Quarterly visual assessment of a stormwater sample from each outfall
By the end of each calendar quarter.
Once each quarter, collect a stormwater sample from each outfall within the first 30 minutes of discharge from a storm at least 72 hours after the previous discharge, and examine it in a clean, clear container in a well-lit area for color, odor, clarity, floating, settled and suspended solids, foam, oil sheen and other signs of pollution. Document it with the SWPPP.
- If the facility is inactive and unstaffed: not required.
- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.
Source: NPDES General Permit for Stormwater Discharges Associated with Industrial Activities (Except Construction), Permit No. SCR000000, section 4.2.1.a, page 28
"Once each quarter for the entire permit term, you must collect a stormwater sample from each outfall (except as noted in Part 4.2.3) and conduct a visual assessment of each of these samples."Open the permit at this section