Arizona Industrial Stormwater MSGP (non-mining) due dates and duties

Every duty in the Arizona Pollutant Discharge Elimination System General Permit for Stormwater Discharges Associated with Industrial Activity to Protected Surface Waters (2024 Multi-Sector General Permit, non-mining), with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 91duties, each cited
  • 5on a schedule
  • 86when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
AZMSG2024-001
In force
January 16, 2025 to January 15, 2030
Official page
azdeq.gov
Rules last checked
November 27, 2026
Today
January 16, 2025 January 15, 2030
Notes on the permit's status and renewal

The permit was signed January 13, 2025, took effect January 16, 2025 and expires at midnight January 15, 2030 (cover page). It covers non-mining industrial activity (40 CFR 122.26(b)(14) categories i, ii, iv to ix and xi) discharging to protected surface waters, which include waters of the U.S. and state-only (non-WOTUS) protected surface waters; some parts apply only to discharges to waters of the U.S. and say so. Mining (Sectors G and J) is covered by ADEQ's separate Mining MSGP, AZMSG2024-002, which StormDue does not list. Facilities covered under the 2019 MSGP had to submit a new NOI between January 16 and April 16, 2025, and other facilities already operating within 60 days of the effective date (Table 1-2); both deadlines have passed and are not shown as dates. If the permit is not reissued before it expires it is administratively continued (Part 1.3.2). No modification of this permit was found on ADEQ's page on November 27, 2026 (the December 26, 2025 modification on ADEQ's site is to the Mining MSGP). Coverage is shown on the NOI Certificate, which carries an LTF authorization number and the coverage effective date.

What does full permit coverage require?

Coverage by Notice of Intent in myDEQ, with the fee, after the SWPPP is prepared. The NOI Certificate, issued once a complete NOI and the fee are received, is the authorization to discharge and carries its effective date.

Every year 2 duties

Pay the annual permit fee

No set date. ADEQ sends an invoice in the anniversary month of the NOI; the permit sets no due date.

A fee applies each year the permit coverage is active. ADEQ invoices it in the anniversary month of the NOI. The permittee stays responsible for the annual fee until coverage is terminated.

  • You file it in the agency's system (myDEQ).
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 1.5.3, page 11
"The permittee is responsible for meeting the terms and conditions of this permit (including annual fee(s)) until the site's authorization to discharge is terminated."
Open the permit at this section

Train stormwater staff at least once a year

Within 1 year after the last training.

Train every employee who works where industrial materials or activities are exposed to stormwater or who carries out permit duties (inspectors, maintenance staff, the Stormwater Pollution Prevention Team) on the control measures and the monitoring, inspection, planning, reporting and record duties, at least once a year, and keep training records with the SWPPP.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 2.2.1.2.8. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 2.2.1.2.8, page 18
"Training shall be conducted at least annually."
Open the permit at this section

One time 2 duties

Prepare the SWPPP before submitting the NOI

No set date. Before the NOI is submitted; the NOI deadlines are in the NOI duties.

Have qualified personnel prepare a Stormwater Pollution Prevention Plan meeting Parts 5 and 8 before the Notice of Intent is submitted, and select and design the control measures, which must be installed before discharge.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 5.0, page 27
"A Stormwater Pollution Prevention Plan (SWPPP) that meets the requirements of Parts 5 and 8 of this permit shall be prepared by qualified personnel prior to submitting a NOI."
Open the permit at this section

Submit a new NOI when ADEQ reissues the permit

No set date. The new permit will set the deadline; it has not been issued.

When ADEQ reissues the general permit, file an electronic NOI in myDEQ within the timeframe the new permit sets, and get new written authorization. Until then an expired permit is administratively continued for covered facilities.

  • You file it in the agency's system (myDEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per appendix b 9a.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section Appendix B, 2.a
"Upon reissuance of the general permit, the permittee shall file an electronic Notice of Intent (NOI) through myDEQ, within the timeframe specified in the new general permit, and shall obtain new written authorization to discharge from the Director."
Open the permit at this section

When something happens 23 duties

File a no-data e-DMR by June 30 and November 30 when no sample was taken

By June 30 (winter wet season) and November 30 (summer wet season).

If no sample was collected in a wet season (no discharge, inactive and unstaffed, or another exemption), still submit the e-DMR with the right No Data (NODI) code: by June 30 for the winter wet season and by November 30 for the summer wet season.

  • When: the site is subject to analytical monitoring.
  • You file it in the agency's system (myDEQ e-DMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 7.1.3, page 41
"the e-DMR shall be submitted no later than the following: Winter Wet Season: June 30 Summer Wet Season: November 30"
Open the permit at this section

Monitor discharges upstream of an Outstanding Arizona Water once per wet season

By October 31 (summer wet season) and May 31 (winter wet season).

A site discharging to a water of the U.S. within 2.5 miles upstream of an Outstanding Arizona Water monitors the parameters ADEQ sets for its activities and location, once per wet season unless ADEQ says otherwise.

  • When: the facility discharges within 2.5 miles upstream of an Outstanding Arizona Water.
  • You file it in the agency's system (myDEQ e-DMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section 6.2.4. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 6.2.4, page 34
"In the event any industrial stormwater discharged from the site is within 2.5 miles (upstream tributary) of a water that is listed as an Outstanding Arizona Water, analytical monitoring will be required under this permit"
Open the permit at this section

AIM natural background exception: send the documentation within 30 days

Within 30 days after you receive the laboratory results showing the AIM trigger.

To claim that an action level exceedance comes only from natural background levels, keep the supporting rationale and data with the SWPPP and email the analysis to ADEQ within 30 calendar days of receiving the lab results showing the AIM trigger. ADEQ approves it unless it objects within 30 days.

  • When: you claim the natural background AIM exception.
  • You send it to the agency (stormwatercompliance@azdeq.gov).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 6.3.6.1, page 37
"The permittee submits the analysis and documentation to ADEQ at stormwatercompliance@azdeq.gov within 30 calendar days of receipt of laboratory results that indicate an AIM trigger event."
Open the permit at this section

AIM water quality exception: send the demonstration within 60 days

Within 60 days after an AIM triggering event happens.

To claim that an AIM trigger causes no exceedance of surface water quality standards, email ADEQ the demonstration (the standards, upstream and downstream concentrations, the discharge concentration, and hardness for hardness-dependent metals) within 60 calendar days of the AIM triggering event, and keep it with the SWPPP.

  • When: you claim the water quality standards AIM exception.
  • You send it to the agency (stormwatercompliance@azdeq.gov).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 6.3.6.4, page 38
"The permittee must demonstrate to ADEQ within 60 calendar days of the AIM triggering event that the triggering event does not result in any exceedance of surface water quality standards."
Open the permit at this section

Apply for an individual permit within 90 days when ADEQ requires one

Within 90 days after you receive ADEQ's notice.

If ADEQ notifies the operator in writing that an individual AZPDES permit is required, submit the application by the deadline. Coverage under this permit ends if the application is late.

  • When: ADEQ requires an individual permit.
  • You file it in the agency's system.
  • Keep the records 3 years.
  • Signed or certified by a responsible official per appendix b 9a.

Inferred from Appendix B, 17.c. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section Appendix B, 17.c
"The discharger shall apply for an individual permit within 90 days of receipt of the notice, unless the Director grants a later date."
Open the permit at this section

Give advance notice of changes expected to cause noncompliance

No set date. Before the change; the permit sets no number of days.

Tell ADEQ in advance of any planned change to the site or activity that the permittee expects will lead to noncompliance with the permit.

  • When: a planned change is expected to cause noncompliance.
  • You send it to the agency.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 7.3.5, page 42
"The permittee must give advance notice to ADEQ of any planned changes in the permitted site or activity which the permittee anticipates will result in noncompliance with permit requirements"
Open the permit at this section

New owner or operator submits an NOI 30 days before taking over

At least 30 days before the new owner or operator takes over.

Coverage does not transfer. A new owner or operator submits its own NOI in myDEQ 30 calendar days before taking over operational control or starting activities at the site, after developing the SWPPP.

Further steps with their own deadlines:

  • Former owner or operator submits a NOT within 30 days. Within 30 days after the new owner or operator takes responsibility. Section 1.3.1 Table 1-2, page 8
    "Permitted owner or operator shall submit a NOT to ADEQ within 30 calendar days after the new owner or operator assumes responsibility for the site."
  • When: the owner or operator changes.
  • You file it in the agency's system (myDEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per appendix b 9a.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 1.3.1 Table 1-2, page 8
"New owner /operator shall submit a NOI to ADEQ 30 calendar days before taking over operational control or initiating activities at the site."
Open the permit at this section

Notify ADEQ at least 10 days before an anticipated bypass

At least 10 days before the bypass.

If a bypass of a treatment facility is known in advance, give ADEQ notice at least ten days before it. An unanticipated bypass is reported within 24 hours.

  • When: a bypass is expected.
  • You send it to the agency.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section Appendix B, 20.c
"If the permittee knows in advance of the need for a bypass, prior notice shall be submitted at least ten days before the date of the bypass."
Open the permit at this section

Notify ADEQ at least 30 days before planned physical changes

At least 30 days before the change is made.

Give ADEQ notice promptly, and no fewer than 30 calendar days before, any planned physical alteration or addition to the site that could significantly change the nature or increase the quantity of pollutants discharged, or (for WOTUS discharges) that could make it a new source.

  • When: a physical alteration or addition is planned.
  • You send it to the agency.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 7.3.4, page 42
"The permittee must give notice to ADEQ promptly, no fewer than 30 calendar days prior to making any planned physical alterations or additions to the permitted site"
Open the permit at this section

Promptly correct missing or wrong information in the NOI or a report

No set date. Promptly; the permit sets no number of days.

On learning that relevant facts were left out of the NOI, or that wrong information was given in the NOI or any report, promptly submit the facts or corrected information to ADEQ.

  • When: you find missing or incorrect information.
  • You send it to the agency.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 7.3.8, page 42
"The permittee must promptly submit facts or information once you become aware of the following: you failed to submit relevant facts in the NOI, or that incorrect information was submitted in the NOI or in any report"
Open the permit at this section

Repair or replace stormwater controls within 14 days of discovery

Within 14 days after you discover the problem.

Make needed maintenance changes as soon as practicable and take reasonable steps to limit discharges until the repair is done. Finish final repairs or replacement as soon as feasible and no later than 14 calendar days after discovery, or before the next measurable storm event if that is sooner. If that cannot be done, document the reason, a schedule and backup measures in the SWPPP.

  • When: a control measure needs repair or replacement.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 2.2.1.2.3. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 2.2.1.2.3, page 17
"Final repairs or replacement of stormwater controls should be completed as soon as feasible but no later than 14 calendar days following discovery, or before the next measurable storm event, whichever is sooner."
Open the permit at this section

Report a reportable-quantity spill to ADEQ Emergency Response immediately

No set date. As soon as the permittee knows of the release.

As soon as the permittee knows of a leak, spill or other release of a hazardous substance or oil at or above a reportable quantity (40 CFR 110, 117 or 302), call ADEQ Emergency Response at (602) 771-2330 or (800) 234-5677. Keep the contact numbers where staff can find them.

  • When: a release of a reportable quantity happens.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 2.2.1.2.4, page 17
"As soon as the permittee has knowledge of a leak, spill, or other release occurs that contains a hazardous substance or oil in an amount equal to or in excess of a reportable quantity"
Open the permit at this section

Report noncompliance that may endanger health or the environment within 24 hours

Within 24 hours after you become aware of the noncompliance.

Tell ADEQ Water Quality Compliance orally within 24 hours of becoming aware of any noncompliance that may endanger health or the environment, and follow up in writing within five calendar days with the cause, the period, and the steps taken to stop it recurring.

Further steps with their own deadlines:

  • Written report within five calendar days. Within 5 days after you become aware of the noncompliance. Section 7.3.2, page 42
    "A written submission must also be provided within five calendar days of the time the permittee becomes aware of the circumstances"
  • When: noncompliance that may endanger health or the environment happens.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 7.3.1, page 42
"The permittee must report any noncompliance which may endanger health or the environment. Any information must be provided orally within 24 hours from the time the permittee becomes aware of the circumstances"
Open the permit at this section

Submit a Control Measure Assessment Report within 30 days of an AIM trigger

Within 30 days after you receive the laboratory data showing the AIM trigger.

When routine monitoring shows an AIM trigger (the average of two consecutive wet seasons above an action level, or one result more than twice it), email ADEQ the Control Measure Assessment Report within 30 calendar days of receiving the lab data: the exceedance, its causes, the controls reviewed and changed, the AIM level and the SWPPP updates.

  • When: an AIM triggering event happens.
  • You send it to the agency (stormwatercompliance@azdeq.gov).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 7.2, page 41
"Within 30 calendar days of receiving the laboratory analytical data verifying that an AIM triggering event occurred per Part 6.3.2, the permittee shall complete and submit an electronic copy of the Control Measure Assessment Report"
Open the permit at this section

Submit a Corrective Action Report within 30 days of discovering a trigger

Within 30 days after you discover the problem.

After an unauthorized discharge, a discharge causing or contributing to a water quality standard exceedance, a waste load allocation exceedance, degradation of an Outstanding Arizona Water, or a violated ELG limit, act at once to mitigate it, document it within 72 hours, complete the corrective action record within 14 days, and email ADEQ's Corrective Action Report form within 30 calendar days of discovery. Keep it with the SWPPP.

Further steps with their own deadlines:

  • Document the discovery within 72 hours. Within 72 hours after you discover the problem. Section 3.2, page 21
    "Within 72 hours of discovery, the permittee shall document the discovery of that condition"
  • Complete and document the corrective action within 14 days. Within 14 days after you discover the problem. Section 3.2, page 22
    "Within 14 calendar days of discovery (or before the next measurable storm event if possible, whichever is sooner) the permittee shall complete and document the following"
  • When: you discover a corrective action condition.
  • You send it to the agency (stormwatercompliance@azdeq.gov).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 3.2, page 21
"The form should be submitted as soon as practicable and must be submitted within 30 calendar days following the discovery of any condition in Part 3.1.1."
Open the permit at this section

Submit a new NOI 30 days before the site location changes

At least 30 days before the site location changes.

When the site moves or its geographic coordinates change, submit a new NOI with the initial fee 30 calendar days before the change, and a Notice of Termination for the old location within 30 calendar days after it.

Further steps with their own deadlines:

  • NOT for the previous location within 30 days. Within 30 days after the site location changes. Section 1.3.1 Table 1-2, page 8
    "shall submit a Notice of Termination (NOT) to ADEQ within 30 calendar days after the site location changes."
  • When: the site location changes.
  • You file it in the agency's system (myDEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per appendix b 9a.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 1.3.1 Table 1-2, page 8
"Owner /operator of the new site location, shall submit a NOI to ADEQ 30 calendar days before changing site locations."
Open the permit at this section

Submit a new NOI 30 days before the site or company name changes

At least 30 days before the name changes.

A change of facility name (or of the permittee's name, Appendix B 19.b) needs a new NOI 30 calendar days before the change, and a Notice of Termination under the old name within 30 calendar days after it.

Further steps with their own deadlines:

  • NOT under the previous name within 30 days. Within 30 days after the name changes. Section 1.3.1 Table 1-2, page 9
    "shall submit a NOT to ADEQ within 30 calendar days after the site name changes."
  • When: the site name changes.
  • You file it in the agency's system (myDEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per appendix b 9a.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 1.3.1 Table 1-2, page 9
"Owner/operator of the site location with a new name, shall submit a NOI to ADEQ 30 calendar days before changing site name."
Open the permit at this section

Submit a revised NOI within 30 days of a change to NOI information

Within 30 days after the information in your NOI changes.

When NOI information changes (site contact, discharge to an MS4, sector or subsector, co-located activities, exposed acreage, SWPPP contact, outfalls, receiving water, sampling type, or inactive and unstaffed status), update the SWPPP and submit a revised NOI in myDEQ within 30 calendar days.

  • When: the information in your NOI changes.
  • You file it in the agency's system (myDEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per appendix b 9a.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 1.3.1 Table 1-2, page 9
"Submit a revised NOI to ADEQ within 30 calendar days of the change to NOI information."
Open the permit at this section

Submit the e-DMR within 30 days of receiving lab results

Within 30 days after you receive the laboratory results.

Enter the monitoring results in the electronic Discharge Monitoring Report in myDEQ within 30 calendar days of receiving the laboratory data, with composite sample details if a flow-weighted sample was used, and hardness values for hardness-dependent metals.

  • When: the site is subject to analytical monitoring.
  • You file it in the agency's system (myDEQ e-DMR).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 7.1.3, page 41
"The permittee shall complete and submit e-DMR within 30 calendar days of receiving the laboratory analytical data."
Open the permit at this section

Submit the NOI at least 30 days before discharge begins

At least 30 days before the date you expect to start discharging.

A new discharger submits a complete and accurate Notice of Intent in myDEQ as soon as possible and at least 30 calendar days before discharge is expected, after the SWPPP is prepared. The NOI Certificate issued on a complete NOI and the fee is the authorization.

  • When: the facility is a new discharger.
  • You file it in the agency's system (myDEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per appendix b 9a.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 1.3.1 Table 1-2, page 8
"Submit NOI as soon as possible, and at least 30 calendar days before discharge is anticipated."
Open the permit at this section

Submit the SWPPP to ADEQ when notified in writing

No set date. The permit sets no number of days; follow the deadline in ADEQ's notice.

On written notice from ADEQ (for example a site within 2.5 miles of a special water, after an inspection, a complaint or a records request), submit a complete, up-to-date SWPPP in myDEQ with the review fee.

  • When: ADEQ asks for the SWPPP in writing.
  • You file it in the agency's system (myDEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 5.5, page 28
"As part of the permitting process, or upon written notification from ADEQ, the permittee shall submit a complete and up-to-date copy of the SWPPP to the Department in response to the following criteria"
Open the permit at this section

Update the NOI within 30 days of becoming inactive and unstaffed, or active again

Within 30 days after the site status changes.

Within 30 calendar days of the site becoming inactive and unstaffed, or reverting to active and staffed, modify the NOI in myDEQ to update the site's status. Reduced inspections, assessments and monitoring apply only from that update; they cannot be claimed retroactively (Part 6.5.4).

  • When: the site becomes inactive and unstaffed, or active again.
  • You file it in the agency's system (myDEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per appendix b 9a.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 4.1.2, page 24
"Within 30 calendar days of becoming inactive and unstaffed or reverting back to an active and staffed site, the permittee must modify the NOI in myDEQ to update the status of the site."
Open the permit at this section

Write a Sampling and Analysis Plan before monitoring starts

No set date. Monitoring begins within 90 days of authorization (Part 6.1.2); the plan is needed before the first sample.

A permittee subject to monitoring writes a Sampling and Analysis Plan covering all required analytical monitoring (sample collection, preservation and handling, equipment calibration, methods and laboratories) and keeps it with the SWPPP. Samples go to a laboratory licensed by the Arizona Department of Health Services.

  • When: the site is subject to analytical monitoring.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 6.1.5, page 32
"Any permittee subject to monitoring shall develop a written SAP covering all analytical monitoring required by this permit. The SAP shall be included with the site's SWPPP."
Open the permit at this section

Ongoing 3 duties

Find and eliminate unauthorized non-stormwater discharges

No set date. Standing duty; an unauthorized discharge is a corrective action condition (Part 3.1.1).

Evaluate the site for non-stormwater discharges and eliminate any not allowed by Part 1.1.3 or another AZPDES permit. Vehicle and equipment washwater, including tank cleaning, is not authorized and must go to a separate permit, a sanitary sewer or other lawful disposal.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 2.2.1.2.9, page 19
"Any non-stormwater discharges from the site not specifically authorized in Part 1.1.3 or covered by another AZPDES permit, shall be eliminated."
Open the permit at this section

Keep permit records for three years after coverage ends

No set date. Standing duty.

Keep the SWPPP and its changes, the Part 5.6 documentation (including corrective actions), all reports and certifications, monitoring data, and the data used for the NOI for at least three years from the date coverage expires or is terminated. ADEQ may extend this.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 7.4, page 42
"for a period of at least three (3) years from the date that the site's coverage under this permit expires or is terminated."
Open the permit at this section

Keep the SWPPP up to date and on site

No set date. Standing duty.

Keep the SWPPP current, change it whenever needed to address a corrective action trigger (within the Part 3.2 deadlines), keep a copy at the site and make it immediately available to ADEQ, EPA (for WOTUS discharges), other agencies with stormwater authority, or a receiving MS4 at an inspection or on request.

  • If the facility is inactive and unstaffed: a different schedule.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 5.3, page 28
"The permittee shall keep an up to date SWPPP. The permittee shall modify the SWPPP whenever necessary to address the triggering conditions for corrective action in Part 3.1."
Open the permit at this section

Only if... 56 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Sector E: sweep or vacuum exposed paved areas at least once a week where cement, aggregate or dust is handled

By the end of each week.

Where cement, aggregate, kiln dust, fly ash or settled dust are handled or processed and may be discharged in stormwater, sweep, vacuum or use an equivalent measure on paved areas exposed to stormwater at least once a week. Record the chosen frequency in the SWPPP.

  • Only if: your permit sector is E; the facility handles cement, aggregate, kiln dust, fly ash or settled dust; the facility discharges to waters of the United States.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 8.E.2.1. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.E.2.1, page 53
"it must be performed at least once a week if cement, aggregate, kiln dust, fly ash, or settled dust are being handled or processed and may be discharged in stormwater."
Open the permit at this section

Sector A wood preserving and surface protection: inspect processing, transport and treated wood storage areas monthly

By the end of each month.

Facilities that perform wood surface protection or preservation inspect their processing areas, transport areas and treated wood storage areas every month, to judge how well their practices keep treatment chemicals off unprotected soil and areas that contact stormwater.

  • Only if: your permit sector is A; the facility does wood surface protection or preservation.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.A.5. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.A.5, page 45
"If the site performs wood surface protection and preservation activities, inspect processing areas, transport areas, and treated wood storage areas monthly"
Open the permit at this section

Sector L operating landfills, open dumps and land application sites: inspect every month

By the end of each month.

Inspect operating landfills, open dumps and land application sites at least once a month. Cover at least: areas not yet finally stabilized, active land application areas, exposed material and waste storage, stabilization and structural control measures, leachate collection and treatment systems, and vehicle entrances and exits, and check that sediment and erosion controls work.

  • Only if: your permit sector is L.
  • Does not apply if: the site is an inactive landfill, open dump or land application site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.L.7.1, page 65
"Inspect operating landfills, open dumps, and land application sites at least once every month."
Open the permit at this section

Sector L sites with a discharge point within 1/4 mile of a special water: inspect discharge points twice a month

By the end of each month, 2 times; at least 7 days apart.

If any discharge point is within 1/4 mile of a special water, inspect the discharge point at least twice each month, with at least 7 calendar days between inspections.

  • Only if: your permit sector is L; a discharge point is within a quarter mile of a special water.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.L.7.2, page 65
"If any discharge point from the site is within 1/4 mile of a special water, the permittee shall inspect the discharge point at least twice per month with at least 7 calendar days between inspections."
Open the permit at this section

Sector O steam electric generating facilities: inspect listed areas every month

By the end of each month.

As part of the site inspection, inspect every month: coal handling areas, loading and unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas, areas next to disposal ponds and landfills, maintenance areas, liquid storage tanks, and long and short term material storage areas.

  • Only if: your permit sector is O.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.O.6.1, page 79
"As part of the site's inspection, inspect the following areas monthly: coal handling areas, loading or unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas"
Open the permit at this section

Sector S airports that deice: routine site inspection every month of the deicing season

By the end of each month.

Conduct routine site inspections at least monthly during the facility's deicing season, and in every other month when deicing chemicals may be used.

  • Only if: your permit sector is S; deicing chemicals are used at the site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.S.6.1 (Additional Inspection Requirements). Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.S.6.1 (Additional Inspection Requirements), page 96
"At a minimum, conduct routine site inspections at least monthly during the deicing season. If the site needs to deice before or after this period, expand the monthly inspections to include all months"
Open the permit at this section

Sector V textile mills, apparel and fabric products: inspect listed activities and areas every month

By the end of each month.

At least monthly, inspect transfer and transmission lines, spill prevention, good housekeeping, management of process waste products, and all structural and nonstructural stormwater management practices.

  • Only if: your permit sector is V.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 8.V.5. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.V.5, page 104
"Inspect, at least monthly, the following activities and areas: transfer and transmission lines, spill prevention, good housekeeping practices, management of process waste products, and all structural and nonstructural stormwater management practices."
Open the permit at this section

Do a routine site inspection every calendar quarter

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins.

Qualified personnel, with a member of the Stormwater Pollution Prevention Team, inspect the exposed areas, pollutant sources, control measures, spill locations, tracking areas and discharge points during normal operating hours, at least once each calendar quarter from the first full calendar quarter after coverage begins, and record the findings with the SWPPP.

  • Only if: the facility is not inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 4.1, page 23
"Routine inspections shall be conducted at least once each calendar quarter beginning with the first full calendar quarter after the site becomes covered under this permit"
Open the permit at this section

Do one routine inspection each calendar year while stormwater is discharging

By December 31 each year.

At least one of the quarterly inspections each calendar year is done while a storm event or discharge is happening at one or more outfalls, when practicable, to see that the controls work. If there is no measurable storm or discharge all year, document that; the four quarterly inspections are still required.

  • Only if: the facility is not inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 4.1, page 23
"The permittee shall conduct at least one of the routine site inspections each calendar year while a stormwater event or discharge is occurring at one or more outfalls, when practicable"
Open the permit at this section

Inactive and unstaffed site with exposure: one visual assessment each calendar year

By December 31 each year.

An inactive and unstaffed site that documents in the SWPPP that it cannot meet the no exposure standard does at least one visual assessment each calendar year. A site with no exposure and a signed statement in the SWPPP does none until it becomes active, staffed or exposed again.

  • Only if: the facility is inactive and unstaffed; the site is inactive and unstaffed with materials or activities still exposed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 4.2.3.4, page 26
"shall conduct at least one visual assessment each calendar year."
Open the permit at this section

Inactive and unstaffed site: inspect once or twice each calendar year

By December 31 each year.

An inactive and unstaffed site with no industrial materials or activities exposed, and a signed statement saying so in the SWPPP, does one routine inspection each calendar year. If materials or activities are still exposed, it does two each calendar year, one in each wet season and at least three months apart. Quarterly inspections resume as soon as the site is active, staffed or exposed again.

  • Only if: the facility is inactive and unstaffed.
  • If the site is inactive and unstaffed with materials or activities still exposed: By October 31 (summer wet season) and May 31 (winter wet season).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 4.1.2, page 24
"Such a site is only required to conduct one routine site inspection each calendar year."
Open the permit at this section

Sample ELG-regulated discharges once each calendar year

By December 31 each year.

Discharges to waters of the U.S. from an activity with an effluent limitations guideline in Table 2.2 are sampled once each calendar year for the Part 8 limits. An exceedance is a violation and starts accelerated monitoring and corrective action.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • You file it in the agency's system (myDEQ e-DMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 6.2.2, page 33
"Analytical monitoring for ELGs is required one time per calendar year (one sample per wet season does not apply to ELG monitoring)."
Open the permit at this section

Sector L inactive landfills, open dumps and land application sites: inspect every quarter

By the end of each calendar quarter.

Inspect inactive landfills, open dumps and land application sites at least once each quarter. Qualified personnel inspect stabilization and structural erosion controls, leachate collection and treatment systems, and all closed land application areas.

  • Only if: your permit sector is L; the site is an inactive landfill, open dump or land application site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.L.7.3, page 65
"Inspect inactive landfills, open dumps, and land application sites at least quarterly. Qualified personnel must inspect landfill (or open dump) stabilization and structural erosion control measures"
Open the permit at this section

Sector M automobile salvage yards: inspect equipment and fluid storage for leaks every quarter

By the end of each calendar quarter.

Each quarter, inspect for signs of leakage all equipment containing oily parts, hydraulic fluids, other fluids or mercury switches, and all vessels and areas where hazardous materials and automotive fluids (mercury switches, brake and transmission fluid, radiator water, antifreeze) are stored.

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.M.4, page 69
"Inspect quarterly for signs of leakage all equipment containing oily parts, hydraulic fluids, any other types of fluids, or mercury switches. Also, inspect quarterly for signs of leakage all vessels"
Open the permit at this section

Do two visual assessments of discharge in each wet season

By October 31 (summer wet season) and May 31 (winter wet season).

During normal operating hours, collect a sample from each outfall within the first 30 minutes of a discharge (at least 72 hours after the previous discharge) and examine it in a clear container for color, odor, clarity, solids, foam, oil sheen and other signs of pollution: two in the summer wet season and two in the winter wet season. Record the results with the SWPPP.

  • Only if: the facility is not inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 4.2, page 24
"The permittee, during normal site operating hours, shall perform two visual assessments during the summer wet season and two visual assessments during the winter wet season when the site is discharging."
Open the permit at this section

Monitor for the impairment pollutant when the NOI Certificate requires it

By October 31 (summer wet season) and May 31 (winter wet season).

For discharges to an impaired or not-attaining water (or an upstream tributary within 2.5 miles), monitor for the pollutant causing the impairment when ADEQ requires it; the type, frequency and parameters are in the NOI Certificate. Unless ADEQ says otherwise, monitoring is once per wet season.

  • Only if: your stormwater reaches an impaired water body.
  • You file it in the agency's system (myDEQ e-DMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.

Inferred from section 6.2.3. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 6.2.3, page 33
"If monitoring is required, the type, frequency, and analytical parameters will be included in the final permit authorization certificate."
Open the permit at this section

Sample each outfall once in each wet season for the sector's parameters

By October 31 (summer wet season) and May 31 (winter wet season).

Collect and analyze one stormwater sample per outfall in the summer wet season and one in the winter wet season, for every routine analytical monitoring parameter of the primary and co-located sectors (Part 8; the NOI Certificate lists them). Monitoring begins within 90 days of authorization. Compare results with the action levels on the e-DMR.

  • Only if: your permit sector is A, B, C, D, E, F, K, L, M, N, O, Q, U, Y, AA; the facility is not inactive and unstaffed.
  • Does not apply if: the facility discharges only to waters that are not waters of the United States and uses control measures instead of monitoring.
  • You file it in the agency's system (myDEQ e-DMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 6.1.2, page 30
"Unless otherwise specified by ADEQ, analytical monitoring shall be conducted one time per wet season (two times per year) for the duration of permit coverage for all types of monitoring"
Open the permit at this section

Sector D inactive and unstaffed asphalt batch plants: two routine site inspections a year, one in each wet season

By October 31 (summer wet season) and May 31 (winter wet season).

While an inactive and unstaffed asphalt batch or bituminous concrete plant (SIC 2951) uses the conditional exemption, routine site inspections drop from quarterly to two per calendar year, one in each wet season and at least three months apart. Also inspect whenever severe weather or a natural disaster may have damaged control measures or increased discharges. The exemption holds only while the listed control measures are kept up (materials in containers and containment, valves closed and secured, good housekeeping, site secured, stockpiles protected from erosion).

  • Only if: your permit sector is D; the facility is inactive and unstaffed; your SIC code starts with 2951.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.D.3. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.D.3, page 51
"The quarterly routine site inspections are reduced to two routine site inspections each calendar year. These inspections shall be conducted in the opposing wet seasons and at least three months apart."
Open the permit at this section

Sector E inactive and unstaffed ready-mixed concrete plants: two routine site inspections a year, one in each wet season

By October 31 (summer wet season) and May 31 (winter wet season).

While an inactive and unstaffed ready-mixed concrete plant (SIC 3273) uses the conditional exemption, routine site inspections drop from quarterly to two per calendar year, one in each wet season and at least three months apart. Also inspect whenever severe weather or a natural disaster may have damaged control measures or increased discharges. The exemption holds only while the listed control measures are kept up (materials in containers and containment, valves closed and secured, good housekeeping, site secured, stockpiles protected from erosion).

  • Only if: your permit sector is E; the facility is inactive and unstaffed; your SIC code starts with 3273.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.E.4. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.E.4, page 54
"The quarterly routine site inspections are reduced to two routine site inspections each calendar year. These inspections shall be conducted in the opposing wet seasons and at least three months apart."
Open the permit at this section

Sector F inactive and unstaffed primary metals facilities: two routine site inspections a year, one in each wet season

By October 31 (summer wet season) and May 31 (winter wet season).

While an inactive and unstaffed primary metals facility (SIC 3312-3399) uses the conditional exemption, routine site inspections drop from quarterly to two per calendar year, one in each wet season and at least three months apart. Also inspect whenever severe weather or a natural disaster may have damaged control measures or increased discharges. The exemption holds only while the listed control measures are kept up (equipment and storage areas safeguarded against leaks and material loss, valves closed and secured, good housekeeping, site secured, stockpiles protected from erosion or downstream catchments kept up).

  • Only if: your permit sector is F; the facility is inactive and unstaffed; your SIC code starts with 33.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.F.5. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.F.5, page 57
"The quarterly routine site inspections are reduced to two routine site inspections each calendar year. These inspections shall be conducted in the opposing wet seasons and at least three months apart."
Open the permit at this section

Sector S airport authority using the alternative visual assessment: two assessments per wet season at each main outfall

By October 31 (summer wet season) and May 31 (winter wet season).

An airport authority that chooses the optional alternative visual assessment does two visual assessments in each wet season at each main outfall, and keeps a SWPPP process for tracing a pollutant found at a main outfall back to a tenant or source.

  • Only if: your permit sector is S; the airport authority chose the alternative visual assessment.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.S.8.1, page 96
"Visual assessment must be conducted two (2) times per wet season at each of the main outfall(s)."
Open the permit at this section

After an ELG exceedance, sample every discharge until two results are below the limit

No set date. Each later discharge-producing storm, until two consecutive results are below the limit.

When a result exceeds an effluent limitations guideline, sample each later storm event that produces an industrial stormwater discharge until two consecutive results are below the limit, and enter each result in the e-DMR within 30 days of receiving it.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs); an effluent limitation guideline limit is exceeded.
  • You file it in the agency's system (myDEQ e-DMR).
  • Keep the records 3 years.
  • The permit says this is done by an accredited laboratory.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 6.4, page 38
"The permittee shall sample each subsequent storm event that results in an industrial stormwater discharge."
Open the permit at this section

AIM Level 1: review the SWPPP and put added measures in place within 30 days

Within 30 days after AIM Level 1 is triggered.

At AIM Level 1, review the SWPPP and control measures immediately and put in place added measures expected to bring results below the action level within 30 calendar days of the lab results, or within 45 days if 30 is infeasible (say why in the report). Return to baseline after two more wet seasons without a trigger.

  • Only if: a parameter is at AIM level 1.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 6.3.3.2, page 35
"the permittee must implement those modifications or control measures within 30 calendar days of receipt of laboratory results, unless doing so within 30 calendar days is infeasible."
Open the permit at this section

AIM Level 2: add pollution prevention and housekeeping measures within 30 days

Within 30 days after AIM Level 2 is triggered.

At AIM Level 2, review the SWPPP and put in place added pollution prevention and good housekeeping measures beyond the Level 1 response within 30 calendar days of the lab results (up to 45 days if 30 is infeasible), and document how they will meet the action level.

  • Only if: a parameter is at AIM level 2.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 6.3.4.2, page 36
"The permittee must implement additional pollution prevention/good housekeeping control measures within 30 calendar days of receipt of laboratory results that indicate an AIM triggering event has occurred"
Open the permit at this section

AIM Level 3: schedule structural or treatment controls within 30 days, install within 60

Within 60 days after AIM Level 3 is triggered.

At AIM Level 3, install structural source controls or treatment controls able to bring results below the action level, at the outfall and its substantially identical outfalls: set the installation schedule within 30 calendar days and install within 60 calendar days (up to 90 if 60 is infeasible).

Further steps with their own deadlines:

  • Only if: a parameter is at AIM level 3.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 6.3.5.2. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 6.3.5.2, page 36
"The permittee must identify the schedule for installing the appropriate structural source and/or treatment control measures within 30 calendar days and install such measures within 60 calendar days."
Open the permit at this section

Sector A timber products: action levels for routine analytical monitoring and wet deck effluent limits

No set date. These are the values a sample is compared with. Action level sampling follows the routine analytical monitoring duty; ELG sampling is once per calendar year (Part 6.2.2) and ELG limits apply only to discharges to waters of the U.S.

The routine analytical monitoring action levels a timber products facility compares its stormwater samples with, by subsector (Table 8.A-1), and the effluent limits for wet deck log spray water discharged to waters of the U.S. (Table 8.A-2).

  • Only if: your permit sector is A.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.A.6, page 45
"Table 8.A-1 identifies routine analytical monitoring parameters and action levels that apply to the specific subsectors of Sector A."
Open the permit at this section

Sector AA fabricated metal products: routine analytical monitoring action levels

No set date. These are the values a sample is compared with. The sampling schedule is in the routine analytical monitoring duty.

The action levels fabricated metal products facilities (AA1) and fabricated metal coating and engraving facilities (AA2) compare their routine stormwater samples with (Table 8.AA-1).

  • Only if: your permit sector is AA.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.AA.5, page 114
"Table 8.AA-1 identifies routine analytical monitoring parameters and action levels that apply to the specific subsectors of Sector AA."
Open the permit at this section

Sector AD designated discharges: get the Director's written permission before submitting the NOI

Before you submit the NOI.

A site seeking coverage under Sector AD (discharges the Director designates, or industrial stormwater not described by Sectors A to AC) gets the Director's written permission to use the permit before it submits an NOI, and must meet the basic eligibility provisions of Part 1.1.

  • Only if: your permit sector is AD.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.AD.1.1, page 117
"the permittee shall obtain the Director's written permission to use this permit prior to submitting an NOI."
Open the permit at this section

Sector B paper and allied products: action levels for routine analytical monitoring

No set date. These are the values a sample is compared with. The sampling schedule is in the routine analytical monitoring duty.

The routine analytical monitoring action levels a paperboard mill compares its stormwater samples with (Table 8.B-1).

  • Only if: your permit sector is B.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.B.2, page 47
"Table 8.B-1 identifies routine analytical monitoring parameters and action levels that apply to the specific subsectors of Sector B."
Open the permit at this section

Sector C chemical and allied products: action levels for routine analytical monitoring and phosphate fertilizer effluent limits

No set date. These are the values a sample is compared with. Action level sampling follows the routine analytical monitoring duty; ELG sampling is once per calendar year (Part 6.2.2) and ELG limits apply only to discharges to waters of the U.S.

The routine analytical monitoring action levels a chemical products facility compares its stormwater samples with, by subsector (Table 8.C-1), and the effluent limits for phosphate fertilizer runoff discharged to waters of the U.S. (Table 8.C-2).

  • Only if: your permit sector is C.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.C.3, page 48
"Table 8.C-1 identifies routine analytical monitoring parameters and action levels that apply to the specific subsectors of Sector C."
Open the permit at this section

Sector D asphalt paving, roofing and lubricants: action levels for routine analytical monitoring and asphalt emulsion effluent limits

No set date. These are the values a sample is compared with. Action level sampling follows the routine analytical monitoring duty; ELG sampling is once per calendar year (Part 6.2.2) and ELG limits apply only to discharges to waters of the U.S.

The routine analytical monitoring action levels an asphalt paving or roofing materials facility compares its stormwater samples with (Table 8.D-1), and the effluent limits for asphalt emulsion facility discharges to waters of the U.S. (Table 8.D-2).

  • Only if: your permit sector is D.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.D.4, page 51
"Table 8.D-1 identifies routine analytical monitoring parameters and action levels that apply to the specific subsectors of Sector D."
Open the permit at this section

Sector D inactive asphalt batch plants: restart monitoring at once when the site becomes active or staffed

When the site becomes active or staffed.

When an inactive and unstaffed asphalt batch or bituminous concrete plant becomes active or staffed, the exemption ends and the permittee must immediately begin routine analytical monitoring and wet season visual assessments as if in the first year of coverage.

  • Only if: your permit sector is D; the facility is inactive and unstaffed; your SIC code starts with 2951.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 8.D.3. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.D.3, page 50
"the permittee shall immediately begin complying with the applicable routine analytical monitoring requirements as if the site were in the first year of permit coverage, including the wet season visual assessment requirements"
Open the permit at this section

Sector E glass, clay, cement, concrete and gypsum: action levels for routine analytical monitoring and cement storage pile effluent limits

No set date. These are the values a sample is compared with. Action level sampling follows the routine analytical monitoring duty; ELG sampling is once per calendar year (Part 6.2.2) and ELG limits apply only to discharges to waters of the U.S.

The routine analytical monitoring action levels a clay, concrete or gypsum products facility compares its stormwater samples with, by subsector (Table 8.E-1), and the effluent limits for cement plant material storage pile discharges to waters of the U.S. (Table 8.E-2).

  • Only if: your permit sector is E.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.E.5, page 54
"Table 8.E-1 identifies routine analytical monitoring parameters and action levels that apply to the specific subsectors of Sector E."
Open the permit at this section

Sector E inactive ready-mixed concrete plants: restart monitoring at once when the site becomes active or staffed

When the site becomes active or staffed.

When an inactive and unstaffed ready-mixed concrete plant becomes active or staffed, the exemption ends and the permittee must immediately begin routine analytical monitoring and wet season visual assessments as if in the first year of coverage.

  • Only if: your permit sector is E; the facility is inactive and unstaffed; your SIC code starts with 3273.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 8.E.4. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.E.4, page 54
"the permittee shall immediately begin complying with the applicable routine analytical monitoring requirements as if the site were in the first year of permit coverage, including the wet season visual assessment requirements"
Open the permit at this section

Sector F inactive primary metals facilities: restart monitoring at once when the site becomes active or staffed

When the site becomes active or staffed.

When an inactive and unstaffed primary metals facility becomes active or staffed, the exemption ends and the permittee must immediately begin routine analytical monitoring and wet season visual assessments as if in the first year of coverage.

  • Only if: your permit sector is F; the facility is inactive and unstaffed; your SIC code starts with 33.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 8.F.5. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.F.5, page 57
"the permittee shall immediately begin complying with the applicable routine analytical monitoring requirements as if the site were in the first year of permit coverage, including the wet season visual assessment requirements"
Open the permit at this section

Sector F primary metals: action levels for routine analytical monitoring

No set date. These are the values a sample is compared with. The sampling schedule is in the routine analytical monitoring duty.

The routine analytical monitoring action levels a primary metals facility compares its stormwater samples with, by subsector (Table 8.F-1).

  • Only if: your permit sector is F.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.F.6, page 57
"Table 8.F-1 identifies routine analytical monitoring parameters and action levels that apply to the specific subsectors of Sector F."
Open the permit at this section

Sector K hazardous waste facilities: action levels and landfill effluent limits

No set date. These are the values a sample is compared with. The routine sampling schedule is in the routine analytical monitoring duty; ELG sampling is once per calendar year (Part 6.2.2) and the ELG limits apply only to discharges to waters of the U.S.

The routine analytical monitoring action levels for hazardous waste treatment, storage and disposal facilities (Table 8.K-1), and the numeric effluent limits for contaminated stormwater from hazardous waste landfills subject to 40 CFR Part 445 Subpart A (Table 8.K-2), which apply only to discharges to waters of the U.S.

  • Only if: your permit sector is K.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.K.5, page 60
"Table 8.K-1 identifies routine analytical monitoring parameters and action levels that apply to the specific subsectors of Sector K."
Open the permit at this section

Sector L closed landfill, land application site or open dump: file the Sector L Closure Certification

No set date. The permit sets no deadline for the Sector L Closure Certification; it is filed instead of an NOI once the site is closed with no exposure.

A closed, inactive or capped landfill, land application site or open dump with no exposure of significant materials to stormwater (for example capped under 40 CFR Part 258 or built over) is no longer an industrial activity. It files ADEQ's Sector L Closure Certification Form, with its certification statement, instead of an NOI. Sites that already filed the form need not file it again this permit term.

  • Only if: your permit sector is L; the site is a Sector L site closed with no exposure.
  • You file it in the agency's system (ADEQ Sector L Closure Certification Form).
  • Keep the records 3 years.
  • Signed or certified by the Legally Responsible Person or a Duly Authorized Representative.

Inferred from section 8.L.11. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.L.11, page 68
"The Sector L Closure Certification Form is available on ADEQ's website for a closed landfill, land application site or open dump not covered under the AZPDES Multi-Sector General Permit."
Open the permit at this section

Sector L landfills, land application sites and open dumps: action levels and landfill effluent limits

No set date. These are the values a sample is compared with. The routine sampling schedule is in the routine analytical monitoring duty; ELG sampling is once per calendar year (Part 6.2.2) and the ELG limits apply only to discharges to waters of the U.S.

The routine analytical monitoring action levels for landfills, land application sites and open dumps (Table 8.L-1), and the numeric effluent limits for contaminated stormwater from non-hazardous waste landfills subject to 40 CFR Part 445 Subpart B (Table 8.L-2), which apply only to discharges to waters of the U.S.

  • Only if: your permit sector is L.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.L.9, page 66
"Table 8.L-1 identifies routine analytical monitoring parameters and action levels that apply to the specific subsectors of Sector L."
Open the permit at this section

Sector L sites with a discharge point within 1/4 mile of a special water: observe discharges within one business day after each storm

Within 1 working day after the measurable storm event ends.

Visually observe stormwater discharges at all discharge locations within one business day of the end of each measurable storm event (a storm that produces a discharge from at least one discharge point, Appendix A).

  • Only if: your permit sector is L; a discharge point is within a quarter mile of a special water.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.L.7.2, page 65
"In addition, the permittee shall visually observe stormwater discharges at all discharge locations within one business day of the end of each measurable storm event."
Open the permit at this section

Sector L: keep records of the wastes placed in each cell, trench or land application area

No set date. A standing record kept with the SWPPP; the permit sets no date.

Keep records with the SWPPP of the types of wastes disposed of in each landfill or open dump cell or trench. Land application sites track the types and quantities of wastes applied in specific areas.

  • Only if: your permit sector is L.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.L.8.1, page 65
"Keep records with the SWPPP of the types of wastes disposed of in each cell or trench of a landfill or open dump."
Open the permit at this section

Sector M automobile salvage yards: action levels for routine analytical monitoring

No set date. These are the values a sample is compared with. The sampling schedule is in the routine analytical monitoring duty.

The routine analytical monitoring action levels for automobile salvage yards (Table 8.M-1).

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.M.5, page 70
"Table 8.M-1 identifies routine analytical monitoring parameters and action levels that apply to Sector M."
Open the permit at this section

Sector M automobile salvage yards: inspect each arriving vehicle for leaks

When the vehicle arrives at the site.

Inspect vehicles for leaks immediately when they arrive at the site, or as soon after as feasible.

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.M.4, page 69
"Immediately (or as soon thereafter as feasible) inspect vehicles arriving at the site for leaks."
Open the permit at this section

Sector N scrap and waste recycling: action levels for routine analytical monitoring

No set date. These are the values a sample is compared with. The sampling schedule is in the routine analytical monitoring duty.

The routine analytical monitoring action levels for scrap and waste recycling facilities, other than those receiving only source-separated recyclables from non-industrial and residential sources (Table 8.N-1).

  • Only if: your permit sector is N.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.N.6, page 76
"Table 8.N-1 identifies routine analytical monitoring parameters and action levels that apply to Sector N."
Open the permit at this section

Sector O steam electric generating facilities: action levels and coal pile effluent limits

No set date. These are the values a sample is compared with. The routine sampling schedule is in the routine analytical monitoring duty; ELG sampling is once per calendar year (Part 6.2.2) and the ELG limits apply only to discharges to waters of the U.S.

The routine analytical monitoring action levels for steam electric generating facilities (Table 8.O-1), and the numeric effluent limits for coal storage pile runoff (Table 8.O-2), which apply only to discharges to waters of the U.S.

  • Only if: your permit sector is O.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.O.7, page 80
"Table 8.O-1 identifies routine analytical monitoring parameters and action levels that apply to the specific subsectors of Sector O."
Open the permit at this section

Sector P land transportation and warehousing: train personnel at least once a year

Within 1 year after the last training.

Train personnel at least once a year on the activities that apply: used oil and spent solvent management, fueling procedures, general good housekeeping, proper painting procedures and used battery management.

  • Only if: your permit sector is P.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 8.P.3.2. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.P.3.2, page 82
"Train personnel at least once a year and address the following activities, as applicable: used oil and spent solvent management; fueling procedures; general good housekeeping practices"
Open the permit at this section

Sector Q water transportation: routine analytical monitoring action levels

No set date. These are the values a sample is compared with. The sampling schedule is in the routine analytical monitoring duty.

The action levels a water transportation facility (subsector Q1) compares its routine stormwater samples with: total phosphorus, total iron, total lead and total zinc (Table 8.Q-1).

  • Only if: your permit sector is Q.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.Q.6, page 86
"Table 8.Q-1 identifies routine analytical monitoring parameters and action levels that apply to Sector Q."
Open the permit at this section

Sector S air transportation: deicing action levels and the urea pavement deicing effluent limit

No set date. These are the values a sample is compared with. The deicing sampling is in the Sector S deicing monitoring duty; ELG sampling is once per calendar year (Part 6.2.2) and applies only to discharges to waters of the U.S.

The action levels an airport that uses more than 100,000 gallons of glycol-based deicing chemicals or 100 tons or more of urea a year compares its deicing outfall samples with (BOD5, COD, ammonia, pH; Table 8.S-1), and the ammonia limit for urea pavement deicing runoff at large primary airports (Table 8.S-2).

  • Only if: your permit sector is S.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.S.7, page 96
"Table 8.S-1 identifies routine analytical monitoring parameters and action levels that apply to Sector S."
Open the permit at this section

Sector S airport authority: keep an inventory of airport tenants covered by the SWPPP

No set date. Standing record kept current; the permit sets no date.

The airport authority keeps a complete, easily accessible inventory of the airport tenants covered by the SWPPP (a list or copies of the tenants' NOIs) and makes it available on request.

  • Only if: your permit sector is S; you are the airport authority.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.S.3.1, page 90
"The airport authority shall maintain a complete inventory of airport tenants covered by the SWPPP. The inventory may consist of a list or copies of the tenant's NOIs."
Open the permit at this section

Sector S airports that deice: do one quarterly inspection during active deicing

No set date. During the deicing season the facility defines for itself (8.S.4.2); the permit sets no calendar date.

Using only qualified personnel, conduct one of the quarterly site inspections while deicing is actually happening, if possible; if weather makes that impracticable, do it during the deicing season while the deicing materials and equipment are in place.

  • Only if: your permit sector is S; deicing chemicals are used at the site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.

Inferred from section 8.S.6.1 (Additional Inspection Requirements). Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.S.6.1 (Additional Inspection Requirements), page 96
"Using only qualified personnel, conduct one of the quarterly site inspections during periods of actual deicing operations, if possible."
Open the permit at this section

Sector S airports: develop the single comprehensive airport SWPPP before any NOI is submitted

Before you submit the NOI.

One comprehensive SWPPP covers all industrial stormwater discharges at the airport and must exist before any operator submits an NOI. A tenant's separate SWPPP must be coordinated and integrated with it before authorization, and the SWPPP names which operator carries out each requirement.

  • Only if: your permit sector is S.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.S.3.3, page 91
"A single comprehensive SWPPP must be developed for all stormwater discharges associated with industrial activity at the airport before submittal of any NOIs."
Open the permit at this section

Sector S large primary airports: keep the SWPPP statement that no urea pavement deicer is used, or meet the ammonia limit

No set date. A standing statement kept up to date in the SWPPP; the permit sets no date. Where the airport meets the limit instead, ELG sampling is once per calendar year (Part 6.2.2).

A primary airport with 1,000 or more annual non-propeller aircraft departures that discharges stormwater from airfield pavement deicing to waters of the U.S. must not discharge urea pavement deicers: it keeps an updated SWPPP statement certifying that no urea pavement deicer is used, or meets the 14.7 mg/L daily maximum ammonia limit of Table 8.S-2.

  • Only if: your permit sector is S; your discharge is subject to federal effluent limitation guidelines (ELGs); the facility is a primary airport with 1,000 or more non-propeller departures a year.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.S.9.1, page 97
"keep an updated statement in the SWPPP that certifies that the permittees do not use pavement deicers containing urea, or (2) meet the effluent limitation in Table 8.S-2."
Open the permit at this section

Sector S sites that deice: keep a record of deicing chemical types and monthly quantities

No set date. A running record of monthly quantities; the permit sets no deadline for each entry.

Record every deicing chemical used (with its Safety Data Sheet) and the quantity used each month, measured or, without metering, estimated. Tenants and fixed-based operators that deice give this information to the airport authority for the comprehensive SWPPP.

  • Only if: your permit sector is S; deicing chemicals are used at the site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.S.6.2 (Additional SWPPP Requirements), page 95
"When deicing chemicals are used, the permittee shall maintain a record of the types (including the Safety Data Sheets [SDS]) used and the monthly quantities"
Open the permit at this section

Sector S: the NOI holder signs the Corrective Action Report, even when a tenant shares the airport SWPPP

No set date. The report's deadline is the Part 3.2 one, within 30 calendar days of discovery (az-msgp.corrective-action-report); this duty sets who signs it and where the records are kept.

Whoever applied for the NOI signs and certifies each Corrective Action Report (Part 3.2), even if a tenant prepared the SWPPP jointly with the airport authority. Keep the corrective action documentation with the SWPPP that applies (the tenant's or the airport authority's).

  • Only if: your permit sector is S; you discover a corrective action condition.
  • You send it to the agency (stormwatercompliance@azdeq.gov).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.S.5, page 95
"The permittee holder (whoever applies for the NOI) is responsible for signing and certifying the Corrective Action Report (Part 3.2), regardless if a tenant has jointly prepared the SWPPP with the airport authority."
Open the permit at this section

Sector U food and kindred products: routine analytical monitoring action levels

No set date. These are the values a sample is compared with. The sampling schedule is in the routine analytical monitoring duty.

The action levels grain mills (U1) and fats and oils producers (U2) compare their routine stormwater samples with (Table 8.U-1). Other Sector U facilities have no sector values.

  • Only if: your permit sector is U.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.U.6, page 102
"Table 8.U-1 identifies routine analytical monitoring parameters and action levels that apply to the specific subsectors of Sector U."
Open the permit at this section

Sector Y rubber and plastic products: routine analytical monitoring action level for rubber products

No set date. These are the values a sample is compared with. The sampling schedule is in the routine analytical monitoring duty.

The action level rubber products manufacturers (subsector Y1) compare their routine stormwater samples with: total zinc (Table 8.Y-1).

  • Only if: your permit sector is Y.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.Y.4, page 109
"Table 8.Y-1 identifies routine analytical monitoring parameters and action levels that apply to Sector Y."
Open the permit at this section

Where the permit is unclear 3 duties

The permit text leaves the timing of these open, so no date is shown. Each one quotes the clause and names the section to check.

Report all other instances of noncompliance

No set date. Part 7.3.7 says to report all instances of noncompliance "annually" on the Non-Compliance Report Form; Appendix B, Subsection 12.e says "at the time monitoring reports are submitted". When is the report due, and on what date for a facility that files no e-DMRs?

Report every instance of noncompliance not reported otherwise, on ADEQ's Non-Compliance Report Form. The permit gives two different times for this report.

  • When: noncompliance happens that is not otherwise reported.
  • You file it in the agency's system.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 7.3.7, page 42
"The permittee shall report all instances of noncompliance annually using the Non-Compliance Report Form provided by the Department"
Open the permit at this section

Sector S airport authority using the alternative visual assessment: submit the visual assessment documentation by June 30

No set date. Part 8.S.8.1 requires the airport authority to submit visual assessment documentation by June 30 "For the first two years of the permit". Counted from the permit's effective date (June 30, 2025 and 2026) or from the airport's coverage or first use of the alternative?

For the first two years of the permit, and later years if ADEQ asks, the airport authority submits its visual assessment documentation to ADEQ by June 30 each year, including the Part 4.2.2 records, the physical indicators of Part 4.2.1 and the steps, sources and outcome of each follow-up investigation.

  • Only if: your permit sector is S; the airport authority chose the alternative visual assessment.
  • You file it in the agency's system (myDEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 8.S.8.1. Check your copy of the permit.

Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.S.8.1, page 97
"For the first two years of the permit (and thereafter if requested by ADEQ), the airport authority shall submit documentation of visual assessment activities to the Department no later than June 30 of each year."
Open the permit at this section

Sector S airports with large deicing use: sample deicing outfalls during the deicing season

No set date. Part 8.S.4.2 says an airport over the deicing thresholds "shall obtain the four required routine analytical monitoring event results" during the deicing season; footnote 1 of Table 8.S-1 says "Collect the two routine analytical monitoring samples". How many deicing samples are required, over what period, and do they replace the one-sample-per-wet-season schedule for these parameters?

An airport where one permittee or a combination of permitted facilities uses 100,000 gallons or more of glycol-based deicing chemicals or 100 tons or more of urea a year samples the outfalls that drain deicing areas for BOD5, COD, ammonia and pH during the deicing season the facility defines. The permit says four results in 8.S.4.2 and two samples in the Table 8.S-1 footnote.

  • Only if: your permit sector is S; the airport uses 100,000 gallons of glycol or 100 tons of urea or more a year.
  • You file it in the agency's system (myDEQ).
  • Keep the records 3 years.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 8.S.4.2, page 94
"When the deicing chemical usage thresholds of 100,000 gallons glycol and/or 100 tons of urea are met, the permittee shall obtain the four required routine analytical monitoring event results for deicing-related parameters"
Open the permit at this section

What does no-exposure certification require?

No Exposure Certification filed in myDEQ: the whole site has a storm-resistant shelter and no industrial materials or activities are exposed. Renewed every five years from the date it is issued.

Every few years 1 duty

Renew the No Exposure Certification every five years

Within 5 years after your no exposure certification was issued.

The No Exposure Certification cannot be transferred and must be renewed with ADEQ every five years from the date it was issued.

  • You file it in the agency's system (myDEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per appendix b 9a.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 1.6.5, page 12
"The NEC is nontransferable and shall be renewed with ADEQ every five years from the date the NEC is issued."
Open the permit at this section

When something happens 1 duty

Get permit coverage again if no exposure can no longer be met

No set date. The permit states no number of days; coverage is needed before industrial stormwater is discharged again.

If the site can no longer meet the no exposure conditions, permit coverage is required again: submit a new NOI.

  • When: the no exposure conditions are no longer met.
  • You file it in the agency's system (myDEQ).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per appendix b 9a.
Source: AZPDES Multi-Sector General Permit AZMSG2024-001 (Industrial Stormwater Permit - 2024), with Appendices A to D, section 1.6.4, page 12
"If at any time the site can no longer satisfy the conditions of no exposure, renewed permit coverage is required and the operator shall submit a new NOI."
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

Arizona Industrial Stormwater MSGP (non-mining) duties, topic by topic

How the Arizona Industrial Stormwater MSGP (non-mining) compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: