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table, including hardness, which has no benchmark.

  • Only if: your SIC code starts with 1094.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 F. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 F, page 32
"Applicability: SIC codes 1094 ... Sample Frequency: 1/year"
Open the permit at this section

Nonferrous rolling, drawing, extruding and foundries (SIC 3351-3357, 3363-3369): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 3351, 3352, 3353, 3354, 3355, 3356, 3357, 3363, 3364, 3365, 3366, 3367, 3368, 3369.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 E. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 E, page 31
"Foundries, SIC codes 3351-3357, 3363-3369 ... Sample Frequency: 1/year"
Open the permit at this section

Paperboard mills (SIC 2631): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 2631.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 A. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 A, page 30
"Applicability: Paperboard Mills, SIC code 2631 ... Sample Frequency: 1/year"
Open the permit at this section

Plastics, synthetics and resins (SIC 2821-2824): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 2821, 2822, 2823, 2824.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 B. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 B, page 30
"Applicability: Plastics, Synthetics, and Resins, SIC codes 2821-2824 ... Sample Frequency: 1/year"
Open the permit at this section

Sawmills and planing mills (SIC 2421): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 2421.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 A. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 A, page 29
"Applicability: General Sawmills and Planing Mills, SIC code 2421 ... Sample Frequency: 1/year"
Open the permit at this section

Scrap recycling facilities (SIC 5093): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 5093.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 J. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 J, page 34
"J. Scrap Recycling Facilities ... Applicability: SIC code 5093 ... Sample Frequency: 1/year"
Open the permit at this section

Soaps, detergents, cosmetics and perfumes (SIC 2841-2844): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 2841, 2842, 2843, 2844.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 B. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 B, page 30
"Applicability: Soaps, Detergents, Cosmetics, and Perfumes, SIC codes 2841-2844 ... Sample Frequency: 1/year"
Open the permit at this section

Steel works, blast furnaces and rolling mills (SIC 3312-3317): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table, and for any parameter limited by an effluent guideline that applies.

  • Only if: your SIC code starts with 3312, 3313, 3314, 3315, 3316, 3317.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 E. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 E, page 31
"Applicability: Steel Works, Blast Furnaces, and Rolling and Finishing Mills ... Sample Frequency: 1/year"
Open the permit at this section

Structural clay products (SIC 3251-3259): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 3251, 3252, 3253, 3254, 3255, 3256, 3257, 3258, 3259.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 D. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 D, page 31
"Applicability: SIC codes 3251-3259 ... Sample Frequency: 1/year"
Open the permit at this section

Wood preserving (SIC 2491): sample once a year

By the end of each reporting year (it starts April 1).

Take a grab sample of a measurable storm event at each outfall with industrial activity in its drainage once in each April to March monitoring period and analyze it for the parameters in the table.

  • Only if: your SIC code starts with 2491.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from Appendix 1 A. Check your copy of the permit.

Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 A, page 29
"Applicability: Wood Preserving, SIC code 2491 ... Sample Frequency: 1/year"
Open the permit at this section

Auto salvage yards: plan for fluid leaks and spills in the SWPPP

No set date. Part of the SWPPP (Appendix 1 I).

Automobile salvage yards include in the SWPPP measures to prevent and respond to leaks and spills of fluids, and processing and storage practices for materials and parts of environmental concern (DEQ's Guideline 37 or a similar guide may be used).

  • Only if: your SIC code starts with 5015.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 I, page 33
"Applicability: SIC code 5015 ... The SWPPP shall include measures to prevent and respond to leaks and spills of fluids."
Open the permit at this section

Discharges to a water with a TMDL: build the TMDL into the SWPPP

No set date. Part of the SWPPP; coverage depends on it (I.B.3, II.C.4.h).

A facility discharging to a water with a TMDL allocation puts the conditions needed to be consistent with the TMDL into its SWPPP, including any wasteload allocation, and outlines the steps to meet it.

  • Only if: a TMDL applies to your discharge.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section II.C.4.h, page 13
"For facilities that discharge to waters with a TMDL allocation the SWPPP shall incorporate the conditions applicable to the discharge necessary for consistency with the assumptions, allocations and requirements of the TMDL."
Open the permit at this section

Scrap recycling facilities: plan for fluid leaks and spills in the SWPPP

No set date. Part of the SWPPP (Appendix 1 J).

Scrap recycling facilities include in the SWPPP measures to prevent and respond to leaks and spills of fluids, and processing and storage practices for materials and parts of environmental concern (DEQ's Guideline 37 or a similar guide may be used).

  • Only if: your SIC code starts with 5093.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section Appendix 1 J, page 34
"Applicability: SIC code 5093 ... The SWPPP shall include measures to prevent and respond to leaks and spills of fluids."
Open the permit at this section

What does no-exposure certification require?

Conditional exemption for no exposure: a No Exposure Certification made under 40 CFR 122.26(g), which also ends coverage under this permit.

One time 1 duty

Submit a No Exposure Certification to end coverage

No set date. The permit sets no date (I.F.1).

A facility whose industrial materials and activities are all protected from exposure to stormwater submits DEQ's No Exposure Certification form, made under 40 CFR 122.26(g). It ends coverage under this permit and begins the certification period.

  • You file it in the agency's system (CERIS-ND).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NDPDES General Permit NDR05-0000, stormwater discharges associated with industrial activity, final (2025-2030), 39 pages, section I.F.1, page 9
"Permittees shall submit a No Exposure Certification form to the department to end permit coverage and begin the certification period."
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

North Dakota Industrial Stormwater General Permit NDR05-0000 duties, topic by topic

How the North Dakota Industrial Stormwater General Permit NDR05-0000 compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: