Get my permit calendar

States / Ohio

Ohio Industrial Stormwater General Permit due dates and duties

Every duty in the Authorization to Discharge Stormwater Associated with Industrial Activity under the National Pollutant Discharge Elimination System, Multi-Sector General Permit, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 53duties, each cited
  • 5on a schedule
  • 48when something happens

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
OHR000007
In force
June 1, 2022 to May 31, 2027
Official page
epa.ohio.gov
Rules last checked
November 26, 2026
Today
June 1, 2022 May 31, 2027
Notes on the permit's status and renewal

Issued May 18, 2022, effective June 1, 2022, expires May 31, 2027 (permit cover page, public notice and Ohio EPA's page, all read November 26, 2026). It replaced OHR000006. Ohio EPA's industrial stormwater page and its general permits page showed no modification of OHR000007 and no draft or proposed replacement on November 26, 2026. If the permit is not reissued by the expiration date it is administratively continued for facilities covered before then (Part 1.3.2). The permit is published as one signed PDF and, on the same page, as separate files for Parts 1 to 5, 6, 7, each Part 8 sector and each appendix; a script compared the words on every page of the part files with the same page of the signed permit: 109 of 148 pages are word for word the same, and the other 39 differ only in spacing, bullet marks, two link labels, the Appendix I form (images in the part file) and the Sector O limit table (no text for its rows in the part file).

What does full permit coverage require?

Every quarter 2 duties

Quarterly visual assessment of a stormwater sample from each outfall

By the end of each calendar quarter.

Each calendar quarter, collect a stormwater sample from each outfall within the first 30 minutes of discharge from a storm that comes at least 72 hours after the previous discharge, and examine it in a clean, clear container in a well-lit area for color, odor, clarity, floating, settled and suspended solids, foam, oil sheen and other signs of pollution. Document the results and keep them with the SWPPP.

  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General Permit OHR000007, Parts 1 to 5 (general requirements for all facilities), section 4.2.1, page 19
"Once each calendar quarter for the entire permit term, you shall collect a stormwater sample from each outfall (except as noted in Part 4.2.3) and conduct a visual assessment of each of these samples."
Open the permit at this section

Routine facility inspection every calendar quarter

By the end of each calendar quarter.

Qualified personnel, with at least one member of the stormwater pollution prevention team taking part, inspect every area where industrial materials or activities are exposed to stormwater and every stormwater control measure, while the facility is operating. Document the date and time, inspectors' names and signatures, weather, discharges seen, and any control measures that need maintenance, repair or replacement.

Further steps with their own deadlines:

  • One inspection each calendar year during a stormwater discharge. By December 31 each year. Section 4.1.1, page 18
    "At least once each calendar year, the routine facility inspection shall be conducted during a period when a stormwater discharge is occurring."
  • If the facility is inactive and unstaffed: No set date. One site inspection a year. The permit does not say whether that means each calendar year or every 12 months.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General Permit OHR000007, Parts 1 to 5 (general requirements for all facilities), section 4.1.1, page 18
"Routine facility inspections shall be conducted at least quarterly (i.e., once each calendar quarter)"
Open the permit at this section

Every year 2 duties

Complete the Annual Report each year and keep it with the SWPPP

No set date. You choose when in the year to complete it, and must keep the same schedule for the whole permit term.

Complete the Annual Reporting Form (Appendix I) once a year: a summary of the past year's routine inspections and visual assessments, corrective actions, and whether coal-tar sealcoat was used. Keep it with the SWPPP. It is sent to Ohio EPA only if Ohio EPA asks for it.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Part 7 (reporting and recordkeeping), section 7.2, page 33
"The timeframe to complete the report is at the discretion of the permittee but the same schedule to complete shall be maintained throughout this permit term."
Open the permit at this section

Train employees at least once a year

No set date. At least once a year, or more often if employee turnover is high. The permit does not say whether that means each calendar year or every 12 months.

Train every employee who works where industrial materials or activities are exposed to stormwater, or who carries out permit duties (inspectors, maintenance staff, the pollution prevention team), on the control measures and on the monitoring, inspection, planning, reporting and documentation requirements. Keep a record of training dates.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General Permit OHR000007, Parts 1 to 5 (general requirements for all facilities), section 2.1.2.9, page 15
"Ohio EPA requires that training be conducted at least annually (or more often if employee turnover is high)."
Open the permit at this section

When something happens 12 duties

Call Ohio EPA as soon as you know of a reportable quantity spill

No set date. As soon as you have knowledge of the discharge. The permit gives no number of hours.

When a leak, spill or other release of a hazardous substance or oil reaches a reportable quantity (40 CFR Parts 110, 117 or 302) within 24 hours, notify the Ohio EPA Division of Emergency and Remedial Response at (800) 282-9378 as soon as you know of the discharge.

  • When: a reportable quantity release.
  • Keep the records 3 years.
Source: General Permit OHR000007, Parts 1 to 5 (general requirements for all facilities), section 2.1.2.4, page 14
"you shall notify the Ohio EPA Division of Emergency and Remedial Response at (800) 282-9378 ... as soon as you have knowledge of the discharge."
Open the permit at this section

Document a corrective action condition within 24 hours, and the response within 30 days

Within 24 hours of discovering the condition.

Within 24 hours of discovering a condition listed in Part 3.1 or 3.2 (an unauthorized release, a numeric limit exceedance, control measures not stringent enough or not properly operated and maintained, a finding by Ohio EPA or the local storm sewer operator, a change that significantly alters the pollutants discharged, or a benchmark average exceedance), document what triggered the review, the problem and the date. Within 30 days, document the corrective action taken or planned, or why none is needed.

Further steps with their own deadlines:

  • Document the corrective action taken or planned. Within 30 days after discovering the condition. Section 3.3, page 17
    "within 30 days of such discovery, you shall document any corrective action(s) to be taken to eliminate or further investigate the deficiency, or if no corrective action is needed, the basis for that determination."
  • When: the you discover a corrective action condition.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General Permit OHR000007, Parts 1 to 5 (general requirements for all facilities), section 3.3, page 17
"You shall document your discovery of any of the conditions listed in Parts 3.1 and 3.2 within 24 hours of making such discovery."
Open the permit at this section

Give advance notice of planned changes that may cause noncompliance

No set date. In advance of the change. The permit gives no number of days.

Give Ohio EPA Central Office advance notice of any planned change in the facility or activity that may result in noncompliance with the permit.

  • When: a planned change may cause noncompliance.
  • You send it to the agency (Ohio EPA Division of Surface Water, Central Office (Part 7.6.1)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Appendix B (standard permit conditions), section B.12.B, page 122
"You shall give advance notice to Ohio EPA of any planned changes in the permitted facility or activity which may result in noncompliance with permit requirements."
Open the permit at this section

Make control measure changes before the next storm if possible

No set date. Before the next storm event if possible, or as soon as practicable after that storm event. The permit gives no number of days.

When a corrective action review shows that control measures must change, make the changes before the next storm event if possible, or as soon as practicable after it. Where the triggering outfall stands for substantially identical outfalls, do the same for each of them.

  • When: a corrective action review finds changes are needed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General Permit OHR000007, Parts 1 to 5 (general requirements for all facilities), section 3.3, page 17
"any modifications to your control measures shall be made before the next storm event if possible, or as soon as practicable following that storm event."
Open the permit at this section

Notify Ohio EPA at least 30 days before transferring permit coverage

At least 30 days before the proposed transfer date.

When the facility changes owner or operator, the current and new permittee jointly submit the NPDES General Permit Transfer application in the Ohio EPA eBusiness Center at least thirty days before the proposed transfer date.

Further steps with their own deadlines:

  • Joint application by the current and new permittee. The permit gives the timing in words, quoted below. Section Appendix L, page 146
    "To transfer this general permit coverage, both the transferor and transferee shall jointly submit a complete and accurate NPDES General Permit Transfer application"
  • When: the coverage is to be transferred to a new owner or operator.
  • You file it in the agency's system (Ohio EPA eBusiness Center).
  • Keep the records 3 years.
Source: Ohio Administrative Code rule 3745-38-02, Requirements for general NPDES permits (effective June 3, 2022), section OAC 3745-38-02(K)(1)
"Ohio EPA shall be notified on a form approved by the director at least thirty days prior, unless a different timeframe is specified in the general permit, to any proposed transfer of coverage under a general NPDES permit."
Open the permit at this section

Promptly correct facts left out of or wrong in the NOI or a report

No set date. Promptly. The permit gives no number of days.

If you learn that relevant facts were left out of the Notice of Intent, or that the NOI or any report contained incorrect information, promptly submit the facts or corrected information to Ohio EPA.

  • When: the you find missing or incorrect information in a submission.
  • You send it to the agency (Ohio EPA Division of Surface Water, Central Office (Part 7.6.1)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Appendix B (standard permit conditions), section B.12.H, page 123
"you shall promptly submit such facts or information."
Open the permit at this section

Report endangering noncompliance within 24 hours, and in writing within five days

Within 24 hours of becoming aware of the noncompliance.

Report any noncompliance that may endanger health or the environment orally to the Ohio EPA district office within 24 hours of becoming aware of it, and send a written report within five days. The 24-hour report also covers an unanticipated bypass or an upset that exceeds an effluent limit, and a violation of a maximum daily discharge limit.

Further steps with their own deadlines:

  • Written report. Within 5 days after becoming aware of the noncompliance. Section B.12.F.1, page 123
    "A written submission shall also be provided within five days of the time you become aware of the circumstances."
  • When: the noncompliance that may endanger health or the environment.
  • You send it to the agency (Ohio EPA District Office for your county (Part 7.6.2), orally first).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Appendix B (standard permit conditions), section B.12.F.1, page 123
"Any information shall be provided orally within 24 hours from the time you become aware of the circumstances."
Open the permit at this section

Report monitoring results in eDMR within 30 days of the lab results

Within 30 days after the you receive the complete lab results for all monitored outfalls.

Submit all benchmark, effluent limit and follow-up monitoring data to Ohio EPA in the eDMR system no later than 30 days after receiving the complete laboratory results for all monitored outfalls. Use paper forms, by the same deadline, only if eDMR cannot be accessed.

  • When: the you receive lab results for a monitoring event.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Part 7 (reporting and recordkeeping), section 7.1, page 33
"no later than 30 days (email date or postmark date) after you have received your complete laboratory results for all monitored outfalls."
Open the permit at this section

Report other noncompliance with the next monitoring report

No set date. At the time monitoring reports are submitted.

Report every instance of noncompliance not already reported in a monitoring report, a compliance schedule report or a 24-hour report at the time monitoring reports are submitted, with the same information as a 24-hour written report.

  • When: the noncompliance not otherwise reported.
  • You send it to the agency (Ohio EPA Division of Surface Water, Central Office (Part 7.6.1)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Appendix B (standard permit conditions), section B.12.G, page 123
"You shall report all instances of noncompliance not reported under Appendix B, Subsections 12.D, 12.E, and 12.F, at the time monitoring reports are submitted."
Open the permit at this section

Submit a Notice of Intent 180 days before a new discharge starts

At least 180 days before the planned start of stormwater discharge.

A new discharger or new source submits a complete Notice of Intent (NOI) in the Ohio EPA eBusiness Center 180 days before stormwater discharge is planned to start. Discharge is authorized only when the Ohio EPA Director approves coverage.

  • When: the you plan a new stormwater discharge.
  • You file it in the agency's system (Ohio EPA eBusiness Center).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per OHR000007 Appendix B 11.A.
Source: General Permit OHR000007, Parts 1 to 5 (general requirements for all facilities), section 1.3.1 Table 1-2, page 9
"180 days prior to the planned commencement of stormwater discharge"
Open the permit at this section

Submit a Notice of Termination within 30 days when coverage should end

Within 30 days after the termination condition is met.

Submit a Notice of Termination (NOT) in the Ohio EPA eBusiness Center within 30 days after operations and industrial stormwater discharges have ceased (with erosion controls in place), a Sector J facility has met its termination requirements, or all discharges are covered by an individual or alternative general permit.

  • When: a termination condition is met.
  • You file it in the agency's system (Ohio EPA eBusiness Center).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per OHR000007 Appendix B 11.A.
Source: General Permit OHR000007, Parts 1 to 5 (general requirements for all facilities), section 1.4.2, page 11
"You shall submit a Notice of Termination within 30 days after one or more of the following conditions have been met:"
Open the permit at this section

Tell Ohio EPA as soon as possible about planned physical changes

No set date. As soon as possible. The permit gives no number of days.

Give notice to Ohio EPA Central Office as soon as possible of any planned physical alteration or addition that could make the facility a new source, or could significantly change the nature or increase the quantity of pollutants discharged.

  • When: a significant physical change is planned.
  • You send it to the agency (Ohio EPA Division of Surface Water, Central Office (Part 7.6.1)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Appendix B (standard permit conditions), section B.12.A, page 122
"You shall give notice to Ohio EPA as soon as possible of any planned physical alterations or additions to the permitted facility."
Open the permit at this section

Ongoing 2 duties

Keep permit records for at least 3 years after coverage ends

Ongoing, no set date.

Keep the SWPPP and its changes, the Part 5.4 records (inspections, visual assessments, training, maintenance, corrective actions), all reports and certifications, monitoring data and the data used for the NOI for at least 3 years from the date coverage expires or is terminated.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 7 (reporting and recordkeeping), section 7.5, page 35
"for a period of at least 3 years from the date that your coverage under this permit expires or is terminated."
Open the permit at this section

Keep the SWPPP current, signed and at the facility

Ongoing, no set date.

Keep a current, signed Stormwater Pollution Prevention Plan (SWPPP) at the facility, immediately available to Ohio EPA, a local agency approving stormwater management plans and the operator of a municipal storm sewer the site drains to. Change it whenever a corrective action condition requires, on the corrective action timetable, and sign and date each change.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Parts 1 to 5 (general requirements for all facilities), section 5.3, page 26
"You shall retain a copy of the current SWPPP required by this permit at the facility, and it shall be immediately available to Ohio EPA"
Open the permit at this section

Only if... 32 duties

These apply only in the situation named on each one. Answer the questions to sort them.

(Sector A) Inspect wood preservation areas every month

By the end of each month.

Timber products facilities that do wood surface protection and preservation inspect processing areas, transport areas and treated wood storage areas monthly, to check that treatment chemicals are kept off unprotected soils and out of stormwater.

  • Only if: your permit sector is A; the facility does wood surface protection or preservation.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector A (Timber Products), section 8.A.5, page 38
"inspect processing areas, transport areas, and treated wood storage areas monthly"
Open the permit at this section

(Sector J) Inspect every month if the site discharges to outstanding or sediment-impaired waters

By the end of each month.

Mineral mining sites that discharge to waters designated as outstanding waters, or to waters impaired for sediment, are inspected monthly instead of quarterly.

  • Only if: your permit sector is J; the site discharges to outstanding waters or waters impaired for sediment.
  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General Permit OHR000007, Part 8 Sector J (Mineral Mining and Dressing), section 8.J.7, page 58
"Sites which discharge to waters which are designated as outstanding waters or waters which are impaired for sediment shall be inspected monthly."
Open the permit at this section

(Sector O) Inspect coal, ash, fuel and storage areas every month

By the end of each month.

Steam electric generating facilities inspect monthly: coal handling areas, loading or unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas, areas next to disposal ponds and landfills, maintenance areas, liquid storage tanks, and long term and short term material storage areas.

  • Only if: your permit sector is O.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector O (Steam Electric Generating Facilities), section 8.O.6.1, page 75
"As part of your inspection, inspect the following areas monthly: coal handling areas, loading or unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas"
Open the permit at this section

(Sector S) Inspect the airport every month of the deicing season

By the end of each month.

Air transportation facilities carry out routine facility inspections at least monthly during the deicing season (for example October through April at most mid-latitude airports), and in every other month in which deicing chemicals may be used.

  • Only if: your permit sector is S; a month in your deicing season.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General Permit OHR000007, Part 8 Sector S (Air Transportation Facilities), section 8.S.5.1, page 88
"At a minimum conduct routine facility inspections at least monthly during the deicing season"
Open the permit at this section

(Sector V) Inspect transfer lines and management practices every month

By the end of each month.

Textile, apparel and leather products facilities inspect at least monthly: transfer and transmission lines, spill prevention, good housekeeping practices, management of process waste products, and all structural and nonstructural management practices.

  • Only if: your permit sector is V.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector V (Textile Mills, Apparel, and Other Fabric Product Manufacturing; Leather and Leather Products), section 8.V.5, page 94
"Inspect, at least monthly, the following activities and areas (at a minimum): transfer and transmission lines, spill prevention, good housekeeping practices, management of process waste products"
Open the permit at this section

(Sector L) Inspect closed landfills, open dumps and land application sites every quarter

By the end of each calendar quarter.

Qualified personnel inspect closed landfills, open dumps and land application sites at least quarterly, covering stabilization and structural erosion control measures, leachate collection and treatment systems, and all closed land application areas.

  • Only if: your permit sector is L.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.L.7.2. Check your copy of the permit.

Source: General Permit OHR000007, Part 8 Sector L (Landfills, Land Application Sites, and Open Dumps), section 8.L.7.2, page 64
"Inspect closed landfills, open dumps, and land application sites at least quarterly."
Open the permit at this section

(Sector M) Inspect for leaks every quarter

By the end of each calendar quarter.

Automobile salvage yards inspect quarterly, for signs of leakage, all equipment containing oily parts, hydraulic fluids, other fluids or mercury switches, and all vessels and areas where hazardous materials and automotive fluids are stored. Vehicles arriving at the site are inspected for leaks immediately, or as soon after as feasible.

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 8.M.4. Check your copy of the permit.

Source: General Permit OHR000007, Part 8 Sector M (Automobile Salvage Yards), section 8.M.4, page 66
"Inspect quarterly for signs of leakage all equipment containing oily parts, hydraulic fluids, any other types of fluids, or mercury switches."
Open the permit at this section

(Sector A) Benchmark values and effluent limits for timber products

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Subsectors A1 to A4, and the effluent limits for discharges from spray down or intentional wetting of logs at wet deck storage areas.

  • Only if: your permit sector is A.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector A (Timber Products), section 8.A.6 Table 8.A-1, page 38
"Table 8.A-1 identifies benchmarks that apply to the specific subsectors of Sector A."
Open the permit at this section

(Sector AA) Benchmark values for fabricated metal products

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Subsectors AA1 (fabricated metal products except coating, SIC 3411 to 3499 and 3911 to 3915) and AA2 (fabricated metal coating and engraving, SIC 3479).

  • Only if: your permit sector is AA.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector AA (Fabricated Metal Products), section 8.AA.5 Table 8.AA-1, page 104
"8.AA.5 Sector-Specific Benchmarks. (See also Part 6 of the permit.)"
Open the permit at this section

(Sector B) Benchmark value for paperboard mills

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentration for Subsector B1, paperboard mills (SIC 2631).

  • Only if: your permit sector is B.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector B (Paper and Allied Products), section 8.B.2 Table 8.B-1, page 40
"8.B.2 Sector-Specific Benchmarks. (See also Part 6 of the permit.)"
Open the permit at this section

(Sector C) Benchmark values for chemicals and allied products

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Subsectors C1 (agricultural chemicals), C2 (industrial inorganic chemicals), C3 (soaps, detergents, cosmetics and perfumes), C4 (plastics, synthetics and resins) and C6 (composting).

  • Only if: your permit sector is C.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector C (Chemicals and Allied Products Manufacturing), section 8.C.4 Table 8.C-1, page 42
"Subsector C1. Agricultural Chemicals"
Open the permit at this section

(Sector D) Benchmark value and effluent limits for asphalt paving, roofing and lubricants

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentration for Subsector D1 (asphalt paving and roofing materials, SIC 2951 and 2952), and the effluent limits for discharges from asphalt emulsion facilities.

  • Only if: your permit sector is D.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector D (Asphalt Paving and Roofing Materials and Lubricant Manufacturing), section 8.D.3 Table 8.D-1, page 43
"Table 8.D-1 identifies benchmarks that apply to the specific subsectors of Sector D."
Open the permit at this section

(Sector E) Benchmark values and effluent limits for glass, clay, cement, concrete and gypsum

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Subsectors E1 (clay product manufacturers) and E2 (concrete and gypsum product manufacturers), and the effluent limits for discharges from material storage piles at cement manufacturing facilities.

  • Only if: your permit sector is E.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector E (Glass, Clay, Cement, Concrete, and Gypsum Products), section 8.E.4 Table 8.E-1, page 46
"Subsector E1. Clay Product Manufacturers"
Open the permit at this section

(Sector F) Benchmark values for primary metals

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Subsectors F1 (steel works, blast furnaces, rolling and finishing mills), F2 (iron and steel foundries), F3 (rolling, drawing and extruding of nonferrous metals) and F4 (nonferrous foundries).

  • Only if: your permit sector is F.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector F (Primary Metals), section 8.F.5 Table 8.F-1, page 48
"8.F.5 Sector-Specific Benchmarks. (See also Part 6 of the permit.)"
Open the permit at this section

(Sector I) Inspect erosion and sediment controls every 7 days

Within 7 days after the last inspection of erosion and sedimentation controls.

Oil and gas extraction and refining facilities inspect all erosion and sedimentation control measures every 7 days.

  • Only if: your permit sector is I.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector I (Oil and Gas Extraction and Refining), section 8.I.5, page 52
"All erosion and sedimentation control measures shall be inspected every 7 days."
Open the permit at this section

(Sector I) Start vegetative practices within 14 days after the last activity in a disturbed area

Within 14 days after the last activity in that area.

Oil and gas facilities begin appropriate vegetative practices (for example seeding, mulching, sod stabilization, buffer strips) on each disturbed area within 14 days following the last activity in that area.

  • Only if: your permit sector is I; the activity in a disturbed area ends.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector I (Oil and Gas Extraction and Refining), section 8.I.3.1, page 51
"Begin implementing appropriate vegetative practices on all disturbed areas within 14 days following the last activity in that area."
Open the permit at this section

(Sector J) Benchmark values and effluent limits for mineral mining and dressing

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Subsectors J1 (sand and gravel mining) and J2 (dimension and crushed stone and nonmetallic minerals), and the effluent limits for mine dewatering discharges at crushed stone, construction sand and gravel, and industrial sand mines.

  • Only if: your permit sector is J.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector J (Mineral Mining and Dressing), section 8.J.8 Table 8.J-1, page 58
"Table 8.J-1 identifies benchmarks that apply to the specific subsectors of Sector J."
Open the permit at this section

(Sector J) Inspect clearing, grading and excavation areas every 7 days, or every 14 days and after storms

No set date. Either at least once every 7 calendar days, or at least once every 14 calendar days and within 24 hours of the end of a storm of 0.5 inches or more. You choose which.

During the exploration and construction phase of a mining site, inspect all disturbed areas, material storage areas exposed to precipitation, sediment and erosion controls, discharge locations and vehicle entrances and exits, and write a report for each inspection. Choose one schedule: at least once every 7 calendar days, or at least once every 14 calendar days and within 24 hours of the end of a storm of 0.5 inches or more.

  • Only if: your permit sector is J; clearing grading or excavation is under way.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General Permit OHR000007, Part 8 Sector J (Mineral Mining and Dressing), section 8.J.4.2.1, page 55
"Inspections shall be conducted either at least once every 7 calendar days or at least once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater."
Open the permit at this section

(Sector J) Start stabilizing a disturbed area within 14 days after work there stops

Within 14 days after the activity in that part of the site stopped.

Where clearing, grading or excavation in part of a mining site has temporarily or permanently ceased, start stabilization measures immediately, and in no case more than 14 days after the activity in that part of the site ceased.

  • Only if: your permit sector is J; clearing grading or excavation stops in part of the site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector J (Mineral Mining and Dressing), section 8.J.4.3.2, page 55
"in no case more than 14 days after the clearing, grading and/or excavation activities in that portion of the site have temporarily ceased."
Open the permit at this section

(Sector K) Benchmark values for hazardous waste treatment, storage or disposal facilities

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Subsector K1 (Industrial Activity Code HZ), for discharges not subject to the effluent limits of 40 CFR Part 445 Subpart A.

  • Only if: your permit sector is K.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector K (Hazardous Waste Treatment, Storage, or Disposal Facilities), section 8.K.5 Table 8.K-1, page 61
"Table 8.K-1 identifies benchmarks that apply to the specific subsectors of Sector K."
Open the permit at this section

(Sector L) Benchmark value for closed landfills, land application sites and open dumps

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentration for Subsector L1 (Industrial Activity Code LF).

  • Only if: your permit sector is L.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector L (Landfills, Land Application Sites, and Open Dumps), section 8.L.9 Table 8.L-1, page 65
"Table 8.L-1 identifies benchmarks that apply to the specific subsectors of Sector L."
Open the permit at this section

(Sector M) Benchmark values for automobile salvage yards

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Subsector M1, automobile salvage yards (SIC 5015).

  • Only if: your permit sector is M.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector M (Automobile Salvage Yards), section 8.M.5 Table 8.M-1, page 67
"8.M.5 Sector-Specific Benchmarks. (See also Part 6 of the permit.)"
Open the permit at this section

(Sector N) Benchmark values for scrap and waste recycling

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Subsector N1, scrap recycling and waste recycling facilities except source-separated recycling (SIC 5093).

  • Only if: your permit sector is N.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector N (Scrap Recycling Facilities), section 8.N.6 Table 8.N-1, page 72
"8.N.6 Sector-Specific Benchmarks. (See also Part 6 of the permit.)"
Open the permit at this section

(Sector O) Effluent limits for coal pile runoff at steam electric generating facilities

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Effluent limits for discharges from coal storage piles at steam electric generating facilities. Sector O has no benchmarks in this permit.

  • Only if: your permit sector is O.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector O (Steam Electric Generating Facilities), section 8.O.8 Table 8.O-2, page 75
"Table 8.O-2 identifies effluent limits that apply to the industrial activities described below."
Open the permit at this section

(Sector Q) Benchmark values for water transportation

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Subsector Q1, water transportation facilities (SIC 4412 to 4499).

  • Only if: your permit sector is Q.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector Q (Water Transportation), section 8.Q.6 Table 8.Q-1, page 81
"8.Q.6 Sector-Specific Benchmarks. (See also Part 6 of the permit.)"
Open the permit at this section

(Sector S) Benchmark values for airports that use large amounts of deicer

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for airports where one permittee, or the permitted facilities together, use more than 100,000 gallons of glycol-based deicing chemicals or 100 tons or more of urea a year on average. They apply only to outfalls that collect runoff from areas where deicing occurs.

  • Only if: your permit sector is S.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector S (Air Transportation Facilities), section 8.S.6 Table 8.S-1, page 88
"Monitor per the requirements in Table 8.S-1."
Open the permit at this section

(Sector U) Benchmark values for food and kindred products

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark concentrations for Subsectors U1 (grain mill products, SIC 2041 to 2048) and U2 (fats and oils products, SIC 2074 to 2079).

  • Only if: your permit sector is U.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector U (Food and Kindred Products), section 8.U.6 Table 8.U-1, page 92
"8.U.6 Sector-Specific Benchmarks. (See also Part 6 of the permit.)"
Open the permit at this section

(Sector Y) Benchmark value for rubber products manufacturing

No set date. These are the values a sample is compared with. The sampling schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark for Subsector Y1, rubber products manufacturing (SIC 3011, 3021, 3052, 3053, 3061, 3069): total zinc, by receiving water hardness.

  • Only if: your permit sector is Y.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
Source: General Permit OHR000007, Part 8 Sector Y (Rubber, Miscellaneous Plastic Products, and Miscellaneous Manufacturing Industries), section 8.Y.4 Table 8.Y-1, page 99
"8.Y.4 Sector-Specific Benchmarks. (See also Part 6 of the permit.)"
Open the permit at this section

Re-sample within 30 days after correcting an effluent limit exceedance

Within 30 days after implementing the corrective action.

After a numeric effluent limit is exceeded and corrective action is taken, sample again for the pollutant that exceeded within 30 calendar days of implementing the corrective action, or during the next qualifying runoff event if none occurs in that time. If the follow-up result also exceeds the limit, submit an Exceedance Report and keep monitoring at least quarterly until the discharge meets the limit or Ohio EPA waives the monitoring.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); a numeric effluent limit is exceeded.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Part 7 (reporting and recordkeeping), section 6.3, page 33
"You shall conduct follow-up monitoring within 30 calendar days (or during the next qualifying runoff event, should none occur within 30 days) of implementing corrective action(s) taken pursuant to Part 3"
Open the permit at this section

Report the receiving water hardness with the first benchmark report

No set date. With your first benchmark monitoring report.

Facilities with a hardness dependent benchmark (cadmium, copper, lead, silver or zinc) determine the hardness of their receiving water by one of the Appendix J methods and submit the value to Ohio EPA with their first benchmark monitoring report.

  • Only if: your permit subsector is A1, A2, C1, C3, C4, F1, F2, F3, F4, K1, M1, N1, Q1, Y1, AA1, AA2.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Part 6 (monitoring), section 6.2.1.1, page 30
"you are required to submit to Ohio EPA with your first benchmark report a hardness value, established consistent with the procedures in Appendix J, which is representative of your receiving water."
Open the permit at this section

Submit an Exceedance Report within 30 days if follow-up monitoring still exceeds a limit

Within 30 days after the you receive the lab results.

If follow-up monitoring again exceeds a numeric effluent limit, submit an Exceedance Report to Ohio EPA no later than 30 days after receiving the lab results, with the permit number, facility and receiving water, the monitoring data from this and earlier events, an explanation of what has been and will be done, and a contact.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); the follow up monitoring exceeds a numeric effluent limit.
  • You send it to the agency (Ohio EPA Division of Surface Water, Central Office (Part 7.6.1)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Part 7 (reporting and recordkeeping), section 7.3, page 34
"If follow-up monitoring pursuant to Part 6.3 exceeds a numeric effluent limit, you shall submit an Exceedance Report to Ohio EPA no later than 30 days after you have received your lab results."
Open the permit at this section

Yearly effluent limit monitoring for discharges under federal effluent guidelines

No set date. Once per year, starting on the date your discharge was authorized. The permit does not say whether the year is the calendar year or is counted from that date.

Once per year, starting on the date discharge was authorized, sample each outfall that carries a discharge listed in Table 6-1 (wet deck log spray down, asphalt emulsion runoff, cement material storage pile runoff, mine dewatering at crushed stone, sand and gravel or industrial sand mines, coal pile runoff at steam electric plants) for the limits in that sector's section of Part 8. Every such outfall must be sampled; substantially identical outfalls may not stand in.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Part 6 (monitoring), section 6.2.2.1, page 32
"Beginning on your date of discharge authorization, you shall monitor once per year at each outfall containing the discharges identified in Table 6-1 for the parameters specified in the sector-specific section of Part 8."
Open the permit at this section

Where the permit is unclear 2 duties

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

Benchmark monitoring: four quarterly samples in the first eight quarters of coverage

No set date. Part 6.2.1.2 requires four benchmark samples "During the first 8 quarterly monitoring periods of your permit coverage", and Part 6.1.7 says monitoring requirements "begin on your date of discharge authorization" and lists calendar quarters. Ohio EPA must say whether the calendar quarter in which coverage was authorized counts as the first of the eight periods, or whether the count starts with the first full quarter.

Facilities in a subsector with benchmarks sample for their benchmark parameters in four of the first eight quarterly monitoring periods of their coverage, one sample per chosen quarter, and compare the average of the four results with the benchmark. If the average is at or below the benchmark, monitoring for that parameter is done for the permit term. If it is above, review the control measures and either make changes and sample four more quarters in the next eight, or document that no further reduction is achievable.

  • Only if: your permit subsector is A1, A2, A3, A4, B1, C1, C2, C3, C4, C6, D1, E1, E2, F1, F2, F3, F4, J1, J2, K1, L1, M1, N1, Q1, S1, U1, U2, Y1, AA1, AA2.
  • Does not apply if: the facility is inactive and unstaffed.
  • You file it in the agency's system (Ohio EPA eDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General Permit OHR000007, Part 6 (monitoring), section 6.2.1.2, page 30
"During the first 8 quarterly monitoring periods of your permit coverage, you shall select a total of 4 quarterly monitoring periods (as identified in Part 6.1.7) and perform benchmark monitoring."
Open the permit at this section

Renew coverage when Ohio EPA issues the next general permit

No set date. OHR000007 expires May 31, 2027 and no draft replacement was on Ohio EPA's pages on 2026-11-26. What deadline will the next general permit set for existing facilities to submit a renewal Notice of Intent? (OHR000007 gave 90 days after its effective date, and Ohio EPA wrote that coverage not renewed by September 1, 2022 would end.).

OHR000007 expires May 31, 2027. To keep coverage after Ohio EPA reissues or replaces it, a covered facility must submit a new Notice of Intent on time under the new permit. The deadline will be set by the new permit, which has not been issued.

  • When: the ohio EPA issues the next general permit.
  • You file it in the agency's system (Ohio EPA eBusiness Center).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per OHR000007 Appendix B 11.A.

Inferred from section 1.3.2. Check your copy of the permit.

Source: General Permit OHR000007, Parts 1 to 5 (general requirements for all facilities), section 1.3.2, page 10
"Your authorization for coverage under a reissued permit or a replacement of this permit following your timely and appropriate submittal of a complete NOI requesting authorization to discharge under the new permit"
Open the permit at this section

What does no-exposure certification require?

Conditional exclusion for no exposure under 40 CFR 122.26(g): no permit is needed once a complete No Exposure Certification is submitted to Ohio EPA, renewed every five years.

Every few years 1 duty

Submit a new No Exposure Certification every five years

Within 5 years after your last no exposure certification.

A facility excluded from permitting because nothing industrial is exposed to stormwater submits a No Exposure Certification to Ohio EPA in the eBusiness Center once every five years.

  • You file it in the agency's system (Ohio EPA eBusiness Center).
Source: General Permit OHR000007, Parts 1 to 5 (general requirements for all facilities), section 1.5, page 11
"You shall submit a No Exposure Certification to Ohio EPA once every five years."
Open the permit at this section

When something happens 1 duty

Submit a Notice of Intent 180 days before a new discharge starts

At least 180 days before the planned start of stormwater discharge.

A new discharger or new source submits a complete Notice of Intent (NOI) in the Ohio EPA eBusiness Center 180 days before stormwater discharge is planned to start. Discharge is authorized only when the Ohio EPA Director approves coverage.

  • When: the you plan a new stormwater discharge.
  • You file it in the agency's system (Ohio EPA eBusiness Center).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per OHR000007 Appendix B 11.A.
Source: General Permit OHR000007, Parts 1 to 5 (general requirements for all facilities), section 1.3.1 Table 1-2, page 9
"180 days prior to the planned commencement of stormwater discharge"
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

Industrial Stormwater General Permit duties, topic by topic

How the Industrial Stormwater General Permit compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: