Utah Multi-Sector General Permit (MSGP) due dates and duties

Every duty in the UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 38duties, each cited
  • 6on a schedule
  • 32when something happens

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
UTR000000
In force
January 1, 2024 to December 31, 2028
Official page
deq.utah.gov
Rules last checked
November 26, 2026
Today
January 1, 2024 December 31, 2028
Notes on the permit's status and renewal

Signed December 27, 2023, effective January 1, 2024, expires at midnight on December 31, 2028 (cover page). The permit is published as a base permit (Parts I to IX) and thirty separate sector appendices (Appendix I.A to I.AD), each its own document on DWQ's site. DWQ's permit page and its public notices page, read November 26, 2026, show no modification, extension or draft replacement. Part II.F.2 lets the Director modify the permit before it expires; the fact sheet names EPA's next MSGP as a possible reason. The previous permit's five sector groups were merged: every sector is now on the same five-year cycle. Each facility gets its own UPDES permit number in the NeT-MSGP authorization email.

What does full permit coverage require?

Coverage by Notice of Intent (NOI) filed in EPA's NeT-MSGP with the permit fee; discharge is authorized once DWQ receives the NOI unless the Director says otherwise.

Every quarter 2 duties

Quarterly visual assessment of a storm water sample from each discharge point

By the end of each calendar quarter.

Once each calendar quarter, collect a grab sample from each discharge point within the first 30 minutes of runoff (or as soon as practicable) from a storm at least 72 hours after the previous one that produced runoff, in daylight and business hours, and examine it for color, odor, clarity, floating, settled and suspended solids, foam and oil sheen. Keep the signed record with the Plan.

  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section IV.B.1, page 18
"The facility shall conduct a visual stormwater quality assessment at least once every quarter (i.e. once each calendar quarter)."
Open the permit at this section

Routine facility inspection every calendar quarter

By the end of each calendar quarter.

Qualified personnel inspect all areas covered by the permit at least once each calendar quarter: exposed materials and activities, stored equipment and containers, vehicle tracking, erosion, unauthorized non-storm water discharges, all discharge points and all control measures, plus the sector's own areas in Part C of its appendix. Keep the signed report with the Plan.

  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section IV.A.1, page 17
"The facility shall be inspected by qualified personnel at least once every quarter (i.e. once each calendar quarter)."
Open the permit at this section

Every year 2 duties

Pay the annual permit fee by December 31

By December 31 each year.

Pay the annual fee in NeT-MSGP by December 31 of each year to keep coverage. DWQ's payment help file says the fee can be paid from October 1.

  • You file it in the agency's system (NeT-MSGP).
  • Keep the records 3 years.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section I.F, page 4
"An annual fee is required to maintain coverage under this permit. The annual fee is due by December 31st of each year."
Open the permit at this section

Submit the annual report by January 30

By January 30, for the calendar year before.

Submit the annual report in NeT-MSGP by January 30 each year, with every benchmark, effluent limitation and additional monitoring result for each discharge point and each quarter of the year before, or the reason no sample was taken. The permit ties the date to "the required sampling period" and also says sectors with no monitoring still submit the report, so it is shown every year. In a year with no required sampling (2025, 2026 or 2028 for a facility without numeric effluent limitations) confirm with the Division whether a report is expected.

  • You file it in the agency's system (NeT-MSGP).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section V.E.2. Check your copy of the permit.

Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section V.E.2, page 22
"The permittee shall submit the annual report no later than the thirtieth (30) day of January of the calendar year following the required sampling period, as discussed in Part V.B."
Open the permit at this section

One time 1 duty

Evaluate every discharge point for non-storm water within the first year

Within 1 year after the NOI submittal date.

Evaluate all discharge points for non-storm water discharges and keep the signed evaluation with the Plan: date, any authorized non-storm water discharges, the method and results, and the points observed. New permittees do this within the first year after submitting the NOI.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section VII.D.6, page 29
"During the first year of this permit, or within the first year of submittal of the NOI for new permittees, all discharge points at the facility shall be evaluated for the presence of non-stormwater discharges."
Open the permit at this section

When something happens 15 duties

After a benchmark exceedance, review and modify controls within 30 days of the lab results

Within 30 days after the lab results received date.

If a sample exceeds a benchmark concentration, identify and modify the storm water controls and practices to meet it, and record the changes in the Plan's modification log, no later than 30 days after receiving the lab results. The exceedance is not a violation; failing to do the review and log it is.

  • When: the benchmark exceeded.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section V.E.4, page 23
"The review and modification of controls and practices shall be completed no later than 30 days after the permittee receives lab sample results."
Open the permit at this section

Complete corrective actions within 14 calendar days of discovery

Within 14 days after the discovery date.

When a spill or unauthorized discharge occurs, a numeric effluent limit is exceeded, controls are not stringent enough for water quality standards, a control measure is missing or not working, or a visual assessment shows pollution: act immediately to minimize the discharge, review and revise the Plan, and finish any further work before the next storm if possible and within 14 calendar days of discovery.

  • When: the corrective action condition found.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section VI.A.2, page 24
"before the next storm event if possible, and within 14 calendar days from the time of discovery that the condition is not met."
Open the permit at this section

Contact the Director within 30 days of finding a conflict with another law

Within 30 days after the knowledge of discrepancy date.

If the permit appears to conflict with a state, municipal, environmental or other law or requirement, contact the Director within 30 days of knowing of the discrepancy.

  • When: the permit conflicts with another requirement.
  • You send it to the agency (Director, Division of Water Quality).
  • Keep the records 3 years.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section II.D, page 11
"the permittee must contact the Director within 30 days of knowledge of any discrepancies."
Open the permit at this section

Give notice at least 90 days before an anticipated bypass

At least 90 days before the bypass date.

If the facility knows in advance that it needs to bypass a treatment facility, submit prior notice at least 90 days before the bypass, with the alternatives considered, the bypass plan, measures to limit impacts, a notification plan and a water quality assessment plan.

  • When: the anticipated bypass.
  • You send it to the agency (Director, Division of Water Quality).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section VIII.M.3.a, page 36
"if the permittee knows in advance of the need for a bypass, it shall submit prior notice, at least 90 days before the date of bypass."
Open the permit at this section

Make Plan changes the Director requires and certify them within 30 days

Within 30 days after the notification date.

If the Director or an authorized representative notifies the facility that the Plan does not meet the permit's minimum requirements, make the changes and send the Director a written certification that they were made, within 30 days of the notification.

  • When: the director notice that plan needs changes.
  • You send it to the agency (Director, Division of Water Quality, PO Box 144870, Salt Lake City, Utah 84114-4870).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section VII.B.3, page 25
"Within 30 days of such notification the permittee shall make the required changes to the Plan and shall submit to the Director a written certification that the requested changes have been made."
Open the permit at this section

New owner or operator files a new NOI within 30 days; the previous one files a Notice of Termination

Within 30 days after the change of owner or operator date.

When a new owner or operator takes over an existing facility, the new one submits a new NOI no later than 30 calendar days after the change. The previous owner or operator submits a Notice of Termination no later than 30 calendar days after the new permittee's coverage becomes active.

Further steps with their own deadlines:

  • Previous owner or operator submits the Notice of Termination. Within 30 days after the new permittee coverage active date. Section I.H, page 5
    "The previous owner or operator shall submit a NOT no later than thirty (30) calendar days after coverage for the new permittee becomes active."
  • When: the change of owner or operator.
  • You file it in the agency's system (NeT-MSGP).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per msgp VIII.K.1.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section I.H, page 5
"the new owner or operator shall submit a new NOI no later than thirty (30) calendar days after the change."
Open the permit at this section

New Source Performance Standards: get the Director's no-impact decision within 180 days of the NOI

Within 180 days after the NOI submission date.

Facilities with storm water discharges subject to New Source Performance Standards obtain, and keep on site, documentation of a final Director decision that the discharge will have no direct or indirect impact on the receiving waters, by 180 days after submitting the NOI.

  • When: the discharge subject to new source performance standards.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section I.B.4, page 1
"This documentation shall be obtained and retained on site by 180 days after submission of the Notice of Intent."
Open the permit at this section

Report noncompliance that may endanger health or the environment within 24 hours

Within 24 hours of the awareness of noncompliance.

Report orally within 24 hours of becoming aware of any noncompliance that may endanger health or the environment, including an unanticipated bypass or an upset that exceeds an effluent limitation, and follow up in writing within five days.

Further steps with their own deadlines:

  • Written follow-up. Within 5 days after the awareness of noncompliance. Section VIII.L.5, page 35
    "A written submission shall also be provided within five days of the time the permittee becomes aware of the circumstances."
  • When: the noncompliance that may endanger health or the environment.
  • You send it to the agency (Oral report to DWQ (the permit names the 24-hour Environmental Incident Line, 801-536-4123, for releases); written follow-up to the Director).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section VIII.L.5, page 35
"Any information shall be provided orally within twenty-four hours from the time the permittee becomes aware of the circumstances."
Open the permit at this section

Reportable-quantity release: notify at once, then update the Plan and report within 14 days

Within 14 days after the knowledge of release date.

When a release of a hazardous substance or oil reaches a reportable quantity in 24 hours, immediately notify the National Response Center (800-424-8802) and DWQ's 24-hour Environmental Incident Line (801-536-4123). Within 14 calendar days of knowing of the release, add its description, circumstances and date to the Plan and send the Director a signed written description.

Further steps with their own deadlines:

  • Immediate telephone notice. The permit gives the timing in words, quoted below. Section II.A.2.a, page 9
    "immediately notify the 24-hour DWQ Environmental Incident Line at (801) 536-4123 as soon as he or she has knowledge of the release"
  • Modify the Plan. Within 14 days after the knowledge of release date. Section II.A.2.b, page 10
    "Modify the Storm Water Pollution Prevention Plan, required under Part VII, within 14 calendar days of knowledge of the release"
  • When: the release at or above a reportable quantity.
  • You send it to the agency (National Response Center and DWQ Environmental Incident Line by phone; written description to the Director).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section II.A.2.c, page 10
"Within 14 calendar days of knowledge of the release, submit a written description to the Director to include:"
Open the permit at this section

Start maintenance or repair of control measures within 24 hours of finding the need

Within 24 hours of the need identified time.

Begin routine maintenance, repair or replacement of control measures, equipment and systems within 24 hours of identifying the need, and take all reasonable steps to prevent pollutant discharges until the work is done.

  • When: the control measure needs maintenance.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section III.D.2, page 12
"Initiating routine maintenance, repair, or replacement within twenty-four hours from the time such needed actions are identified."
Open the permit at this section

Submit a Change NOI within 30 days after NOI information changes

Within 30 days after the change date.

If any information supplied in the NOI changes at the facility, submit a Change NOI in NeT-MSGP within 30 days after the change.

  • When: the NOI information changed.
  • You file it in the agency's system (NeT-MSGP).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per msgp VIII.K.1.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section I.H, page 5
"If any information supplied in the NOI changes at the facility, the Change NOI shall be submitted with thirty (30) days after the change occurs."
Open the permit at this section

Submit a Notice of Termination within 30 days when coverage should end

Within 30 days after the termination condition date.

Submit a Notice of Termination (NOT) in NeT-MSGP within 30 days after a new owner or operator is authorized, operations and industrial storm water discharges have ended for good, an exclusion applies (no exposure, no discharge, oil and gas), or an individual or alternative general permit covers all discharges.

  • When: the termination condition met.
  • You file it in the agency's system (NeT-MSGP).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section I.G, page 5
"The Permittee shall submit a NOT within 30 days after one of the following conditions occurs:"
Open the permit at this section

Submit the Notice of Intent in NeT-MSGP, with the fee, to be authorized to discharge

No set date. Before discharging: the permit authorizes discharge only after the NOI is received and sets no number of days.

Prepare the Storm Water Pollution Prevention Plan first, then submit a complete Notice of Intent (NOI) in EPA's NeT-MSGP and pay the permit fee. Discharge is authorized once DWQ receives the NOI, unless the Director says otherwise. The permit gives no number of days before discharge.

  • When: the new facility or discharge without coverage.
  • You file it in the agency's system (NeT-MSGP).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per msgp VIII.K.1.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section I.E, page 4
"electronically prepare and submit a complete and accurate Notice of Intent (NOI), including payment of the appropriate permit fee, to be authorized to discharge under this general permit."
Open the permit at this section

Tell the Director of planned facility changes as soon as possible

No set date. As soon as possible, and before the change: the permit sets no number of days.

Give the Director notice as soon as possible of a planned physical alteration or addition that could make the facility a new source or significantly change the nature or increase the quantity of pollutants discharged, and advance notice of any planned change that may result in noncompliance.

  • When: the planned physical alteration or addition.
  • You send it to the agency (Director, Division of Water Quality).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section VIII.L.1, page 34
"The permittee shall give notice to the Director as soon as possible of any planned physical alteration or additions to the permitted facility."
Open the permit at this section

Used oil release: written report to the Director within 15 days

Within 15 days after the release date.

For a used oil release over 25 gallons, or a smaller one that may threaten health or the environment, stop, contain and clean it up, notify the DEQ 24-hour Environmental Incident Line (801-536-4123), and send the Director a written report within 15 days.

  • When: the reportable used oil release.
  • You send it to the agency (Director, Division of Water Quality).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section II.A.1.c, page 9
"Within 15 days after any release of used oil that is reported under Part II.A.1.b, the person responsible for the material at the time of the release shall submit to the Director a written report"
Open the permit at this section

Ongoing 3 duties

Amend the Storm Water Pollution Prevention Plan whenever the facility changes or the Plan proves ineffective

No set date. Standing duty: amend whenever a change or an ineffective Plan calls for it. The permit says the Plan should be reviewed at least annually and sets no date.

Amend the Plan whenever a change in design, construction, operation or maintenance has a significant effect on the potential to discharge pollutants, or the Plan proves ineffective. Log each change in the Plan's modification log. The permit says the Plan should be reviewed at least annually.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section VII.C, page 26
"The permittee shall amend the Plan whenever there is a change in design, construction, operation, or maintenance that has a significant effect on the potential for the discharge of pollutants to waters of the State."
Open the permit at this section

Keep monitoring records and copies of reports for at least three years

No set date. Standing duty: three years from the date of each sample, measurement, report or application.

Keep all monitoring information, copies of every report the permit requires and the data used for the NOI for at least three years from the date of the sample, measurement, report or application. Keep inspection, assessment, evaluation and monitoring records with the Plan in an accessible format.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section VIII.J.2, page 33
"for a period of at least three (3) years from the date of the sample, measurement, report, or application."
Open the permit at this section

Train employees who work where industrial materials are exposed or who carry out the permit

No set date. The permit sets no date: the frequency is the one written in the Plan, and the permit says training should be conducted at least annually.

Train every employee who works in areas where industrial materials or activities are exposed to storm water or who is responsible for permit tasks, including the pollution prevention team. The Plan sets the frequency and keeps a log of dates, people and topics. The permit says training should be at least annual.

  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section VII.D.5.c, page 28
"Training should be conducted at least annually and should follow the requirements in Part III.J."
Open the permit at this section

Only if... 12 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Sector A: inspect wood surface protection and preservation areas at least monthly

By the end of each month.

Timber products facilities that do wood surface protection or preservation inspect the processing areas, transport areas and treated wood storage areas at least monthly, to check the practices that keep treatment chemicals off unprotected soils that storm water will reach.

  • Only if: your permit sector is A; the facility performs wood surface protection or preservation.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from Appendix I.A, C.1. Check your copy of the permit.

Source: Appendix I.A: Timber Products Facilities, section Appendix I.A, C.1, page 2
"the permittee shall inspect the following areas at least monthly to assess the usefulness of practices to minimize the deposit of treatment chemicals on unprotected soils"
Open the permit at this section

Sector O: inspect coal handling, fueling, storage and ash areas at least monthly

By the end of each month.

Steam electric power facilities inspect at least monthly, where present: coal handling areas, loading and unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas, areas next to disposal ponds and landfills, maintenance areas, liquid storage tanks and material storage areas.

  • Only if: your permit sector is O.
  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from Appendix I.O, C. Check your copy of the permit.

Source: Appendix I.O: Steam Electric Power Generating Facilities, Including Coal Handling Areas, section Appendix I.O, C, page 3
"the permittee shall also inspect the following areas at least monthly, if they are located at the facility:"
Open the permit at this section

Sector S: inspect at least monthly during the deicing season

By the end of each month.

Air transportation facilities increase the routine inspection to at least monthly during the deicing season the facility has identified, and in any other month in which deicing chemicals are used.

  • Only if: your permit sector is S; the month in the deicing season or with deicing chemical use.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from Appendix I.S, C.1. Check your copy of the permit.

Source: Appendix I.S: Air Transportation Facilities, section Appendix I.S, C.1, page 4
"The permittee shall increase inspection frequency to at least monthly during the deicing season, as identified in Part B.1.j of Appendix I.S."
Open the permit at this section

Sector V: inspect transfer lines, spill controls and housekeeping at least monthly

By the end of each month.

Textile mills, apparel and other fabric product facilities inspect at least monthly, where present: transfer and transmission lines, spill prevention controls, good housekeeping practices, management of process waste products, and all structural and nonstructural management practices.

  • Only if: your permit sector is V.
  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from Appendix I.V, C. Check your copy of the permit.

Source: Appendix I.V: Textile Mills, Apparel, and Other Fabric Product Manufacturing Facilities, section Appendix I.V, C, page 2
"the permittee shall also inspect the following areas at least monthly, if they are located at the facility:"
Open the permit at this section

Sample for numeric effluent limitations at least once every calendar year

By December 31 each year.

Facilities with a discharge listed in a numeric effluent limitation table of their sector appendix (Sectors A, C, D, E, J, K, L, O and S) sample that discharge at least once in every calendar year of coverage and report the results in the annual report. The limits may not be exceeded at any time.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • You file it in the agency's system (NeT-MSGP).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section V.B.2, page 20
"Numeric effluent limitation monitoring shall be conducted at least annually for each calendar year the permittee has authorization to discharge."
Open the permit at this section

Sector L: inspect inactive or stabilized landfill areas at least quarterly

By the end of each calendar quarter.

Inactive landfills, open dumps and land application sites are inspected at least quarterly in the areas considered inactive or stabilized: stabilization and erosion controls, leachate collection and treatment systems and all closed land application areas.

  • Only if: your permit sector is L; the facility has inactive or stabilized landfill areas.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from Appendix I.L, C.2. Check your copy of the permit.

Source: Appendix I.L: Landfills and Land Application Sites, section Appendix I.L, C.2, page 2
"The facility shall be inspected at least quarterly in areas of the facility that are considered inactive or stabilized"
Open the permit at this section

Quarterly benchmark monitoring in 2027 for the sector's parameters

By the end of each calendar quarter, from January 1, 2027 to December 31, 2027.

In calendar year 2027 (and in 2024, now past), take at least one grab sample each calendar quarter from every discharge point and have it analyzed for the benchmark parameters of the facility's sector table, and of any co-located sector, in Part E of Appendix I. Report the results in the annual report. A result above a benchmark is not a violation, but it starts a 30-day review of controls.

  • Only if: your permit sector is G, H, K, L, M, N, Q, S, AA, or your SIC code starts with 2411, 2421, 2426, 2429, 2431, 2435, 2436, 2439, 2441, 2449, 2451, 2452, 2491, 2493, 2499, 2631, 281, 282, 284, 287, 2951, 2952, 325, 326, 327, 331, 332, 335, 336, 1411, 142, 1442, 1446, 1481, 1499, 204, 207, 3011, 3021, 3052, 3053, 3061, 3069.
  • Does not apply if: the facility is inactive and unstaffed.
  • You file it in the agency's system (NeT-MSGP).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section V.B.1, page 20
"Analytical benchmark monitoring of stormwater discharges shall be conducted at least quarterly (i.e. once each calendar quarter) in the first (2024) and fourth (2027) calendar year after the effective date of the permit."
Open the permit at this section

Oil and gas facilities: get coverage and a Plan within 30 days of learning coverage is needed

Within 30 days after the first knowledge date.

An oil or gas exploration, production, processing, treatment or transmission facility that has a reportable-quantity release in storm water, or contributes to a water quality standard violation, obtains coverage under this permit and prepares and implements a Storm Water Pollution Prevention Plan within 30 calendar days of first knowing it.

  • Only if: your permit sector is I; the reportable quantity release or water quality violation.
  • You file it in the agency's system (NeT-MSGP).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per msgp VIII.K.1.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section I.L, page 6
"on or before the date 30 calendar days after first knowledge of meeting one of the requirements in this Part."
Open the permit at this section

Report a numeric effluent limitation exceedance to the Director within 30 days of the lab results

Within 30 days after the lab results received date.

If a sample exceeds a numeric effluent limitation, send the Director an exceedance report no later than 30 days after receiving the lab results: permit number, facility name and address, receiving water or discharge point, the results, the cause, what has been or will be done to prevent it, and contacts.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); the numeric effluent limitation exceeded.
  • You send it to the agency (Director, Division of Water Quality, PO Box 144870, Salt Lake City, Utah 84114-4870).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section V.E.4, page 23
"an exceedance report shall be submitted to the Director, in accordance with Part VIII.K, no later than 30 days after receiving lab sample results"
Open the permit at this section

Sector E: sweep or clean paved areas at least once a week where cement, aggregate, kiln dust or fly ash is handled

No set date. At least once a week while those materials are handled or processed in the area.

Glass, clay, cement, concrete and gypsum product facilities sweep paved areas exposed to storm water, or use an equivalent measure, as often as activity and rain require, and not less than once per week while cement, aggregate, kiln dust or fly ash is being handled or processed in the area.

  • Only if: your permit sector is E; the cement aggregate kiln dust or fly ash handled or processed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: Appendix I.E: Glass, Clay, Cement, Concrete, and Gypsum Product Manufacturing Facilities, section Appendix I.E, B.1, page 1
"but shall not be less than once per week when cement, aggregate, kiln dust or fly ash are being handled or otherwise processed in the area"
Open the permit at this section

Sector I: inspect erosion controls every 7 days, or every 14 days and after a 0.5 inch storm

No set date. At least once every 7 calendar days, or every 14 calendar days and within 24 hours of a storm of 0.5 inches or more: counted from the last inspection, not from the calendar.

Oil and gas extraction facilities with coverage inspect all erosion controls either at least once every 7 calendar days, or every 14 calendar days and within 24 hours of a storm event of 0.5 inches or more.

  • Only if: your permit sector is I.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Appendix I.I: Oil and Gas Extraction Facilities, section Appendix I.I, C.1, page 2
"All erosion controls at the facility shall be inspected either: a. At least once every 7 calendar days; or b. Every 14 calendar days and within 24 hours of a storm event 0.5 inches or greater."
Open the permit at this section

Sector L: inspect operating landfills every 7 days, or monthly where stabilized, arid or semi-arid

No set date. At least once every seven calendar days, counted from the last inspection; at least once every month for stabilized areas and arid or semi-arid sites.

Operating landfills, open dumps and land application sites are inspected at least once every seven calendar days, focused on areas not yet finally stabilized: active land application areas, exposed storage, stabilization and erosion controls, leachate systems and truck entrances. Stabilized areas, completed land application areas and sites in an arid or semi-arid climate (average annual rainfall up to 20 inches) may inspect at least once every month.

Further steps with their own deadlines:

  • Reduced frequency for stabilized, arid or semi-arid areas. The permit gives the timing in words, quoted below. Section Appendix I.L, C.1, page 2
    "may reduce frequency and shall conduct inspections at least once every month."
  • Only if: your permit sector is L.
  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: Appendix I.L: Landfills and Land Application Sites, section Appendix I.L, C.1, page 2
"The facility shall be inspected at least once every seven (7) calendar days."
Open the permit at this section

Where the permit is unclear 2 duties

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

Comprehensive site compliance evaluation at least once per year

No set date. Part IV.C.1: "at least once per year". Is the year the calendar year, a year of the facility's coverage, or twelve months from the previous evaluation?

At least once per year, review the whole facility against the Plan: every industrial activity and material, the control measures, storm water management and erosion controls, spill equipment, whether the Plan is current, and the records kept with it. Keep the signed report with the Plan. Inactive and unstaffed sites still owe it.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section IV.C.1. Check your copy of the permit.

Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section IV.C.1, page 19
"The facility shall conduct a comprehensive site compliance evaluation at least once per year."
Open the permit at this section

Reauthorize the NOI or file a new one when the general permit expires

No set date. Part I.F: "Failure to do so within 60 days of the permit's expiration date will result in termination of coverage". Is the NOI reauthorized within the 60 days before December 31, 2028 (by November 1, 2028) or within the 60 days after it (by March 1, 2029)?

When the general permit expires (December 31, 2028), reauthorize the NOI or submit a new NOI in NeT-MSGP to stay covered under the new or reissued permit. Missing the 60-day window ends coverage.

  • You file it in the agency's system (NeT-MSGP).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per msgp VIII.K.1.

Inferred from section I.F. Check your copy of the permit.

Source: UPDES Multi-Sector General Permit (MSGP) for Storm Water Discharges Associated with Industrial Activities, Permit No. UTR000000, Parts I to IX, section I.F, page 4
"Failure to do so within 60 days of the permit's expiration date will result in termination of coverage under this permit."
Open the permit at this section

What does no-exposure certification require?

No Exposure Certification (NEC) filed in NeT-MSGP: the facility is excluded from the permit while no industrial materials or activities are exposed to storm water. The form says it is submitted again once every five years.

Every few years 1 duty

No Exposure facilities: submit the certification again once every five years

Within 5 years after no exposure certification issue date.

A facility excluded by a No Exposure Certification submits the signed certification to the Director again once every five years, in NeT-MSGP, and must get permit coverage if exposure can no longer be avoided.

  • You file it in the agency's system (NeT-MSGP).
  • Signed or certified by a responsible official per msgp VIII.K.1.

Inferred from Who May File a No Exposure Certification, item 3. Check your copy of the permit.

Source: No Exposure Certification (NEC) form for exclusion from UPDES storm water permitting, section Who May File a No Exposure Certification, item 3, page 1
"Submit the signed certification to the Director once every five years;"
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

Multi-Sector General Permit (MSGP) duties, topic by topic

How the Multi-Sector General Permit (MSGP) compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: