Inspect the site at least twice a year
Within 181 days after the last inspection.
An appropriately trained person familiar with the permit and the SWPPP inspects the site at least semi-annually, to find control measures that need maintenance or changes and to check that the SWPPP is complete and accurate.
- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- The permit says this is done by qualified personnel, as the permit defines them.
Inferred from section 3.9.1. Check your copy of the permit.
Source: General Permit for Storm Water Discharges Associated with Industrial Activities (SDR000000), Sections 1.0 to 6.15 (34 printed pages) and Attachments A to G, 66 PDF pages, section 3.9.1, page 17
"site inspections shall be conducted by the permittee at least semi-annually. An appropriately trained person familiar with the general permit conditions and the SWPPP must conduct the inspections."Open the permit at this section