Rhode Island MSGP RIR500000 due dates and duties

Every duty in the Rhode Island Pollutant Discharge Elimination System Multi-Sector General Permit, Stormwater Discharge Associated with Industrial Activity, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 74duties, each cited
  • 7on a schedule
  • 67when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
RIR500000
In force
September 1, 2024 to August 31, 2029
Official page
dem.ri.gov
Rules last checked
November 27, 2026
Today
September 1, 2024 August 31, 2029
Notes on the permit's status and renewal

The cover page names RIPDES Permit No. RIR500000, the Multi-Sector General Permit for stormwater discharge associated with industrial activity (excluding construction activity), signed July 16, 2024 by RIDEM's Office of Water Resources: "This general permit shall become effective on September 1, 2024" and the authorization to discharge expires "August 31, 2029". RIDEM's industrial stormwater page, read November 27, 2026, posts this file as the 2024 MSGP reissuance (effective September 1, 2024, expiring August 31, 2029) with no modification, and says the MSGP was re-issued in 2013, 2019 and September 1, 2024. It replaced the 2019 MSGP, which expired May 2, 2024. No modification, extension or draft renewal was found on RIDEM's pages or the web on November 27, 2026. On that date the permit was current, not administratively continued; Part I.C.4 would continue it under Title 250 RICR-150-10-1 section 1.13 if it is not reissued in time. The copy EPA Region 1 posts (2025) has the same permit text with extra pages. An application fee applies when a SWMP goes with the NOI, and every facility pays an annual fee under RIDEM's fee rules (Appendix C); amounts are not shown.

What does full permit coverage require?

Permit coverage: SWMP first, then an NOI with the SWMP in NeT, 60 days before a new discharge starts; authorization comes 60 days after a complete NOI unless RIDEM says otherwise.

Every half year 1 duty

Report monitoring data in NetDMR within 15 days after each half year

By July 15 (January to June) and January 15 (July to December).

Submit all benchmark, effluent limit and impaired waters monitoring data in NetDMR no later than 15 days after the last day of the monitoring period: by July 15 for January to June and by January 15 for July to December. Report every sample taken in the period, and any failure to monitor with the reason.

  • You file it in the agency's system (NetDMR (EPA Central Data Exchange)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.

Inferred from section VII.C. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VII.C, page 44
"All monitoring data collected pursuant to Parts VI.B.1., VI.B.2. and VI.B.3. must be submitted electronically using the NetDMR system available at EPA's Central Data Exchange"
Open the permit at this section

Every year 3 duties

Submit the Annual Report by January 30

By January 30, for the calendar year before.

Submit the Annual Report in NeT by January 30 each year with the past calendar year's information: summaries of routine inspections, visual assessments, benchmark monitoring with exceedances, and corrective actions (with the status of any not finished), any incidents of noncompliance or a statement that there were none, and the facility and contact details.

  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VII.D, page 44
"The permittee must submit an Annual Report electronically using NeT, per Part VII.B., by January 30th for each year of permit coverage containing information generated from the past calendar year."
Open the permit at this section

Pay RIDEM's annual fee

No set date. The permit gives no date; RIDEM's fee rules set it.

Every covered facility is subject to an annual fee under RIDEM's fee rules. The amount and billing date are set by those rules, not by the permit, and are not shown here.

  • You send it to the agency (RIDEM, as billed).
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section Appendix C (NOI instructions, Fees), page 152
"Note that all facilities are subject to an annual fee in accordance with the Rules and Regulations Governing the Establishment of Various Fees"
Open the permit at this section

Train employees at least once a year

Within 1 year after the last training.

Train every employee who works where industrial materials or activities are exposed to stormwater, or who carries out permit duties (inspectors, maintenance staff, the pollution prevention team), on the control measures and the monitoring, inspection, reporting and documentation requirements. At least annually, more often if turnover is high; keep a log of who was trained and when.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section II.A.2.i. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section II.A.2.i, page 15
"Training must be conducted at least annually (or more often if employee turnover is high)."
Open the permit at this section

One time 2 duties

Apply under the next permit once RIDEM issues it

No set date. The next permit will set the deadline (X.C, I.C.4).

To keep discharging after August 31, 2029, apply for and obtain coverage as the next permit requires once RIDEM issues it. If the permit is not reissued in time it is administratively continued, and discharges covered before it expired stay covered until coverage under the new permit, an NOT, an individual permit decision, or RIDEM's decision not to reissue.

  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section X.C, page 121
"If the permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the permittee must apply for and obtain authorization as required by the new permit once the Department issues it."
Open the permit at this section

Write or update the SWMP before submitting the NOI

No set date. Before the NOI is submitted; the SWMP goes in with the NOI (I.C.1.b, V.A).

Develop a Stormwater Management Plan (SWMP) under Parts V and VIII, or update the existing one, before submitting the Notice of Intent, and submit the SWMP electronically with the NOI in NeT. The SWMP is signed under Part X.G and kept at the facility.

  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool), with the NOI).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section I.C.1.b, page 9
"The permittee must complete the development of a SWMP or update the facility's existing SWMP consistent with Parts V and VIII, prior to submitting the NOI for coverage under this permit."
Open the permit at this section

When something happens 17 duties

Check idle vehicles and equipment for leaks at least monthly

By the end of each month.

Unless infeasible, drain fluids from vehicles and equipment to be decommissioned, and inspect any vehicles and equipment left unused for extended periods for leaks at least monthly.

  • When: vehicles or equipment stay unused for extended periods.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section II.A.2.a. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section II.A.2.a, page 13
"for any equipment and vehicles that will remain unused for extended periods of time, inspect at least monthly for leaks"
Open the permit at this section

Inspect and maintain baghouses at least quarterly

By the end of each calendar quarter.

Inspect and maintain baghouses at least quarterly so dust cannot escape, and remove dust at the base of the exterior baghouse immediately.

  • When: the facility has a baghouse.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section II.A.2.c. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section II.A.2.c, page 14
"Inspecting and maintaining baghouses at least quarterly to prevent the escape of dust from the system and immediately removing any accumulated dust at the base of the exterior baghouse."
Open the permit at this section

Amend the SWMP when things change and submit it within 30 days

Within 30 days after the SWMP amendment.

Amend the SWMP immediately after a change in design, construction, operation or maintenance that significantly affects the potential to discharge pollutants, a release of reportable quantities of hazardous substances or oil, or a showing that the SWMP is ineffective, and when corrective action requires it. Submit the changes within 30 days of the amendment as a Change NOI in NeT.

  • When: you amend the SWMP.
  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool), as a Change NOI).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section V.D, page 29
"Changes must be noted and submitted to this department within thirty (30) days of the date of the amendments. An updated SWMP must be submitted electronically using NeT via the submission of a "Change NOI"."
Open the permit at this section

Correct the NOI or a report promptly when information was wrong or missing

No set date. Promptly (VII.F); the permit gives no number of days.

Promptly submit the facts if the permittee learns that it left relevant facts out of the NOI or submitted incorrect information in the NOI or any report.

  • When: you find that the NOI or a report left out facts or was wrong.
  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VII.F, page 46
"The permittee must promptly submit facts or information if the permittee becomes aware that the permittee failed to submit relevant facts in the NOI, or that the permittee submitted incorrect information in the NOI or in any report."
Open the permit at this section

Corrective action: document within 24 hours, fix within 14 days

Within 14 days after you discover the condition (up to 45 days where the permit allows more time).

When a numeric limit is exceeded, controls are not stringent enough for water quality standards or the non-numeric limits, a required control was never installed or is not working, a visual assessment shows pollution, or indicator monitoring shows ineffective control: document the discovery within 24 hours, act immediately to minimize the discharge, and complete the corrective action before the next storm if possible and within 14 calendar days (at most 45 days if 14 is infeasible, with the reason and schedule documented).

Further steps with their own deadlines:

  • Document the condition within 24 hours. Within 24 hours after you discover the condition. Section III.B.3.a, page 23
    "The permittee must document the discovery of any of the conditions listed in Parts III.B.1. and III.B.2. within 24 hours of making such discovery."
  • Document the corrective action within 14 days. Within 14 days after you discover the condition. Section III.B.4, page 24
    "Within 14 days of discovery of any condition listed in Part III.B., the permittee must document the following information"
  • Update the SWMP within 14 days of finishing. Within 14 days after the corrective action work is complete. Section III.B.3.b, page 24
    "the permittee must modify the SWMP accordingly within 14 calendar days of completing corrective action work."
  • When: you find a condition that needs corrective action.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section III.B.3.b, page 23
"the permittee must complete the corrective actions ... before the next storm event if possible, and within 14 calendar days from the time of discovery of the corrective action condition."
Open the permit at this section

Discharging since before May 2, 2024 without coverage: submit the NOI immediately

No set date. Immediately (I.C.2.d); the permit gives no number of days.

A facility whose industrial stormwater discharge began before May 2, 2024 and was not authorized under the 2019 permit submits an NOI in NeT immediately. Authorization comes 60 days after a complete NOI unless RIDEM says otherwise in writing.

  • When: the facility has discharged industrial stormwater since before May 2, 2024 without coverage.
  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section I.C.2.d, page 9
"For facilities with discharges of stormwater associated with industrial activity which commenced before May 2, 2024 and were not authorized under the previous MSGP, the NOI must be submitted immediately."
Open the permit at this section

Fix the SWMP within 30 days of RIDEM's notice and certify the changes

Within 30 days after RIDEM's notice.

If RIDEM reviews the SWMP and notifies the permittee that it falls short of Part V, make the changes within 30 days of the notice (unless RIDEM allows otherwise) and send RIDEM a written certification that they were made.

  • When: RIDEM tells you the SWMP falls short of Part V.
  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool) (VII.H)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section V.C, page 29
"Unless otherwise provided by the Director, the permittee shall have thirty (30) days after such notification to make the necessary changes."
Open the permit at this section

New discharge: submit the NOI 60 days before discharge starts

At least 60 days before the discharge starts.

A facility whose industrial stormwater discharge starts after September 1, 2024 submits a complete NOI in NeT, with its SWMP, 60 days before the discharge starts. Authorization comes 60 days after a complete NOI unless RIDEM says otherwise in writing, and benchmark monitoring starts as if in the first year of coverage.

  • When: the facility will start a new industrial stormwater discharge.
  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section I.C.2.b, page 9
"For facilities with discharges of stormwater associated with industrial activity which commence after the effective date of this permit, the NOI must be submitted sixty (60) days prior to the commencement of such discharge."
Open the permit at this section

New owner or operator: submit a new NOI

At least 60 days before the transfer.

Coverage does not transfer. On a transfer of ownership or operation, the new owner or operator submits a complete and accurate NOI under Appendix C by the deadlines of Part I.C.2. This pack dates it 60 days before the transfer, the Part I.C.2.b deadline for a discharge that begins after the permit's effective date.

  • When: ownership or operation of the facility is transferred.
  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.

Inferred from section VII.F. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VII.F, page 46
"Transfer of ownership and/or operation - The permittee must submit a complete and accurate NOI in accordance with the requirements of Appendix C of this permit and by the deadlines specified in Part I.C.2."
Open the permit at this section

Notify RIDEM immediately of a release at or above a reportable quantity

When you learn of the release.

On a leak, spill or other release of a hazardous substance or oil at or above a reportable quantity, notify RIDEM's Office of Water Resources immediately (and the MS4 operator if discharging through one), in addition to the federal reports under 40 CFR 117 and 302. Record the incident, revise the SWMP and update the spill list.

  • When: a release reaches a reportable quantity of a hazardous substance or oil.
  • You send it to the agency (RIDEM Office of Water Resources).
  • Keep the records 5 years.

Inferred from section X.I. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section X.I, page 122
"If a release in excess of reportable quantities occurs, the permittee must notify the Office of Water Resources immediately."
Open the permit at this section

Notify RIDEM in writing 10 days before a planned bypass

At least 10 days before the bypass.

If a bypass of stormwater controls is known in advance, notify RIDEM in writing at least ten days before it, with its expected quantity and effect.

  • When: you plan to bypass stormwater controls.
  • You send it to the agency (RIDEM Office of Water Resources, in writing).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section X.P.1, page 123
"If the permittee knows in advance of the need for a bypass, he or she shall notify this Department in writing at least ten days prior to the date of the bypass."
Open the permit at this section

Report an unanticipated bypass orally within 24 hours and in writing within 5 days

Within 24 hours after you become aware of the bypass.

Report an unanticipated bypass of stormwater controls to RIDEM orally within 24 hours of becoming aware of it, and in writing within five days with its cause, dates and times, and steps to stop it recurring.

Further steps with their own deadlines:

  • Written submission within five days. Within 5 days after you become aware of the bypass. Section X.P.2, page 123
    "A written submission shall also be provided within five (5) days of the time the permittee became aware of the bypass."
  • When: stormwater controls are bypassed without warning.
  • You send it to the agency (RIDEM Office of Water Resources, orally; written follow-up).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section X.P.2, page 123
"Any information regarding the unanticipated bypass shall be provided orally within twenty-four hours from the time the per- mittee became aware of the circumstances."
Open the permit at this section

Report noncompliance that may endanger health or the environment within 24 hours

Within 24 hours after you become aware of the circumstances.

Report orally to RIDEM, and to the MS4 operator if discharging through one, any noncompliance that may endanger health or the environment within 24 hours of becoming aware of it, and follow with a written submission within five days.

Further steps with their own deadlines:

  • Written follow-up within five days. Within 5 days after you become aware of the circumstances. Section VII.F, page 45
    "A written submission must also be provided within five days of the time the permittee becomes aware of the circumstances"
  • When: noncompliance may endanger health or the environment.
  • You send it to the agency (RIDEM Office of Water Resources, orally; written follow-up).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VII.F, page 45
"Any information must be provided orally within 24 hours from the time the permittee becomes aware of the circumstances"
Open the permit at this section

Report on compliance schedule dates within 14 days

Within 14 days after the compliance schedule date.

Where a compliance schedule applies under the permit, report compliance or noncompliance with each interim and final requirement, or progress, no later than 14 days after each schedule date.

  • When: a compliance schedule date passes.
  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool) (VII.H)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VII.F, page 46
"Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this permit must be submitted no later than 14 days following each schedule date"
Open the permit at this section

Site becomes inactive and unstaffed: re-certify the NOI and send a signed statement

No set date. The permit gives no number of days (IV.A.2).

When a covered facility changes from active to inactive and unstaffed, with no industrial materials or activities exposed, modify and re-certify the NOI and submit a signed, certified statement to RIDEM saying so; keep a copy with the SWMP.

  • When: the facility becomes inactive and unstaffed.
  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool), as a modified NOI).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section IV.A.2, page 26
"If you are already covered under the permit and your facility has changed from active to inactive and unstaffed, you must modify and re-certify your NOI."
Open the permit at this section

Submit a Notice of Termination within 30 days

Within 30 days after the termination condition is met.

Submit a Notice of Termination (NOT) in NeT within 30 days after a new owner or operator takes over, operations cease with no more industrial stormwater discharge and erosion controls in place, a Sector G, H or J site meets its termination requirements, or the discharges are covered by an individual or alternative general permit.

  • When: a new operator takes over, the discharge ends, or another permit covers it.
  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section I.D.2, page 10
"The permittee must submit a Notice of Termination within thirty (30) days after one or more of the following conditions have been met"
Open the permit at this section

Tell RIDEM as soon as possible of planned changes

No set date. As soon as possible (VII.F); the permit gives no number of days.

Give RIDEM notice as soon as possible of planned physical alterations, operational changes or additions that would make the facility a new source or significantly change or increase its pollutants; build and implement the stormwater controls before discharges from the change begin, and restart benchmark monitoring as if in the first year once they do. Also give advance notice of planned changes expected to cause noncompliance.

  • When: you plan a change that could make the facility a new source or significantly change its pollutants.
  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool) (VII.H)).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VII.F, page 45
"The permittee must give notice to the Department as soon as possible of any planned physical alterations, operational changes or additions to the permitted facility that qualify the facility as a new source"
Open the permit at this section

Ongoing 2 duties

Keep permit records for at least 5 years after coverage ends

No set date. Standing duty (VII.G).

Keep the SWMP and its changes, the Part V.I documentation (including corrective actions), all reports and certifications, monitoring data and the data used for the NOI for at least 5 years from the date coverage expires or is terminated.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VII.G, page 46
"for a period of at least 5 years from the date that coverage under this permit expires or is terminated."
Open the permit at this section

Keep the current SWMP at the facility and available

No set date. Standing duty (V.H).

Keep a complete copy of the current SWMP, with its supporting documents and signed certification page, at the facility. It must be immediately available to employees, EPA, RIDEM and the MS4 operator during an onsite inspection, and available to the public with confidential or personal information redacted.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section V.H, page 35
"The permittee must retain a complete copy of the current SWMP required by this permit at the facility in an accessible format."
Open the permit at this section

Only if... 47 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Sector E: sweep at least once a week where cement or dust is handled

By the end of each week.

Glass, clay, cement, concrete and gypsum facilities sweep paved exposed areas (or use equivalent measures) at least once a week where cement, aggregate, kiln dust, fly ash or settled dust are handled or processed, and record the frequency in the SWMP.

  • Only if: your permit sector is E; cement, aggregate, kiln dust, fly ash or settled dust is handled or processed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section VIII.E.2.a. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.E.2.a, page 52
"it must be performed at least once a week if cement, aggregate, kiln dust, fly ash, or settled dust are being handled or processed."
Open the permit at this section

Sector I: inspect erosion and sediment controls every 7 days

By the end of each week.

Oil and gas extraction facilities inspect all erosion and sedimentation control measures every 7 days, and begin vegetative practices on disturbed areas within 14 days after the last activity there.

Further steps with their own deadlines:

  • Vegetative practices within 14 days. Within 14 days after the last activity in the disturbed area. Section VIII.I.3.a, page 71
    "Begin implementing appropriate vegetative practices on all disturbed areas within 14 days following the last activity in that area."
  • Only if: your permit sector is I.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section VIII.I.5. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.I.5, page 71
"All erosion and sedimentation control measures must be inspected every 7 days."
Open the permit at this section

Sector L: inspect active landfills every 7 days (monthly when stabilized), inactive ones quarterly

By the end of each week.

Inspect operating landfills, open dumps and land application sites at least once every 7 days, focusing on areas not yet finally stabilized, active application areas, exposed storage, controls, leachate systems and truck entrances; once a month for stabilized sites or completed application areas. Inspect inactive sites at least quarterly.

  • Only if: your permit sector is L.
  • If the site is stabilized or land application there is complete: By the end of each month.
  • If the landfill, open dump or land application site is inactive: By the end of each calendar quarter.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section VIII.L.7.a. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.L.7.a, page 82
"Except in arid and semi-arid climates, inspect operating landfills, open dumps, and land application sites at least once every 7 days."
Open the permit at this section

Sectors G, H and J: inspect exploration and construction disturbance every 7 days

By the end of each week.

During clearing, grading and excavation in the exploration and construction phase of a mine, inspect disturbed areas, exposed storage areas, controls, discharge points and site exits at least once every 7 calendar days, or every 14 days and within 24 hours after a storm of 0.5 inches or more, and write an inspection report. Monthly is allowed when the whole site is temporarily stabilized or runoff is unlikely in winter. Continue until final stabilization or the start of active mining.

Further steps with their own deadlines:

  • Temporary stabilization within 14 days. Within 14 days after clearing, grading or excavation stops for now in that area. Section VIII.J.4.c.2, page 58
    "Stabilization measures should be initiated immediately in portions of the site where clearing, grading and/or excavation activities have temporarily ceased, but in no case more than 14 days after"
  • Final stabilization within 14 days. Within 14 days after exploration or construction stops for good in that area. Section VIII.J.4.c.3, page 74
    "Stabilization measures should be initiated immediately in portions of the site where mining, exploration, and/or construction activities have permanently ceased, but in no case more than 14 days after"
  • Only if: your permit sector is G, H, J; clearing, grading or excavation is under way in the exploration or construction phase.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section VIII.J.4.b.1. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.J.4.b.1, page 73
"Inspections must be conducted either at least once every 7 calendar days or at least once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater."
Open the permit at this section

Sector A: inspect wood treatment areas monthly

By the end of each month.

A timber products facility that does wood surface protection or preservation inspects processing areas, transport areas and treated wood storage areas monthly, to check that practices keep treatment chemicals off unprotected soils and areas that stormwater reaches.

  • Only if: your permit sector is A; the facility does wood surface protection or preservation.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section VIII.A.5. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.A.5, page 48
"If the facility performs wood surface protection and preservation activities, inspect processing areas, transport areas, and treated wood storage areas monthly"
Open the permit at this section

Sector O: inspect coal, ash, fuel and storage areas monthly

By the end of each month.

Steam electric generating facilities inspect coal handling, loading and unloading, switchyard, fueling, bulk storage, ash handling, disposal pond and landfill margins, maintenance, liquid tank and material storage areas monthly.

  • Only if: your permit sector is O.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section VIII.O.6. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.O.6, page 92
"As part of the inspection, inspect the following areas monthly"
Open the permit at this section

Sector S: routine inspections monthly through the deicing season

By the end of each month.

Airports hold routine facility inspections at least monthly during the deicing season (for example October through April), extended to every month in which deicing chemicals may be used. Users of deicing chemicals record the types used and the monthly quantities.

  • Only if: your permit sector is S; the deicing season is under way.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section VIII.S.6.a. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.S.6.a, page 106
"At a minimum, conduct routine facility inspections at least monthly during the deicing season (e.g., October through April for most mid-latitude airports)."
Open the permit at this section

Sector V: inspect textile process areas monthly

By the end of each month.

Textile mills and apparel facilities inspect, at least monthly, transfer and transmission lines, spill prevention, good housekeeping, management of process waste and all structural and nonstructural practices.

  • Only if: your permit sector is V.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section VIII.V.5. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.V.5, page 111
"Inspect, at least monthly, the following activities and areas (at a minimum): transfer and transmission lines, spill prevention, good housekeeping practices, management of process waste products, and all structural and nonstructural management practices."
Open the permit at this section

Sectors G and J: inspect monthly where discharging to outstanding waters or waters impaired for sediment or nitrogen

By the end of each month.

Metal and non-metallic mineral mines inspect at least quarterly, and monthly where the site discharges to waters designated as outstanding or impaired for sediment or nitrogen (exploration and construction areas follow the 7-day schedule).

  • Only if: your permit sector is G, J; the site discharges to outstanding waters or waters impaired for sediment or nitrogen.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section VIII.J.7. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.J.7, page 76
"Sites which discharge to waters which are designated as outstanding waters or waters which are impaired for sediment or nitrogen must be inspected monthly."
Open the permit at this section

Benchmark monitoring, twice each half year for the first year

By the end of each half year (June 30 and December 31), 2 times; at least 30 days apart.

Sample each outfall (or one of each group of substantially identical outfalls) twice between January 1 and June 30 and twice between July 1 and December 31 for TSS and oil and grease (Table VI-1) and the sector's own benchmark parameters (Part VIII), from measurable storm events at least 30 days apart. If the average of the four results for a parameter does not exceed its benchmark, monitoring for that parameter is done for the permit term; if it exceeds, monitoring continues each half year and corrective action follows Part III.A.

  • Only if: the facility is not inactive and unstaffed.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VI.B.1.b, page 39
"Each monitoring event must be conducted during a measurable storm event that follows the preceding monitoring event by at least thirty (30) days."
Open the permit at this section

Discharging to an impaired water: monitor the impairment pollutants twice each half year

By the end of each half year (June 30 and December 31), 2 times.

A facility discharging to a water listed as impaired in RIDEM's Integrated Water Quality Monitoring and Assessment Report current at the time of the NOI samples each outfall (except substantially identical ones) at least twice between January 1 and June 30 and twice between July 1 and December 31 for every impairment pollutant with an approved method (TSS for sediment or turbidity), unless RIDEM says otherwise.

  • Only if: your stormwater reaches an impaired water body.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VI.B.3.a, page 41
"If the facility discharges to an impaired water, the permittee must monitor for all pollutants for which the waterbody is impaired and for which a standard analytical method exists (see 40 CFR Part 136)."
Open the permit at this section

Effluent limit monitoring once a year at each outfall

By December 31 each year.

A facility with a discharge subject to an effluent limitations guideline in Table VI-2 (wet deck log spraying, phosphate fertilizer, asphalt emulsion, cement storage piles, mine dewatering at sand, gravel and crushed stone mines, hazardous and non-hazardous waste landfills, coal piles at steam electric plants, urea airfield deicing) samples each outfall carrying it once a year for the sector's limit parameters. Substantially identical outfalls cannot be skipped.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.

Inferred from section VI.B.2.a. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VI.B.2.a, page 40
"the permittee must monitor once per year at each outfall containing the discharges identified in Table VI-2"
Open the permit at this section

Impaired water: sweep each quarter, and for bacteria inspect catch basins each quarter

By the end of each calendar quarter.

A facility discharging to a water impaired for bacteria, aluminum, lead, cadmium, zinc, copper, iron, turbidity, TSS, chloride, dissolved oxygen, total nitrogen, total phosphorus or total organic carbon sweeps impervious surfaces at least once each quarter (as soon as conditions allow when snow or ice prevents it, with the reason recorded) and keeps exposed areas free of solid waste and floatable debris. Where the impairment is bacteria, it also deters animals, installs source controls, inspects catch basins and other BMPs once each quarter and does at least one dry weather inspection for sewer cross-connections.

  • Only if: your stormwater reaches an impaired water body; the receiving water is impaired for a pollutant listed in Part II.B.2.a (bacteria, aluminum, lead, cadmium, zinc, copper, iron, turbidity, TSS, chloride, dissolved oxygen, nitrogen, phosphorus or organic carbon).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section II.B.2.a. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section II.B.2.a, page 18
"Sweep impervious surfaces (i.e., roads, parking lots) at a minimum frequency of once per quarter, unless safety concerns due to extended periods of snow/ice cover make sweeping impracticable"
Open the permit at this section

Inactive and unstaffed site: one inspection a year

By December 31 each year.

A facility that is inactive and unstaffed with no industrial materials or activities exposed to stormwater conducts one routine inspection a year instead of quarterly ones. It indicates the status on its NOI (or modifies and re-certifies the NOI), sends RIDEM a signed statement and keeps a copy with the SWMP. Quarterly inspections resume immediately if the site becomes active or staffed or materials become exposed.

  • Only if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section IV.A.2. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section IV.A.2, page 26
"Such a facility is only required to conduct an annual inspection in accordance with the requirements of Part IV.A."
Open the permit at this section

One routine inspection each calendar year during a discharge

By December 31 each year.

At least once each calendar year, hold the routine facility inspection while stormwater is discharging, observing the control measures and the discharge points (or nearby downstream locations if they are inaccessible).

  • Only if: the facility is not inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section IV.A.1, page 25
"At least once each calendar year, the routine facility inspection must be conducted during a period when a stormwater discharge is occurring."
Open the permit at this section

Routine facility inspection each calendar quarter

By the end of each calendar quarter.

During operating hours, qualified personnel with at least one member of the pollution prevention team inspect exposed areas, potential pollutant sources, areas of spills in the past 3 years and the stormwater controls, at least once each calendar quarter. Document each inspection and keep it with the SWMP.

  • Only if: the facility is not inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section IV.A.1, page 25
"Routine facility inspections must be conducted at least quarterly (i.e., once each calendar quarter)"
Open the permit at this section

Sector M: inspect arriving vehicles for leaks and fluid equipment each quarter

By the end of each calendar quarter.

Automobile salvage yards inspect vehicles for leaks immediately when they arrive (or as soon as feasible), and inspect quarterly for leaks all equipment containing oily parts, hydraulic or other fluids or mercury switches, and all vessels and areas storing hazardous materials and automotive fluids.

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section VIII.M.4. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.M.4, page 84
"Inspect quarterly for signs of leakage all equipment containing oily parts, hydraulic fluids, any other types of fluids, or mercury switches."
Open the permit at this section

Sector P with exposed solid waste: indicator monitoring for Enterococcus and copper twice each half year

By the end of each half year (June 30 and December 31), 2 times; at least 30 days apart.

Land transportation and warehousing facilities where the temporary storage or transfer of solid waste (not recyclables) is exposed to stormwater sample each outfall at least twice between January 1 and June 30 and twice between July 1 and December 31 for Enterococcus (MPN/100mL) and total copper (mg/L), from storms at least 30 days apart, and report the results.

  • Only if: your permit sector is P; the temporary storage or transfer of solid waste (not recyclables) is exposed to stormwater.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.P.7, page 95
"Table VIII.P-2 identifies indicator monitoring parameters that apply to certain subsectors within Sector P."
Open the permit at this section

Sectors M, Q, R and AA: indicator monitoring for copper twice each half year

By the end of each half year (June 30 and December 31), 2 times; at least 30 days apart.

Automobile salvage yards (M1), water transportation (Q1), ship and boat yards (R1) and fabricated metal facilities (AA1, AA2) sample each outfall (except substantially identical ones) at least twice between January 1 and June 30 and twice between July 1 and December 31 for total copper, from storms at least 30 days apart, and report the results. There is no threshold; missing it is a permit violation.

  • Only if: your permit sector is M, Q, R, AA.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VI.B.4.a, page 42
"the permittee must monitor at least twice in each of the 6-month intervals (January 1 - June 30, July 1 - December 31), for the indicator monitoring parameter, unless the Director informs the permittee otherwise."
Open the permit at this section

Visual assessment of each outfall, twice each half year

By the end of each half year (June 30 and December 31), 2 times; at least 30 days apart.

Twice between January 1 and June 30 and twice between July 1 and December 31, collect a stormwater sample from each outfall within the first 30 minutes of discharge and examine it in a clear container for color, odor, clarity, solids, foam, oil sheen and other signs of pollution. Each assessment must be at least 30 days after the previous one. Document the results and keep them with the SWMP.

  • Only if: the facility is not inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section IV.B.1, page 26
"Each visual assessment of stormwater inspection must be conducted no less than thirty (30) days following the preceding visual assessment of stormwater inspection."
Open the permit at this section

(Sector A) Timber products: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

General sawmills (A1), wood preserving (A2), log storage (A3) and other wood products (A4) each have their own benchmark parameters, sampled on the benchmark schedule. Wet deck log spray down discharges must also meet the Table VIII.A-2 limits, sampled once a year.

  • Only if: your permit sector is A.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.A.6, page 48
"Table VIII.A-1 identifies benchmarks that apply to the specific subsectors of Sector A."
Open the permit at this section

(Sector AA) Fabricated metal products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Fabricated metal products except coating (AA1) and fabricated metal coating and engraving (AA2) monitor zinc and nitrate plus nitrite nitrogen, and AA1 also aluminum, on the benchmark schedule. Indicator monitoring for copper is a separate duty.

  • Only if: your permit sector is AA.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.AA.5, page 116
"Table VIII.AA-1 identifies benchmarks that apply to the specific subsectors of Sector AA."
Open the permit at this section

(Sector B) Paper and allied products: benchmark value

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Paperboard mills (SIC 2631) monitor chemical oxygen demand on the benchmark schedule. Other paper and allied products facilities have no sector benchmark.

  • Only if: your permit sector is B.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.B.1, page 49
"The requirements in Subpart B apply to stormwater discharges associated with industrial activity from Paper and Allied Products Manufacturing facilities"
Open the permit at this section

(Sector C) Chemicals: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Agricultural chemicals (C1), industrial inorganic chemicals (C2), soaps and cosmetics (C3) and plastics and resins (C4) each have their own benchmark parameters. Phosphate fertilizer runoff (SIC 2874) must also meet the Table VIII.C-2 limits, sampled once a year.

  • Only if: your permit sector is C.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.C.3, page 50
"Table VIII.C-1 identifies benchmarks that apply to the specific subsectors of Sector C."
Open the permit at this section

(Sector D) Asphalt paving and roofing: benchmark value and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Asphalt paving and roofing materials makers (SIC 2951, 2952) monitor TSS on the benchmark schedule. Asphalt emulsion facilities must also meet the Table VIII.D-2 limits, sampled once a year.

  • Only if: your permit sector is D.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.D.3, page 51
"Table VIII.D-1 identifies benchmarks that apply to the specific subsectors of Sector D."
Open the permit at this section

(Sector E) Glass, clay, cement, concrete and gypsum: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Clay product makers (E1) monitor aluminum and concrete and gypsum product makers (E2) monitor TSS on the benchmark schedule. Material storage piles at cement plants must also meet the Table VIII.E-2 limits, sampled once a year.

  • Only if: your permit sector is E.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.E.4, page 52
"Table VIII.E-1 identifies benchmarks that apply to the specific subsectors of Sector E."
Open the permit at this section

(Sector F) Primary metals: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Steel works (F1), iron and steel foundries (F2), nonferrous rolling and drawing (F3) and nonferrous foundries (F4) each have their own benchmark parameters, sampled on the benchmark schedule.

  • Only if: your permit sector is F.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.F.5, page 54
"Table VIII.F-1 identifies benchmarks that apply to the specific subsectors of Sector F."
Open the permit at this section

(Sector G) Metal mining: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Active copper ore mining and dressing (G1) monitors the Table VIII.G-1 parameters. Discharges from waste rock and overburden piles at active metal mines (G2) monitor the Table VIII.G-2 parameters once in the first year and twice a year after that for any parameter above its benchmark, plus the ore-specific parameters of Table VIII.G-3.

  • Only if: your permit sector is G.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.G.8.a, page 60
"Active copper ore mining and dressing facilities must sample and analyze stormwater discharges for the pollutants listed in Table VIII.G-1."
Open the permit at this section

(Sector H) Coal mines: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Coal mines and related areas (SIC 1221-1241) monitor aluminum and TSS on the benchmark schedule.

  • Only if: your permit sector is H.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.H.8, page 69
"Table VIII.H-1 identifies benchmarks that apply to Sector H."
Open the permit at this section

(Sector I) Oil and gas extraction: benchmark value

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Oil and gas extraction and refining (SIC 1311, 1321, 1381-1389) monitors oil and grease on the benchmark schedule.

  • Only if: your permit sector is I.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.I.6, page 71
"Table VIII.I-1 identifies benchmarks that apply to the specific subsectors of Sector I."
Open the permit at this section

(Sector J) Non-metallic mineral mining: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Sand and gravel mining (J1) and dimension and crushed stone (J2) have their own benchmark parameters. Mine dewatering at crushed stone, construction sand and gravel and industrial sand mines must also meet the Table VIII.J-2 limits, sampled once a year.

  • Only if: your permit sector is J.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.J.8, page 76
"Table VIII.J-1 identifies benchmarks that apply to the specific subsectors of Sector J."
Open the permit at this section

(Sector K) Hazardous waste facilities: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Hazardous waste treatment, storage and disposal facilities (activity code HZ) monitor the Table VIII.K-1 parameters on the benchmark schedule where their discharges are not subject to the 40 CFR 445 Subpart A limits. Hazardous waste landfills subject to those limits meet Table VIII.K-2, sampled once a year.

  • Only if: your permit sector is K.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.K.5, page 79
"Table VIII.K-1. identifies benchmarks that apply to the specific subsectors of Sector K."
Open the permit at this section

(Sector L) Landfills and land application sites: benchmark value and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Landfills, land application sites and open dumps (activity code LF) monitor TSS on the benchmark schedule where their discharges are not subject to the 40 CFR 445 Subpart B limits. Non-hazardous waste landfills subject to those limits meet Table VIII.L-2, sampled once a year.

  • Only if: your permit sector is L.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.L.9, page 83
"Table VIII.L-1 identifies benchmarks that apply to the specific subsectors of Sector L."
Open the permit at this section

(Sector M) Automobile salvage yards: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Automobile salvage yards (SIC 5015) monitor TSS, oil and grease, aluminum and lead on the benchmark schedule. Indicator monitoring for copper is a separate duty.

  • Only if: your permit sector is M.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.M.5, page 85
"Table VIII.M-1. identifies benchmarks that apply to Sector M."
Open the permit at this section

(Sector N) Scrap and waste recycling: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Scrap and waste recycling facilities (SIC 5093) monitor COD, oil and grease, TSS, aluminum, copper, lead and zinc on the benchmark schedule. Facilities where shredding is exposed to stormwater, or that process construction and demolition debris, also monitor seven PCB congeners.

  • Only if: your permit sector is N.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.N.6, page 89
"Table VIII.N-1. identifies benchmarks that apply to Sector N."
Open the permit at this section

(Sector O) Steam electric generating facilities: effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Coal storage pile runoff at steam electric plants must meet the Table VIII.O-2 limits for TSS and pH, sampled once a year. Sector O has no benchmark table.

  • Only if: your permit sector is O.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.O.7, page 93
"Table VIII.O-2 identifies effluent limits that apply to the industrial activities described below."
Open the permit at this section

(Sector P) Land transportation and warehousing: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Land transportation and warehousing facilities (SIC 4011, 4013, 4111-4173, 4212-4231, 4311, 5171) monitor oil and grease on the benchmark schedule; where solid waste storage or transfer is exposed to stormwater they also monitor aluminum, lead and zinc.

  • Only if: your permit sector is P.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.P.6, page 95
"Table VIII.P-1. identifies benchmarks that apply to certain subsectors within Sector P."
Open the permit at this section

(Sector Q) Water transportation: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Water transportation facilities (SIC 4412-4499) monitor aluminum, oil and grease, lead and zinc on the benchmark schedule. Indicator monitoring for copper is a separate duty.

  • Only if: your permit sector is Q.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.Q.6, page 97
"Table VIII.Q-1 identifies benchmarks that apply to the specific subsectors of Sector Q."
Open the permit at this section

(Sector R) Ship and boat building and repair: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Ship and boat building and repair yards (SIC 3731, 3732) monitor aluminum, oil and grease, lead and zinc on the benchmark schedule. Indicator monitoring for copper is a separate duty.

  • Only if: your permit sector is R.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.R.6, page 100
"Table VIII.R-1 identifies benchmarks that apply to the specific subsectors of Sector R."
Open the permit at this section

(Sector S) Air transportation: deicing benchmark values and urea limit

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Airports where the permittees together use more than 100,000 gallons of glycol-based deicers or 100 tons or more of urea a year on average monitor BOD5, COD, ammonia and pH at outfalls draining deicing areas, sampled while deicing occurs. Primary airports with 1,000 or more annual jet departures that use urea for pavement deicing meet the Table VIII.S-2 ammonia limit.

  • Only if: your permit sector is S.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.S.7, page 106
"Table VIII.S-1 identifies benchmarks that apply to the specific subsectors of Sector S."
Open the permit at this section

(Sector U) Food and kindred products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Grain mill products (U1) monitor TSS; fats and oils products (U2) monitor BOD5, COD, nitrate plus nitrite nitrogen and TSS, on the benchmark schedule.

  • Only if: your permit sector is U.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.U.6, page 109
"Table VIII.U-1 identifies benchmarks that apply to the specific subsectors of Sector U."
Open the permit at this section

(Sector Y) Rubber products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Rubber products makers (SIC 3011, 3021, 3052, 3053, 3061, 3069) monitor zinc on the benchmark schedule.

  • Only if: your permit sector is Y.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VIII.Y.4, page 113
"Table VIII.Y-1 identifies benchmarks that apply to the specific subsectors of Sector Y."
Open the permit at this section

Effluent limit exceeded: follow-up sample within 30 days, then an Exceedance Report

Within 30 days after you implement the corrective action.

After a sample exceeds a numeric effluent limit, take corrective action under Part III and sample again for the pollutant within 30 calendar days of implementing it (or in the next qualifying runoff event if none occurs). If the follow-up sample also exceeds the limit, send RIDEM an Exceedance Report within 30 days of receiving the lab results and keep monitoring at least quarterly until the discharge meets the limit or RIDEM waives it.

Further steps with their own deadlines:

  • Exceedance Report after the follow-up sample also exceeds. Within 30 days after you receive the follow-up lab results. Section VII.E, page 45
    "the permittee must submit an Exceedance Report to the Department no later than 30 days after receipt of the lab results."
  • Quarterly monitoring until the limit is met. The permit gives the timing in words, quoted below. Section VI.C.2, page 43
    "The permittee must continue to monitor, at least quarterly, until the discharge is in compliance with the effluent limit or until the Department waives the requirement for additional monitoring."
  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); a sample exceeds a numeric effluent limit.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VI.C, page 43
"The permittee must conduct follow-up monitoring within 30 calendar days (or during the next qualifying runoff event, should none occur within 30 days) of implementing corrective action(s)"
Open the permit at this section

Level One corrective action within 14 days of the fourth result

Within 14 days after you receive the fourth benchmark monitoring result (up to 45 days where the permit allows more time).

If, after the first year of benchmark monitoring, the average of the four results for a parameter exceeds its benchmark (and the cause is not natural background alone), review the SWMP against Parts II and VIII, inspect to find the cause, revise the SWMP and add operational source control BMPs within 14 calendar days of receiving the fourth result. If that is infeasible, document why and finish as soon as practicable, no later than 45 calendar days after discovery. Summarize it in the Annual Report.

  • Only if: a parameter is at level 1.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section III.A.1.a, page 20
"the permittee must complete the corrective actions described in Parts III.A.1.a.1., III.A.1.a.2., and III.A.1.a.3. within fourteen (14) calendar days of receipt of the fourth monitoring results."
Open the permit at this section

Level Three corrective action: treatment BMPs and a report with the next Annual Report

By January 30 after Level Three corrective action is triggered.

If the average of four benchmark results taken after Level Two is complete still exceeds, review the SWMP, add or improve treatment BMPs and fully implement them no later than six months after the Level Three monitoring year, and attach a Level Three Corrective Action Report (an industrial activity or non-industrial source demonstration) to the next Annual Report due after Level Three is triggered, unless RIDEM grants a waiver.

Further steps with their own deadlines:

  • Treatment BMPs fully implemented. Within 181 days after the Level Three benchmark monitoring year ends. Section III.A.3.c, page 22
    "Fully implement the SWMP and modifications/enhancements of existing BMPs and/or construction of additional Treatment BMPs as necessary, as soon as possible but no later than six months following the Level 3 benchmark monitoring year"
  • Waiver request to RIDEM. Within 30 days after the Level Three benchmark monitoring year ends. Section III.A.3.c.2, page 22
    "the permittee may request a waiver from this requirement by submitting to the Director a detailed explanation and technical basis for the request, no later than 30 days following the end of the Level 3 benchmark monitoring year."
  • Treatment BMP operation and maintenance plan in the SWMP. Within 30 days after construction of the treatment BMPs is complete. Section III.A.3.b.1.vi, page 21
    "The O&M Plan must be included in the SWMP within 30 days of completion of construction of the ... treatment BMPs."
  • Only if: a parameter is at level 3.
  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool), attached to the Annual Report).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section III.A.3.b, page 21
"the permittee must submit a Level Three Corrective Action Report as an attachment to the next Annual Report due after Level Three Corrective Actions have been triggered."
Open the permit at this section

Level Two corrective action: structural BMPs within six months after the second year

Within 181 days after the second benchmark monitoring year ends.

If the average of the four benchmark results still exceeds after the second year of benchmark monitoring, review the SWMP, add structural source control BMPs and fully implement them as soon as possible, no later than six months after the second benchmark monitoring year. A waiver request goes to RIDEM within 30 days after that year ends; an extension may be requested. Summarize it in the Annual Report.

Further steps with their own deadlines:

  • Waiver request to RIDEM. Within 30 days after the second benchmark monitoring year ends. Section III.A.2.c.2, page 20
    "the permittee may request a waiver from this requirement by submitting to the Director a detailed explanation and technical basis for the request, no later than 30 days following the end of the second benchmark monitoring year."
  • Only if: a parameter is at level 2.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 5 years.

Inferred from section III.A.2.c. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section III.A.2.c, page 20
"Fully implement the SWMP and Structural Source Control BMPs as soon as possible but no later than six months following the second benchmark monitoring year."
Open the permit at this section

Send a receiving-water hardness value with the first benchmark report

No set date. With the first benchmark monitoring report (VI.B.1.a.2); that report is due 15 days after the first monitoring period ends (VII.C).

A facility in a sector whose benchmarks depend on hardness (fresh water discharges of cadmium, copper, lead, nickel, silver or zinc) determines the hardness of its receiving fresh water under Appendix D and submits the value to RIDEM with its first benchmark report. The value picks the benchmark from the sector's hardness table.

  • Only if: your permit sector is A, C, F, G, K, M, N, P, Q, R, Y, AA; the facility discharges to fresh water.
  • You file it in the agency's system (NetDMR).
  • Keep the records 5 years.
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section VI.B.1.a.2, page 39
"the permittee is required to submit to RIDEM with the first benchmark report a hardness value, established consistent with the procedures in Appendix D, which is representative of the facility's receiving water."
Open the permit at this section

What does no-exposure certification require?

No Exposure Certification, submitted in NeT and again every five years.

Every few years 1 duty

Submit the No Exposure Certification, and again every five years

Within 5 years after your last No Exposure Certification.

A facility whose industrial materials and activities are sheltered from rain, snow, snowmelt and runoff may submit a No Exposure Certification (NEC) in NeT instead of holding permit coverage. Submit it again once every five years; this pack dates the next one five years after the last.

  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool)).
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.

Inferred from section I.E. Check your copy of the permit.

Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section I.E, page 11
"The permittee must submit a No Exposure Certification form to the RIDEM once every five (5) years. The permittee must submit the NEC to the Director electronically through NeT."
Open the permit at this section

When something happens 1 duty

No exposure lost: apply for permit coverage

No set date. The permit gives no number of days ("at any time", I.E).

If industrial activity changes so that materials are exposed to stormwater, a facility relying on the No Exposure Certification submits a permit application (an NOI) and follows the permit.

  • When: materials become exposed to stormwater.
  • You file it in the agency's system (EPA NeT (NPDES eReporting Tool)).
  • Signed or certified by a responsible official per 250-RICR-150-10-1 section 1.12.
Source: RIPDES Multi-Sector General Permit RIR500000 (2024), with Appendices A to F, section I.E, page 11
"If, at any time, the industrial activity is modified such that materials are exposed to stormwater, the facility must submit a permit application and comply with all pertinent sections of this general permit."
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

Rhode Island MSGP RIR500000 duties, topic by topic

How the Rhode Island MSGP RIR500000 compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: