New York MSGP due dates and duties

Every duty in the SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 77duties, each cited
  • 7on a schedule
  • 70when something happens

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
GP-0-23-001
In force
March 8, 2023 to March 7, 2028
Official page
dec.ny.gov
Rules last checked
November 26, 2026
Today
March 8, 2023 March 7, 2028
Notes on the permit's status and renewal

Effective March 8, 2023 and expiring March 7, 2028 as printed on the signed cover page (an image with no text layer, read by eye). DEC's April 10, 2023 letters to permittees say the permit "will expire on February 28, 2028"; the cover page is the permit and its date is the one used here. It replaced GP-0-17-004, which expired February 28, 2023; facilities covered then had interim coverage and 90 days to file a new NOI (Part I.F.2), a deadline that has passed. Checked November 26, 2026: DEC's MSGP page lists only the March 8, 2023 permit, fact sheet and responsiveness summary, and a search of the Environmental Notice Bulletin and dec.ny.gov found no modification, extension or draft renewal. If no new permit is in effect at expiration and this one is extended under the State Administrative Procedure Act, coverage continues (Appendix G.9).

What does full permit coverage require?

Permit coverage by electronic Notice of Intent; discharges are authorized 30 calendar days after the Department receives a complete NOI.

Every quarter 2 duties

Quarterly visual monitoring of a storm discharge at each outfall

By the end of each calendar quarter.

In each calendar quarter, look at a sample of stormwater discharge from each outfall during a qualifying storm event, taken in the first 30 minutes of discharge (or as soon as practical, within one hour), and record it on the Department's Quarterly Visual Monitoring form kept with the SWPPP. No lab analysis is needed. If no qualifying storm produced runoff in the quarter, document that in the SWPPP.

Further steps with their own deadlines:

  • Repeat the visual check after a corrective action. The permit gives the timing in words, quoted below. Section IV.E.5, page 32
    "An additional visual inspection must be performed ... during a qualifying storm event following the implementation of the corrective action."
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section IV.E.1, page 32
"The monitoring must be made at least once in each of the following quarters:"
Open the permit at this section

Routine inspection of stormwater controls every quarter

By the end of each calendar quarter.

A qualified person inspects how the stormwater controls in the SWPPP are performing, in all areas where industrial materials or activities are exposed, at least quarterly, or more often where the facility's sector says so. Write up each inspection and any deficiencies and keep it with the SWPPP.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section IV.B.1. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section IV.B.1, page 30
"At a minimum, the inspection frequency must be on a quarterly basis or more frequently as specified in the facility's applicable industrial sector in Part VII."
Open the permit at this section

Every year 5 duties

Annual dry weather flow inspection

By December 31 each year.

Once each year, after at least three consecutive days without precipitation, a qualified person inspects for non-stormwater discharges to the stormwater drainage system, writes an inspection report and updates the non-stormwater discharge certification in the SWPPP.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section IV.C.1. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section IV.C.1, page 30
"The qualified person must perform and document at least one dry weather flow inspection each year after at least three (3) consecutive days of no precipitation."
Open the permit at this section

Comprehensive site compliance inspection at least once a year

By December 31 each year.

A qualified person inspects every area where industrial materials or activities are exposed to stormwater, all outfalls and all stormwater controls at least once per year, and writes a report at the end of the inspection. Keep the report with the SWPPP for at least five years.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section IV.A. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section IV.A, page 28
"The qualified person must conduct a comprehensive site compliance inspection at least once per year."
Open the permit at this section

Train stormwater staff at least once a year

By December 31 each year.

Train every employee who works where industrial materials or activities are exposed to stormwater or who carries out permit duties (inspectors, maintenance staff, the whole Pollution Prevention Team) at least annually. Keep an annual signed and dated training log in the SWPPP.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section II.A.8.b. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section II.A.8.b, page 11
"At a minimum, all training must be conducted annually."
Open the permit at this section

Submit the Annual Certification Report by January 28

By January 28, for the calendar year before.

Submit the electronic Annual Certification Report, a summary of the calendar year's monitoring, inspections, corrective actions and facility information, so the Department receives it by January 28 of the following year.

  • You file it in the agency's system (nForm (NYSDEC online forms)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VI.A.1.c, page 42
"the ACR covers January 1 through December 31 and must be received by the Department on an annual basis by January 28 of the following calendar year"
Open the permit at this section

Pay the annual regulatory fee billed by the Department

No set date. Billed by the Department; the amount and due date are not in the permit.

Covered facilities owe an annual fee until a complete Notice of Termination is received. The permit does not state the amount or the due date; the Department bills it.

  • You send it to the agency (NYSDEC invoice).
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section I.E, page 5
"The owner or operator continues to be responsible for meeting permit requirements and payment of annual fees until a complete NOT is received by the Department."
Open the permit at this section

When something happens 23 duties

Check unused vehicles and equipment for leaks at least monthly

By the end of each month.

Drain fluids from equipment and vehicles that will be decommissioned. Inspect any equipment and vehicles that will sit unused for extended periods at least monthly for leaks.

  • When: the equipment or vehicles stored unused.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section II.A.1.g. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section II.A.1.g, page 8
"for any equipment and vehicles that will remain unused for extended periods of time, inspect at least monthly for leaks"
Open the permit at this section

Coal pile runoff: TSS and pH twice a year, with numeric limits

By the end of each half year (June 30 and December 31), once.

Any facility with stormwater discharges from coal storage piles, whatever its sector, takes a grab sample of the coal pile runoff in each semi-annual period for total suspended solids and pH and must meet the Table IV.3 limits. The runoff must not be diluted to meet the limit.

  • When: the facility has coal pile runoff.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section IV.F.1.d, page 34
"Facilities with discharges of stormwater from coal storage piles must comply with the effluent limitations and monitoring requirements of Table IV.3 for all discharges containing the coal pile runoff, regardless of the facility's sector of industrial activity."
Open the permit at this section

Inspect and maintain baghouses every quarter

By the end of each calendar quarter.

Facilities with baghouses inspect and maintain them quarterly while they operate, or as the manufacturer recommends, and remove dust at the base of the exterior baghouse immediately.

  • When: the facility has a baghouse.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section II.A.3.a(3). Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section II.A.3.a(3), page 9
"Inspecting and maintaining baghouses quarterly during periods of operation, or in accordance with manufacturers recommendations"
Open the permit at this section

Submit the semi-annual DMR by July 28 and January 28

By July 28 (January to June) and January 28 (July to December).

Where benchmark, numeric effluent limitation or coal pile monitoring applies, submit the Discharge Monitoring Report in NetDMR so it is received within 28 days after each monitoring period ends: by July 28 for January to June and by January 28 for July to December. A DMR is due for every period, even when there was no discharge.

  • When: the benchmark or numeric limit monitoring applies.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VI.A.2.a, page 42
"All DMRs must be received by the Department 28 days after the end of the monitoring period."
Open the permit at this section

Answer a Department information request within 5 business days

Within 5 working days after the department request for information.

Furnish any information the Department asks for to check compliance within five business days, unless the Department sets another time. Records kept under the permit must be made available or furnished within 25 business days of a request.

Further steps with their own deadlines:

  • Retained records. Within 25 working days after the department request for records. Section VI.C.2.d, page 45
    "furnish to the Department within 25 business days of receipt of a Department request for such information"
  • When: the department requests information.
  • You send it to the agency (NYSDEC).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section Appendix G.8, page 187
"The owner or operator must furnish to the Department, within five (5) business days, unless otherwise set forth by the Department, any information that the Department may request"
Open the permit at this section

Develop and implement the SWPPP before submitting the NOI

Before the NOI submission.

Develop and implement a Stormwater Pollution Prevention Plan that meets Part III and the facility's sector requirements in Part VII before the NOI is submitted. The SWPPP is prepared by a qualified person and signed; parts that are engineering must be prepared by or under a New York licensed professional engineer.

  • When: the new facility.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section I.D.1.a, page 3
"Develop and implement a Stormwater Pollution Prevention Plan (SWPPP) or update and implement the existing SWPPP, in accordance with the requirements in Part III and applicable sections of Part VII prior to submitting the NOI"
Open the permit at this section

Document a corrective action condition within 24 hours

Within 24 hours of becoming aware of the condition.

Within 24 hours of becoming aware of a condition that needs corrective action (pollution or an exceedance, or a non-stormwater discharge), write down the condition, the date identified, when each corrective action started and finished or will finish, and what was done, with a signed certification. Keep it with the SWPPP.

  • When: the corrective action condition found.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section V.C, page 41
"Owners or operators must document the existence of any of the conditions listed in Parts V.A or V.B within 24 hours of becoming aware of such condition."
Open the permit at this section

Erosion and sediment control inspector: 4 hours of training every 3 years

Within 3 years after the last erosion and sediment control training.

If the facility's controls include erosion and sediment controls, the person who inspects them must have 4 hours of Department endorsed training, and 4 more hours every three years after that.

  • When: the facility has erosion and sediment controls.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section Appendix A, Qualified Person, page 170
"After receiving the initial training, the qualified person must receive four (4) hours of training, every three (3) years."
Open the permit at this section

File a Notice of Termination when coverage is no longer needed

No set date. No deadline is stated. Permit duties and annual fees continue until the Department receives a complete NOT.

Submit an electronic NOT when all industrial stormwater discharges are eliminated, when all stormwater goes to a sanitary or combined sewer or treatment works whose owner accepted it, when industrial activity has ceased and all materials, equipment and residues are removed, when another SPDES authorization covers all the discharges, or when the owner or operator changes.

  • When: the coverage no longer needed.
  • You file it in the agency's system (nForm (NYSDEC online forms)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per msgp appendix G10a.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section I.E, page 5
"To terminate permit coverage, the owner or operator must submit a complete NOT which is signed in accordance with Appendix G.8."
Open the permit at this section

Fix the cause of pollution or an exceedance within 12 weeks of discovery

Within 84 days after the discovery of the pollution or exceedance.

When quarterly visual monitoring or the comprehensive inspection shows stormwater pollution, or a benchmark or numeric limit sample shows an exceedance, inspect for the sources, put additional controls in place before the next anticipated storm event if practicable and no more than 12 weeks after discovery, revise the SWPPP, and keep adding controls if results stay unsatisfactory.

Further steps with their own deadlines:

  • Ask for more time if the work will take longer than 12 weeks. The permit gives the timing in words, quoted below. Section V.A.2.b, page 40
    "If implementation will take longer than 12 weeks, the owner or operator must submit a proposed schedule for completion of the project and obtain a written approval from the Regional Water Manager"
  • When: the pollution or exceedance discovered.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section V.A.2.a, page 40
"The implementation must be completed before the next anticipated storm event, if practicable, but not more than 12 weeks after discovery."
Open the permit at this section

Give the Department a copy of the SWPPP within 5 business days of a request

Within 5 working days after the department request for SWPPP.

Have the SWPPP available at an on-site inspection, furnish a copy within five business days of a Department request, give the public a copy within 14 days of a written request (and payment), and give an MS4 operator the SWPPP within 5 days of a written request if you discharge through its system.

Further steps with their own deadlines:

  • Copy to a member of the public. Within 14 days after receipt of the written public request. Section III.C, page 25
    "The owner or operator must make a copy of the SWPPP available to the public within fourteen (14) days of receipt of a written request."
  • SWPPP to the MS4 operator. Within 5 days after the written MS4 operator request. Section III.D.1.b, page 25
    "must make their SWPPP available to the MS4 operator within 5 days of a written request."
  • When: the SWPPP requested.
  • You send it to the agency (Copy of the SWPPP to whoever asked).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section III.C, page 25
"The owner or operator must furnish a copy of the SWPPP within five (5) business days of a Department request in accordance with Appendix G.6."
Open the permit at this section

Give the MS4 operator signed ACR and DMR copies when asked

No set date. On request of the MS4 operator; no number of days is stated.

A facility with at least one industrial stormwater discharge through a municipal separate storm sewer system submits signed copies of its ACRs and DMRs for those outfalls to the MS4 operator when the operator asks.

  • When: the MS4 operator requests reports.
  • You send a copy to the operator of your storm sewer system (MS4).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VI.A.3.a, page 43
"must submit signed copies of ACRs and DMRs for those outfalls to the MS4 Operator upon request of the MS4 Operator."
Open the permit at this section

Keep the duly authorized representative on file with the Department

Before the next report signed by the representative.

Reports may be signed by a duly authorized representative only if a responsible official authorized that person or position in writing and the authorization was submitted to the Department. When the person or position changes, submit a new authorization before or together with the next report.

  • When: the authorized representative changes.
  • You send it to the agency (NYSDEC).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per msgp appendix G10a.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section Appendix G.10.c, page 189
"a new authorization satisfying the requirements of (b) must be submitted to the Department prior to or together with any reports, information, or applications to be signed by an authorized representative."
Open the permit at this section

Old owner files a Notice of Termination when the owner or operator changes

No set date. No number of days is stated. The original owner or operator stays responsible for the permit and fees until the NOT is received.

When the owner or operator changes, the original owner or operator submits an electronic Notice of Termination and should tell the new one in writing that coverage may be needed. The new owner or operator checks Part I and submits its own NOI if coverage is required. Coverage does not transfer.

  • When: the change of owner or operator.
  • You file it in the agency's system (nForm (NYSDEC online forms)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per msgp appendix G10a.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section I.D.4, page 4
"The original owner or operator must submit the Notice of Termination (NOT) to end coverage under this permit for their facility"
Open the permit at this section

Repair a failing control before the next storm, and within 12 weeks at most

Within 84 days after the completion of the most recent inspection.

When a control is not working as designed, maintain or repair it before the next anticipated storm event. If that is impracticable, finish as soon as practicable and no more than 12 weeks after the most recent routine or comprehensive inspection was completed, unless the Department gives a later date in writing.

  • When: the control needs repair or replacement.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section II.A.3.b(1), page 9
"maintenance must be scheduled and accomplished as soon as practicable, but not more than 12 weeks after completion of the most recent routine facility inspection or the comprehensive site inspection"
Open the permit at this section

Report a spill to the NYSDEC Spills hotline within two hours

Within 2 hours of the discovery of the spill.

Report spills of petroleum or hazardous substances to the NYSDEC Spills hotline (1-800-457-7362) within two hours after discovery. If the release enters an MS4, also notify the MS4 owner within two hours. Federal notice to the National Response Center (1-800-424-8802) may also be required.

Further steps with their own deadlines:

  • Notify the MS4 owner. Within 2 hours of the discovery of the release. Section VI.A.3.d, page 43
    "the owner or operator must also notify the owner of the MS4 within 2 hours after discovery."
  • When: the spill of petroleum or hazardous substance.
  • You send it to the agency (NYSDEC Spills hotline 1-800-457-7362).
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VI.A.3.b, page 43
"Notification of any spill listed must be reported to the NYSDEC Spills hotline (1-800-457-7362) within two hours after discovery."
Open the permit at this section

Representative outfall waiver: form with the NOI, and again after an exceedance

No set date. With the NOI, or after two clean consecutive monitoring periods following an exceedance; no calendar date.

A facility with two or more outfalls whose discharges are substantially identical may sample the worst-case outfall only, for quarterly visual and benchmark monitoring, if it submits a Representative Outfall Waiver Form with the NOI and keeps it with the SWPPP. After any event that triggers corrective action at the sampled outfall the waiver is suspended and every outfall is monitored, until two consecutive reported periods show no benchmark exceedance at any outfall and a new form is submitted.

  • When: claiming representative outfall waiver.
  • You file it in the agency's system (nForm (NYSDEC online forms)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section IV.G.3.c, page 38
"the owner or operator must submit a completed Representative Outfall Waiver Form with the NOI and keep it with the SWPPP."
Open the permit at this section

Screen and log every discharge from secondary containment

No set date. Before each discharge from secondary containment; no calendar date.

Before each discharge of stormwater from a secondary containment system, screen it for contamination (a visual check at least). If screening shows contamination, sample it; discharge only if it contains no pollutants. Sample the first discharge after any cleaned up spill or leak. Keep a logbook of each discharge: screening method, results, date, time, volume and supervising person.

Further steps with their own deadlines:

  • Remove spilled substances from chemical bulk storage containment. Within 24 hours of the discovery of spill in containment. Section II.A.12.c, page 12
    "All spilled or leaked substances must be removed from secondary containment systems as soon as practical and for Chemical Bulk Storage (CBS) storage areas within 24 hours of the owner or operator discovering the spill"
  • When: the discharge from secondary containment.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section IV.D.4, page 31
"Prior to each discharge ... from a secondary containment system the stormwater must be screened for contamination."
Open the permit at this section

Send the Adverse Climatic Conditions Waiver Form with the DMR

No set date. Submitted with the DMR for the monitoring period, so that DMR's due date applies.

If the only qualifying storms in a monitoring period were dangerous for staff or made the sample point inaccessible or sampling impossible, the facility may claim the waiver by signing the Adverse Climatic Conditions Waiver Form, submitting it with the DMR for that period and keeping it with the SWPPP. Inconvenient storm timing is not a reason.

  • When: claiming adverse climatic conditions waiver.
  • You file it in the agency's system (NetDMR, attached to the DMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section IV.G.1, page 37
"an Adverse Climatic Conditions Waiver Form must be signed and submitted to the Department with any associated DMR"
Open the permit at this section

Send the Corrective Action/Non-Compliance Event Form with the DMR that reports an exceedance

No set date. Submitted with the DMR that reports the exceedance, so that DMR's due date applies (July 28, January 28, or 28 days after the quarter).

When a result exceeds a numeric effluent limitation, or exceeds the benchmark for the pollutant that impairs the receiving water, report the exceedance and its cause, the corrective actions taken, the preventive actions including SWPPP changes, and the corrective actions at outfalls covered by a representative outfall waiver, on the Department's form, submitted with the DMR that reports the exceedance.

  • When: the numeric limit or impaired water benchmark exceeded.
  • You file it in the agency's system (NetDMR, attached to the DMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VI.A.2.b, page 43
"the owner or operator must report the following information when there is an exceedance of a numeric effluent limitation or exceedance of a benchmark cutoff concentration of the impairing pollutant of concern"
Open the permit at this section

Submit the electronic Notice of Intent at least 30 days before industrial activity begins

At least 30 days before the start of industrial activity.

New dischargers submit a complete electronic NOI at least 30 calendar days before industrial activity begins at the facility. The SWPPP must be developed and implemented first. Coverage starts 30 calendar days after the Department receives a complete NOI, unless the Department says otherwise.

  • When: the new facility.
  • You file it in the agency's system (nForm (NYSDEC online forms)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per msgp appendix G10a.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section I.F.1, page 6
"must submit a complete Department approved electronic NOI at least thirty (30) calendar days before industrial activity begins at the facility."
Open the permit at this section

Tell the Department promptly when NOI information changes

No set date. The permit says "promptly" and sets no number of days.

Submit corrections or updates through the electronic NOI form as soon as you learn that information on the original NOI is no longer valid. Discharges from industrial activities or outfalls that are not on a submitted NOI are not authorized until a complete NOI is received.

  • When: the NOI information changed.
  • You file it in the agency's system (nForm (NYSDEC online forms)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per msgp appendix G10a.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section I.D.3, page 4
"must promptly notify the Department of all corrections or updates to the information provided in the original NOI when they become aware that the information on the original NOI is not valid."
Open the permit at this section

Unauthorized non-stormwater discharge: notify the Regional Water Manager and stop it

No set date. The permit says to notify and to "begin immediate actions"; it sets no number of hours or days.

If a non-stormwater discharge is found, identify its source. If it is not authorized by this permit or another SPDES permit, notify the Regional Water Manager and begin immediate actions to eliminate it, and record those actions in the SWPPP. If it is an authorized non-stormwater discharge that was not yet certified, update the discharge certification.

  • When: the unauthorized non stormwater discharge found.
  • You send it to the agency (NYSDEC Regional Water Manager (Appendix E)).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section V.B, page 40
"the owner or operator must notify the Regional Water Manager (Appendix E), of the unauthorized discharge and begin ... immediate actions to eliminate the discharge."
Open the permit at this section

Ongoing 2 duties

Amend the SWPPP when the facility changes or controls prove ineffective

No set date. Event driven: the schedule for corrected controls ends no later than 12 weeks from discovery (see the corrective action duty).

Amend the SWPPP whenever a change in design, construction, operation or maintenance may affect pollutant discharges, or when inspections or monitoring show the chosen controls are ineffective. A change to stormwater controls must name the corrective actions and a schedule that ends no later than 12 weeks from the date of discovery, unless the Department approves more time in writing.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section III.E, page 27
"The modification must identify the corrective actions needed and include a schedule for the implementation with a final date no later than 12 weeks from date of discovery unless the Department approves additional time in writing."
Open the permit at this section

Keep monitoring records at least five years

Ongoing, no set date.

Keep all monitoring information, the data used for the NOI and copies of every report for at least 5 years from the date of the sample, measurement, report or application. Keep the SWPPP and the NOT for at least five years after the Department receives a complete NOT.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VI.C.2, page 45
"The owner or operator must retain records of all monitoring information for a period of at least 5 years from the date of the sample, measurement, report or application."
Open the permit at this section

Only if... 40 duties

These apply only in the situation named on each one. Answer the questions to sort them.

(Sector E) Sweep at least once a week where cement, aggregate or dust is handled

By the end of each week.

Glass, clay, cement, concrete and gypsum facilities set a sweeping frequency (or equivalent measure) in the SWPPP. It must be at least once per week where cement, aggregate, kiln dust, fly ash or settled dust are handled or processed.

  • Only if: your permit sector is E; the cement aggregate kiln dust fly ash or settled dust handled.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section VII.E Good Housekeeping. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.E Good Housekeeping, page 59
"shall not be less than once per week if cement, aggregate, kiln dust; fly ash, or settled dust are being handled or processed."
Open the permit at this section

(Sector O) Weekly visual check of aboveground tanks, pipelines and pumps

By the end of each week.

At steam electric generating stations, visually inspect the structural integrity of all aboveground tanks, pipelines, pumps and related equipment weekly, and complete needed repairs immediately.

  • Only if: your permit sector is O.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section VII.O Spill Reduction Measures. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.O Spill Reduction Measures, page 118
"the structural integrity of all aboveground tanks, pipelines, pumps and other related equipment shall be visually inspected on a weekly basis."
Open the permit at this section

(Sector A) Monthly inspections where wood is surface protected or preserved

By the end of each month.

Timber facilities that do wood surface protection or preservation inspect processing areas, transport areas and treated wood storage areas monthly, to check that practices keep treatment chemicals off unprotected soil and out of stormwater.

  • Only if: your permit sector is A; the wood surface protection or preserving.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section VII.A Inspections. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.A Inspections, page 48
"Inspections at processing areas, transport areas, and treated wood storage areas of facilities performing wood surface protection and preservation activities shall be performed monthly"
Open the permit at this section

(Sector D) Monthly routine facility inspections

By the end of each month.

Asphalt paving, roofing material and lubricant manufacturers inspect material storage and handling areas, liquid storage tanks, hoppers and silos, vehicle and equipment maintenance, cleaning and fueling areas, material handling vehicles, spray racks, and equipment and processing areas every month.

  • Only if: your permit sector is D.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section VII.D Inspections. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.D Inspections, page 55
"The SWPPP shall provide for monthly routine facility inspections as part of the maintenance program"
Open the permit at this section

(Sector G) Inspect active metal mining sites at least monthly

By the end of each month.

Active metal mining sites are inspected at least monthly. Temporarily inactive sites are inspected at least quarterly unless adverse weather makes the site inaccessible.

  • Only if: your permit sector is G; the active mining site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section VII.G Inspections. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.G Inspections, page 69
"Active mining sites must be inspected at least monthly."
Open the permit at this section

(Sector O) Monthly inspection at steam electric generating stations

By the end of each month.

A qualified person inspects coal handling areas, loading and unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas and the other areas the sector lists every month.

  • Only if: your permit sector is O.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section VII.O Inspections. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.O Inspections, page 116
"The qualified person shall conduct a monthly inspection which include the following areas:"
Open the permit at this section

(Sector S) Inspect monthly during the deicing season

By the end of each month.

Air transportation facilities set an inspection frequency in the SWPPP: at least once per month during the deicing and anti-icing season (for example October through April at most airports), plus any other month in which deicing chemicals may be used. If large quantities of deicing chemicals are being spilled or discharged, or water quality impacts are reported, inspect weekly until that is under control.

  • Only if: your permit sector is S; deicing season month.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.S Inspections, page 138
"At a minimum, inspections shall be conducted once per month during deicing/anti-icing season (e.g., October through April for most airports)."
Open the permit at this section

(Sector V) Inspect textile and apparel facilities at least monthly

By the end of each month.

Textile mills, apparel and other fabric product facilities inspect at least monthly, covering transfer and transmission lines, spill prevention, good housekeeping, management of process waste products and all structural and nonstructural management practices.

  • Only if: your permit sector is V.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section VII.V Inspections. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.V Inspections, page 146
"Inspections shall be conducted at least monthly, and shall include the following activities and areas (at a minimum):"
Open the permit at this section

Benchmark monitoring twice a year (January to June, July to December)

By the end of each half year (June 30 and December 31), once.

Facilities whose sector table in Part VII lists benchmark parameters for their activity sample each outfall once in each semi-annual period, January 1 to June 30 and July 1 to December 31, from a qualifying storm event, have an ELAP certified lab analyze the sample, and report the results on a Discharge Monitoring Report. If no qualifying storm produced runoff in a period, document that in the SWPPP and still file the DMR.

  • Only if: your permit sector is A, B, C, D, E, F, G, I, J, K, L, M, N, O, P, Q, S, T, U, Y, Z, AA, AC.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section IV.F.3.a, page 36
"Monitoring of stormwater discharges associated with industrial activity from each outfall must be performed and documented during the monitoring periods listed in Table IV.2"
Open the permit at this section

Numeric effluent limitation monitoring twice a year

By the end of each half year (June 30 and December 31), once.

Facilities with a discharge subject to a federal effluent limitation guideline listed in Appendix D (wet deck log storage, phosphate fertilizer, asphalt emulsion, cement material storage piles, mine dewatering at sand, gravel and crushed stone mines, landfills, coal piles, airport urea deicing) and facilities with other numeric limits in their sector (Sector G mercury, Subsector N-4 mercury and PCBs, Sector O PCBs) sample those discharges in each semi-annual period and report on a DMR. An exceedance of a numeric limit is a permit violation.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section IV.F.1.b, page 33
"Numeric Effluent Limitation Monitoring - this applies to specific industrial activities listed in Appendix D and specified in the applicable Sector in Part VII."
Open the permit at this section

Quarterly monitoring for the pollutant that impairs the receiving water

By the end of each calendar quarter.

If the facility discharges to an impaired waterbody and the cause of the impairment is a pollutant among the benchmarks or numeric limits that apply to the facility, sample for that pollutant every calendar quarter, in addition to the semi-annual sector monitoring, and report on a quarterly DMR.

  • Only if: your stormwater reaches an impaired water body.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section IV.F.1.c, page 33
"the facility is required to conduct the additional sampling requirements detailed in Part IV.F.2 for that particular pollutant(s) only."
Open the permit at this section

Submit the quarterly DMR for impaired-water monitoring within 28 days of each quarter

By April 28 (Q1), July 28 (Q2), October 28 (Q3) and January 28 (Q4).

Facilities doing quarterly monitoring for discharges to impaired waterbodies submit those results in NetDMR no later than 28 days after each quarter ends: April 28, July 28, October 28 and January 28.

  • Only if: your stormwater reaches an impaired water body.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VI.B Submission Deadlines table, page 44
"Results must be received in NetDMR no later than 28 days following the end of the reporting period."
Open the permit at this section

(Sector A) Timber products: benchmark values and numeric limits

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

General sawmills and planing mills (SIC 2421), wood preserving (SIC 2491), log storage and handling (SIC 2411) and the other wood product codes listed in the table each have their own benchmark parameters. Wet deck log storage discharges (SIC 2411) must also meet the Table VII-A-1 limits. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is A.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.A Benchmarks, page 49
"Timber product facilities are required to monitor their stormwater discharges for the pollutants of concern listed in the appropriate section of Table VII-A-2."
Open the permit at this section

(Sector AA) Fabricated metal products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Fabricated metal products except coating (SIC 3411-3471, 3482-3499, 3911-3915) monitor total nitrogen, aluminum, iron and zinc; fabricated metal coating and engraving (SIC 3479) monitors total nitrogen and zinc. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is AA.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.AA Benchmarks, page 162
"Metal fabricating facilities are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-AA 1."
Open the permit at this section

(Sector AC) Electronic and electrical equipment, photographic and optical goods: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Electronic and electrical equipment, instruments, photographic, medical and optical goods, watches and clocks, and computer and office equipment manufacturers monitor total suspended solids, copper and lead. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is AC.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.AC Benchmarks, page 164
"Facilities under this sector are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-AC-1."
Open the permit at this section

(Sector B) Paper and allied products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Paperboard mills (SIC 2631) monitor chemical oxygen demand. Other paper and allied products facilities have no benchmark parameters. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is B.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.B Benchmarks, page 50
"Paperboard mills are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-B-1."
Open the permit at this section

(Sector C) Chemical and allied products: benchmark values and numeric limits

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Agricultural chemicals (SIC 2873-2879), industrial inorganic chemicals (SIC 2812-2819), soaps, detergents, cosmetics and perfumes (SIC 2841-2844), plastics, synthetics and resins (SIC 2821-2824) and petroleum refineries (SIC 2911) each have their own benchmark parameters. Phosphate fertilizer manufacturing runoff (SIC 2874) must also meet the Table VII-C-1 limits. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is C.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.C Benchmarks, page 53
"are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-C-2 below."
Open the permit at this section

(Sector D) Asphalt paving, roofing materials and lubricants: benchmark values and numeric limits

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Asphalt paving and roofing materials manufacturers (SIC 2951, 2952) monitor total suspended solids. Discharges from areas where asphalt paving and roofing emulsions are produced must also meet the Table VII-D-1 limits. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is D.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.D Benchmarks, page 57
"Asphalt Paving and Roofing Materials (SIC 2951, 2952) Total Suspended Solids (TSS) 100 mg/L"
Open the permit at this section

(Sector E) Glass, clay, cement, concrete and gypsum products: benchmark values and numeric limits

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Clay product manufacturers (SIC 3245-3259, 3261-3269) monitor aluminum; concrete and gypsum product manufacturers (SIC 3271-3275) monitor total suspended solids, pH and iron. Runoff from material storage piles at cement manufacturing facilities (SIC 3241) must also meet the Table VII-E-1 limits. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is E.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.E Benchmarks, page 60
"are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-E-2."
Open the permit at this section

(Sector F) Primary metals: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Steel works, blast furnaces and rolling and finishing mills (SIC 3312-3317), iron and steel foundries (SIC 3321-3325), nonferrous rolling, drawing and extruding (SIC 3351-3357) and nonferrous foundries (SIC 3363-3369) each have their own benchmark parameters. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is F.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.F Benchmarks, page 63
"Primary metals facilities are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-F-1 below."
Open the permit at this section

(Sector G) Metal mining: benchmark values and numeric limits

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Active ore mining and dressing facilities with discharges from waste rock and overburden piles monitor the Table VII-G-3 parameters; Table VII-G-2 says which metals apply to each type of ore. All Sector G discharges must meet the Table VII-G-1 mercury limit. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is G.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.G Benchmarks, page 70
"Active ore mining and dressing facilities with discharges from waste rock and overburden piles must perform analytic monitoring for the parameters listed in Table VII-G-3."
Open the permit at this section

(Sector I) Inspect erosion controls at least every seven calendar days

Within 7 days after the last erosion control inspection.

Oil and gas extraction and refining facilities inspect all erosion controls on the site at least once every seven calendar days.

  • Only if: your permit sector is I.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.I Erosion and Sediment Control Inspections, page 76
"The SWPPP shall include procedures for inspection of all erosion controls on the site at least once every seven calendar days."
Open the permit at this section

(Sector I) Oil and gas extraction and refining: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Oil and gas extraction facilities (SIC Major Group 13) monitor total suspended solids, chlorides and pH. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is I.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.I Benchmarks, page 77
"are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-I-1."
Open the permit at this section

(Sector J) Inspect erosion and sediment controls every seven days while soil is disturbed

Within 7 days after the last erosion and sediment control inspection.

At mineral mining and dressing sites where soil disturbance is going on, a qualified person inspects areas with the potential to discharge to surface water at least once every seven calendar days. Where disturbance is temporarily suspended and temporary stabilization is in place, or runoff is unlikely because of winter conditions, at least once every thirty calendar days.

  • Only if: your permit sector is J; the soil disturbance ongoing.
  • If the soil disturbance suspended and stabilized or winter conditions: Within 30 days after the last erosion and sediment control inspection.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.J Erosion and Sediment Control Inspections, page 81
"For sites where soil disturbance activities are on-going, the qualified person shall conduct a site inspection at least once every seven (7) calendar days."
Open the permit at this section

(Sector J) Mineral mining and dressing: benchmark values and numeric limits

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Sand and gravel mining (SIC 1442, 1446) and dimension stone, crushed stone and nonmetallic minerals except fuels (SIC 1411, 1422-1429, 1481, 1499) each have their own benchmark parameters. Mine dewatering discharges at construction sand and gravel, industrial sand and crushed stone mines (SIC 1422-1429, 1442, 1446) must also meet the Table VII-J-1 limits. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is J.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.J Benchmarks, page 83
"required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-J-2."
Open the permit at this section

(Sector K) Hazardous waste treatment, storage or disposal: benchmark values and numeric limits

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Hazardous waste treatment, storage or disposal facilities monitor the Table VII-K-2 benchmark parameters for stormwater other than contaminated stormwater from landfills. Contaminated stormwater discharges from hazardous waste landfills subject to 40 CFR Part 445 Subpart A must meet the Table VII-K-1 limits. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is K.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.K Benchmarks, page 87
"are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-K-2."
Open the permit at this section

(Sector L) Inspect erosion and sediment controls every seven days while soil is disturbed

Within 7 days after the last erosion and sediment control inspection.

At landfill sites where soil disturbance is going on, a qualified person inspects erosion and sediment controls at least once every seven calendar days. If the Department has authorized more than five acres of disturbance at one time: at least two inspections every seven calendar days, at least two full calendar days apart. Where disturbance is temporarily suspended and temporary stabilization is in place: at least once every thirty calendar days.

  • Only if: your permit sector is L; the soil disturbance ongoing.
  • If the more than five acres disturbed at one time: a different schedule.
  • If the soil disturbance suspended and stabilized: Within 30 days after the last erosion and sediment control inspection.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.L ESC Inspection Frequency, page 93
"For sites where soil disturbance activities are on-going, the qualified person shall conduct a site inspection at least once every seven (7) calendar days."
Open the permit at this section

(Sector L) Inspect operating landfills and land application sites every seven days

Within 7 days after the last facility inspection.

Operating landfills and land application sites, including landfills that do not meet the RCRA Subtitle D criteria, are inspected at least once every seven days. Inactive ones are inspected at least quarterly.

  • Only if: your permit sector is L; operating landfill or land application site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.L Facility Inspections, page 96
"Operating landfills, ... and land application sites shall be inspected at least once every seven days."
Open the permit at this section

(Sector L) Landfills and land application sites: benchmark values and numeric limits

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Landfills and land application sites, including landfills that do not meet the RCRA Subtitle D criteria, monitor the Table VII-L-2 benchmark parameters for stormwater other than contaminated stormwater subject to limits. Contaminated stormwater discharges from landfills subject to 40 CFR Part 445 Subpart B must meet the Table VII-L-1 limits. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is L.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.L Benchmarks, page 98
"Landfill and land application sites are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-L-2."
Open the permit at this section

(Sector M) Automobile salvage yards: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Automobile salvage yards (SIC 5015) monitor total suspended solids, oil and grease, benzene, ethylbenzene, toluene, xylene, aluminum, iron and lead. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is M.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.M Benchmarks, page 105
"Automobile salvage yards are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-M-1."
Open the permit at this section

(Sector N) Scrap recycling and waste recycling: benchmark values and numeric limits

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Subsectors N-2 to N-6 monitor the Table VII-N-2 benchmark parameters. Subsector N-4 also monitors benzene, ethylbenzene, toluene and xylene at outfalls draining shredder operations and storage areas, and must meet the Table VII-N-1 limits for mercury and PCBs. Facilities engaged only in Subsector N-1 activities are not required to do benchmark monitoring. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is N.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.N Benchmarks, page 114
"Facilities in these subsectors must complete the benchmark analysis in Table VII-N-2 below"
Open the permit at this section

(Sector O) Steam electric generating stations: benchmark values and numeric limits

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Steam electric generating facilities monitor oil and grease and iron, and must meet the Table VII-O-1 PCB limit. Coal pile runoff is sampled for TSS and pH twice a year under Table IV.3 (see the coal pile duty). Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is O.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.O Benchmarks, page 120
"Steam electric power generating facilities are required to monitor their stormwater discharges for the pollutant of concern listed in Table VII-O-2."
Open the permit at this section

(Sector P) Land transportation and warehousing: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Land transportation and warehousing facilities with vehicle and equipment maintenance or cleaning (SIC 4011, 4013, 4111-4173, 4212-4231, 4311 and 5171) monitor oil and grease, chemical oxygen demand, benzene, ethylbenzene, toluene and xylene. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is P.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.P Benchmarks, page 123
"Land transportation and/or warehousing facilities are required to monitor their stormwater discharges for the pollutant of concern listed in Table VII-P-1."
Open the permit at this section

(Sector Q) Water transportation: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Water transportation facilities (SIC 4412-4499) monitor aluminum, iron, lead and zinc. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is Q.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.Q Benchmarks, page 129
"Water transportation facilities are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-Q-1."
Open the permit at this section

(Sector S) Air transportation: benchmark values and numeric limits

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Airports that use more than 100,000 gallons of glycol-based deicing or anti-icing chemicals, or 100 tons or more of urea, on an average annual basis monitor the Table VII-S-2 parameters at outfalls that collect runoff from deicing areas. Primary airports with 1,000 or more annual non-propeller aircraft departures must not discharge airfield pavement deicers containing urea: they either certify each year on the annual report that they use none, or meet the Table VII-S-1 ammonia limit. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is S.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.S Benchmarks, page 140
"Airports that use more than 100,000 gallons of glycol-based deicing/anti-icing chemicals and/or 100 tons or more of urea on an average annual basis shall sample their stormwater discharges"
Open the permit at this section

(Sector T) Treatment works: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Treatment works with a design flow of 1.0 MGD or more, or required to have an approved pretreatment program, monitor chemical oxygen demand. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is T.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.T Benchmarks, page 142
"Treatment works are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-T-1"
Open the permit at this section

(Sector U) Food and kindred products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Grain mill products (SIC 2041-2048) and fats and oils products (SIC 2074-2079) each have their own benchmark parameters. Other food and kindred products facilities have no benchmark parameters. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is U.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.U Benchmarks, page 144
"Grain mills and fats and oils products facilities are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-U-1."
Open the permit at this section

(Sector Y) Rubber, plastics and miscellaneous manufacturing: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Rubber product manufacturers (SIC 3011-3069) monitor zinc. Plastic products and miscellaneous manufacturing facilities have no benchmark parameters. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is Y.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.Y Benchmarks, page 153
"Rubber product manufacturing facilities are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-Y-1."
Open the permit at this section

(Sector Z) Leather tanning and finishing: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and numeric limit monitoring duties.

Leather tanning and finishing facilities (SIC 3111) monitor total nitrogen and chromium. Samples are taken and reported on the semi-annual schedule of the benchmark and numeric limit monitoring duties.

  • Only if: your permit sector is Z.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.Z Benchmarks, page 155
"Leather tanning and finishing facilities are required to monitor their stormwater discharges for the pollutants of concern listed in Table VII-Z-1."
Open the permit at this section

Inactive and unstaffed site: waiver form with each DMR

No set date. Submitted with each DMR while the waiver is claimed, so the DMR due dates apply.

Inspections and monitoring can be waived for a monitoring period in which the facility is inactive and unstaffed the whole time and no industrial materials or activities are exposed. Keep a certification of the inactive dates with the SWPPP, do and document a comprehensive site inspection before shutting down, and sign and submit the Inactive or Unstaffed Waiver Form with each DMR.

Further steps with their own deadlines:

  • Comprehensive site inspection before shutdown. The permit gives the timing in words, quoted below. Section IV.G.2.b, page 38
    "Perform and document a Comprehensive Site Inspection prior to shut down."
  • Only if: the facility is inactive and unstaffed.
  • You file it in the agency's system (NetDMR, attached to the DMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section IV.G.2.c, page 38
"When this waiver is being claimed, the waiver form must be signed and submitted with each DMR and be included with the SWPPP."
Open the permit at this section

Where the permit is unclear 3 duties

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

(Sectors J and L) Finish erosion control corrective actions within seven calendar days

No set date. Sectors J and L say the owner or operator "shall begin implementing the corrective actions within one (1) business day of this notification and shall complete the corrective actions within seven (7) calendar days". Do the seven calendar days count from the notification or from the day the work begins?

After an erosion and sediment control inspection, the qualified person tells the owner or operator and the contractor of any corrective actions within one business day. The owner or operator begins them within one business day of that notice and completes them within seven calendar days unless the Department says otherwise.

  • Only if: your permit sector is J, L; the erosion control inspection finds corrective actions.
  • If your permit sector is L: a different schedule.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.J Erosion and Sediment Control Inspections, page 82
"shall complete the corrective actions within seven (7) calendar days unless otherwise notified by the Department."
Open the permit at this section

(Sectors Q and R) Monthly inspections of washing, blasting, painting and storage areas

No set date. Sectors Q and R list areas to include "in all monthly inspections", but neither sector has a sentence that sets a monthly frequency, and Part IV.B makes quarterly the minimum unless the sector specifies more. Do water transportation facilities and ship and boat yards owe monthly inspections?

Water transportation facilities and ship and boat yards include pressure washing areas, blasting, sanding and painting areas, material storage areas, engine maintenance and repair areas, material handling areas, dry dock areas and general yard areas in "all monthly inspections".

  • Only if: your permit sector is Q, R.
  • If your permit sector is R: a different schedule.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section VII.Q Inspections. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VII.Q Inspections, page 128
"The following areas shall be included in all monthly inspections:"
Open the permit at this section

Submit a new NOI when the next MSGP is issued

No set date. When will the Department issue the permit that replaces GP-0-23-001, and what NOI deadline will it set for facilities covered now? Also, the signed cover page says the permit expires March 7, 2028, while DEC's April 10, 2023 letters to permittees say February 28, 2028: which date does the Department use?

An NOI is good for one permit term. GP-0-23-001 is printed to expire March 7, 2028. When the Department issues the next MSGP, covered facilities will need a new NOI by the deadline that permit sets. If no new permit is in effect by expiration and this one is extended, coverage continues under its terms.

  • When: issuance of the next MSGP.
  • You file it in the agency's system (nForm (NYSDEC online forms)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per msgp appendix G10a.

Inferred from section VI.B Submission Deadlines table. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VI.B Submission Deadlines table, page 44
"Submit once per 5-year permit term"
Open the permit at this section

What does no-exposure certification require?

Conditional Exclusion for No Exposure, by an electronic No Exposure Certification resubmitted every 5 years; not transferable.

When something happens 4 duties

Apply for permit coverage when no exposure no longer holds

No set date. The permit sets no number of days: coverage is needed when the exclusion stops applying.

A facility under the no exposure exclusion must keep everything sheltered. If materials or activities become exposed, it must apply for MSGP coverage.

  • When: the materials or activities become exposed.
  • You file it in the agency's system (nForm (NYSDEC online forms)).
  • Signed or certified by a responsible official per msgp appendix G10a.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section I.D.5.c, page 5
"The facility must apply for MSGP coverage when the no exposure exclusion ceases to apply."
Open the permit at this section

Develop and implement the SWPPP before submitting the NOI

Before the NOI submission.

Develop and implement a Stormwater Pollution Prevention Plan that meets Part III and the facility's sector requirements in Part VII before the NOI is submitted. The SWPPP is prepared by a qualified person and signed; parts that are engineering must be prepared by or under a New York licensed professional engineer.

  • When: the new facility.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section I.D.1.a, page 3
"Develop and implement a Stormwater Pollution Prevention Plan (SWPPP) or update and implement the existing SWPPP, in accordance with the requirements in Part III and applicable sections of Part VII prior to submitting the NOI"
Open the permit at this section

Report a spill to the NYSDEC Spills hotline within two hours

Within 2 hours of the discovery of the spill.

Report spills of petroleum or hazardous substances to the NYSDEC Spills hotline (1-800-457-7362) within two hours after discovery. If the release enters an MS4, also notify the MS4 owner within two hours. Federal notice to the National Response Center (1-800-424-8802) may also be required.

Further steps with their own deadlines:

  • Notify the MS4 owner. Within 2 hours of the discovery of the release. Section VI.A.3.d, page 43
    "the owner or operator must also notify the owner of the MS4 within 2 hours after discovery."
  • When: the spill of petroleum or hazardous substance.
  • You send it to the agency (NYSDEC Spills hotline 1-800-457-7362).
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section VI.A.3.b, page 43
"Notification of any spill listed must be reported to the NYSDEC Spills hotline (1-800-457-7362) within two hours after discovery."
Open the permit at this section

Submit the electronic Notice of Intent at least 30 days before industrial activity begins

At least 30 days before the start of industrial activity.

New dischargers submit a complete electronic NOI at least 30 calendar days before industrial activity begins at the facility. The SWPPP must be developed and implemented first. Coverage starts 30 calendar days after the Department receives a complete NOI, unless the Department says otherwise.

  • When: the new facility.
  • You file it in the agency's system (nForm (NYSDEC online forms)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per msgp appendix G10a.
Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section I.F.1, page 6
"must submit a complete Department approved electronic NOI at least thirty (30) calendar days before industrial activity begins at the facility."
Open the permit at this section

Where the permit is unclear 1 duty

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

Resubmit the No Exposure Certification every 5 years

No set date. Part I.D.5.b says the No Exposure Certification "must be submitted once every 5 years". Do the five years count from the date the last certification was submitted, from the date the Department accepted it, or from the permit term?

A facility that relies on the Conditional Exclusion for No Exposure submits the electronic No Exposure Certification once every 5 years. The certification cannot be transferred to a new operator.

  • You file it in the agency's system (nForm (NYSDEC online forms)).
  • Signed or certified by a responsible official per msgp appendix G10a.

Inferred from section I.D.5.b. Check your copy of the permit.

Source: SPDES Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity, GP-0-23-001 (March 8, 2023), section I.D.5.b, page 5
"This certification must be submitted once every 5 years and is non-transferable."
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

MSGP duties, topic by topic

How the MSGP compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: