Idaho MSGP IDR050000 due dates and duties

Every duty in the Idaho Pollutant Discharge Elimination System (IPDES) Multi-Sector General Permit (MSGP) for Stormwater Discharges Associated with Industrial Activity in Idaho, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 84duties, each cited
  • 8on a schedule
  • 76when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
IDR050000
In force
May 2, 2026 to May 1, 2031
Official page
www2.deq.idaho.gov
Rules last checked
November 28, 2026
Today
May 2, 2026 May 1, 2031
Notes on the permit's status and renewal

Cover page: Issuance Date 04/02/2026, Effective Date 05/02/2026, Expiration Date 05/01/2031, signed by the Administrator, Surface and Wastewater Division. It replaces the 2021 MSGP that EPA issued and DEQ took over on July 1, 2021, which expired February 26, 2026 and was administratively continued until this permit took effect (DEQ memorandum of December 1, 2025). Facilities covered under the 2021 MSGP had to submit a new NOI no later than 90 days after that permit's expiration (Appendix K; Table 1-2 prints the deadline as an unfilled placeholder), and new operators working under DEQ's No Action Assurance within 90 days after May 2, 2026; both dates have passed and are not shown. On November 28, 2026, DEQ's document folder for this permit listed no modification of it. The issued permit leaves several dates as placeholders ("[insert 90 days after effective date]"); see open question q1. Fees apply under IDAPA 58.01.25.110; amounts are left out.

What does full permit coverage require?

Coverage under the MSGP: an NOI through the IPDES E-Permitting System with the fees; discharge is authorized 30 days after DEQ says the NOI is complete.

Every quarter 2 duties

Quarterly visual assessment of a stormwater sample from each discharge point

By the end of each calendar quarter.

Each quarter, collect a sample from each discharge point (substantially identical points may rotate) within the first 30 minutes of discharge from a storm at least 72 hours after the previous discharge, and look at it in a clean clear container for color, odor, clarity, solids, foam, oil sheen and other signs of pollution. Document and sign the results.

  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 3.B.1, page 31
"Once each quarter for your entire permit coverage, you must collect a stormwater sample from each discharge point (except as noted in Part 3.B.4) and conduct a visual assessment of each of these samples."
Open the permit at this section

Routine facility inspection every calendar quarter (once a year at an inactive, unstaffed site)

By the end of each calendar quarter.

Qualified personnel inspect exposed areas, potential pollutant sources, spill areas from the past three years, discharge points and control measures during operating hours, at least once each calendar quarter; at least one inspection each calendar year must be during a discharge. Document the findings with a signed statement and summarize them in the Annual Report. An inactive and unstaffed site with nothing exposed owes one site inspection a year instead.

  • If the facility is inactive and unstaffed: a different schedule.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 3.A.4, page 29
"The qualified personnel must conduct routine inspections at least quarterly (i.e., once each calendar quarter) or in some instances more frequently (e.g., monthly)."
Open the permit at this section

Every year 2 duties

Submit the Annual Report by January 30

By January 30, for the calendar year before.

Submit the Annual Report through the IPDES E-Permitting System summarizing the past calendar year's routine inspections, visual assessments, corrective actions and AIM responses (with the status of any open items) and any noncompliance, with up-to-date contact information and a signed certification.

  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.D, page 77
"You must submit an annual report to DEQ via the IPDES E-Permitting System, per Part 7.B, by January 30th for each year of permit coverage containing information generated from the past calendar year."
Open the permit at this section

Update the public SWPPP within 45 days after the year's last routine inspection

Within 45 days after the year's last routine inspection.

Update the SWPPP information made public through the NOI attachment, the SWPPP web address or the NOI form no later than 45 days after the final routine facility inspection of the year.

  • You file it in the agency's system (IPDES E-Permitting System (NOI attachment or NOI form) or the SWPPP web address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 Appendix K, Summary of Permit Reports and Submittals, section Appendix K, Part 6 row, page 4
"no later than 45 days after conducting the final routine facility inspection for the year."
Open the permit at this section

One time 3 duties

Apply for coverage under the next permit before this one expires

No set date. The deadline will be set by the reissued permit; this permit gives none.

To keep operating after May 1, 2031, apply for and obtain coverage under the reissued permit. Coverage ends if the NOI for the reissued permit is not submitted by the deadline that permit sets; if no new permit is issued in time this one is administratively continued for covered operators (1.C.6, 1.C.7).

  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per IDAPA 58.01.25.090.01.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 9 Standard Permit Conditions (9 pages), section 9.B, page 249
"If the operator wishes to continue an activity regulated by the GP after the expiration date of the GP, the operator must apply for and obtain a new GP coverage."
Open the permit at this section

Inspect and document every discharge point for unauthorized non-stormwater discharges by the end of the first year

Within 364 days after your coverage began.

By the end of the first year of coverage, inspect and document all discharge points for unauthorized non-stormwater discharges (date, criteria, points observed, and actions taken to eliminate any found), as part of the SWPPP.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 6.B.3.d, page 68
"By the end of the first year of your permit coverage under this permit, you must inspect and document all discharge points at your facility as part of the SWPPP."
Open the permit at this section

Write the SWPPP before submitting the NOI

No set date. Before the NOI is submitted (Part 6); the permit gives no number of days.

Prepare the Stormwater Pollution Prevention Plan (SWPPP) before submitting the Notice of Intent. A SWPPP written for the 2021 MSGP must be reviewed and updated to this permit first. Make it public by attaching it to the NOI, giving its web address in the NOI, or entering SWPPP information in the NOI (Part 6.D).

  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 6, page 65
"You must prepare a SWPPP for your facility before submitting your NOI for permit coverage."
Open the permit at this section

When something happens 19 duties

Report monitoring results in NetDMR by the 30th of the month after each quarter

By April 30 (Q1), July 30 (Q2), October 30 (Q3) and January 30 (Q4).

Submit all indicator, benchmark, effluent limit and impaired waters monitoring results for each quarter in NetDMR by April 30, July 30, October 30 and January 30. Report a failure to monitor, no discharge, or monitoring not required for a discharge point by the same date.

  • When: monitoring is required this period.
  • If there was no discharge in the period: a different schedule.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.C.3, page 77
"For both indicator and benchmark monitoring, you are required to submit sampling results to DEQ no later than the 30th day of the month after the end of the monitoring period"
Open the permit at this section

Climates with irregular discharges: send DEQ a revised monitoring schedule ahead of time

At least 60 days before the first indicator sample is due.

A facility in an arid, semi-arid or long-freezing climate that spreads its monitoring into the seasons when discharges occur must report the revised schedule to DEQ 60 days before the first indicator sample is due, and by the due date of the first benchmark sample, and keep it with the SWPPP.

Further steps with their own deadlines:

  • Benchmark monitoring: revised schedule by the first benchmark sample due date. Before the first benchmark sample is due. Section 4.B.2.d, page 45
    "provided that they report this revised schedule directly to DEQ by the due date of the first benchmark sample"
  • When: you spread monitoring into wetter seasons because discharges are irregular.
  • You send it to the agency (DEQ regional office (Part 7.H)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 4.B.1.b, page 40
"provided you report this revised schedule directly to DEQ 60 days before the due date of the first indicator monitoring sample"
Open the permit at this section

Document the triggering condition within 24 hours and the response within 14 days

Within 1 day after you become aware of the condition.

Record the condition or AIM trigger (and spill details) within 24 hours of becoming aware of it, and the corrective action or AIM response taken or planned, with dates, within 14 days of discovery. Keep it with the SWPPP and summarize it in the Annual Report.

Further steps with their own deadlines:

  • Document the corrective action or AIM response within 14 days of discovery. Within 14 days after you discover the condition. Section 5.C.2, page 64
    "the corrective actions and/or AIM responses you took or will take as a result of the conditions listed in Parts 5.A.1, 5.B.3, 5.B.4, and/or 5.B.5 within 14 days from the time of discovery of any of"
  • When: a condition requiring corrective action happens, or an AIM triggering event happens.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 5.C.1, page 64
"You must document the existence of any of the conditions listed in Parts 5.A.1, 5.B.3, 5.B.4, or 5.B.5 within 24 hours of becoming aware of such condition."
Open the permit at this section

Existing facility discharging without coverage: submit the NOI immediately

No set date. Immediately (Table 1-2); the permit gives no number of days.

An existing facility that has been discharging industrial stormwater without coverage under the 2021 MSGP or another IPDES permit submits an NOI immediately; its discharges are unpermitted until covered.

  • When: the facility has been discharging industrial stormwater without permit coverage.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per IDAPA 58.01.25.090.01.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 1.C.3 Table 1-2, page 12
"Immediately; your stormwater discharges are currently unpermitted"
Open the permit at this section

Fix conditions requiring corrective action within 14 days (45 at most)

Within 14 days after you discover the condition (up to 45 days where the permit allows more time).

On a triggering condition (unauthorized release, numeric limit violation, inadequate, missing or poorly maintained controls, visual evidence of pollution): take all reasonable steps the same day, finish the corrective action before the next storm if possible and within 14 calendar days of discovery, or document why not and finish within 45 days. Going past 45 days needs a written notice to the DEQ regional office through E-Permitting. Update the SWPPP within 14 days of finishing the work.

Further steps with their own deadlines:

  • Update the SWPPP within 14 days of completing the corrective action. Within 14 days after the corrective action work is completed. Section 5.A.3.b, page 53
    "you must modify your SWPPP accordingly within 14 calendar days of completing corrective action work."
  • Beyond 45 days: notify the DEQ regional office in writing through E-Permitting. Within 45 days after you discover the condition. Section 5.A.3.b, page 53
    "provided that you notify the appropriate DEQ regional office in writing using a reporting notification on the IPDES E-Permitting System, of your intention to exceed 45 days"
  • When: a condition requiring corrective action happens.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 5.A.3.b, page 52
"within 14 calendar days from the time of discovery that the condition in Part 5.A.1 is not met."
Open the permit at this section

Give DEQ notice at least 10 days before a planned bypass

At least 10 days before the planned bypass.

If you know in advance that a bypass of treatment will be needed, give DEQ prior notice, if possible at least 10 days before it. An unanticipated bypass that exceeds a limit is a 24-hour report.

  • When: you know in advance that a bypass will be needed.
  • You file it in the agency's system (DEQ (electronic notice, 40 CFR 127)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 9 Standard Permit Conditions (9 pages), section 9.M.1.e, page 254
"If the operator knows in advance of the need for a bypass, it shall submit prior notice to DEQ, if possible, at least 10 days before the date of the bypass."
Open the permit at this section

New facility, or one moving from another permit: submit the NOI at least 30 days before discharging

At least 30 days before you start discharging.

A new facility, or an existing facility moving from an individual or other general permit, submits a complete NOI through the IPDES E-Permitting System at least 30 calendar days before it starts discharging under this permit, with the applicable fees. Discharge is authorized 30 days after DEQ says the NOI is complete, unless DEQ denies or delays it.

  • When: the facility is new, or is moving to this permit from an individual or other general permit.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per IDAPA 58.01.25.090.01.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 1.C.3 Table 1-2, page 12
"At least 30 calendar days prior to commencing discharge."
Open the permit at this section

New operator: submit an NOI at least 30 days before taking over (the old operator then files an NOT)

At least 30 days before control of the facility is transferred.

When a new operator takes over an existing covered facility, the new operator submits its own NOI at least 30 calendar days before the transfer of control (Table 1-2). Part 1.C.4.b instead says no later than 30 days after the change; the earlier date is shown. The previous operator submits a Notice of Termination within 30 days after the new operator's coverage becomes active. Coverage cannot be transferred; DEQ requires the new operator's own NOI.

Further steps with their own deadlines:

  • Previous operator: Notice of Termination within 30 days after the new operator is covered. Within 30 days after the new operator's coverage becomes active. Section 1.C.4.b, page 13
    "previous operator must submit a Notice of Termination (NOT) no later than thirty (30) calendar days after MSGP coverage becomes active for the new operator"
  • Later reading in Part 1.C.4.b: new NOI no later than 30 days after the change. Within 30 days after the operator changes. Section 1.C.4.b, page 12
    "the new operator must submit a new NOI no later than thirty (30) calendar days after a change in operators."
  • When: the operator changes.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per IDAPA 58.01.25.090.01.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 1.C.3 Table 1-2, page 12
"At least 30 calendar days prior to the date of transfer of control to the new operator."
Open the permit at this section

Notify DEQ at least 30 days before planned physical changes

At least 30 days before the planned change.

Give DEQ notice no fewer than 30 days before planned physical alterations or additions that could make the facility a new source or significantly change the nature or increase the quantity of pollutants discharged. Also send to the MS4 operator if discharging through an MS4.

  • When: a significant physical change is planned.
  • You send it to the agency (DEQ regional office (Part 7.H)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.F.4, page 78
"You must give notice to DEQ promptly, no fewer than 30 days prior to making any planned physical alterations or additions to the permitted facility"
Open the permit at this section

Promptly correct missing or wrong information in the NOI or any report

No set date. "Promptly"; no number of days stated.

When you learn that relevant facts were left out of the NOI, or that incorrect information was submitted in the NOI or any report, submit the facts promptly.

  • When: you find incorrect or missing information.
  • You send it to the agency (DEQ regional office (Part 7.H)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.F.8, page 79
"You must promptly submit facts or information if you become aware that you failed to submit relevant facts in your NOI, or that you submitted incorrect information in your NOI or in any report;"
Open the permit at this section

Report any other noncompliance when you submit monitoring reports

No set date. At the time monitoring reports (DMRs) are submitted (7.F.7).

Report every instance of noncompliance not already reported in the Annual Report, a compliance schedule report or a 24-hour report at the time monitoring reports are submitted.

  • When: noncompliance happens that has not been reported.
  • You send it to the agency (DEQ regional office (Part 7.H)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.F.7, page 78
"You must report all instances of noncompliance not reported in your annual report, compliance schedule report, or 24-hour report at the time monitoring reports are submitted;"
Open the permit at this section

Report monitoring results in NetDMR within 30 days of the full lab results (Appendix K)

Within 30 days after you receive the full lab results for the period.

Appendix K gives a second DMR deadline: within 30 days of receiving the full laboratory results for all monitored discharge points for the period. When results arrive early in a quarter this date comes before the 30th of the following month, and the earlier date applies.

  • When: monitoring is required this period.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 Appendix K, Summary of Permit Reports and Submittals, section Appendix K, Part 4 and 7.C row, page 4
"Within 30 days of receiving your full laboratory results for all monitored discharge points during the reporting period."
Open the permit at this section

Report noncompliance that may endanger health or the environment by phone within 24 hours

Within 1 day after you become aware of the noncompliance.

Report noncompliance that may endanger human health or the environment, any unanticipated bypass or upset exceeding a limit, and any violation of a maximum daily limit to the DEQ regional office on the 24-hour IPDES hotline, 1-833-IPDES24 (1-833-473-3724), within 24 hours of becoming aware; then send a written report through E-Permitting within 5 days. Also send to the MS4 operator if discharging through an MS4.

Further steps with their own deadlines:

  • Written report through E-Permitting within 5 days. Within 5 days after you become aware of the noncompliance. Section 7.F.2, page 78
    "A written submission must also be submitted through the IPDES E-Permitting System within 5 days of the time you become aware of the circumstances;"
  • When: noncompliance that may endanger health or the environment happens.
  • You send it to the agency (24-hour IPDES hotline 1-833-IPDES24, then IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.F.1, page 78
"Any information must be provided orally within 24 hours from the time you become aware of the circumstances;"
Open the permit at this section

Report on any compliance schedule within 14 days after each schedule date

Within 14 days after the compliance schedule date.

If DEQ sets a compliance schedule, report compliance or noncompliance with each interim and final requirement no later than 14 days after each schedule date.

  • When: a compliance schedule date set by DEQ passes.
  • You send it to the agency (DEQ regional office (Part 7.H)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.F.6, page 78
"must be submitted no later than 14 days following each schedule date;"
Open the permit at this section

Reportable-quantity spill: call the NRC and the Idaho State Comm Center at once, report to DEQ within five days

Within 5 days after you learn of the release.

When a release of a hazardous substance or oil at or above a reportable quantity (40 CFR 110, 117 or 302) occurs in a 24-hour period, notify the National Response Center and the Idaho State Communications Center, (208) 632-8000, as soon as you know of it; within five calendar days, report the release, its circumstances and date to DEQ through the IPDES E-Permitting System.

Further steps with their own deadlines:

  • Call the National Response Center and the Idaho State Comm Center as soon as you know. The permit gives the timing in words, quoted below. Section 2.A.2.d, page 23
    "and the Idaho State Comm Center at (208) 632-8000 as soon as you have knowledge of the release."
  • When: a release of a reportable quantity happens.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 2.A.2.d, page 23
"you must also, within five calendar days of knowledge of the release, provide a description of the release, the circumstances leading to the release, and the date of the release to DEQ through the IPDES E-Permitting System."
Open the permit at this section

Submit a Change NOI within 30 days after NOI information changes

Within 30 days after the change.

If any information in the NOI changes, submit a Change NOI through the IPDES E-Permitting System within 30 calendar days after the change.

  • When: the information in your NOI changes.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per IDAPA 58.01.25.090.01.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 1.C.4.a, page 12
"you must submit a Change NOI form within thirty (30) calendar days after the change occurs."
Open the permit at this section

Submit a Notice of Termination within 30 days after coverage is no longer needed

Within 30 days after a condition for ending coverage is met.

Submit a Notice of Termination (NOT) through the IPDES E-Permitting System within 30 days after a new operator is authorized, operations and industrial stormwater discharges have ended (with erosion and sediment controls in place), Sector G, H or J termination conditions are met, or other permit coverage is obtained.

  • When: a condition for ending coverage is met.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 1.D.2, page 15
"You must submit a NOT within 30 days after one or more of the following conditions have been met:"
Open the permit at this section

Submit the AIM Corrective Action Report within 14 days after finishing AIM corrective actions

Within 14 days after the AIM corrective actions are completed.

After completing the corrective actions an AIM level requires, submit an AIM Corrective Action Report to DEQ through the IPDES E-Permitting System within 14 days, describing the trigger, the inspection and evaluation of the cause, the actions taken and the completion date.

  • When: an AIM triggering event happens.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 5.B, page 53
"You must submit an AIM Corrective Action Report to DEQ via the IPDES E-Permitting System in accordance with Part 7 within fourteen (14) days following completion of corrective actions required under this section."
Open the permit at this section

Tell DEQ in advance about planned changes you expect will cause noncompliance

No set date. "Advance notice"; no number of days stated.

Give DEQ advance notice of any planned change in the facility or activity that you expect will result in noncompliance.

  • When: a planned change is expected to cause noncompliance.
  • You send it to the agency (DEQ regional office (Part 7.H)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.F.5, page 78
"You must give advance notice to DEQ of any planned changes in the permitted facility or activity which you anticipate will result in noncompliance with permit requirements;"
Open the permit at this section

Ongoing 5 duties

Keep records for three years after coverage ends

No set date. Standing duty.

Keep the SWPPP and its changes, Part 6.E documentation (including corrective action and AIM records), all reports and certifications, monitoring data and NOI data for at least three years after coverage expires or is terminated.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years after coverage expires or is terminated.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.G, page 79
"for a period of at least 3 years from the date that your coverage under this permit expires or is terminated."
Open the permit at this section

Keep the SWPPP current, signed and on site, and update it after corrective actions

No set date. Standing duty.

Keep a complete, current SWPPP at the facility, immediately available to employees, DEQ, the MS4 operator and federal inspectors; modify it based on corrective actions and Part 5 deadlines and sign and date each change.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 6.C, page 72
"You must modify your SWPPP based on any corrective actions and deadlines required under Part 5."
Open the permit at this section

Pay the annual and application fees

No set date. The permit points to IDAPA 58.01.25.110 and gives no due date or amount.

Pay DEQ all applicable annual and application fees under IDAPA 58.01.25.110. The permit does not state amounts or due dates.

  • You file it in the agency's system (IPDES E-Permitting System (fees)).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 1.C.2, page 11
"The permittee must submit to DEQ all applicable annual and application fees in accordance with IDAPA 58.01.25.110."
Open the permit at this section

Post a public sign of permit coverage

No set date. Standing duty from authorization.

Post and maintain a legible sign at a safe, publicly accessible place near the facility with the statement that it is permitted under Idaho DEQ's MSGP, the IPDES ID, a contact phone number, and either the SWPPP web address or the DEQ regional office contact statement.

  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 1.C.5, page 13
"You must post a sign or other notice of your permit coverage at a safe, publicly accessible location in close proximity to your facility."
Open the permit at this section

Train employees on the SWPPP on the schedule set in the SWPPP

No set date. The permit requires the SWPPP to state the training frequency (6.B.5.a.5) but sets none for most sectors.

Train all employees who work in exposed areas or carry out permit duties, including the stormwater pollution prevention team, on the topics in Part 2.A.2.h, at the frequency the SWPPP sets, and keep a log of training dates.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 2.A.2.h, page 24
"You must train all employees who work in areas where industrial materials or activities are exposed to stormwater"
Open the permit at this section

Only if... 52 duties

These apply only in the situation named on each one. Answer the questions to sort them.

(Sector E) Sweep at least weekly where cement, aggregate or dust is handled

By the end of each week.

On paved exposed areas, sweep or vacuum (or use an equivalent measure) at a frequency set in the SWPPP, and at least once a week where cement, aggregate, kiln dust, fly ash or settled dust is handled or processed.

  • Only if: your permit sector is E; cement, aggregate, kiln dust, fly ash or settled dust is handled or processed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 8.E.2.1. Check your copy of the permit.

Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.E.2.1, page 90
"it must be performed at least once a week in areas where cement, aggregate, kiln dust, fly ash, or settled dust are being handled or processed"
Open the permit at this section

(Sector A) Inspect wood preservation areas every month

By the end of each month.

Timber products facilities that do wood surface protection and preservation inspect processing areas, transport areas and treated wood storage areas monthly, to check that treatment chemicals stay off unprotected soils and out of stormwater.

  • Only if: your permit sector is A; the facility does wood surface protection and preservation.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.A.5, page 82
"inspect processing areas, transport areas, and treated wood storage areas monthly"
Open the permit at this section

(Sector O) Inspect coal handling and other listed areas every month

By the end of each month.

Steam electric generating facilities inspect monthly the coal handling, loading and unloading, switchyard, fueling, bulk storage, ash handling, disposal pond and landfill, maintenance, liquid tank and material storage areas.

  • Only if: your permit sector is O.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.O.6, page 206
"inspect the following areas monthly: coal handling areas, loading or unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas"
Open the permit at this section

(Sector Q) Clean blasting debris and paint chips from stormwater conveyances every month

By the end of each month.

Water transportation facilities clean stormwater conveyances of abrasive blasting debris and paint chips at least once a month.

  • Only if: your permit sector is Q; abrasive blasting or painting is done at the facility.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.Q.3.1.2, page 212
"At least once per month, you must clean stormwater conveyances of deposits of abrasive blasting debris and paint chips."
Open the permit at this section

(Sector S) Inspect the airport every month of the deicing season

By the end of each month.

Air transportation facilities inspect at least monthly during the deicing season they define (for example October through April), and in every other month when deicing chemicals may be used.

  • Only if: your permit sector is S; it is a month of the deicing season.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.S.6, page 225
"At a minimum, you must conduct facility inspections at least monthly during the deicing season"
Open the permit at this section

(Sector V) Inspect listed activities and areas every month

By the end of each month.

Textile, apparel and fabric product facilities inspect at least monthly transfer and transmission lines, spill prevention, good housekeeping, process waste management and all structural and non-structural practices.

  • Only if: your permit sector is V.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.V.5, page 233
"Inspect, at least monthly, the following activities and areas (at a minimum): transfer and transmission lines, spill prevention, good housekeeping practices"
Open the permit at this section

(Sectors G, J) Inspect monthly when discharging to Tier II or sediment- or nitrogen-impaired waters

By the end of each month.

Metal and non-metallic mineral mines (other than earth-disturbing work before active mining) inspect at least quarterly, and monthly if they discharge to Tier II waters (Sector J: Tier II or III) or to waters impaired for sediment or nitrogen.

  • Only if: your permit sector is G, J; the site discharges to Tier II waters or to waters impaired for sediment or nitrogen.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.G.7, page 121
"Sites which discharge to waters designated as Tier II waters which are impaired for sediment or nitrogen must be inspected monthly."
Open the permit at this section

(Sector M) Inspect equipment and fluid storage for leaks every quarter

By the end of each calendar quarter.

Automobile salvage yards inspect arriving vehicles for leaks immediately (or as soon as practicable), and every quarter inspect all equipment with oily parts, hydraulic or other fluids or mercury switches, and all vessels and areas storing hazardous materials and automotive fluids, for leaks.

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.M.4, page 195
"Inspect quarterly for signs of leakage all equipment containing oily parts, hydraulic fluids, any other types of fluids, or mercury switches."
Open the permit at this section

Discharges to impaired waters: monitor every quarter for the impairment pollutants

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins.

A facility whose first receiving water is impaired (with or without a TMDL) samples each discharge point (except substantially identical ones) every quarter for the whole permit term for every pollutant causing the impairment that has a standard method (TSS for sediment or turbidity). A detection starts AIM Level 1.

  • Only if: your stormwater reaches an impaired water body.
  • Does not apply if: the facility is inactive and unstaffed.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 4.B.4.a, page 48
"monitoring is required quarterly for the entirety of the permit term."
Open the permit at this section

Effluent limit monitoring once a year at each regulated discharge point

By December 31 each year, starting with the calendar year that includes the first full quarter after your coverage begins.

Once a year, sample each discharge point carrying a Table 4-3 regulated discharge (wet deck log spray, phosphate fertilizer runoff, asphalt emulsion runoff, cement storage piles, mine dewatering at sand, gravel and crushed stone mines, hazardous and non-hazardous waste landfills, coal storage piles at power plants, urea pavement deicing runoff) for the Part 8 limits. Substantially identical discharge points cannot be used.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 4.B.3. Check your copy of the permit.

Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 4.B.3, page 46
"you must monitor once per year at each stormwater discharge point containing the discharges identified in Table 4-3 for the parameters specified in the sector-specific section of Part 8."
Open the permit at this section

PAH indicator monitoring twice a year for the first three years

By the end of each half year (June 30 and December 31), starting with the first full calendar quarter after your coverage begins.

Sample for the 16 priority PAHs once every six months (six results in all) in the first three years of coverage if paved areas with industrial activity are sealed or re-sealed with coal-tar sealcoat during coverage, or for Sector A facilities with exposed creosote or creosote-treated wood, Sector C (SIC 2911), D, F, H, I, M, O, P (SIC 4011, 4013, 5171), Q (SIC 4491), R and S. Report in NetDMR.

  • Only if: paved areas with industrial activity are sealed or re-sealed with coal-tar sealcoat during your coverage, or your permit sector is D, F, H, I, M, O, R, S, or your SIC code starts with 2911, 4011, 4013, 5171, 4491, or the facility is a Sector A facility that makes, uses or stores creosote or creosote-treated wood exposed to precipitation.
  • Does not apply if: the facility is inactive and unstaffed.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 4.B.1.a.2, page 39
"You must conduct indicator monitoring of stormwater discharges for PAHs bi-annually (i.e., sample twice per year, once"
Open the permit at this section

Quarterly benchmark monitoring for the first three years (at least 12 quarters)

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins.

For the benchmark parameters of every subsector at the site (primary and co-located), sample each discharge point every quarter for the first three years of coverage, at least 12 quarterly results. A parameter whose annual average stays at or below its benchmark can stop after 12 quarters; one that exceeds continues quarterly, with AIM responses, until the average is back below the benchmark.

  • Only if: your permit subsector is A1, A2, A3, A4, B1, C1, C2, C3, C4, D1, E1, E2, E3, F1, F2, F3, F4, G1, G2, H1, I1, J1, J2, J3, K1, L1, L2, M1, N1, N2, O1, P1, Q1, R1, S1, U1, U2, U3, Y1, Y2, AA1, AA2, AB1, AD1.
  • Does not apply if: the facility is inactive and unstaffed.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 4.B.2.c, page 44
"Benchmark monitoring of stormwater discharges is required quarterly, as identified in Part 4.A.7, in the first 3 years of permit coverage."
Open the permit at this section

Quarterly indicator monitoring for pH, TSS and COD (report only)

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins.

Sample each discharge point every quarter for pH, total suspended solids and chemical oxygen demand and report the results in NetDMR. There is no threshold; the results are report-only. Applies for the whole of coverage.

  • Only if: your permit subsector is B2, C5, D2, F5, J3, T1, V1, W1, X1, Z1, AC1, S1.
  • Does not apply if: the facility is inactive and unstaffed.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 4.B.1.a.1, page 39
"You must conduct indicator monitoring of stormwater discharges for pH, TSS, and COD each quarter, beginning in your first full quarter of permit coverage as identified in Part 4.A.7."
Open the permit at this section

(Sector S) Certify in each Annual Report that no urea pavement deicers are used

By January 30, for the calendar year before.

Primary airports with 1,000 or more annual jet departures that discharge pavement deicing runoff and comply with the urea limit by not using urea certify in each Annual Report (due January 30) that they do not use pavement deicers containing urea.

  • Only if: your permit sector is S; the airport meets the urea limit by not using pavement deicers that contain urea.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.D.1, page 77
"provide a statement certifying that you do not use pavement deicers containing urea."
Open the permit at this section

(Sectors G, H, J) Construction dewatering to sensitive waters: report weekly turbidity averages each quarter

By April 30 (Q1), July 30 (Q2), October 30 (Q3) and January 30 (Q4).

Sites discharging construction dewatering water to sediment-impaired, Tier II or Tier III waters sample turbidity, compare weekly averages with the 50 NTU benchmark, and report the weekly averages in NetDMR no later than 30 days after each monitoring quarter ends (April 30, July 30, October 30, January 30).

  • Only if: your permit sector is G, H, J; construction dewatering water is discharged to sediment-impaired, Tier II or Tier III waters.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.G.4.5.4, page 113
"You must submit reports of your weekly average turbidity data to DEQ no later than 30 days following the end of each monitoring quarter."
Open the permit at this section

(Sector A) Timber products: benchmark values and effluent limits

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors A1, A2, A3, A4; effluent limits in Table 8.A-3, sampled once a year.

  • Only if: your permit sector is A.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.A.7 Table 8.A-2, page 82
"Table 8.A-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector AA) Fabricated metal products: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors AA1, AA2.

  • Only if: your permit sector is AA.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.AA.6 Table 8.AA-2, page 243
"Table 8.AA-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector AB) Transportation equipment, industrial or commercial machinery: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors AB1.

  • Only if: your permit sector is AB.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.AB.4 Table 8.AB-2, page 244
"Table 8.AB-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector AD) Non-classified facilities (designated by DEQ): benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors AD1.

  • Only if: your permit sector is AD.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.AD.4 Table 8.AD-2, page 247
"Table 8.AD-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector B) Paper and allied products: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors B1.

  • Only if: your permit sector is B.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.B.3 Table 8.B-2, page 85
"Table 8.B-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector C) Chemical and allied products manufacturing, and refining: benchmark values and effluent limits

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors C1, C2, C3, C4; effluent limits in Table 8.C-3, sampled once a year.

  • Only if: your permit sector is C.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.C (8.C.1 as printed) Table 8.C-2, page 87
"Table 8.C-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector D) Asphalt paving and roofing materials and lubricant manufacturing: benchmark values and effluent limits

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors D1; effluent limits in Table 8.D-3, sampled once a year.

  • Only if: your permit sector is D.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.D.4 Table 8.D-2, page 89
"Table 8.D-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector E) Glass, clay, cement, concrete, and gypsum products: benchmark values and effluent limits

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors E1, E2, E3; effluent limits in Table 8.E-3, sampled once a year.

  • Only if: your permit sector is E.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.E.5 Table 8.E-2, page 91
"Table 8.E-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector F) Primary metals: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors F1, F2, F3, F4.

  • Only if: your permit sector is F.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.F.6 Table 8.F-2, page 94
"Table 8.F-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector G) Metal mining: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors G1, G2.

  • Only if: your permit sector is G.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.G.8.2, 8.G.8.3 Tables 8.G-3 and 8.G-4, page 122
"Table 8.G-3 identifies benchmarks that apply to active copper ore mining and dressing facilities."
Open the permit at this section

(Sector G) Train employees at least once every 12 months

Within 365 days after the last training.

Active and temporarily inactive metal mining facilities conduct employee stormwater training at least annually.

  • Only if: your permit sector is G.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.G.5.1, page 119
"Conduct employee training at least annually at active and temporarily inactive facilities."
Open the permit at this section

(Sector G) Waste rock and overburden piles: benchmark monitoring once in the first year, then twice a year for exceeded parameters

No set date. Once in the first year of coverage, then twice a year only for exceeded parameters; the permit gives no date within the year.

Active metal mines sample discharges from waste rock and overburden piles once in the first year of coverage for the Table 8.G-4 parameters and the Table 8.G-5 parameters for the ore mined, then twice a year in later years for any parameter that exceeded its benchmark. Radium and uranium are sampled quarterly for the first four full quarters.

  • Only if: your permit sector is G; the facility is an active metal mine with waste rock or overburden piles.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.G.8.3, page 122
"perform benchmark monitoring once in the first year for the parameters listed in Table 8.G-4, and twice annually in all subsequent years of coverage under this permit for any parameters for which the benchmark has been exceeded."
Open the permit at this section

(Sector H) Coal mines and coal mining-related facilities: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors H1.

  • Only if: your permit sector is H.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.H.9 Table 8.H-3, page 152
"Table 8.H-3 identifies benchmarks that apply to"
Open the permit at this section

(Sector I) Inspect erosion and sediment controls every 7 days

Within 7 days after the last inspection.

Oil and gas extraction facilities inspect all erosion and sediment controls every 7 days, or once every 14 calendar days and within 24 hours of a storm of 0.25 inches or more.

  • Only if: your permit sector is I.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.I.5, page 156
"All erosion and sediment controls must be inspected either: 1) every 7 days; or 2) once every 14 calendar days and within 24 hours of a storm event of 0.25 inches or greater."
Open the permit at this section

(Sector I) Oil and gas extraction: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors I1.

  • Only if: your permit sector is I.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.I.7 Table 8.I-2, page 156
"Table 8.I-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector J) Non-metallic mineral mining and dressing: benchmark values and effluent limits

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors J1, J2, J3; effluent limits in Table 8.J-4, sampled once a year.

  • Only if: your permit sector is J.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.J.9 Table 8.J-3, page 182
"Table 8.J-3 identifies benchmarks that apply to"
Open the permit at this section

(Sector J) Train employees at least once every 12 months

Within 365 days after the last training.

Active and temporarily inactive non-metallic mineral mining sites conduct employee stormwater training at least annually.

  • Only if: your permit sector is J.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.J.5.1, page 179
"Conduct employee training at least annually at active and temporarily inactive sites."
Open the permit at this section

(Sector K) Hazardous waste treatment, storage, or disposal facilities: benchmark values and effluent limits

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors K1; effluent limits in Table 8.K-3, sampled once a year.

  • Only if: your permit sector is K.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.K.6 Table 8.K-2, page 186
"Table 8.K-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector L) Inspect operating landfills, dumps and land application sites every 7 days

Within 7 days after the last inspection.

Except in arid and semi-arid climates, inspect operating landfills, open dumps and land application sites at least once every 7 days; stabilized areas, completed land application areas and arid or semi-arid sites at least once a month. Inactive sites at least quarterly.

  • Only if: your permit sector is L; the facility operates a landfill, open dump or land application site.
  • If the area is stabilized, land application is complete, or the climate is arid or semi-arid: a different schedule.
  • If the landfill, open dump or land application site is inactive: a different schedule.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.L.7.1, page 191
"landfills, open dumps, and land application sites at least once every 7 days."
Open the permit at this section

(Sector L) Landfills, land application sites, and open dumps: benchmark values and effluent limits

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors L1, L2; effluent limits in Table 8.L-3, sampled once a year.

  • Only if: your permit sector is L.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.L.10 Table 8.L-2, page 191
"Table 8.L-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector M) Automobile salvage yards: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors M1.

  • Only if: your permit sector is M.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.M.6 Table 8.M-2, page 195
"Table 8.M-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector N) Scrap recycling and waste recycling facilities: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors N1, N2.

  • Only if: your permit sector is N.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.N.7 Table 8.N-2, page 201
"Table 8.N-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector O) Steam electric generating facilities: benchmark values and effluent limits

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors O1; effluent limits in Table 8.O-3, sampled once a year.

  • Only if: your permit sector is O.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.O.8 Table 8.O-2, page 206
"Table 8.O-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector P) Land transportation and warehousing: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors P1.

  • Only if: your permit sector is P.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.P.7 Table 8.P-2, page 211
"Table 8.P-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector P) Train personnel at least once a year

Within 365 days after the last training.

Land transportation and warehousing facilities train personnel at least once a year on used oil and solvent management, fueling, good housekeeping, painting and the other listed topics that apply.

  • Only if: your permit sector is P.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.P, page 209
"Train personnel at least once a year and address the following activities, as applicable"
Open the permit at this section

(Sector Q) Water transportation: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors Q1.

  • Only if: your permit sector is Q.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.Q.7 Table 8.Q-2, page 215
"Table 8.Q-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector R) Ship and boat building and repair yards: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors R1.

  • Only if: your permit sector is R.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.R.7 Table 8.R-2, page 218
"Table 8.R-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector S) Air transportation: benchmark values and effluent limits

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors S1; effluent limits in Table 8.S-3, sampled once a year.

  • Only if: your permit sector is S.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.S.8 Table 8.S-2, page 226
"Table 8.S-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector U) Food and kindred products: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors U1, U2, U3.

  • Only if: your permit sector is U.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.U.7 Table 8.U-2, page 231
"Table 8.U-2 identifies benchmarks that apply to"
Open the permit at this section

(Sector Y) Rubber, miscellaneous plastic products, and miscellaneous manufacturing industries: benchmark values

No set date. These are the values a sample is compared with. The schedule is in the benchmark monitoring and effluent limit monitoring duties.

Benchmark values for subsectors Y1, Y2.

  • Only if: your permit sector is Y.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.Y.5 Table 8.Y-2, page 238
"Table 8.Y-2 identifies benchmarks that apply to"
Open the permit at this section

(Sectors G, H, J) Inspect earth-disturbing work before active mining every 7 days

Within 7 days after the last inspection.

During earth-disturbing activities before active mining, inspect the disturbed areas and controls at least once every 7 calendar days, or once every 14 calendar days and within 24 hours of a storm of 0.25 inches or more (or a qualifying snowmelt). Sites discharging to sediment-impaired or Tier II waters inspect every 7 days and within 24 hours of such a storm. Write the report within 24 hours of each inspection.

  • Only if: your permit sector is G, H, J; earth-disturbing work before active mining is under way.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 8 Sector-Specific Requirements (167 pages), section 8.G.4.6.1, page 114
"At least once every 7 calendar days, or"
Open the permit at this section

AIM Level 1: inspect within 7 days to find the cause of the exceedance

Within 7 days after you receive lab results showing an AIM trigger.

When AIM Level 1 is triggered, conduct and document an inspection under Part 3 to investigate the cause of the benchmark exceedance or impairment detection within 7 days, and record the findings in the SWPPP.

Further steps with their own deadlines:

  • Part 3.A.4 reading: AIM inspection within 14 days of triggering AIM. Within 14 days after you receive lab results showing an AIM trigger. Section 3.A.4, page 29
    "Inspections required in response to an AIM triggering event per Part 5.B must be conducted within 14 days of triggering AIM for every instance in which AIM is triggered."
  • Only if: a parameter is at AIM level 1.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 5.B.3.c.1, page 55
"Conduct and document an inspection as described in Part 3 to investigate the cause of the benchmark exceedance(s) within 7 days of triggering AIM Level 1."
Open the permit at this section

AIM Level 1: put added measures in place within 14 days of the lab results (45 at most)

Within 14 days after you receive lab results showing an AIM trigger (up to 45 days where the permit allows more time).

After the Level 1 inspection, review the SWPPP and controls immediately and implement any added measures within 14 days of receiving the lab results that show the trigger, or within 45 days if 14 is infeasible (documented). Then keep monitoring that parameter quarterly for four more quarters.

  • Only if: a parameter is at AIM level 1.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 5.B.3.d, page 56
"you must implement those modifications or control measures within 14 days of receipt of laboratory results that indicate an AIM triggering event per Part 5.B.2 has occurred, unless doing so within 14 days is infeasible."
Open the permit at this section

AIM Level 2: added pollution prevention measures within 14 days (extension request needed for up to 45)

Within 14 days after you receive lab results showing an AIM trigger (up to 45 days where the permit allows more time).

Implement additional pollution prevention and good housekeeping measures beyond Level 1 within 14 days of receiving the lab results that show the trigger, and document how they will meet the benchmark. Taking up to 45 days needs an extension request to DEQ through E-Permitting; DEQ may grant more. Then keep monitoring quarterly for four quarters.

Further steps with their own deadlines:

  • If 14 days is infeasible: send DEQ an extension request. Within 14 days after you receive lab results showing an AIM trigger. Section 5.B.4.b, page 57
    "you may take up to 45 days to implement such measure, in which case you must submit an extension request to DEQ"
  • Only if: a parameter is at AIM level 2.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 5.B.4.b, page 57
"You must implement additional pollution prevention/good housekeeping SCMs within 14 days of receipt of laboratory results that indicate an AIM triggering event per Part 5.B.2.a has occurred"
Open the permit at this section

AIM Level 3: schedule structural or treatment controls within 14 days and install them within 60

Within 60 days after you receive lab results showing an AIM trigger (up to 90 days where the permit allows more time).

Identify the schedule for structural source controls or treatment within 14 days of receiving the lab results that show the trigger, and install them within 60 days; up to 90 days needs an extension request to DEQ through E-Permitting, and DEQ may grant more. Then keep monitoring quarterly for four quarters.

Further steps with their own deadlines:

  • Identify the installation schedule within 14 days of the lab results. Within 14 days after you receive lab results showing an AIM trigger. Section 5.B.5.b, page 58
  • If 60 days is infeasible: send DEQ an extension request (up to 90 days). Within 60 days after you receive lab results showing an AIM trigger. Section 5.B.5.b, page 58
    "If it is not feasible within 60 days, you may take up to 90 days to install such measures, in which case you must submit an extension request to DEQ"
  • Only if: a parameter is at AIM level 3.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 5.B.5.b, page 58
"identify the schedule for installing the appropriate structural source and/or treatment stormwater control measures within 14 days of receipt of laboratory results that indicate an AIM triggering event"
Open the permit at this section

Effluent limit exceeded: follow-up sample within 30 days of the corrective action

Within 30 days after the corrective action is in place.

After a result exceeds a numeric effluent limit, take corrective action and sample again within 30 calendar days of implementing it (or at the next measurable storm if none occurs). If the follow-up also exceeds, submit an Exceedance Report and monitor at least quarterly until the discharge meets the limit.

Further steps with their own deadlines:

  • If the follow-up exceeds: Exceedance Report within 30 days of the follow-up lab results. Within 30 days after you receive the follow-up lab results. Section 4.B.3.b.1, page 47
    "You must submit an Exceedance Report no later than 30 days after you have received your laboratory results from your follow-up monitoring consistent with Part 7.E"
  • Part 7.E reading: Exceedance Report by the 30th day of the month after the monitoring period. Within 30 days after the quarter of the follow-up sample ends. Section 7.E, page 77
    "you must submit an exceedance report to DEQ no later than the 30th day of the month after the end of the"
  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); a numeric effluent limit is exceeded.
  • You file it in the agency's system (NetDMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 4.B.3.b, page 47
"conduct follow-up monitoring within 30 calendar days (or during the next measurable storm event, should none occur within 30 days) of implementing your corrective action(s)."
Open the permit at this section

Hardness-dependent benchmarks: report the receiving water hardness with the NOI

No set date. With the NOI (Part 4.B.2.a, Appendix G section 2).

Facilities with a hardness-dependent benchmark (cadmium, chromium III, lead, nickel, silver or zinc in fresh water) find the receiving water hardness by their own grab sample, a group of dischargers or third-party data under 10 years old (40 CFR Part 136 methods), document the method, and include the value in the NOI so NetDMR carries the right benchmark.

  • Only if: your permit subsector is A1, C1, C3, C4, F1, F2, F3, F4, G2, I1, K1, L2, M1, N1, N2, O1, P1, Q1, R1, Y1, AA1, AA2, AB1.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 4.B.2.a, page 41
"you must include in your NOI a hardness value, established consistent with the procedures in Appendix G, that is representative of your receiving water."
Open the permit at this section

What does no-exposure certification require?

Conditional exclusion for no exposure under 40 CFR 122.26(g): an NEC through the IPDES E-Permitting System instead of permit coverage, resubmitted every five years.

Every few years 1 duty

Renew the No Exposure Certification every five years

Within 5 years after your last no exposure certification.

A facility excluded under the no exposure certification submits a new NEC to DEQ through the IPDES E-Permitting System once every five years. A covered facility that switches to an NEC also files an NOT for its permit coverage.

  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 1.E, page 16
"You must submit a NEC form to DEQ once every five years."
Open the permit at this section

When something happens 11 duties

Existing facility discharging without coverage: submit the NOI immediately

No set date. Immediately (Table 1-2); the permit gives no number of days.

An existing facility that has been discharging industrial stormwater without coverage under the 2021 MSGP or another IPDES permit submits an NOI immediately; its discharges are unpermitted until covered.

  • When: the facility has been discharging industrial stormwater without permit coverage.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per IDAPA 58.01.25.090.01.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 1.C.3 Table 1-2, page 12
"Immediately; your stormwater discharges are currently unpermitted"
Open the permit at this section

Give DEQ notice at least 10 days before a planned bypass

At least 10 days before the planned bypass.

If you know in advance that a bypass of treatment will be needed, give DEQ prior notice, if possible at least 10 days before it. An unanticipated bypass that exceeds a limit is a 24-hour report.

  • When: you know in advance that a bypass will be needed.
  • You file it in the agency's system (DEQ (electronic notice, 40 CFR 127)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Part 9 Standard Permit Conditions (9 pages), section 9.M.1.e, page 254
"If the operator knows in advance of the need for a bypass, it shall submit prior notice to DEQ, if possible, at least 10 days before the date of the bypass."
Open the permit at this section

New facility, or one moving from another permit: submit the NOI at least 30 days before discharging

At least 30 days before you start discharging.

A new facility, or an existing facility moving from an individual or other general permit, submits a complete NOI through the IPDES E-Permitting System at least 30 calendar days before it starts discharging under this permit, with the applicable fees. Discharge is authorized 30 days after DEQ says the NOI is complete, unless DEQ denies or delays it.

  • When: the facility is new, or is moving to this permit from an individual or other general permit.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per IDAPA 58.01.25.090.01.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 1.C.3 Table 1-2, page 12
"At least 30 calendar days prior to commencing discharge."
Open the permit at this section

New operator: submit an NOI at least 30 days before taking over (the old operator then files an NOT)

At least 30 days before control of the facility is transferred.

When a new operator takes over an existing covered facility, the new operator submits its own NOI at least 30 calendar days before the transfer of control (Table 1-2). Part 1.C.4.b instead says no later than 30 days after the change; the earlier date is shown. The previous operator submits a Notice of Termination within 30 days after the new operator's coverage becomes active. Coverage cannot be transferred; DEQ requires the new operator's own NOI.

Further steps with their own deadlines:

  • Previous operator: Notice of Termination within 30 days after the new operator is covered. Within 30 days after the new operator's coverage becomes active. Section 1.C.4.b, page 13
    "previous operator must submit a Notice of Termination (NOT) no later than thirty (30) calendar days after MSGP coverage becomes active for the new operator"
  • Later reading in Part 1.C.4.b: new NOI no later than 30 days after the change. Within 30 days after the operator changes. Section 1.C.4.b, page 12
    "the new operator must submit a new NOI no later than thirty (30) calendar days after a change in operators."
  • When: the operator changes.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per IDAPA 58.01.25.090.01.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 1.C.3 Table 1-2, page 12
"At least 30 calendar days prior to the date of transfer of control to the new operator."
Open the permit at this section

Notify DEQ at least 30 days before planned physical changes

At least 30 days before the planned change.

Give DEQ notice no fewer than 30 days before planned physical alterations or additions that could make the facility a new source or significantly change the nature or increase the quantity of pollutants discharged. Also send to the MS4 operator if discharging through an MS4.

  • When: a significant physical change is planned.
  • You send it to the agency (DEQ regional office (Part 7.H)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.F.4, page 78
"You must give notice to DEQ promptly, no fewer than 30 days prior to making any planned physical alterations or additions to the permitted facility"
Open the permit at this section

Promptly correct missing or wrong information in the NOI or any report

No set date. "Promptly"; no number of days stated.

When you learn that relevant facts were left out of the NOI, or that incorrect information was submitted in the NOI or any report, submit the facts promptly.

  • When: you find incorrect or missing information.
  • You send it to the agency (DEQ regional office (Part 7.H)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.F.8, page 79
"You must promptly submit facts or information if you become aware that you failed to submit relevant facts in your NOI, or that you submitted incorrect information in your NOI or in any report;"
Open the permit at this section

Report any other noncompliance when you submit monitoring reports

No set date. At the time monitoring reports (DMRs) are submitted (7.F.7).

Report every instance of noncompliance not already reported in the Annual Report, a compliance schedule report or a 24-hour report at the time monitoring reports are submitted.

  • When: noncompliance happens that has not been reported.
  • You send it to the agency (DEQ regional office (Part 7.H)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.F.7, page 78
"You must report all instances of noncompliance not reported in your annual report, compliance schedule report, or 24-hour report at the time monitoring reports are submitted;"
Open the permit at this section

Report noncompliance that may endanger health or the environment by phone within 24 hours

Within 1 day after you become aware of the noncompliance.

Report noncompliance that may endanger human health or the environment, any unanticipated bypass or upset exceeding a limit, and any violation of a maximum daily limit to the DEQ regional office on the 24-hour IPDES hotline, 1-833-IPDES24 (1-833-473-3724), within 24 hours of becoming aware; then send a written report through E-Permitting within 5 days. Also send to the MS4 operator if discharging through an MS4.

Further steps with their own deadlines:

  • Written report through E-Permitting within 5 days. Within 5 days after you become aware of the noncompliance. Section 7.F.2, page 78
    "A written submission must also be submitted through the IPDES E-Permitting System within 5 days of the time you become aware of the circumstances;"
  • When: noncompliance that may endanger health or the environment happens.
  • You send it to the agency (24-hour IPDES hotline 1-833-IPDES24, then IPDES E-Permitting System).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.F.1, page 78
"Any information must be provided orally within 24 hours from the time you become aware of the circumstances;"
Open the permit at this section

Report on any compliance schedule within 14 days after each schedule date

Within 14 days after the compliance schedule date.

If DEQ sets a compliance schedule, report compliance or noncompliance with each interim and final requirement no later than 14 days after each schedule date.

  • When: a compliance schedule date set by DEQ passes.
  • You send it to the agency (DEQ regional office (Part 7.H)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.F.6, page 78
"must be submitted no later than 14 days following each schedule date;"
Open the permit at this section

Reportable-quantity spill: call the NRC and the Idaho State Comm Center at once, report to DEQ within five days

Within 5 days after you learn of the release.

When a release of a hazardous substance or oil at or above a reportable quantity (40 CFR 110, 117 or 302) occurs in a 24-hour period, notify the National Response Center and the Idaho State Communications Center, (208) 632-8000, as soon as you know of it; within five calendar days, report the release, its circumstances and date to DEQ through the IPDES E-Permitting System.

Further steps with their own deadlines:

  • Call the National Response Center and the Idaho State Comm Center as soon as you know. The permit gives the timing in words, quoted below. Section 2.A.2.d, page 23
    "and the Idaho State Comm Center at (208) 632-8000 as soon as you have knowledge of the release."
  • When: a release of a reportable quantity happens.
  • You file it in the agency's system (IPDES E-Permitting System).
  • Keep the records 3 years.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 2.A.2.d, page 23
"you must also, within five calendar days of knowledge of the release, provide a description of the release, the circumstances leading to the release, and the date of the release to DEQ through the IPDES E-Permitting System."
Open the permit at this section

Tell DEQ in advance about planned changes you expect will cause noncompliance

No set date. "Advance notice"; no number of days stated.

Give DEQ advance notice of any planned change in the facility or activity that you expect will result in noncompliance.

  • When: a planned change is expected to cause noncompliance.
  • You send it to the agency (DEQ regional office (Part 7.H)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: IDR050000 IPDES Multi-Sector General Permit, Parts 1-7 (80 pages), section 7.F.5, page 78
"You must give advance notice to DEQ of any planned changes in the permitted facility or activity which you anticipate will result in noncompliance with permit requirements;"
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

Idaho MSGP IDR050000 duties, topic by topic

How the Idaho MSGP IDR050000 compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: