Oregon 1200-Z Industrial Stormwater General Permit due dates and duties

Every duty in the General Permit, National Pollutant Discharge Elimination System Industrial Stormwater Discharge Permit No. 1200-Z, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 41duties, each cited
  • 9on a schedule
  • 32when something happens

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
1200-Z
In force
July 1, 2026 to June 30, 2031
Where you file
Your DEQ Online (YDO)
Official page
oregon.gov
Rules last checked
November 26, 2026
Today
July 1, 2026 June 30, 2031
Notes on the permit's status and renewal

Reissued July 1, 2026; it replaces the 2021 permit, which expired June 30, 2026. DEQ's page says the current permit is "in effect as on July 1, 2026". The permit file on DEQ's site was last changed July 1, 2026, and neither DEQ's industrial stormwater page nor its rulemaking page showed a modification, correction or extension on November 26, 2026. If the permit is not reissued by June 30, 2031, its conditions are administratively extended until the new permit takes effect (Condition I.2.f and I.3.f). Existing registrants were assigned to this permit by DEQ and must send an updated SWPCP by November 30, 2026. DEQ's agents (Clean Water Services, City of Portland, City of Eugene) handle applications, reports and inspections in their areas, often on paper.

What does full permit coverage require?

Registered under the 1200-Z by application to DEQ or its agent; DEQ grants coverage after a 30 calendar day public notice of the SWPCP.

Every month 2 duties

Do a visual observation of the discharge every month it discharges

By the end of each month.

Once a month, during a discharge event in scheduled operating hours and safe conditions, take a grab sample at every discharge point in a clean, colorless container and look for floating and suspended solids, color, odor, foam, oil sheen or other signs of pollution. Record the date, time, location, type of discharge and findings. No observation is needed in a month with no discharge event during scheduled operating hours.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule B.34.a, page 34
"The permit registrant must perform visual observations at all discharge points once a month during a discharge event."
Open the permit at this section

Inspect the site every month

By the end of each month.

Each month, trained personnel who know the SWPCP inspect the areas where industrial materials or activities are exposed to stormwater, all control measures and treatment, and every monitoring point, and write a report with the date and time, inspector names, observations, the condition of the drainage system and any corrective action.

Further steps with their own deadlines:

  • Permanent corrective action after an inspection. Within 30 days after the inspection date. Section Schedule B.33.d.ii, page 34
    "Conduct all permanent corrective action required as a result of inspection within 30 calendar days or by next storm event."
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule B.33.a, page 33
"Monthly Inspection Requirements a. The permit registrant must inspect areas where industrial materials or activities are exposed to stormwater"
Open the permit at this section

Every quarter 1 duty

Submit the quarterly DMR (even with no discharge or a waiver)

By November 15 (July-September), February 15 (October-December), May 15 (January-March) and August 15 (April-June).

Submit a Discharge Monitoring Report for each reporting quarter: by November 15 for July to September, February 15 for October to December, May 15 for January to March and August 15 for April to June. Include all sample results or the reason a sample was missed, lab reports, pH field notes and chain of custody. A DMR is due even when there was no discharge, a monitoring waiver is in place or operations are inactive.

  • You file it in the agency's system (Your DEQ Online DMR (paper DMR in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule B.35.a; Schedule B.36, Table 7, page 35
"The permit registrant must submit a Discharge Monitoring Report quarterly."
Open the permit at this section

Every half year 1 duty

Sample for benchmarks four times a year, two in each half

By the end of each half year (June 30 and December 31), 2 times; at least 14 days apart.

Sample each monitoring point four times a year, two samples between January 1 and June 30 and two between July 1 and December 31, at least 14 days apart, for the statewide benchmarks of your georegion (Table 4) and any sector benchmarks in Schedule E. Sample in the first 12 hours of a discharge event; if that is not practicable, sample as soon as practicable and say why with the DMR. Sampling is not required outside scheduled operating hours or in unsafe conditions.

  • You file it in the agency's system (Your DEQ Online DMR (paper DMR in agents' areas)).
  • Keep the records 3 years.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule B.28.f, Table 6, page 31
"Sample discharge four times per year, two samples between January 1 and June 30, and two samples between July 1 and December 31"
Open the permit at this section

Every year 3 duties

Report the Tier 2 geometric mean evaluation on the August 15 DMR

By August 15, after each reporting year ends.

After each full reporting year (July 1 to June 30), work out the geometric mean of all qualifying samples at each monitoring point for each statewide benchmark and report it on the DMR due August 15. For pH, report the share of results outside the range over two full reporting years.

  • You file it in the agency's system (Your DEQ Online DMR (paper DMR in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule B.35.b, page 35
"The permit registrant must report Tier 2 geometric mean benchmark evaluation on the DMR due on August 15 after each full reporting year."
Open the permit at this section

Pay the annual permit fee billed by DEQ

No set date. Billed by DEQ; the permit gives no due date.

Pay the fees Oregon rule requires each year coverage is kept, until DEQ approves termination.

  • You file it in the agency's system (Your DEQ Online invoice).
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule F, A9, page 143
"The permittee must pay the fees required by OAR."
Open the permit at this section

Train employees within 30 calendar days of hire and every year after

Within 1 year after the date of the previous training.

Train the people who work where stormwater is exposed to industrial activity or who carry out the SWPCP: no later than 30 calendar days after hiring, no later than 30 calendar days after a change in duties for key personnel, no later than 60 calendar days after a revised SWPCP is submitted for certain changes, and annually after that. Keep a training log with dates, names and titles on site.

  • If the new hire in exposed areas or with swpcp duties: Within 30 days after the hire date.
  • If the change in duties for key personnel: Within 30 days after the date duties changed.
  • If the revised swpcp submitted for a listed change: Within 60 days after submittal of the date the revised swpcp was.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from Schedule A.8.j.iii. Check your copy of the permit.

Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule A.8.j.iii, page 12
"Education training must occur: ... Annually thereafter."
Open the permit at this section

One time 1 duty

Apply to renew at least 180 days before the permit expires

By January 1, 2031.

A registrant that wants to keep discharging after June 30, 2031 must apply to have the permit renewed at least 180 days before it expires, which is January 1, 2031. DEQ may allow a later application, but not later than the expiration date.

  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule F, A4, page 142
"The application must be submitted at least 180 days before the expiration date of this permit."
Open the permit at this section

When something happens 19 duties

Existing registrants send an updated SWPCP by November 30, 2026

By November 30, 2026.

A facility that was covered under the 2021 permit and wants uninterrupted coverage submits an updated Stormwater Pollution Control Plan to DEQ or its agent by November 30, 2026, and keeps meeting the implementation deadlines set under the previous permit, including Tier 2 deadlines.

  • When: the covered under the 2021 permit.
  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Condition I.3.b, page 7
"Permit registrants that seek uninterrupted coverage must submit an updated SWPCP to DEQ or agent by November 30, 2026, unless DEQ or agent approves a later date."
Open the permit at this section

Submit the stamped mass reduction measures certification by December 31, 2026

By December 31, 2026.

A facility with mass reduction measures (infiltration or other volume reduction) installed voluntarily, or in an earlier permit cycle under an approved Tier 2 mass reduction waiver, submits the Mass Reduction Certification Form and design specifications, stamped by an Oregon registered professional engineer or certified engineering geologist, by December 31, 2026. Measures not yet built are certified before construction.

  • When: the mass reduction measures installed and not yet certified.
  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Keep the records 3 years.
  • The permit says this is done by a licensed professional engineer.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule A.13.c, page 15
"The permit registrant must submit the mass reduction measure stamped certification to DEQ or agent by December 31, 2026, unless DEQ or agent approves a later date."
Open the permit at this section

Request a monitoring variance for a missed sample with the February 15 or August 15 DMR

By February 15 (July-December) and August 15 (January-June).

If a required sample was missed because no storm produced a discharge during scheduled operating hours and safe conditions, request a monitoring variance for each missed sample with the DMR due February 15 (for July to December) or August 15 (for January to June), with data showing why sampling did not happen in the six-month period.

  • When: the sample missed for lack of a discharge.
  • You file it in the agency's system (Your DEQ Online DMR (paper DMR in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from Schedule B.29.b. Check your copy of the permit.

Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule B.29.b, page 31
"Variance requests must be submitted by February 15 and August 15 with the Discharge Monitoring Report for each missed sample."
Open the permit at this section

Restart waived monitoring on July 1, 2030

By July 1, 2030.

Monitoring waivers end with the last full reporting year of the permit term, which begins July 1, 2030. A registrant with an approved benchmark waiver must start monitoring again on that date without being told.

  • When: the monitoring waiver in effect.
  • You file it in the agency's system (Your DEQ Online DMR (paper DMR in agents' areas)).
  • Keep the records 3 years.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule B.30.d, page 32
"Approved monitoring waivers are valid until the last full reporting year of the permit term, which begins on July 1, 2030."
Open the permit at this section

Apply for coverage at least 60 calendar days before starting the activity

At least 60 days before the start of the activity that needs coverage.

A new facility submits a complete application to DEQ or its agent at least 60 calendar days before starting the activity that needs coverage: the application and first annual fee, the DEQ application form, a Land Use Compatibility Statement and a PDF of the SWPCP. A facility already operating without a permit applies immediately.

  • When: the new facility.
  • If the designated by the director as needing a permit: Within 60 days after the deq notice that coverage is required.
  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Condition I.2.a.i, page 6
"New facility: Submit a complete application to DEQ or agent (See Schedule D.4 for description of agent) at least 60 calendar days before initiating the activity that requires permit coverage,"
Open the permit at this section

File a Notice of Termination when coverage is no longer needed

No set date. No deadline stated; permit conditions and annual fees continue until DEQ approves the termination (Schedule D.5.c).

To end coverage after all industrial stormwater discharge has stopped, or after getting an individual permit, submit a Notice of Termination to DEQ or its agent for approval, pay all outstanding fees and report the status of compliance. All permit conditions and annual fees continue until DEQ approves the termination.

  • When: the termination condition met.
  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule D.5.b, page 45
"Complete and submit a Notice of Termination to DEQ or agent for approval."
Open the permit at this section

File a transfer or legal name change within 30 calendar days

Within 30 days after the date the name change or transfer was complete.

The new owner or operator submits the DEQ name change or transfer form, an updated SWPCP and the fee no later than 30 calendar days after the legal name change or transfer of control is complete. DEQ then approves or denies it.

  • When: the legal name change or transfer of control.
  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Condition I.4.a, page 7
"the new owner or operator must submit a transfer or legal name change electronically, no later than 30 calendar days after the legal name change or transfer control of the facility is complete."
Open the permit at this section

Fix control measures before the next storm or within 30 calendar days

Within 30 days after the discovery date.

When control measures must be modified to meet the permit's technology-based limits, implement the change before the next storm event if practicable, and no later than 30 calendar days from discovery.

  • When: the control measure needs modification.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule A.9.f, page 13
"the permit registrant must implement the modifications before the next storm event if practicable or no later than 30 calendar days from discovery, unless DEQ or agent approves a later date."
Open the permit at this section

Give 60 calendar days notice before changing to a new primary industrial sector

At least 60 days before the planned change date.

Before changing industrial processes to a new primary industrial sector, submit a Land Use Compatibility Statement, a revised SWPCP and the environmental management plan review fee at least 60 calendar days before the change. DEQ holds a 30 calendar day public notice on the revised SWPCP.

  • When: the planned change to a new primary industrial sector.
  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Condition I.3.d, page 7
"must submit the following to DEQ or agent at least 60 calendar days before initiating the planned change:"
Open the permit at this section

Give written notice at least ten days before a planned bypass of treatment

At least 10 days before the date of the bypass.

If you know in advance that stormwater must be diverted around any part of the treatment facility, send DEQ written notice at least ten days before the bypass. An unanticipated bypass that exceeds an effluent limit is reported within 24 hours.

  • When: the planned bypass of treatment.
  • You file it in the agency's system (DEQ (written notice)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule F, B3.c(1), page 144
"If the permittee knows in advance of the need for a bypass, a written notice must be submitted to DEQ at least ten days before the date of the bypass."
Open the permit at this section

New registrants put control measures in place within 90 calendar days of coverage

Within 90 days after receipt of the date coverage was.

A new registrant (a new facility, or an existing one that had no stormwater permit) must have its stormwater control measures in place no later than 90 calendar days after receiving coverage. Control measures that need capital improvements have two years.

Further steps with their own deadlines:

  • Control measures that need capital improvements. Within 2 years after receipt of the date coverage was. Section Schedule A.21.d, page 25
    "Control measures that require capital improvements must be completed no later than two years after receiving permit coverage, unless DEQ or agent approves a later date."
  • When: the new permit coverage.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule A.21.d, page 25
"no later than 90 calendar days after receiving permit coverage."
Open the permit at this section

Phone DEQ within 24 hours of dangerous noncompliance; written report within 5 days

Within 1 day after becoming aware of the noncompliance.

Report any noncompliance that may endanger health or the environment, an unanticipated bypass or upset that exceeds an effluent limit, or a violation of a maximum daily limit by telephone to the DEQ regional office (or the Oregon Emergency Response System, 1-800-452-0311, outside business hours) within 24 hours of becoming aware of it, and follow with a written submission within 5 days.

Further steps with their own deadlines:

  • Written submission. Within 5 days after becoming aware of the noncompliance. Section Schedule F, D5.b(3), page 149
    "A written submission must be provided within 5 days of the time the permittee becomes aware of the circumstances."
  • When: the noncompliance endangering health or environment or daily limit exceeded.
  • You file it in the agency's system (DEQ regional office by phone, or OERS 1-800-452-0311; written report to DEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule F, D5, page 148
"Any information must be provided orally (by telephone) to the DEQ regional office or Oregon Emergency Response System (1-800-452-0311) as specified below within 24 hours from the time the permittee becomes aware of the circumstances."
Open the permit at this section

Report other noncompliance with the next monitoring report

No set date. With the next Discharge Monitoring Report (Schedule F, D6).

Report every instance of noncompliance that was not reported within 24 hours or under a compliance schedule when the monitoring reports (DMRs) are submitted: what happened and why, the dates and times, how long it is expected to last and the steps taken to prevent it.

  • When: the noncompliance not already reported.
  • You file it in the agency's system (Your DEQ Online DMR (paper DMR in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule F, D6, page 150
"The permittee must report all instances of noncompliance not reported under General Condition D4 or D5 at the time monitoring reports are submitted."
Open the permit at this section

Report within 30 calendar days when the discharge contributes to a water quality standard exceedance

Within 30 days after the discovery or deq determination.

If you discover, or DEQ or its agent determines, that the discharge contributes to an exceedance of instream water quality standards, investigate and review the SWPCP within 24 hours, submit a Water Quality Standards Corrective Action Report within 30 calendar days, and implement the corrective action before the next storm event or within 30 calendar days, whichever comes first.

Further steps with their own deadlines:

  • Investigate and review the SWPCP within 24 hours. The permit gives the timing in words, quoted below. Section Schedule A.10.a, page 13
    "the permit registrant must take the following corrective actions within 24 hours of discovery or being informed by DEQ or agent:"
  • Implement the corrective action. Within 30 days after the discovery or deq determination. Section Schedule A.10.b.iv, page 13
    "The permit registrant must implement the corrective action before the next storm event or no later than 30 calendar days after discovery or determination, whichever comes first, unless DEQ or agent approves a later date."
  • When: the discharge contributes to a water quality standard exceedance.
  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule A.10.b, page 13
"the permit registrant must submit a Water Quality Standards Corrective Action Report to DEQ or agent within 30 calendar days"
Open the permit at this section

Send SWPCP revisions within 30 calendar days of the change or request

Within 30 days after the date of the request or the change to the facility.

Submit a revised SWPCP to DEQ or its agent when site contacts change, after a corrective action or inspection, when the site, operations or controls change the pollutants or the discharge, or when monitoring or discharge points change. Revisions are due no later than 30 calendar days from the request date or the change to the facility.

  • When: the swpcp revision needed or requested.
  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule A.16.h, page 16
"SWPCP revisions in response to Schedule A.16.b above are due no later than 30 calendar days from the request date or the change to the facility, unless DEQ or agent approves a later date."
Open the permit at this section

Submit a monitoring and water quality evaluation program within 180 calendar days (Three Basin Rule waters)

Within 180 days after the date coverage was obtained.

A new registrant discharging to the Clackamas River, the McKenzie River above Hayden Bridge or the North Santiam River under OAR 340-041-0350 submits a monitoring and water quality evaluation program to DEQ no later than 180 calendar days after getting coverage, and puts it in place no later than 30 calendar days after DEQ approves it.

Further steps with their own deadlines:

  • Implement the approved program. Within 30 days after the date of deq approval. Section Schedule B.32.b, page 33
    "No later than 30 calendar days from DEQ approval, the permit registrant must implement the monitoring and water quality evaluation program."
  • When: the new registrant discharging to clackamas mckenzie or north santiam.
  • You file it in the agency's system (DEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule B.32.a, page 33
"No later than 180 calendar days after obtaining permit coverage, the permit registrant must submit to DEQ a monitoring and water quality evaluation program."
Open the permit at this section

Tell DEQ in advance about planned changes

No set date. No number of days is stated: as soon as possible, and before the change (Schedule F, D1 and D2).

Give DEQ notice as soon as possible of planned physical alterations or additions to the facility, and advance notice of any planned change that may result in noncompliance. Plans and specifications for treatment or disposal systems need DEQ approval before construction.

  • When: the planned change to the facility.
  • You file it in the agency's system (DEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule F, D2, page 148
"The permittee must give advance notice to DEQ of any planned changes in the permitted facility or activity that may result in noncompliance with permit requirements."
Open the permit at this section

Tier 1 corrective action before the next storm or within 30 calendar days

Within 30 days after the receipt of sample results or the visual observation.

When a qualifying sample exceeds a statewide or sector benchmark, or a visual observation shows signs of pollution, investigate the cause, review the SWPCP and controls, and carry out Tier 1 corrective actions before the next storm event or no later than 30 calendar days after receiving the results or doing the visual observation, whichever comes first. Write a Tier 1 report and keep it on site.

  • When: the benchmark exceedance or visual signs of pollution.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule A.18.d.i, page 20
"Implement Tier 1 corrective actions before the next storm event or no later than 30 calendar days after receiving the sample results or completing the monthly visual inspection, whichever comes first."
Open the permit at this section

Tier 2 response due December 31 after a reporting year whose geometric mean exceeds a benchmark

By December 31 after the june 30 end of the full reporting year that triggered tier 2.

If the geometric mean of the qualifying samples at a monitoring point for a full reporting year is above a statewide benchmark (or, for pH, half or more of the results over two full reporting years are outside the range), submit a Tier 2 report proposing treatment, stamped by an Oregon registered professional engineer, or a mass reduction or background waiver request, by December 31 of that calendar year. Install and implement the approved response by September 30 of the second calendar year after that December 31, and tell DEQ within 30 calendar days of finishing.

Further steps with their own deadlines:

  • Install and implement the approved Tier 2 response. The permit gives the timing in words, quoted below. Section Schedule A.19.h.iii, page 22
    "The approved Tier 2 report or mass reduction waiver must be installed and implemented no later than September 30 of the second calendar year after December 31 calendar year"
  • Tell DEQ the completion date and send the SWPCP revision. Within 30 days after implementation of the date the tier 2 response was. Section Schedule A.19.h.iv, page 22
    "No later than 30 calendar days from implementing Tier 2 report or mass reduction waiver, the permit registrant must:"
  • When: the tier 2 triggered by the geometric mean evaluation.
  • You file it in the agency's system (Your DEQ Online (SWPCP appendix; paper in agents' areas)).
  • Keep the records 3 years.
  • The permit says this is done by a licensed professional engineer.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule A.19.h.i, page 22
"The permit registrant must submit a proposed Tier 2 corrective action response to DEQ or agent no later than December 31 of that calendar year (six months after the end of the full reporting year that triggered Tier 2)"
Open the permit at this section

Ongoing 3 duties

Keep records three years and produce them within 10 business days of a request

Ongoing, no set date.

Keep the SWPCP and revisions, the permit, the coverage notice, maintenance and housekeeping records, Tier 1 reports, inspection reports and visual observations, DMRs, lab reports, chain of custody, training records and all reports sent to DEQ at the facility for at least three years, and make them available to DEQ, its agent or the local municipality within 10 business days of a request.

Further steps with their own deadlines:

  • Provide the SWPCP, DMRs and records on request. Within 10 working days after the date of the request. Section Schedule D.2, page 40
    "must be made available to DEQ, agents and local government responsible for stormwater management in the permit registrant’s area within 10 business days from date of request, unless a later date is approved."
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule B.38, page 36
"All records must be retained by the permit registrant and kept for at least three years and made available to DEQ, agent or local municipality within 10 business days from date of request,"
Open the permit at this section

Keep the SWPCP current and follow it

Ongoing, no set date.

Keep the Stormwater Pollution Control Plan current, revise it as the site changes and implement it. It is prepared by a qualified person, signed under 40 CFR 122.22 and kept with a dated log of revisions.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule A.15.f, page 16
"The permit registrant must keep the SWPCP current and revise it as necessary to reflect current site conditions and changes to the site."
Open the permit at this section

Meet the Schedule E requirements for your sector

Ongoing, no set date.

Meet the sector-specific limits, SWPCP items, inspections and benchmarks in Schedule E for the primary industrial activity and any co-located activity, in the areas where those activities occur, on top of Schedules A, B and C. Sector benchmarks are sampled on the same schedule as the statewide benchmarks.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule E.1, page 46
"The permit registrant must meet the sector-specific requirements in Schedule E associated with their primary industrial activity and any co-located industrial activities, as defined in Schedule D of this permit."
Open the permit at this section

Only if... 9 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Auto salvage yards inspect for leaks monthly

By the end of each month.

A used motor vehicle parts facility (Sector M, SIC 5015) inspects vehicles for leaks when they arrive, and every month inspects all equipment containing oily parts, hydraulic or other fluids or mercury switches, and all vessels and areas where hazardous materials and automotive fluids are stored, for signs of leakage.

  • Only if: your SIC code starts with 5015.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule E.M.3, page 110
"monthly for signs of leakage all equipment containing oily parts, hydraulic fluids, any other types of fluids, or mercury switches."
Open the permit at this section

Wood preserving facilities inspect processing, transport and treated wood storage areas monthly

By the end of each month.

A wood preserving facility (SIC 2491) inspects processing areas, transport areas and treated wood storage areas every month to check the practices that keep treatment chemicals off unprotected soil and out of stormwater.

  • Only if: your SIC code starts with 2491.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule E.A.3.1, page 53
"If your facility is a wood preserving facility under SIC 2491, inspect processing areas, transport areas, and treated wood storage areas monthly"
Open the permit at this section

Sample for impairment pollutants four times a year (303(d)-listed waters)

By the end of each half year (June 30 and December 31), 2 times; at least 14 days apart.

A facility discharging to a Category 5 303(d)-listed water samples every discharge point into that water for the pollutants it is listed for (pH, total copper, total lead, total zinc, total iron, E. coli, fecal coliform or enterococcus) four times a year, two samples in each half, against the concentrations in Table 5, Table 5A and Appendix A.

  • Only if: your stormwater reaches an impaired water body.
  • You file it in the agency's system (Your DEQ Online DMR (paper DMR in agents' areas)).
  • Keep the records 3 years.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule B.24, page 27
"The permit registrant must monitor for pH, total copper, total lead and total zinc at all discharge points into impaired receiving waters that correspond to the specific pollutant(s) for which the water body is impaired."
Open the permit at this section

Sample for numeric effluent limits twice a year, one in each half

By the end of each half year (June 30 and December 31), once.

A facility with a Table 3 regulated activity (certain asphalt emulsion, cement storage pile, landfill, coal pile and airport deicing discharges) samples that discharge twice a year, one sample between January 1 and June 30 and one between July 1 and December 31, against the limits in Schedule E. After an exceedance it does follow-up monitoring, and if that also exceeds, samples four times a year until the limit is met.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • You file it in the agency's system (Your DEQ Online DMR (paper DMR in agents' areas)).
  • Keep the records 3 years.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule B.28.f, Table 6, page 31
"Sample discharge two times per year, one sample between January 1 and June 30, and one sample between July 1 and December 31"
Open the permit at this section

Cement, concrete and similar facilities sweep paved areas at least once a week

No set date. At least once a week while those materials are handled or processed; the permit does not say which day a week ends for this duty.

A Sector E facility (glass, clay, cement, concrete and gypsum products) sweeps the paved areas exposed to stormwater, or uses an equivalent measure, at least once a week while cement, aggregate, kiln dust, fly ash or settled dust are being handled or processed, and states the frequency in the SWPCP.

  • Only if: your permit sector is E; the cement aggregate kiln dust fly ash or settled dust handled.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule E.E.2.1, page 58
"it must be performed at least once a week if cement, aggregate, kiln dust, fly ash, or settled dust are being handled or processed."
Open the permit at this section

Complete the bacteria or iron measures within 90 calendar days of the triggering results

Within 90 days after the receipt of the triggering sample results.

When impairment monitoring for E. coli, fecal coliform, enterococcus or iron hits its trigger, carry out the permit's narrative measures (for example annual storm line and catch basin cleaning, sweeping at least once a calendar quarter, animal deterrence or soil stabilization) no later than 90 calendar days from receiving the results, keep them up, and record the completion dates in a SWPCP revision.

Further steps with their own deadlines:

  • Sweep at least once per calendar quarter. By the end of each calendar quarter. Section Schedule A.20.h.iv(3); A.20.i.i(2), page 24
    "Implement sweeping or other equivalent methods of cleaning sufficient to minimize the discharge of sediment and debris, but in no case less than once per calendar quarter when industrial activity has occurred at the site;"
  • Clean storm sewer lines and catch basins annually. The permit gives the timing in words, quoted below. Section Schedule A.20.h.iv(2); A.20.i.i(3), page 23
    "Clean storm sewer lines, including catch basins, annually. Frequency of cleaning may be reduced, or decreased to catch basins, only after the first annual cleaning"
  • Only if: your stormwater reaches an impaired water body; the bacteria or iron impairment results trigger narrative limits.
  • You file it in the agency's system (Your DEQ Online (SWPCP revision; paper in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule A.20.j, page 24
"The permit registrant must complete the water quality-based narrative effluent limits no later than 90 calendar days from receiving sample results of the triggering event above in Schedule A.20.h and i. above and continue as required."
Open the permit at this section

Notify DEQ within 30 calendar days when impairment results trigger a numeric limit

Within 30 days after the receipt of the sample results.

When impairment monitoring for pH, copper, lead or zinc hits a trigger (two consecutive qualifying samples outside the pH range or above the Table 5 concentration, or one sample above twice the Table 5 concentration), notify DEQ or its agent no later than 30 calendar days from receiving the results. You may then request a compliance schedule of up to 24 months; without one, the Table 5 concentration is an enforceable limit at once.

Further steps with their own deadlines:

  • Compliance schedule actions at 6, 12, 18 and 24 months. The permit gives the timing in words, quoted below. Section Schedule C.2, Table 9, page 38
    "The permit registrant must request a compliance schedule from DEQ or agent and shall carry out the actions by the specified due dates below."
  • Final compliance with the numeric effluent limits. The permit gives the timing in words, quoted below. Section Schedule C.1.a, page 38
    "Failure to comply with the final compliance schedule within 24 months following the triggering event specified in Schedule A.20.e is a permit violation."
  • Status report after each compliance schedule action date. The timing is not settled: Schedule C.3 says compliance schedule status reports are due "within 14 business days after each action due date listed in Table 9", while Schedule F, D4 says compliance schedule reports are due "no later than 14 days following each schedule date". Which applies, and is each action date counted from the sample date or the date the results arrived? Section Schedule C.3, page 38
    "The permit registrant must submit status reports to DEQ or agent within 14 business days after each action due date listed in Table 9."
  • Only if: your stormwater reaches an impaired water body; the impairment results trigger a numeric effluent limit.
  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule A.20.f, page 23
"the permit registrant must notify DEQ or agent no later than 30 calendar days from receiving the sample results."
Open the permit at this section

Operating landfills, open dumps and land application sites inspect at least every 7 days

Within 7 days after the date of the previous inspection.

An operating landfill, open dump or land application site (Sector L) is inspected at least once every 7 days, looking at unstabilized areas, active land application areas, exposed storage, controls, leachate systems and vehicle entrances. Stabilized sites, completed land application areas, sites in arid or semi-arid climates and inactive sites are inspected at least monthly.

  • Only if: your permit sector is L.
  • If the stabilized arid or inactive landfill site: By the end of each month.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule E.L.4, page 108
"open dumps, and land application sites at least once every 7 days."
Open the permit at this section

Send a numeric limit Exceedance Report within 30 calendar days of the follow-up results

Within 30 days after the receipt of the follow up sample results.

If follow-up sampling after an exceedance of a technology-based numeric effluent limit also exceeds the limit, submit an Exceedance Report to DEQ or its agent no later than 30 calendar days after receiving the results, with the data, the causes and the corrections made or planned, and sample four times a year until the limit is met.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); the follow up sample exceeds a numeric effluent limit.
  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule B.37, page 36
"the permit registrant must submit an Exceedance Report to DEQ or agent no later than 30 calendar days after receiving the sample results."
Open the permit at this section

Where the permit is unclear 1 duty

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

Primary airports certify each year that they use no urea pavement deicers

No set date. Schedule E.S.7.1 tells primary airports to "certify annually on the annual report" that they use no pavement deicers containing urea, but the 1200-Z has no annual report. Where and by what date does DEQ want this certification each year?

A primary airport with 1,000 or more annual non-propeller aircraft departures that discharges stormwater from airfield pavement deicing either certifies every year that it does not use pavement deicers containing urea, or meets the ammonia limit in Table E.S-2.

  • Only if: your permit sector is S; the primary airport with 1000 or more annual jet departures.
  • You file it in the agency's system (Not stated).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from Schedule E.S.7.1. Check your copy of the permit.

Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule E.S.7.1, page 128
"such airports must do one of the following: (1) certify annually on the annual report that you do not use pavement deicers containing urea, or (2) meet the effluent limitation in Table E.S-2."
Open the permit at this section

What does no-exposure certification require?

Conditional "no exposure" exclusion under 40 CFR 122.26(g), certified to DEQ or its agent every five years and approved or denied within 60 calendar days.

Every few years 1 duty

Recertify no exposure every five years from the first submittal

Within 5 years after the first submittal date or its latest five year anniversary.

A facility with a "no exposure" conditional exclusion signs and submits the No Exposure Certification to DEQ or its agent once every five years, starting five years after the date it first submitted one, and keeps the approved certification on site.

  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Condition I.5.a.iv, page 8
"Submit the signed certification to DEQ or agent once every five years, beginning five years after the date of first submittal."
Open the permit at this section

When something happens 2 duties

Apply for coverage at least 60 calendar days before starting the activity

At least 60 days before the start of the activity that needs coverage.

A new facility submits a complete application to DEQ or its agent at least 60 calendar days before starting the activity that needs coverage: the application and first annual fee, the DEQ application form, a Land Use Compatibility Statement and a PDF of the SWPCP. A facility already operating without a permit applies immediately.

  • When: the new facility.
  • If the designated by the director as needing a permit: Within 60 days after the deq notice that coverage is required.
  • You file it in the agency's system (Your DEQ Online (paper in agents' areas)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Condition I.2.a.i, page 6
"New facility: Submit a complete application to DEQ or agent (See Schedule D.4 for description of agent) at least 60 calendar days before initiating the activity that requires permit coverage,"
Open the permit at this section

Phone DEQ within 24 hours of dangerous noncompliance; written report within 5 days

Within 1 day after becoming aware of the noncompliance.

Report any noncompliance that may endanger health or the environment, an unanticipated bypass or upset that exceeds an effluent limit, or a violation of a maximum daily limit by telephone to the DEQ regional office (or the Oregon Emergency Response System, 1-800-452-0311, outside business hours) within 24 hours of becoming aware of it, and follow with a written submission within 5 days.

Further steps with their own deadlines:

  • Written submission. Within 5 days after becoming aware of the noncompliance. Section Schedule F, D5.b(3), page 149
    "A written submission must be provided within 5 days of the time the permittee becomes aware of the circumstances."
  • When: the noncompliance endangering health or environment or daily limit exceeded.
  • You file it in the agency's system (DEQ regional office by phone, or OERS 1-800-452-0311; written report to DEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: 1200-Z Industrial Stormwater General Permit (issued July 1, 2026), section Schedule F, D5, page 148
"Any information must be provided orally (by telephone) to the DEQ regional office or Oregon Emergency Response System (1-800-452-0311) as specified below within 24 hours from the time the permittee becomes aware of the circumstances."
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

1200-Z Industrial Stormwater General Permit duties, topic by topic

How the 1200-Z Industrial Stormwater General Permit compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: