Visual assessment of every outfall each quarter
By the end of each calendar quarter.
Once a quarter, visually assess all outfalls and their runoff for color, odor, clarity, floating, settled and suspended solids, sediment buildup, foam, oil sheen and other signs of pollution. Document each assessment in a signed report kept with the SWPPP. If you see evidence of pollution, start corrective actions.
- If the facility is inactive and unstaffed: not required.
- Nothing is filed; keep the record at the facility.
- Keep the records 3 years.
- Signed or certified by a responsible official or duly authorized representative.
Inferred from section 4.1. Check your copy of the permit.
Source: Tennessee Multi-Sector General Permit (TMSP) for Discharges of Stormwater Associated with Industrial Activities, Permit Number TNR050000 (2025 TMSP Final Permit Signed), section 4.1, page 20
"Visual assessments of all outfalls must be conducted quarterly."Open the permit at this section