Virginia Industrial Stormwater General Permit due dates and duties

Every duty in the VPDES General Permit for Stormwater Discharges Associated with Industrial Activity, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 47duties, each cited
  • 3on a schedule
  • 44when something happens

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
VAR05
In force
July 1, 2024 to June 30, 2029
Official page
law.lis.virginia.gov
Rules last checked
November 26, 2026
Today
July 1, 2024 June 30, 2029
Notes on the permit's status and renewal

The permit is a regulation: 9VAC25-151 of the Virginia Administrative Code, effective July 1, 2024, expiring June 30, 2029 (9VAC25-151-40). The text read is the consolidated code on law.lis.virginia.gov as of November 26, 2026. Amendments since reissuance, all present in that text: September 25, 2024 (references to the Virginia Erosion and Stormwater Management Regulation, Virginia Register 41:1); December 18, 2024 (the 40 CFR Part 136 reference date in 9VAC25-151-15, 41:7); November 3, 2025 and January 12, 2026 (web addresses and the emergency telephone number, 42:6 and 42:11); January 1, 2026 (0.26 pounds per acre per year phosphorus criterion and BMP references for new facilities and expansions in the Chesapeake Bay watershed, 42:7); September 23, 2026 (point source nutrient credits for calendar years 2025 and 2026, 43:1, 9VAC25-151-400 E 2 d). The page prints the date it was served, so its file hash changes daily while the regulation text does not. The DEQ website refused automated access on November 26, 2026, so DEQ guidance, forms and notices were not read. The Virginia Regulatory Town Hall page for the chapter, read the same day, lists no regulatory action underway.

What does full permit coverage require?

Coverage under the general permit by an accepted registration statement.

Every quarter 2 duties

Quarterly visual examination of a stormwater sample from each outfall

By the end of each calendar quarter.

Once in each calendar quarter, take a grab sample of the stormwater discharge from each outfall (substantially identical outfalls may be represented by one) and examine it in a well-lit area for color, odor, clarity, floating, settled and suspended solids, foam, oil sheen and other signs of pollution. No lab analysis. Keep the record with the SWPPP. If no storm produced runoff in a quarter, document that instead.

  • Does not apply if: the department granted an inactive and unstaffed site waiver.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I A 1 a (1)
"The visual examinations shall be made at least once in each of the following three-month periods: January through March, April through June, July through September, and October through December."
Open the permit at this section

Routine facility inspection at least once every calendar quarter

By the end of each calendar quarter.

Staff who can assess conditions that affect stormwater quality and judge control measures, with at least one pollution prevention team member, inspect all exposed industrial areas, areas with spills or leaks in the past three years, discharge points and control measures during operating hours. The SWPPP sets the frequency, at least once per calendar quarter. Record the date, inspectors, weather and discharges, and anything needing maintenance, repair or replacement in the SWPPP.

Further steps with their own deadlines:

  • One inspection each calendar year during a stormwater discharge. By December 31 each year. Section Part III B 5
    "At least once each calendar year, the routine facility inspection shall be conducted during a period when a stormwater discharge is occurring."
  • Correct deficiencies found within 60 days of the inspection. Within 60 days after the inspection that found the deficiency. Section Part III B 5
    "shall be corrected as soon as practicable, but not later than within 60 days of the inspection, unless permission for a later date is granted in writing by the director."
  • Repair control measures found not working: before the next expected storm, at the latest 60 days after the inspection. Within 60 days after the inspection that found the problem. Section Part III C
    "maintenance shall be scheduled and accomplished as soon as practicable, but not later than within 60 days of the inspection, unless permission for a later date is granted in writing by the director."
  • Does not apply if: the active veep e3 or e4 status.
  • If the department granted an inactive and unstaffed site waiver: No set date. Once a year under the waiver; the regulation does not say whether that year is the calendar year (Part I A 4 a).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: 9VAC25-151-80, Stormwater pollution prevention plans (Part III), section Part III B 5
"shall be at a minimum of once per calendar quarter unless more frequent intervals are specified elsewhere in the permit or written approval is received from the department for less frequent intervals."
Open the permit at this section

One time 1 duty

Submit a new registration statement at least 60 days before the permit expires on June 30, 2029

By May 1, 2029.

To keep discharging after the permit expires on June 30, 2029, submit a new registration statement at least 60 days before that date, unless DEQ has allowed a later date (never later than the expiration date). Coverage then continues automatically until DEQ issues coverage under the next permit or says the discharge is not eligible.

  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 9VAC25-31-110 A.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II M
"the permittee shall submit a new registration statement at least 60 days before the expiration date of the existing permit, unless permission for a later date has been granted by the department."
Open the permit at this section

When something happens 20 duties

Inspect unused equipment and vehicles for leaks at least monthly

By the end of each month.

Drain fluids from equipment and vehicles that will be decommissioned. For equipment and vehicles that stay unused for extended periods, inspect at least monthly for leaks. Required unless infeasible.

  • When: the equipment or vehicles left unused for extended periods.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 9VAC25-151-80, Stormwater pollution prevention plans (Part III), section Part III B 4 b (2) (g)
"for any equipment and vehicles that remain unused for extended periods of time, inspect at least monthly for leaks."
Open the permit at this section

Coal pile runoff: sample for TSS and pH once in each half year

By the end of each half year (June 30 and December 31), once.

Any facility with stormwater discharges from coal storage piles, whatever its sector, samples every discharge containing coal pile runoff at least once in each semiannual monitoring period for total suspended solids and pH and meets the Table 70-3 limits. The runoff may not be diluted to meet the limit.

  • When: the discharge of coal pile runoff.
  • Does not apply if: the department granted an inactive and unstaffed site waiver.
  • You file it in the agency's system (DEQ e-DMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I A 1 c (2) (a)
"Facilities with discharges of stormwater from coal storage piles shall comply with the limitations and monitoring requirements of Table 70-3 for all discharges containing the coal pile runoff, regardless of the facility's sector of industrial activity."
Open the permit at this section

Add a significant spill or leak to the SWPPP list within 60 days

Within 60 days after the incident.

The SWPPP lists significant spills and leaks of toxic or hazardous pollutants at exposed areas, or that drained to a stormwater conveyance, in the past three years. Update the list within 60 days of a new incident.

  • When: the significant spill or leak in an exposed area.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 9VAC25-151-80, Stormwater pollution prevention plans (Part III), section Part III B 3 c
"The list shall be updated within 60 days of the incident if significant spills or leaks occur in exposed areas of the facility during the term of the permit."
Open the permit at this section

Amend the SWPPP within 60 days of a change, deficiency, spill or unauthorized discharge

Within 60 days after the discovery observation or event requiring the change.

Review and amend the SWPPP when construction or a change in design, operation or maintenance affects pollutant discharges, when inspections or evaluations find deficient control measures, when officials say changes are needed, after a significant spill, leak or unauthorized discharge, or when DEQ says a TMDL applies. Make the changes within 60 calendar days and start new or modified control measures before the next storm if possible.

Further steps with their own deadlines:

  • Start new or modified control measures before the next storm, at the latest 60 days after discovery. Within 60 days after the discovery observation or event requiring the change. Section Part III F 2
    "shall be initiated before the next storm event if possible, but no later than 60 days after discovery, or as otherwise provided or approved by the director."
  • When: the event requiring a SWPPP modification.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 9VAC25-151-80, Stormwater pollution prevention plans (Part III), section Part III F 2
"SWPPP modifications shall be made within 60 calendar days after discovery, observation or event requiring an SWPPP modification."
Open the permit at this section

Change the SWPPP within 60 days of a notice from the director and certify it in writing

Within 60 days after the receipt of the notification.

If the director notifies the permittee that the SWPPP, control measures or other parts of the stormwater program do not meet the permit, make the required changes within 60 days of receiving the notice (unless a later date is granted in writing) and send the director a written certification that they were made.

  • When: the notification from the director.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-80, Stormwater pollution prevention plans (Part III), section Part III E 3
"The permittee shall make any required changes to the SWPPP within 60 days of receipt of the notification, unless permission for a later date is granted in writing by the director"
Open the permit at this section

Corrective action: revise the SWPPP within 60 days of finding a deficiency

Within 60 days after the discovery of the deficiency.

Take corrective action when an inspection or other event shows control measures must change, an effluent limit, TMDL wasteload allocation or local Chesapeake Bay ordinance reduction is exceeded, controls are not stringent enough for water quality standards, or a benchmark is exceeded. Review and revise the SWPPP within 60 days of discovery, change or add control measures before the next expected storm if possible and within 60 days at the latest, and keep dated records with the SWPPP.

Further steps with their own deadlines:

  • Modify or add control measures before the next expected storm, at the latest 60 days after discovery. Within 60 days after the discovery of the deficiency. Section Part I A 6 a
    "implementation shall be completed before the next anticipated storm event if possible, but no later than 60 days after the deficiency is discovered, or as otherwise provided or approved by the department."
  • Where construction is needed, finish it within three years of discovery. Within 3 years after the discovery of the deficiency. Section Part I A 6 a
    "as expeditiously as practicable, but no later than three years after the deficiency is discovered."
  • When: the deficiency or exceedance discovered.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I A 6 a
"Revisions to the SWPPP shall be completed within 60 days following the discovery of the deficiency."
Open the permit at this section

Exceedance report within 30 days of implementing the corrective action

Within 30 days after implementing the relevant corrective action.

When monitoring shows a discharge exceeded an effluent limitation or TMDL wasteload allocation, or DEQ finds the discharge causes or contributes to a water quality standard exceedance, act at once to eliminate it and submit a signed exceedance report to DEQ within 30 calendar days of implementing the corrective action.

  • When: the effluent limit or TMDL wasteload allocation exceeded.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I A 6 c
"Within 30 calendar days of implementing the relevant corrective action, an exceedance report shall be submitted to the department and shall be signed in accordance with Part II K."
Open the permit at this section

Facilities continuing from the 2019 permit: update the SWPPP within 90 days of coverage

Within 90 days after the department grants coverage under this permit.

A facility that was covered under the 2019 industrial stormwater general permit and continues under this one updates the SWPPP to meet the 2024 permit and implements the revisions within 90 days of DEQ granting coverage.

  • When: continuing coverage from the 2019 permit.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-80, Stormwater pollution prevention plans (Part III), section Part III A 1
"shall update and implement any revisions to the SWPPP within 90 days of the department granting coverage under this permit."
Open the permit at this section

File a notice of termination when coverage is no longer needed

No set date. The permit sets no deadline; duties continue until the notice of termination is filed.

The owner may end coverage by filing a signed notice of termination with the DEQ regional office once operations and industrial stormwater discharges have ceased, a new owner has taken over (not needed if a VPDES Change of Ownership Agreement Form was submitted), an individual permit covers the discharges, or DEQ agrees coverage is no longer needed.

  • When: the coverage no longer needed.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I B 13
"The owner may terminate coverage under this general permit by filing a notice of termination with the department."
Open the permit at this section

Give DEQ notice of planned physical changes as soon as possible

No set date. As soon as possible; the permit sets no number of days.

Notify DEQ as soon as possible of planned physical alterations or additions that make the facility a new source, could significantly change the nature or increase the quantity of pollutants discharged, or change sludge use or disposal; and give advance notice of planned changes that may result in noncompliance.

  • When: the planned physical alteration or addition.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II J 1
"The permittee shall give notice to the department as soon as possible of any planned physical alterations or additions to the permitted facility."
Open the permit at this section

Give notice of an anticipated bypass at least 10 days ahead if possible

At least 10 days before the date of the bypass.

If the permittee knows in advance that a bypass of a treatment facility is needed, submit prior notice, if possible at least 10 days before the bypass. An unanticipated bypass is reported as noncompliance within 24 hours.

  • When: the anticipated bypass.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II U 2 a
"prior notice shall be submitted, if possible at least 10 days before the date of the bypass."
Open the permit at this section

New owner: submit a registration statement within 30 days of the ownership change

Within 30 days after the ownership change.

When the owner of a covered facility changes, the new owner submits a complete registration statement within 30 days of the ownership change, and updates and implements any SWPPP revisions within 60 days of it.

Further steps with their own deadlines:

  • Update the SWPPP within 60 days of the ownership change. Within 60 days after the ownership change. Section Part III A 3
    "the new owner of the facility shall update and implement any revisions to the SWPPP within 60 days of the ownership change."
  • When: the change of ownership.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 9VAC25-31-110 A.
Source: 9VAC25-151-60, Registration statement and stormwater pollution prevention plan, section B 3
"the new owner of the facility shall submit a complete registration statement within 30 days of the ownership change."
Open the permit at this section

Notify DEQ within 30 days if a waived inactive site becomes active, staffed or exposed

Within 30 days after the change in circumstances.

A facility holding the inactive and unstaffed site waiver notifies DEQ within 30 days if materials or activities become exposed to stormwater or the facility becomes active or staffed, and resumes quarterly visual monitoring, routine inspections and all other monitoring immediately.

  • When: the waived inactive site becomes active staffed or exposed.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I A 4 c
"the permittee shall notify the department within 30 days, and all quarterly visual monitoring, routine facility inspections, and monitoring requirements shall be resumed immediately."
Open the permit at this section

Notify DEQ within 30 days of adding or deleting an outfall

Within 30 days after the outfall change.

When a stormwater outfall is added or deleted, update the SWPPP and notify DEQ within 30 days of the change, with a copy of the updated SWPPP site map.

  • When: the outfall added or deleted.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I B 11
"The permittee shall update the SWPPP and notify the department of all outfall changes within 30 days of the change."
Open the permit at this section

Pay the required permit fee

No set date. The amount and due date are not in this regulation; they come from the fee regulation and DEQ, which this pack has not read.

Authorization to discharge depends on the owner submitting the required permit fee.

  • You send it to the agency (DEQ).
Source: 9VAC25-151-50, Authorization to discharge, section A 2
"The owner submits the required permit fee;"
Open the permit at this section

Report an unauthorized discharge within 24 hours and in writing within five days

Within 24 hours of the discovery of the discharge.

Notify DEQ immediately on discovering an unauthorized discharge to state waters (or one that may reasonably be expected to reach them), in no case later than 24 hours after discovery, by telephone or the online pollution response portal. Send a written report within five days of discovery.

Further steps with their own deadlines:

  • Written report within five days of discovery. Within 5 days after the discovery of the discharge. Section Part II G
    "A written report of the unauthorized discharge shall be submitted to the department within five days of discovery of the discharge."
  • When: the unauthorized discharge.
  • You file it in the agency's system (DEQ regional office (telephone or online pollution response portal)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II G
"shall notify the department of the discharge immediately upon discovery of the discharge, but in no case later than 24 hours after the discovery."
Open the permit at this section

Report noncompliance that may harm state waters or public health within 24 hours

Within 24 hours of becoming aware of the circumstances.

Report any noncompliance that may adversely affect state waters or endanger public health within 24 hours of becoming aware of it (including any unanticipated bypass and any upset that causes a discharge), then submit a written report within five days unless DEQ waives it. Other noncompliance is reported in writing with the next monitoring reports.

Further steps with their own deadlines:

  • Written report within five days. The permit gives the timing in words, quoted below. Section Part II I 1 b
    "A written report shall be submitted within five days and shall contain:"
  • Other noncompliance: report in writing with the next monitoring reports. The permit gives the timing in words, quoted below. Section Part II I 2
    "The permittee shall report all instances of noncompliance not reported under Part II I 1 in writing at the time the next monitoring reports are submitted."
  • When: the noncompliance that may affect state waters or public health.
  • You file it in the agency's system (DEQ regional office (telephone or online pollution response portal)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II I 1 a
"A report shall be provided within 24 hours from the time the permittee becomes aware of the circumstances."
Open the permit at this section

Report on each compliance schedule date within 14 days

Within 14 days after each schedule date.

If the permit coverage carries a compliance schedule, submit a report of compliance, noncompliance or progress no later than 14 days after each schedule date.

  • When: the compliance schedule date.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II E
"shall be submitted no later than 14 days following each schedule date."
Open the permit at this section

Send DEQ a new signatory authorization when the authorized person or position changes

No set date. Before or together with the next report the new representative signs.

Reports may be signed by a duly authorized representative only if a responsible official authorized that person or position in writing and the authorization was submitted to DEQ. If it is no longer accurate, submit a new authorization before or together with the next report or information that person signs.

  • When: the authorized representative changed.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 9VAC25-31-110 A.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II K 3
"a new authorization satisfying the requirements of Part II K 2 shall be submitted to the department before or together with any reports, or information to be signed by an authorized representative."
Open the permit at this section

Submit a registration statement at least 60 days before a new facility starts industrial activity

At least 60 days before the planned start of industrial activity.

The owner of a new discharge submits a complete registration statement (Virginia's notice of intent) to the DEQ regional office at least 60 days before the date planned for the start of industrial activity. The SWPPP must be prepared and implemented before the registration statement is submitted.

Further steps with their own deadlines:

  • Prepare and implement the SWPPP before submitting the registration statement. The permit gives the timing in words, quoted below. Section Part III A 2
    "shall prepare and implement the SWPPP before submitting the registration statement."
  • When: the new facility.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 9VAC25-31-110 A.
Source: 9VAC25-151-60, Registration statement and stormwater pollution prevention plan, section B 2
"Any owner proposing a new discharge of stormwater associated with industrial activity shall submit a complete registration statement at least 60 days before the date planned for the beginning of the industrial activity at the facility."
Open the permit at this section

Ongoing 1 duty

Keep the SWPPP, monitoring records and reports for three years after coverage ends

Ongoing, no set date.

Keep copies of the SWPPP and its modifications, all monitoring records, all reports the permit requires and the data used for the registration statement for at least three years from the date coverage expires or is terminated; longer during unresolved litigation or if DEQ asks. Keep the current SWPPP at the facility, available at once to DEQ, EPA or the MS4 operator.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II B 2
"for a period of at least three years from the date that coverage under this permit expires or is terminated."
Open the permit at this section

Only if... 16 duties

These apply only in the situation named on each one. Answer the questions to sort them.

(Sector E) Sweep paved areas at least weekly where cement, aggregate or dust is handled

By the end of each week.

Clay, cement, concrete and gypsum facilities keep spilled cement, aggregate, kiln dust, fly ash and settled dust out of stormwater from exposed paved areas by regular sweeping or equivalent measures. The SWPPP sets the frequency, which is at least once per week where those materials are handled or processed.

  • Only if: your permit sector is E; the cement aggregate kiln dust fly ash or settled dust handled or processed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 9VAC25-151-130, Sector E, Clay, cement, concrete, and gypsum products, section B 1
"but shall not be less than once per week if cement, aggregate, kiln dust, fly ash, or settled dust are being handled or processed."
Open the permit at this section

(Sector A) Inspect wood surface protection and preservation areas monthly

By the end of each month.

Timber products facilities that do wood surface protection or preservation inspect processing areas, transport areas and treated wood storage areas monthly, to check that practices keep treatment chemicals off unprotected soils and out of areas that contact stormwater.

  • Only if: your permit sector is A; the wood surface protection or preservation activities.
  • Does not apply if: the active veep e3 or e4 status.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 9VAC25-151-90, Sector A, Timber products facilities, section C 2
"shall be performed monthly to assess the usefulness of practices in minimizing the deposit of treatment chemicals on unprotected soils and in areas that will come in contact with stormwater discharges."
Open the permit at this section

(Sector L) Inspect stabilized landfill areas and completed land application areas every month

By the end of each month.

At operating sites, stabilized areas and areas where land application has been completed are inspected at least once every month.

  • Only if: your permit sector is L; the stabilized areas or completed land application areas.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: 9VAC25-151-190, Sector L, Landfills, land application sites and open dumps, section D 2 a
"For stabilized sites and areas where land application has been completed, inspections shall be conducted at least once every month."
Open the permit at this section

(Sector M) Inspect equipment, containers and fluid storage areas for leaks every quarter

By the end of each calendar quarter.

Automobile salvage yards inspect vehicles for leaks on arrival or as soon as feasible. Equipment containing oily parts, hydraulic or other fluids or mercury switches, and all vessels, containers, tanks and areas where hazardous materials and automotive fluids are stored, are inspected at least quarterly for leaks. Keep the quarterly inspection records with the SWPPP.

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 9VAC25-151-200, Sector M, Automobile salvage yards, section B 2
"shall be inspected at least quarterly (four times per year) for signs of leaks."
Open the permit at this section

Benchmark monitoring once in each half year (January to June, July to December)

By the end of each half year (June 30 and December 31), once.

Facilities in a sector with benchmark parameters (Table 70-1 and the Part IV sector tables) take one grab sample from each outfall in each semiannual period and analyze it for the sector's parameters, starting with the first full monitoring period after coverage is granted. After four consecutive periods whose average for every parameter at an outfall is below the benchmark, the facility may ask DEQ for a waiver for the rest of the permit term. A result above a benchmark is not a violation but requires corrective action (SWPPP review).

  • Only if: your permit sector is A, B, C, E, F, H, K, L, M, N, Q, U, Y, AA, AB, AF, or your permit sector is D, or your SIC code starts with 2951, 2952, or your permit sector is G, or your SIC code starts with 1021, or your permit sector is G, or the discharge from waste rock or overburden piles at an active site, or your permit sector is AD, or the department set benchmark monitoring for the facility.
  • Does not apply if: your permit sector is O, AE; the department granted an inactive and unstaffed site waiver; the department approved benchmark monitoring waiver.
  • You file it in the agency's system (DEQ e-DMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I A 2 d (2)
"Monitoring shall be conducted at least once in each of the following semiannual periods each year of permit coverage: January through June, and July through December."
Open the permit at this section

Effluent limitation monitoring once in each half year for discharges with numeric limits

By the end of each half year (June 30 and December 31), once.

Facilities with discharges subject to a stormwater effluent limitation guideline (Table 70-2: cement material storage piles, phosphate fertilizer runoff, wet deck log storage, asphalt emulsion production areas, landfills) sample each such discharge at least once in every semiannual monitoring period for the limited pollutants in the Part IV sector table. Every outfall is sampled: the substantially identical outfall option does not apply.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • Does not apply if: the department granted an inactive and unstaffed site waiver.
  • You file it in the agency's system (DEQ e-DMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I A 1 c (1) (b)
"Permittees shall monitor the discharges for the presence of the pollutant subject to the effluent limitation at least once during each of the monitoring periods after coverage under the permit begins."
Open the permit at this section

Impaired waters monitoring once every six months after DEQ notice

By the end of each half year (June 30 and December 31), once.

When DEQ notifies a facility in writing that it discharges to a water listed as impaired in the 2022 Integrated Report with no approved TMDL wasteload allocation, sample at least once every six months for each pollutant causing the impairment that has a standard analytical method (TSS for sediment or turbidity impairments). The facility may ask DEQ to stop if the pollutant is below the quantitation level or present only from natural background.

  • Only if: your stormwater reaches an impaired water body; the written notification from the department.
  • Does not apply if: the department granted an inactive and unstaffed site waiver.
  • You file it in the agency's system (DEQ e-DMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I A 1 c (4) (a)
"permittees shall monitor the discharges for all pollutants for which the waterbody is impaired, and for which a standard analytical method exists, at least once every six months after coverage under the permit begins"
Open the permit at this section

TMDL wasteload allocation monitoring once every six months after DEQ notice

By the end of each half year (June 30 and December 31), once.

When DEQ notifies a facility in writing that it is a source of a pollutant with an EPA-approved TMDL wasteload allocation, sample for that pollutant once every six months (DEQ may set another frequency for PCBs). If every sample in the first four monitoring periods is below the quantitation level, the facility may ask DEQ in writing to stop.

  • Only if: a TMDL applies to your discharge; the written notification from the department.
  • Does not apply if: the department granted an inactive and unstaffed site waiver.
  • You file it in the agency's system (DEQ e-DMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I A 1 c (3) (a)
"permittees shall monitor the discharges for the pollutant subject to TMDL wasteload allocation once every six months after coverage under the permit begins"
Open the permit at this section

(Chesapeake Bay) Submit quarterly nitrogen and phosphorus results by the 10th of January, April, July and October

By April 10 (Q1), July 10 (Q2), October 10 (Q3) and January 10 (Q4).

While Chesapeake Bay TMDL quarterly monitoring is required, report the results for each outfall in e-DMR by January 10, April 10, July 10 and October 10.

  • Only if: the facility is in chesapeake bay watershed; the chesapeake bay TMDL quarterly monitoring required.
  • You file it in the agency's system (DEQ e-DMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-400, Chesapeake Bay total maximum daily load compliance (Part V), section Part V C 1, Table 400-1
"Submit the results by January 10, April 10, July 10, and October 10"
Open the permit at this section

Submit semiannual monitoring results in e-DMR by July 10 and January 10

By July 10 (January to June) and January 10 (July to December).

Report benchmark, effluent limitation, coal pile, TMDL and impaired waters monitoring results for each outfall in DEQ's e-DMR system by January 10 and July 10. If no sample could be taken, submit the documentation of why (no rain, outfalls viewed, or deviation from the 72-hour interval) with the e-DMR.

  • Only if: your permit sector is A, B, C, E, F, H, K, L, M, N, Q, U, Y, AA, AB, AF, or your permit sector is D, or your SIC code starts with 2951, 2952, or your permit sector is G, or your SIC code starts with 1021, or your permit sector is G, or the discharge from waste rock or overburden piles at an active site, or your permit sector is AD, or the department set benchmark monitoring for the facility, or your discharge is subject to federal effluent limitation guidelines (ELGs), or a TMDL applies to your discharge, or your stormwater reaches an impaired water body, or the discharge of coal pile runoff.
  • You file it in the agency's system (DEQ e-DMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I A 5 a, Table 70-4
"Submit the results by January 10 and by July 10."
Open the permit at this section

(Chesapeake Bay) Annual progress report by June 30 while reductions are still owed

By June 30 each year.

A facility that must reduce nitrogen or phosphorus loads under Part V submits an annual report to DEQ by June 30 of each year describing progress toward the reductions, until its demonstration of compliance is complete.

  • Only if: the facility is in chesapeake bay watershed; the chesapeake bay TMDL reductions required and demonstration not complete.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-400, Chesapeake Bay total maximum daily load compliance (Part V), section Part V A 3
"an annual report shall be submitted to the department by June 30 of each year describing the progress in meeting the required reductions until such time that the demonstration is completed."
Open the permit at this section

(Chesapeake Bay) Report evidence of point source nutrient credits for calendar year 2026 by July 1, 2027

By July 1, 2027.

A permittee that uses point source nitrogen or phosphorus credits to meet its Chesapeake Bay reductions for calendar year 2026 must acquire them no later than June 1, 2027 and report evidence of having obtained them to DEQ within 30 days of that deadline.

  • Only if: the facility is in chesapeake bay watershed; the point source nutrient credits used for calendar year 2026.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from Part V E 2 d (5). Check your copy of the permit.

Source: 9VAC25-151-400, Chesapeake Bay total maximum daily load compliance (Part V), section Part V E 2 d (5)
"The permittee reports evidence of having obtained such credits to the department within 30 days of the deadlines specified in Part V E 2 d (2)."
Open the permit at this section

(Chesapeake Bay) Submit loading calculations, and an action plan if needed, within 60 days after the fourth quarter of monitoring

Within 60 days after the completion of the fourth quarterly monitoring period.

After the fourth quarterly monitoring period, calculate the facility's total nitrogen and total phosphorus loading rates (Part V D) and submit the calculations on DEQ's form to the regional office within 60 days. If either rate is above the Part V A rates (1.5 lb/acre/year phosphorus, 12.3 lb/acre/year nitrogen), submit a Chesapeake Bay TMDL action plan with them.

Further steps with their own deadlines:

  • Achieve required reductions within two years after the fourth quarterly monitoring period. Within 2 years after the end of the fourth quarterly monitoring period. Section Part V A 3
    "Reductions, if applicable, shall be achieved by two years following the end of the fourth quarterly monitoring period"
  • Submit the demonstration by the 10th of the month after the two-year period. The permit gives the timing in words, quoted below. Section Part V A 3
    "The demonstration shall be submitted to the department no later than the 10th of the month directly following the two year period."
  • Only if: the facility is in chesapeake bay watershed; completion of the fourth quarterly chesapeake bay monitoring period.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-400, Chesapeake Bay total maximum daily load compliance (Part V), section Part V A 3
"shall be submitted no later than 60 days following the completion of the fourth quarterly monitoring period to the DEQ regional office serving the area where the industrial facility is located on a form provided by the department."
Open the permit at this section

(Sector G) Inspect clearing, grading and excavation areas every 7 days, or every 14 days and after storms

No set date. At least once every seven calendar days, or once every 14 calendar days plus within 24 hours after a storm of 0.5 inches or more; count from your last inspection.

During the exploration and construction phase of a metal mine, inspect disturbed areas, exposed material storage, erosion and sediment controls, discharge locations and vehicle entrances at least once every seven calendar days, or at least once every 14 calendar days and within 24 hours of the end of a storm of 0.5 inches or more. Monthly is allowed when the whole site is temporarily stabilized or runoff is unlikely because of frozen conditions. Write a report for each inspection.

Further steps with their own deadlines:

  • Start stabilization within 14 days after activity stops in an area. Within 14 days after clearing grading or excavation ceasing in that area. Section E 1 d
    "but in no case more than 14 days after the clearing, grading, and excavation activities in that portion of the site have temporarily ceased."
  • Only if: your permit sector is G; clearing grading or excavation in the exploration or construction phase.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 9VAC25-151-150, Sector G, Metal mining (ore mining and dressing), section E 2 a
"Inspections shall be conducted at least once every seven calendar days or at least once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater."
Open the permit at this section

(Sector L) Inspect operating landfills, open dumps and land application sites every seven days

No set date. At least once every seven days while the site is operating; count from your last inspection.

Qualified staff inspect operating landfills, open dumps and land application sites at least once every seven days: areas not finally stabilized, active land application areas, exposed material and waste storage, stabilization and structural controls, leachate collection and treatment systems, and where equipment and waste trucks enter and leave.

  • Only if: your permit sector is L; operating site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: 9VAC25-151-190, Sector L, Landfills, land application sites and open dumps, section D 2 a
"Operating landfills, open dumps, and land application sites shall be inspected at least once every seven days."
Open the permit at this section

Pollutant minimization plan within 180 days of DEQ notice

Within 180 days after the receipt of notification from the department.

A facility that exceeds a TMDL wasteload allocation and is notified by DEQ in writing prepares a pollutant minimization plan to find and reduce sources of the pollutant in its stormwater, and submits it to DEQ for approval within 180 days of receiving the notice.

  • Only if: a TMDL applies to your discharge; the department notification to prepare a pollutant minimization plan.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part I A 1 c (3) (d)
"The PMP shall be developed and submitted to the department for approval within 180 days of the receipt of notification from the department."
Open the permit at this section

Where the permit is unclear 6 duties

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

(Chesapeake Bay) Sample total nitrogen and total phosphorus in each of the first four quarters of coverage

No set date. Part V A 3 requires samples "during each of the first four quarters of permit coverage" and Part V B 4 defines the quarters as calendar quarters, but Part V does not say whether the quarter in which coverage begins counts when it is not a full quarter.

Facilities in the Chesapeake Bay watershed that first obtain coverage under the 2024 permit (other than newly constructed facilities under 9VAC25-151-60 C 13), and facilities registered before July 1, 2022 that did not finish four samples per outfall under the 2019 permit, sample each outfall for total nitrogen (TKN plus nitrite and nitrate) and total phosphorus in each of the first four quarters of permit coverage.

  • Only if: the facility is in chesapeake bay watershed; completion of the four nitrogen and phosphorus samples per outfall not yet.
  • You file it in the agency's system (DEQ e-DMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from Part V A 3. Check your copy of the permit.

Source: 9VAC25-151-400, Chesapeake Bay total maximum daily load compliance (Part V), section Part V A 3
"After the facility is granted coverage under the permit, samples shall be collected during each of the first four quarters of permit coverage."
Open the permit at this section

(Sector A) Mulch dyeing benchmark waiver: certify annually that waived parameters are not in the dyes

No set date. Table 90-2 footnote 2 requires a certification statement "submitted to the department annually" for an approved mulch dye benchmark waiver, with no date or starting point.

A mulch dyeing facility with a DEQ-approved benchmark monitoring waiver for parameters its dyes or colorants do not contain submits a certification statement to DEQ annually that it does not use mulch dyeing products containing any waived parameter.

  • Only if: your permit sector is A; the approved mulch dye benchmark monitoring waiver.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from E, Table 90-2 footnote 2. Check your copy of the permit.

Source: 9VAC25-151-90, Sector A, Timber products facilities, section E, Table 90-2 footnote 2
"a certification statement is submitted to the department annually that the facility does not use mulch dyeing products that contain any of the specifically waived parameters."
Open the permit at this section

Current permittee: notify DEQ of a transfer of the facility

No set date. Part II Y 2 a says the current permittee notifies the department "within 30 days of the transfer of the title". DEQ must say whether the notice is due before the transfer (as 40 CFR 122.61(b) requires, at least 30 days in advance) or within 30 days after it.

Coverage may transfer automatically to a new permittee if the current permittee notifies DEQ within 30 days of the transfer of title, the notice includes a written agreement with a specific transfer date, and DEQ does not object.

  • When: the transfer of title to the facility.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from Part II Y 2 a. Check your copy of the permit.

Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II Y 2 a
"The current permittee notifies the department within 30 days of the transfer of the title to the facility or property, unless permission for a later date has been granted by the department;"
Open the permit at this section

Evaluate every outfall for unauthorized discharges annually

No set date. Part III D 2 a requires outfalls to be "evaluated annually" for unauthorized discharges without saying whether that means once in each calendar year or within 12 months of the last evaluation.

The SWPPP must document that all stormwater outfalls associated with industrial activity were evaluated annually for unauthorized (nonstormwater) discharges: the date, the criteria used, the outfalls or drainage points observed, the results and any action taken. With written DEQ approval a facility may evaluate at least 20% of its outfalls each year in rotation.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from Part III D 2 a. Check your copy of the permit.

Source: 9VAC25-151-80, Stormwater pollution prevention plans (Part III), section Part III D 2 a
"all stormwater outfalls associated with industrial activity have been evaluated annually for the presence of unauthorized discharges."
Open the permit at this section

Observe every control measure during a discharge at least annually

No set date. Part III C requires control measures to be observed during a discharge "at least annually" without saying whether that means once in each calendar year or within 12 months of the last observation.

All control measures in the SWPPP must be kept in effective operating condition and observed at least annually while a stormwater discharge is occurring, to check they work. Where a discharge location cannot be reached, observe a nearby downstream location. Record the observations in the SWPPP.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from Part III C. Check your copy of the permit.

Source: 9VAC25-151-80, Stormwater pollution prevention plans (Part III), section Part III C
"shall be observed at least annually when a stormwater discharge is occurring to ensure that they are functioning correctly."
Open the permit at this section

Train employees at least annually

No set date. Part III B 4 b (6) requires training "at least annually" without saying whether that means once in each calendar year or within 12 months of the last session.

Run a stormwater training program: at least annually for all employees who work where industrial materials or activities are exposed to stormwater and for those who carry out SWPPP activities (inspectors, maintenance staff). Cover the SWPPP, spill response, good housekeeping, material management and control measure upkeep. Keep the schedule, each session and who attended in the SWPPP.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from Part III B 4 b (6). Check your copy of the permit.

Source: 9VAC25-151-80, Stormwater pollution prevention plans (Part III), section Part III B 4 b (6)
"Training shall be provided at least annually for all employees who work in areas where industrial materials or activities are exposed to stormwater, and for employees who are responsible for implementing activities identified in the SWPPP"
Open the permit at this section

What does no-exposure certification require?

Conditional exclusion for no exposure under 9VAC25-31-120 E: a certification accepted by DEQ, resubmitted every five years. The permit requirements then do not apply.

When something happens 8 duties

Give DEQ notice of planned physical changes as soon as possible

No set date. As soon as possible; the permit sets no number of days.

Notify DEQ as soon as possible of planned physical alterations or additions that make the facility a new source, could significantly change the nature or increase the quantity of pollutants discharged, or change sludge use or disposal; and give advance notice of planned changes that may result in noncompliance.

  • When: the planned physical alteration or addition.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II J 1
"The permittee shall give notice to the department as soon as possible of any planned physical alterations or additions to the permitted facility."
Open the permit at this section

Give notice of an anticipated bypass at least 10 days ahead if possible

At least 10 days before the date of the bypass.

If the permittee knows in advance that a bypass of a treatment facility is needed, submit prior notice, if possible at least 10 days before the bypass. An unanticipated bypass is reported as noncompliance within 24 hours.

  • When: the anticipated bypass.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II U 2 a
"prior notice shall be submitted, if possible at least 10 days before the date of the bypass."
Open the permit at this section

New owner: submit a registration statement within 30 days of the ownership change

Within 30 days after the ownership change.

When the owner of a covered facility changes, the new owner submits a complete registration statement within 30 days of the ownership change, and updates and implements any SWPPP revisions within 60 days of it.

Further steps with their own deadlines:

  • Update the SWPPP within 60 days of the ownership change. Within 60 days after the ownership change. Section Part III A 3
    "the new owner of the facility shall update and implement any revisions to the SWPPP within 60 days of the ownership change."
  • When: the change of ownership.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 9VAC25-31-110 A.
Source: 9VAC25-151-60, Registration statement and stormwater pollution prevention plan, section B 3
"the new owner of the facility shall submit a complete registration statement within 30 days of the ownership change."
Open the permit at this section

Report an unauthorized discharge within 24 hours and in writing within five days

Within 24 hours of the discovery of the discharge.

Notify DEQ immediately on discovering an unauthorized discharge to state waters (or one that may reasonably be expected to reach them), in no case later than 24 hours after discovery, by telephone or the online pollution response portal. Send a written report within five days of discovery.

Further steps with their own deadlines:

  • Written report within five days of discovery. Within 5 days after the discovery of the discharge. Section Part II G
    "A written report of the unauthorized discharge shall be submitted to the department within five days of discovery of the discharge."
  • When: the unauthorized discharge.
  • You file it in the agency's system (DEQ regional office (telephone or online pollution response portal)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II G
"shall notify the department of the discharge immediately upon discovery of the discharge, but in no case later than 24 hours after the discovery."
Open the permit at this section

Report noncompliance that may harm state waters or public health within 24 hours

Within 24 hours of becoming aware of the circumstances.

Report any noncompliance that may adversely affect state waters or endanger public health within 24 hours of becoming aware of it (including any unanticipated bypass and any upset that causes a discharge), then submit a written report within five days unless DEQ waives it. Other noncompliance is reported in writing with the next monitoring reports.

Further steps with their own deadlines:

  • Written report within five days. The permit gives the timing in words, quoted below. Section Part II I 1 b
    "A written report shall be submitted within five days and shall contain:"
  • Other noncompliance: report in writing with the next monitoring reports. The permit gives the timing in words, quoted below. Section Part II I 2
    "The permittee shall report all instances of noncompliance not reported under Part II I 1 in writing at the time the next monitoring reports are submitted."
  • When: the noncompliance that may affect state waters or public health.
  • You file it in the agency's system (DEQ regional office (telephone or online pollution response portal)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II I 1 a
"A report shall be provided within 24 hours from the time the permittee becomes aware of the circumstances."
Open the permit at this section

Report on each compliance schedule date within 14 days

Within 14 days after each schedule date.

If the permit coverage carries a compliance schedule, submit a report of compliance, noncompliance or progress no later than 14 days after each schedule date.

  • When: the compliance schedule date.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II E
"shall be submitted no later than 14 days following each schedule date."
Open the permit at this section

Send DEQ a new signatory authorization when the authorized person or position changes

No set date. Before or together with the next report the new representative signs.

Reports may be signed by a duly authorized representative only if a responsible official authorized that person or position in writing and the authorization was submitted to DEQ. If it is no longer accurate, submit a new authorization before or together with the next report or information that person signs.

  • When: the authorized representative changed.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 9VAC25-31-110 A.
Source: 9VAC25-151-70, General permit (cover page, Part I and Part II), section Part II K 3
"a new authorization satisfying the requirements of Part II K 2 shall be submitted to the department before or together with any reports, or information to be signed by an authorized representative."
Open the permit at this section

Submit a registration statement at least 60 days before a new facility starts industrial activity

At least 60 days before the planned start of industrial activity.

The owner of a new discharge submits a complete registration statement (Virginia's notice of intent) to the DEQ regional office at least 60 days before the date planned for the start of industrial activity. The SWPPP must be prepared and implemented before the registration statement is submitted.

Further steps with their own deadlines:

  • Prepare and implement the SWPPP before submitting the registration statement. The permit gives the timing in words, quoted below. Section Part III A 2
    "shall prepare and implement the SWPPP before submitting the registration statement."
  • When: the new facility.
  • You send it to the agency (DEQ regional office serving the facility).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per 9VAC25-31-110 A.
Source: 9VAC25-151-60, Registration statement and stormwater pollution prevention plan, section B 2
"Any owner proposing a new discharge of stormwater associated with industrial activity shall submit a complete registration statement at least 60 days before the date planned for the beginning of the industrial activity at the facility."
Open the permit at this section

Where the permit is unclear 1 duty

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

Submit a no exposure certification once every five years

No set date. A no exposure certification "must be submitted to the department once every five years" (9VAC25-151-50 D; 9VAC25-31-120 E 1 c). DEQ must say whether the five years count from the date the last certification was submitted or the date it was accepted.

A facility that qualifies for the conditional exclusion for no exposure (9VAC25-31-120 E) submits a signed no exposure certification to DEQ once every five years. Once DEQ accepts a complete certification the permit requirements no longer apply and no notice of termination is needed. If materials or activities become exposed, the exclusion ends.

  • You file it in the agency's system (DEQ (electronic submission)).
  • Signed or certified by a responsible official per 9VAC25-31-110 A.

Inferred from D. Check your copy of the permit.

Source: 9VAC25-151-50, Authorization to discharge, section D
"A no exposure certification must be submitted to the department once every five years."
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

Industrial Stormwater General Permit duties, topic by topic

How the Industrial Stormwater General Permit compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: