Nebraska Industrial Storm Water General Permit NER920000 (ISW-GP) due dates and duties

Every duty in the Authorization to Discharge Under the National Pollutant Discharge Elimination System (NPDES), General NPDES Permit Number NER920000 for Storm Water Discharges Associated with Industrial Activity to Waters of the State of Nebraska, with when it is due and the section it comes from.

Get my permit calendar

Free, no account. Your own dates in a minute.

  • 93duties, each cited
  • 7on a schedule
  • 86when something happens

Set up your facility free to date the ones that count from your own records, such as your last training.

StormDue reminds and keeps records. It does not file anything with the agency and does not certify or guarantee compliance. Check each duty against your permit; you are responsible for your filings.

What is this permit, and where do I file?

Permit number
NER920000
In force
April 1, 2022 to March 31, 2027
Official page
dwee.nebraska.gov
Rules last checked
November 28, 2026
Today
April 1, 2022 March 31, 2027
Notes on the permit's status and renewal

Cover page: "This permit shall become effective on April 1, 2022" and "This permit and the authorization to discharge shall expire at midnight, on March 31, 2027." DWEE's industrial storm water page, read November 28, 2026, says the Department "has issued the ... (ISW-GP) NER920000. The permit became effective April 1, 2022 and expires March 31, 2027", and links this file from its forms page, so NER920000 is the current permit; it replaced NER910000 (issued July 18, 2016, extended June 30, 2021, per the 2022 issuance letter). No modification, renewal draft or public notice for it was posted on that date. The agency was renamed from NDEE to DWEE; the permit text still says NDEE. Existing NER910000 permittees had to submit a new NOI by September 28, 2022 (Table 1-2); that date has passed and is not shown. If not reissued before it expires, the permit is administratively continued under NDEE Title 119, Chapter 24 (Part 1.3.6). The standard conditions (Appendix A) and definitions (Appendix B) are separate files on DWEE's forms page.

What does full permit coverage require?

Coverage under NER920000: a SWPPP first, then a complete electronic NOI through NDEE's website; new dischargers are authorized 30 days after NDEE receives a complete NOI, or on NDEE's notice.

Every quarter 2 duties

Quarterly visual assessment of a storm water sample from each outfall

By the end of each calendar quarter.

Each quarter, collect a sample from each outfall within the first 30 minutes of a discharge (or as soon as practicable, saying why), from a storm at least 72 hours after the previous discharge, and look at it in a clean clear container in good light for color, odor, clarity, solids, foam, oil sheen and other signs of pollution. Record it, signed and certified, with the SWPPP; evidence of pollution starts corrective action.

  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 4.2.1, page 27
"Once each quarter for the entire permit term, you must collect a storm water sample from each outfall (except as noted in Part 4.2.3) and conduct a visual assessment of each of these samples."
Open the permit at this section

Routine facility inspection each calendar quarter

By the end of each calendar quarter.

During normal operating hours, qualified personnel with at least one member of the pollution prevention team inspect exposed areas, SWPPP source areas, places where spills or leaks happened in the past 3 years, all outfalls and all control measures at least once each calendar quarter, and record the findings with the SWPPP.

  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 4.1.1, page 26
"Routine facility inspections must be conducted at least quarterly (i.e., once each calendar quarter) or in some instances, more frequently (e.g., monthly)."
Open the permit at this section

Every year 2 duties

Annual comprehensive site inspection

By December 31 each year.

Once each calendar year, inspect all areas covered by the permit, review the past year's visual and analytical monitoring, check control measures, and record the findings with a signed certification. It may count as one of the routine inspections if it covers both.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 4.3.1, page 29
"You must conduct annual comprehensive site inspections while you are covered under this permit. Annual, as defined in this Part, means once during each calendar year beginning with the period you are authorized to discharge under this permit."
Open the permit at this section

Do one routine inspection a year while storm water is discharging

By December 31 each year.

At least once each calendar year, hold a routine facility inspection while storm water is discharging off-site or to an on-site retention structure.

  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 4.1.1, page 26
"At least once each calendar year, the routine facility inspection must be conducted during a period when storm water is discharging off-site or to an on-site storm water retention structure."
Open the permit at this section

One time 2 duties

Apply for coverage under the reissued permit before this one expires

By March 30, 2027.

To keep discharging after NER920000 expires (midnight, March 31, 2027), apply for and obtain coverage under a new permit. The pack dates March 30, 2027, the day before expiry, the earlier reading; the reissued permit may set its own NOI deadline.

  • You file it in the agency's system (NDEE Industrial Storm Water online application (ecmp.nebraska.gov)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per ner920000 appendix a 12.

Inferred from section 4. Duty to Reapply. Check your copy of the permit.

Source: NER920000 Appendix A, Standard Conditions Applicable to all NPDES Permits, 12 pages (printed A1 to A12), section 4. Duty to Reapply, page 2
"If the permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the permittee must apply for and obtain a new permit."
Open the permit at this section

Prepare the SWPPP before submitting the NOI

No set date. Before the NOI is submitted (Part 5); the permit gives no number of days.

Prepare a Storm Water Pollution Prevention Plan (SWPPP) meeting Part 5, developed by a qualified person and signed under Appendix A section 12, before submitting the Notice of Intent. A facility that had a SWPPP under the previous permit reviews and updates it to this permit first.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 5, page 30
"You must prepare a SWPPP for your facility before submitting your NOI for permit coverage."
Open the permit at this section

When something happens 32 duties

Inspect idle equipment and vehicles for leaks at least monthly

By the end of each month.

Unless infeasible, drain fluids from equipment and vehicles before on-site storage or disposal, and inspect equipment or vehicles that will stay unused for extended periods for leaks at least monthly.

  • When: equipment or vehicles will stay unused for extended periods.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 2.1.2.1, page 16
"Drain fluids from equipment and vehicles prior to on-site storage or disposal, and for any equipment or vehicles that will remain unused for extended periods of time, inspect at least monthly for leaks"
Open the permit at this section

After an effluent limit exceedance: monitor at least quarterly until back in compliance

By the end of each calendar quarter.

After a result exceeds a numeric effluent limit, monitor that discharge at least once each quarter until it is in compliance with the limit or NDEE waives the extra monitoring.

  • When: a monitoring result exceeds a numeric effluent limit.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 6.2.3.3, page 43
"You must monitor, at least quarterly, until your storm water discharge is in compliance with the effluent limit or until the Department waives the requirement for additional monitoring."
Open the permit at this section

AIM exception: show NDEE within 30 days that no water quality standard is exceeded

Within 30 days after the AIM triggering event (up to 90 days where the permit allows more time).

To claim the Part 3.2.6.4 exception, demonstrate to NDEE within 30 days of the AIM triggering event that it does not cause any exceedance of water quality standards, with the receiving water standards, flows, upstream and downstream concentrations from composite sampling, the discharge concentration, dilution and hardness. Up to 90 days if 30 is infeasible and documented in the SWPPP.

  • When: you claim the AIM exception for a discharge that causes no water quality standard exceedance.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 3.2.6.4, page 24
"You must demonstrate to the Department within 30 days of the AIM triggering event that the triggering event does not result in any exceedance of water quality standards."
Open the permit at this section

Corrective action: document within 24 hours, fix within 14 days

Within 24 hours after you discover the condition.

When a Part 3.1.1 condition (an unauthorized release, an effluent limit violation, controls not enough for water quality standards or the non-numeric limits, an inspection finding that controls need changing or are not maintained, or a visual assessment showing pollution) or a Part 3.1.2 condition (a change that significantly changes or increases pollutants) is found, take reasonable steps immediately, document it within 24 hours, and complete the corrective action within 14 calendar days.

Further steps with their own deadlines:

  • Complete the corrective action within 14 days. Within 14 days after you discover the condition. Section 3.1.3, page 20
    "If additional actions are necessary, you must complete the corrective actions before the next storm event, if possible, and within 14 calendar days from the time of discovery."
  • Finish no later than 45 days after discovery. Within 45 days after you discover the condition. Section 3.1.3, page 20
    "which must be done as soon as practicable after the 14-day timeframe but no longer than 45 days after discovery."
  • Document the corrective action within 14 days. Within 14 days after you discover the condition. Section 3.3.2, page 25
    "Within 14 days of discovery of any condition listed in Parts 3.1.1, 3.1.2, 3.2.3, 3.2.4, or 3.2.5 you must document the following information"
  • Modify the SWPPP within 14 days of finishing the work. Within 14 days after the corrective action work is finished. Section 3.1.3, page 20
    "you must modify your SWPPP accordingly within 14 calendar days of completing corrective action work."
  • When: you find a condition that needs corrective action.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 3.1.3, page 20
"You must document your discovery of any of the conditions listed in Parts 3.1.1 and 3.1.2 within 24 hours of making such discovery."
Open the permit at this section

Effluent limit exceeded: report it to NDEE within 24 hours, in writing within 5 days

Within 24 hours after you learn of the exceedance.

If a monitoring result exceeds a numeric effluent limit, report it to NDEE as Part 7.3 requires; the pack dates the 24-hour oral report and the 5-day written report, the earliest Part 7.3 deadlines.

Further steps with their own deadlines:

  • Written report within 5 days. Within 5 days after you learn of the exceedance. Section 7.3, page 45
    "A written submission must also be provided within 5 days of the time you become aware of the circumstances"
  • When: a monitoring result exceeds a numeric effluent limit.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 6.2.3.3. Check your copy of the permit.

Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 6.2.3.3, page 43
"If any monitoring value exceeds a numeric effluent limitation contained in this permit, you must submit a report to the Department consistent with Part 7.3."
Open the permit at this section

Enclose or cover salt piles

No set date. Standing duty (2.1.2.7).

Enclose or cover storage piles of salt, or piles containing salt, used for deicing or other commercial or industrial purposes, and minimize exposure when adding to or taking from the pile.

  • When: the facility has salt piles or piles containing salt.
  • Nothing is filed; keep the record at the facility.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 2.1.2.7, page 17
"In order to minimize pollutant discharges you must enclose or cover storage piles of salt, or piles containing salt, used for deicing or other commercial or industrial purposes, including maintenance of paved surfaces."
Open the permit at this section

Facility already operating without coverage: submit the NOI immediately

When you learn the facility needs coverage.

A facility that was operating before April 1, 2022 but was not covered under NER910000 or another NPDES permit submits its NOI immediately, to shorten the time its discharges are unauthorized. Authorization comes 60 days after NDEE receives a complete NOI, or when NDEE notifies you.

  • When: the facility was operating before April 1, 2022 without coverage under NER910000 or another NPDES permit.
  • You file it in the agency's system (NDEE Industrial Storm Water online application (ecmp.nebraska.gov)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per ner920000 appendix a 12.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 1.3.3, Table 1-2, page 9
"Immediately, to minimize the time discharges from the facility will continue to be unauthorized."
Open the permit at this section

Give advance notice of changes expected to cause noncompliance

No set date. In advance of the change (7.3, Appendix A 14.b); no number of days.

Give NDEE advance notice of any planned change in the facility or activity that you expect will result in noncompliance with the permit.

  • When: a planned change may cause noncompliance.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 7.3, page 45
"You must give advance notice to the Department of any planned changes in the permitted facility or activity which you anticipate will result in noncompliance with permit requirements"
Open the permit at this section

Give notice at least 10 days before an anticipated bypass

At least 10 days before the bypass.

If you know in advance that a bypass of a treatment facility will be needed, notify NDEE, if possible at least ten days before the bypass. An unanticipated bypass is reported within 24 hours.

  • When: you know in advance that a bypass of a treatment facility is needed.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: NER920000 Appendix A, Standard Conditions Applicable to all NPDES Permits, 12 pages (printed A1 to A12), section 15.b Notice, page 7
"If the permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible, at least ten days before the date of the bypass."
Open the permit at this section

New operator: submit a new NOI before taking over

At least 30 days before the change of operator.

When a new operator takes over operational control of a covered facility, the new operator submits a complete and accurate NOI. The pack dates it 30 days before the change of operator, the earlier of the permit's two readings.

  • When: a new operator takes over operational control of the facility.
  • You file it in the agency's system (NDEE Industrial Storm Water online application (ecmp.nebraska.gov)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per ner920000 appendix a 12.

Inferred from section 7.3. Check your copy of the permit.

Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 7.3, page 45
"You must submit a complete and accurate NOI electronically on the NDEE website in accordance with the requirements of Part 1.3 and by the deadlines specified in Table 1-2"
Open the permit at this section

Notify NDEE as soon as possible of planned physical changes

No set date. As soon as possible (7.3, Appendix A 14.a); no number of days.

Notify NDEE as soon as possible of any planned physical alteration or addition that could make the facility a new source or significantly change the nature or increase the quantity of pollutants discharged.

  • When: a physical alteration or addition is planned that may make the facility a new source or significantly change its pollutants.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 7.3, page 45
"You must give notice to the Department as soon as possible of any planned physical alterations or additions to the permitted facility"
Open the permit at this section

Notify NDEE when a facility converts between stationary and portable

No set date. The permit sets no number of days (1.8.3).

Notify NDEE in writing if a stationary facility is converted to a portable facility, or a portable one to stationary.

  • When: the facility is converted from stationary to portable, or from portable to stationary.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 1.8.3, page 12
"The permittee shall notify the Department in writing if a facility is “converted” from a stationary to a portable facility, or vice-versa."
Open the permit at this section

Portable facility site preparation: inspect every 14 days and within 24 hours after a half-inch storm

Within 14 days after the last inspection.

While clearing, grading, excavation or construction is under way before a portable facility starts operating, inspect all disturbed and material storage areas, controls, discharge locations and vehicle exits at least once every 14 calendar days and within 24 hours after the end of a storm of 0.5 inches or more, with a report of the Part 4.1 information for each.

Further steps with their own deadlines:

  • Inspect within 24 hours after a storm of 0.5 inches or more. Within 24 hours after a storm of 0.5 inches or more ends. Section 1.8.4.2.1, page 12
    "within 24 hours of the end of a storm event of 0.5 inches or greater."
  • When: clearing, grading, excavation or construction is under way before a portable facility starts operating.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 1.8.4.2.1, page 12
"Inspections must be conducted at least once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater."
Open the permit at this section

Portable facility site preparation: stabilize within 14 days after work stops

Within 14 days after clearing, grading or excavation stops in part of the site.

Start stabilizing any part of the site where clearing, grading or excavation has temporarily or permanently stopped immediately, and in no case more than 14 days after work there stopped; where winter, semi-arid or drought conditions prevent it, start as soon as practicable and use interim measures.

  • When: clearing, grading, excavation or construction is under way before a portable facility starts operating.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 1.8.4.3.2, page 13
"but in no case more than 14 days after the clearing, grading and/or excavation activities in that portion of the site have temporarily ceased."
Open the permit at this section

Portable facility: final inspection and site closure when leaving a temporary site

No set date. When activities at the temporary site end (1.8.5.2, 1.8.7); no number of days.

When activities at a temporary site end, inspect the entire site for spilled materials, industrial materials and wastes and remove them, including petroleum affected soils. On agricultural land, also remediate compaction, replace topsoil and return the land to its earlier use (seeding a crop or cover crop), unless the landowner agrees in writing to take responsibility.

  • When: a portable facility ends its activities at a temporary site.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 1.8.5.2, page 14
"Upon termination of activities at a temporary site, the entire site must undergo a Final Inspection for the presence of spilled materials, industrial materials, and industrial wastes."
Open the permit at this section

Portable facility: inspect within 7 days after relocation and again within 90 days

Within 7 days after the relocation.

At each new location, inspect within the first seven days after relocation and at least once more within the first 90 days of operation to see that all controls are installed and working. Quarterly routine inspections resume after the first 90 days, and when activities at a temporary site end, the whole site gets a Final Inspection for spilled and industrial materials and wastes.

Further steps with their own deadlines:

  • Inspect again within the first 90 days of operation. Within 90 days after operation starts at the new location. Section 1.8.5.2, page 14
    "at least one additional time within the first 90 days of operation to ensure that all controls are properly installed and functioning."
  • When: a portable facility is relocated.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 1.8.5.2, page 14
"At portable sources, the permittee shall conduct inspections within the first seven days after relocation and at least one additional time within the first 90 days of operation"
Open the permit at this section

Portable facility: notify NDEE at least 20 days before each relocation

At least 20 days before the relocation.

A portable facility (for example a portable asphalt or concrete plant) notifies NDEE of each relocation at least 20 days in advance, or as soon as practicable, on the Relocation Notice Form (Attachment 5). If it will discharge through an MS4 and the MS4 requires it or asks, it notifies the MS4 operator in writing at the same time.

  • When: a portable facility is relocated.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 1.8.1, page 11
"The permittee shall provide the Department with notification of the relocation of any facility at least 20 days in advance of each relocation, or as soon as practicable."
Open the permit at this section

Previous operator: submit a NOT within 30 days after the new operator takes over

Within 30 days after the new operator takes over.

When a new owner or operator takes over responsibility for the facility, the previous operator submits a Notice of Termination. The pack dates it 30 days after the new operator takes over (Part 1.4.2), the earlier of the permit's two readings.

  • When: a new operator takes over operational control of the facility.
  • You file it in the agency's system (NDEE Industrial Storm Water online application (ecmp.nebraska.gov)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 1.4.2. Check your copy of the permit.

Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 1.4.2, page 10
"You must submit a NOT within 30 days after one or more of the following conditions have been met: ... A new owner or operator has taken over responsibility for the facility"
Open the permit at this section

Promptly correct missing or wrong information in the NOI or a report

No set date. Promptly (7.3, Appendix A 14.i); no number of days.

If you learn that you left relevant facts out of the NOI or gave incorrect information in the NOI or any report, submit the facts or correct information promptly.

  • When: you learn that the NOI or a report left out relevant facts or gave incorrect information.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 7.3, page 45
"You must promptly submit facts or information if you become aware that you failed to submit relevant facts in your NOI, or that you submitted incorrect information in your NOI or in any report."
Open the permit at this section

Repair or replace control measures as expeditiously as practicable

No set date. As expeditiously as practicable (2.1.2.3); the Part 3.1.3 corrective action deadlines apply where Part 3 is triggered.

Maintain all control measures in effective operating condition, and when one needs repair or replacement, make the repair or modification as expeditiously as practicable; a control not achieving its intended effect is a Part 3 corrective action condition.

  • When: a control measure needs repair or replacement.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 2.1.2.3, page 16
"If you find that your control measures need to be replaced or repaired, you must make the necessary repairs or modifications as expeditiously as practicable."
Open the permit at this section

Report a change to the NOI information within 30 days

Within 30 days after the change.

If any information in the NOI changes after authorization, send it to NDEE in writing within 30 calendar days after the change. To correct fields in the electronic NOI, contact NDEE for instructions.

  • When: the information in your NOI changes.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 1.3.4.1, page 9
"If any of the information supplied on the NOI changes, you must submit in writing to the Department within thirty (30) calendar days after the change occurs."
Open the permit at this section

Report a reportable quantity spill as soon as you know of it

When you learn of the release.

When a leak, spill or other release of a hazardous substance or oil at or above a reportable quantity occurs in a 24-hour period, notify the National Response Center, (800) 424-8802, and NDEE, (402) 471-2186 in business hours or the Nebraska State Patrol, (402) 471-4545, at other times, as soon as you know of it.

  • When: a release of a hazardous substance or oil reaches a reportable quantity.
  • You file it in the agency's system (Phone: National Response Center and NDEE (or the Nebraska State Patrol after hours)).
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 2.1.2.4, page 17
"you must notify the National Response Center (NRC) at (800) 424-8802 in accordance with the requirements of 40 CFR Part 110, 40 CFR Part 117, and 40 CFR Part 302 as soon as you have knowledge of the discharge."
Open the permit at this section

Report noncompliance that may endanger health or the environment orally within 24 hours

Within 24 hours after you become aware of the noncompliance.

Report to NDEE orally within 24 hours of becoming aware of any noncompliance that may endanger health or the environment (including an unanticipated bypass or upset that exceeds a limit), and in writing within 5 days. If you discharge through an MS4 that requires it, send the reports there too.

Further steps with their own deadlines:

  • Written report within 5 days. Within 5 days after you become aware of the noncompliance. Section 7.3, page 45
    "A written submission must also be provided within 5 days of the time you become aware of the circumstances"
  • When: noncompliance may endanger health or the environment.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 7.3, page 45
"You must report any noncompliance which may endanger health or the environment. Any information must be provided orally within 24 hours from the time you become aware of the circumstances"
Open the permit at this section

Report on a compliance schedule within 14 days of each schedule date

Within 14 days after each date in the compliance schedule.

If NDEE sets a compliance schedule, report compliance or noncompliance with each interim and final requirement, or progress, no later than 14 days after each schedule date.

  • When: NDEE sets a compliance schedule for the facility.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 7.3, page 45
"Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this permit must be submitted no later than 14 days following each schedule date"
Open the permit at this section

Report other noncompliance when monitoring reports are submitted

No set date. At the time monitoring reports are submitted (7.3); under this permit monitoring reports go to NDEE only on request (7.2).

Report every instance of noncompliance not already reported in a monitoring report, compliance schedule report or 24-hour report at the time monitoring reports are submitted, with the Appendix A 14.g information.

  • When: other noncompliance occurs.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 7.3, page 45
"You must report all instances of noncompliance not reported in your monitoring report (pursuant to Part 7.2), compliance schedule report, or 24-hour report at the time monitoring reports are submitted"
Open the permit at this section

Send a copy of the SWPPP within 7 days of a request

Within 7 days after the request.

Keep a complete current SWPPP at the facility, immediately available to employees, EPA, NDEE and the MS4 operator, and furnish a copy of it, or other information requested, within 7 calendar days unless the request says otherwise.

  • When: NDEE asks for the SWPPP or other information.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 5.3, page 34
"Unless specified elsewhere in this permit or in the request, you are required to furnish a copy of the SWPPP and any other information requested within 7 calendar days."
Open the permit at this section

Send copies of submissions to the MS4 operator if it asks

No set date. At the same time as each submission to NDEE (7.5.2).

If the facility discharges through a municipal separate storm sewer system (MS4) or combined sewer, ask the operator at the time of application whether it wants copies, and if it does, send it copies of NDEE submissions at the same time.

  • When: the MS4 or combined sewer operator the facility discharges to wants copies of submissions.
  • You send a copy to the operator of your storm sewer system (MS4).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 7.5.2, page 46
"If required or upon request, copies of all required submissions to the Department shall be concurrently submitted to the appropriate Municipal Separate Storm Sewer Systems (MS4s) operator."
Open the permit at this section

Send monitoring reports within 14 days when NDEE asks

Within 14 days after the request.

Keep all Part 6.2 monitoring data with the SWPPP once the complete lab results for all monitored outfalls for the period are in, and submit the reporting forms within 14 days when NDEE asks. NDEE strongly recommends its Storm Event Monitoring Report form (ISW-SEMR, Attachment 4).

  • When: NDEE asks for your monitoring reports.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 7.2, page 45
"Upon request by the Department, reporting forms must be submitted within fourteen days to the appropriate address identified in Part 7.5.1."
Open the permit at this section

Send the corrective action documentation to NDEE within 30 days of discovery

Within 30 days after you discover the condition.

Submit the Part 3.3 corrective action documentation (Sections 1 and 2 of the Corrective Actions Form, Attachment 3) to NDEE within 30 days of first discovering the condition, and keep a copy with the SWPPP. This also covers AIM Level 1, 2 and 3 triggers.

  • When: you find a condition that needs corrective action.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 3.3.2, page 25
"You must submit this documentation to the Department within 30 days of initial discovery and retain a copy onsite with your SWPPP as required in Part 5.4."
Open the permit at this section

Submit a Notice of Termination within 30 days after coverage is no longer needed

Within 30 days after the condition for ending coverage is met.

Submit a complete and accurate NOT electronically within 30 days after operations cease with no more industrial storm water discharges and the Part 2.1.2.5 erosion and sediment controls in place, a Sector G, H or J site meets its termination conditions, or another permit covers all discharges.

  • When: operations stop with no more industrial storm water discharges, a Sector G, H or J site meets its termination conditions, or another permit covers all discharges.
  • You file it in the agency's system (NDEE Industrial Storm Water online application (ecmp.nebraska.gov)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 1.4.2, page 10
"You must submit a NOT within 30 days after one or more of the following conditions have been met:"
Open the permit at this section

Submit the NOI at least 30 days before operation starts

At least 30 days before the facility starts operating.

A new discharger or new source submits a complete and accurate electronic NOI through NDEE's website at least 30 days before the facility starts operating. Discharge authorization comes 30 days after NDEE receives a complete NOI, or when NDEE notifies you.

  • When: the facility is a new discharger or new source that will start discharging.
  • You file it in the agency's system (NDEE Industrial Storm Water online application (ecmp.nebraska.gov)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official per ner920000 appendix a 12.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 1.3.3, Table 1-2, page 9
"A minimum of 30 days prior to commencing operation of the facility."
Open the permit at this section

Tell NDEE when an inactive site becomes active or exposed again

No set date. Immediately, when circumstances change (6.2.1.3); no number of days.

A facility that stopped indicator, benchmark or impaired waters monitoring as inactive and unstaffed notifies NDEE as soon as it has materials or activities exposed to storm water or becomes active or staffed, and restarts monitoring as if in its first year of coverage. A facility that becomes inactive and unstaffed during the term notifies NDEE before stopping monitoring.

  • When: an inactive and unstaffed site becomes active or staffed, or has materials or activities exposed to storm water.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 6.2.1.3, page 40
"You must notify the Department that your facility has materials or activities exposed to storm water or has become active and/or staffed."
Open the permit at this section

Ongoing 3 duties

Evaluate for non-storm water discharges and record it in the SWPPP

No set date. Part of the SWPPP (5.1.3.4); an unauthorized discharge must be eliminated immediately.

Evaluate the facility for non-storm water discharges, eliminate any that are not authorized, and record the date, criteria, outfalls observed, discharges found and actions taken in the SWPPP.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 5.1.3.4, page 32
"You must document that you have evaluated for the presence of non-storm water discharges and that all unauthorized discharges have been eliminated."
Open the permit at this section

Keep permit records for 3 years after coverage ends

No set date. Standing duty while covered and for 3 years after (7.4).

Keep the SWPPP and its modifications, the Part 5.4 records (including corrective action records), all reports and certifications, monitoring data and the data used for the NOI for at least 3 years after coverage expires or is terminated.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 7.4, page 45
"for a period of at least 3 years from the date that your coverage under this permit expires or is terminated."
Open the permit at this section

Train employees on the control measures and the permit's duties

No set date. The permit sets no frequency; NDEE recommends training at least once a year, or more often if turnover is high (2.1.2.9).

Train every employee who works where industrial materials or activities are exposed to storm water, or who carries out the permit's duties (inspectors, maintenance staff, the pollution prevention team), on the control measures and on monitoring, inspection, planning, reporting and documentation. Keep the schedule, content and a log of training dates in the SWPPP.

  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 2.1.2.9, page 17
"You must train all employees who work in areas where industrial materials or activities are exposed to storm water, or who are responsible for implementing activities necessary to meet the conditions of this permit"
Open the permit at this section

Only if... 51 duties

These apply only in the situation named on each one. Answer the questions to sort them.

Sector A wood preserving: inspect treatment areas monthly

By the end of each month.

A timber products facility that does wood surface protection or preserving inspects processing areas, transport areas and treated wood storage areas monthly for treatment chemicals reaching unprotected soils or areas in contact with storm water.

  • Only if: your permit sector is A; the facility does wood surface protection or preserving.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.A.5, page 49
"If your facility performs wood surface protection and preservation activities, inspect processing areas, transport areas, and treated wood storage areas monthly"
Open the permit at this section

Sector G sites draining to a State Resource Water Class A: inspect monthly

By the end of each month.

Metal mining sites that discharge to waters designated State Resource Waters, Class A inspect monthly instead of quarterly (other sites inspect at least quarterly unless adverse weather makes the site inaccessible).

  • Only if: your permit sector is G; the site discharges to a State Resource Water, Class A.
  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.G.7, page 64
"Sites which discharge to waters designated as State Resource Waters, Class A must be inspected monthly."
Open the permit at this section

Sector J sites draining to outstanding waters: inspect monthly

By the end of each month.

Non-metallic mineral mining sites that discharge to waters designated as outstanding waters inspect monthly instead of quarterly.

  • Only if: your permit sector is J; the site discharges to waters designated as "outstanding waters".
  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.J.7, page 80
"Sites which discharge to waters which are designated as outstanding waters must be inspected monthly."
Open the permit at this section

Sector O: inspect coal, fuel, ash and storage areas monthly

By the end of each month.

Steam electric generating facilities inspect coal handling, loading and unloading, switchyard, fueling, bulk storage, ash handling, disposal pond and landfill edges, maintenance, liquid storage tank and material storage areas monthly.

  • Only if: your permit sector is O.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.O.6, page 99
"As part of your inspection, inspect the following areas monthly: coal handling areas, loading or unloading areas, switchyards, fueling areas, bulk storage areas, ash handling areas"
Open the permit at this section

Sector S: record deicing chemical types and monthly quantities

By the end of each month.

Where deicing chemicals are used, keep a record of the types used (with Safety Data Sheets) and the quantities each month, measured or estimated, for all deicing chemicals; deicing operators give the information to the airport authority.

  • Only if: your permit sector is S; the airport uses deicing chemicals.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.S.4.2, page 108
"If deicing chemicals are used, you must maintain a record of the types (including the Safety Data Sheets [SDS]) used and the monthly quantities, either as measured or, in the absence of metering, using best estimates."
Open the permit at this section

Sector S: routine inspections monthly during the deicing season

By the end of each month.

Airports conduct routine facility inspections at least monthly during the deicing season (for example October to April), and in every other month when deicing chemicals may be used.

  • Only if: your permit sector is S; it is the deicing season, or a month in which deicing chemicals may be used.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.S.5.1, page 109
"At a minimum conduct routine facility inspections at least monthly during the deicing season (e.g., October - April)."
Open the permit at this section

Sector V: inspect monthly

By the end of each month.

Textile, apparel and fabric product facilities inspect at least monthly transfer and transmission lines, spill prevention, good housekeeping, process waste management and all management practices.

  • Only if: your permit sector is V.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.V.5, page 115
"Inspect, at least monthly, the following activities and areas (at a minimum): transfer and transmission lines; spill prevention; good housekeeping practices; management of process waste products; and all structural and nonstructural management practices."
Open the permit at this section

After an AIM trigger: keep monitoring that parameter quarterly

By the end of each calendar quarter.

After meeting each AIM level's responses and deadlines, keep benchmark monitoring the parameter that caused the trigger at all affected discharge points every quarter for the next four quarters, starting no later than the next full quarter. If four quarters pass without a trigger, the status returns to baseline.

  • Only if: a parameter is at AIM level 1 or higher.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 3.2.3.3, page 21
"After compliance with AIM Level 1 responses and deadlines, you must continue quarterly benchmark monitoring for the next four quarters for the parameter(s) that caused the AIM triggering event at all affected storm water discharge points"
Open the permit at this section

Quarterly indicator monitoring for pH, TSS and COD (report only)

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins.

Facilities in subsectors without benchmarks sample each outfall every quarter for pH, total suspended solids and chemical oxygen demand, starting in the first full quarter of coverage, for the entire coverage. There is no threshold and no follow-up, but skipping it is a violation.

  • Only if: your permit subsector is B2, C5, D2, E3, F5, I1, J3, L2, N2, O1, P1, R1, T1, U3, V1, W1, X1, Y2, Z1, AB1, AC1, AD1.
  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 6.2.1.1.a.ii, page 39
"You must conduct indicator monitoring of storm water discharges for pH, TSS, and COD each quarter, beginning in your first full quarter of permit coverage as identified in Part 6.1.7."
Open the permit at this section

Sector L inactive landfills and land application sites: inspect quarterly

By the end of each calendar quarter.

Qualified personnel inspect inactive landfills, open dumps and land application sites at least quarterly, covering stabilization and erosion controls, leachate systems and closed land application areas.

  • Only if: your permit sector is L; the landfill, open dump or land application site is inactive.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.L.7.2, page 87
"Inspect inactive landfills, open dumps, and land application sites at least quarterly."
Open the permit at this section

Sector M: inspect equipment and fluid storage for leaks each quarter

By the end of each calendar quarter.

Each quarter, inspect all equipment containing oily parts, hydraulic or other fluids or mercury switches, and all vessels and areas where hazardous materials and automotive fluids are stored, for signs of leakage.

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.M.4, page 90
"Inspect quarterly for signs of leakage: all equipment containing oily parts, hydraulic fluids, any other types of fluids, or mercury switches."
Open the permit at this section

(Sector A) Timber products: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Sawmills (A1), wood preserving (A2), log storage (A3) and other wood products (A4) each have their own benchmarks. Wet deck log spray down must also meet the Table 8.A-2 limits, sampled once a year.

  • Only if: your permit sector is A.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.A.6, page 50
"Table 8.A-1 identifies benchmarks that apply to the specific subsectors of Sector A."
Open the permit at this section

(Sector AA) Fabricated metal products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Fabricated metal products except coating (AA1) and fabricated metal coating and engraving (AA2) have their own benchmarks.

  • Only if: your permit sector is AA.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.AA.5, page 122
"Table 8.AA-1 identifies benchmarks that apply to the specific subsectors of Sector AA."
Open the permit at this section

(Sector B) Paperboard mills: benchmark value

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Paperboard mills (B1) monitor COD on the benchmark schedule; other paper and allied products facilities (B2) do quarterly indicator monitoring instead.

  • Only if: your permit sector is B.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.B.2, page 51
"8.B.2 Sector-Specific Benchmarks. (See also Part 6)"
Open the permit at this section

(Sector C) Chemicals: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Agricultural chemicals (C1), industrial inorganic chemicals (C2), soaps and cosmetics (C3) and plastics and resins (C4) have their own benchmarks. Phosphate fertilizer runoff (SIC 2874) must also meet the Table 8.C-2 limits, sampled once a year.

  • Only if: your permit sector is C.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.C.3, page 52
"Table 8.C-1 identifies benchmarks that apply to the specific subsectors of Sector C."
Open the permit at this section

(Sector D) Asphalt paving and roofing: benchmark value and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Asphalt paving and roofing materials facilities (D1) monitor TSS on the benchmark schedule. Asphalt emulsion facilities must also meet the Table 8.D-2 limits, sampled once a year.

  • Only if: your permit sector is D.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.D.3, page 54
"Table 8.D-1 identifies benchmarks that apply to the specific subsectors of Sector D."
Open the permit at this section

(Sector E) Glass, clay, cement and concrete: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Clay products (E1) monitor aluminum and concrete and gypsum products (E2) monitor TSS on the benchmark schedule. Runoff from material storage piles at cement plants (SIC 3241) must also meet the Table 8.E-2 limits, sampled once a year.

  • Only if: your permit sector is E.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.E.4, page 55
"Table 8.E-1 identifies benchmarks that apply to the specific subsectors of Sector E."
Open the permit at this section

(Sector F) Primary metals: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Steel works (F1), iron and steel foundries (F2), nonferrous rolling and drawing (F3) and nonferrous foundries (F4) have their own benchmarks.

  • Only if: your permit sector is F.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.F.5, page 58
"Table 8.F-1 identifies benchmarks that apply to the specific subsectors of Sector F."
Open the permit at this section

(Sector G) Metal mining: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Active copper ore mining and dressing (G1) has its own benchmarks; discharges from waste rock and overburden piles at active metal mines (G2) are monitored for the Table 8.G-2 parameters on their own schedule.

  • Only if: your permit sector is G.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.G.8.1, page 65
"Table 8.G-1 identifies benchmarks that apply to active copper ore mining and dressing facilities."
Open the permit at this section

(Sector H) Coal mines: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Coal mines and related areas (H1) monitor aluminum and TSS on the benchmark schedule.

  • Only if: your permit sector is H.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.H.8, page 73
"8.H.8 Sector-Specific Benchmarks. (See also Part 6)"
Open the permit at this section

(Sector J) Non-metallic mineral mining: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Sand and gravel mining (J1) and dimension and crushed stone (J2) have their own benchmarks. Mine dewatering at crushed stone, construction sand and gravel and industrial sand mines must also meet the Table 8.J-2 limits, sampled once a year.

  • Only if: your permit sector is J.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.J.8, page 81
"Table 8.J-1 identifies benchmarks that apply to the specific subsectors of Sector J."
Open the permit at this section

(Sector K) Hazardous waste treatment, storage and disposal: benchmark values and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Hazardous waste TSDFs (K1) have benchmarks for discharges not subject to 40 CFR 445 Subpart A. Contaminated storm water from hazardous waste landfills subject to Subpart A must meet the Table 8.K-2 limits, sampled once a year.

  • Only if: your permit sector is K.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.K.5, page 84
"Table 8.K-1 identifies benchmarks that apply to the specific subsectors of Sector K."
Open the permit at this section

(Sector L) Landfills and land application sites: benchmark value and effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Landfills, land application sites and open dumps (L1) monitor TSS on the benchmark schedule where not subject to 40 CFR 445 Subpart B. Contaminated storm water from non-hazardous waste landfills subject to Subpart B must meet the Table 8.L-2 limits, sampled once a year.

  • Only if: your permit sector is L.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.L.9, page 88
"Table 8.L-1 identifies benchmarks that apply to the specific subsectors of Sector L."
Open the permit at this section

(Sector M) Automobile salvage yards: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Automobile salvage yards (M1, SIC 5015) monitor TSS, aluminum and lead on the benchmark schedule.

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.M.5, page 91
"Table 8.M-1 identifies benchmarks that apply to Sector M."
Open the permit at this section

(Sector N) Scrap and waste recycling: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Scrap and waste recycling facilities other than those taking only source-separated recyclables (N1, SIC 5093) monitor COD, TSS, aluminum, copper, lead and zinc on the benchmark schedule.

  • Only if: your permit sector is N.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.N.6, page 96
"Table 8.N-1 identifies benchmarks that apply to Sector N."
Open the permit at this section

(Sector O) Steam electric generating: coal pile effluent limits

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Runoff from coal storage piles at steam electric generating facilities must meet the Table 8.O-1 limits, sampled once a year. Sector O has no benchmarks; O1 does quarterly indicator monitoring and PAH monitoring.

  • Only if: your permit sector is O.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.O.7, page 99
"Table 8.O-1 identifies effluent limitations that apply to the industrial activities described below."
Open the permit at this section

(Sector Q) Water transportation: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Water transportation facilities (Q1, SIC 4412-4499) monitor aluminum, lead and zinc on the benchmark schedule.

  • Only if: your permit sector is Q.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.Q.6, page 103
"Table 8.Q-1 identifies benchmarks that apply to Sector Q."
Open the permit at this section

(Sector S) Air transportation: deicing benchmarks and urea effluent limit

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Airports using more than 100,000 gallons of pure glycol or 100 tons or more of urea a year monitor BOD5, COD, ammonia and pH at outfalls draining deicing areas, with the four samples taken in the deicing season. Primary airports that do not certify against urea use must meet the Table 8.S-2 ammonia limit.

  • Only if: your permit sector is S.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.S.6, page 109
"Table 8.S-1 identifies benchmarks that apply to Sector S."
Open the permit at this section

(Sector U) Food and kindred products: benchmark values

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Grain mill products (U1) monitor TSS, and fats and oils products (U2) monitor BOD5, COD, nitrate plus nitrite and TSS on the benchmark schedule.

  • Only if: your permit sector is U.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.U.6, page 113
"Table 8.U-1 identifies benchmarks that apply to the specific subsectors of Sector U."
Open the permit at this section

(Sector Y) Rubber products: benchmark value

No set date. Applies to every sample; the schedule is in the benchmark and effluent limit monitoring duties.

Rubber products manufacturers (Y1) monitor zinc on the benchmark schedule; other Sector Y facilities (Y2) do quarterly indicator monitoring.

  • Only if: your permit sector is Y.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.Y.4, page 119
"Table 8.Y-1 identifies benchmarks that apply to Sector Y."
Open the permit at this section

AIM Level 1: add or change controls within 14 days of the lab results

Within 14 days after benchmark results show an AIM triggering event (up to 45 days where the permit allows more time).

When quarterly benchmark results show an AIM triggering event (a four-quarter average above the benchmark, or fewer samples already summing to more than four times it), immediately review the SWPPP and controls, and put any needed changes in place within 14 days of receiving the lab results (45 days if 14 is infeasible and documented), or document why the existing controls will bring results below the benchmark.

  • Only if: a parameter is at AIM level 1.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 3.2.3.2, page 21
"you must implement those modifications or control measures within 14 days of receipt of laboratory results, unless doing so within 14 days is infeasible."
Open the permit at this section

AIM Level 2: add pollution prevention measures within 14 days of the lab results

Within 14 days after benchmark results show an AIM triggering event (up to 45 days where the permit allows more time).

If the continued quarterly results show another AIM triggering event, put in place additional pollution prevention and good housekeeping measures beyond the Level 1 response within 14 days of receiving the lab results (up to 45 days if documented; NDEE may grant more on a demonstration), and document how they will meet the benchmark.

  • Only if: a parameter is at AIM level 2.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 3.2.4.2, page 22
"You must implement additional pollution prevention/good housekeeping storm water control measures within 14 days of receipt of laboratory results that indicate an AIM triggering event has occurred"
Open the permit at this section

AIM Level 3: schedule structural or treatment controls within 14 days and install within 60

Within 14 days after benchmark results show an AIM triggering event.

If the exceedance continues after Level 2, identify a schedule for structural source controls or treatment controls within 14 days and install them within 60 days (up to 90 if documented as infeasible; NDEE may extend), for the discharge point and its substantially identical outfalls. The pack counts both from receipt of the lab results that show the trigger.

Further steps with their own deadlines:

  • Install the structural or treatment controls within 60 days. Within 60 days after benchmark results show an AIM triggering event (up to 90 days where the permit allows more time). Section 3.2.5.2, page 23
    "install such measures within 60 days. If is not feasible within 60 days, you may take up to 90 days to install such measures"
  • Only if: a parameter is at AIM level 3.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 3.2.5.2. Check your copy of the permit.

Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 3.2.5.2, page 23
"You must identify the schedule for installing the appropriate structural source and/or treatment storm water control measures within 14 days and install such measures within 60 days."
Open the permit at this section

Annual effluent limitation monitoring for discharges under effluent guidelines

Once each year of your coverage, counted from when it began.

Once a year, starting in the first full quarter after authorization, sample every discharge point that carries a Table 6-2 regulated discharge (wet deck log spray, phosphate fertilizer runoff, asphalt emulsion, cement material piles, mine dewatering at crushed stone, sand and gravel or industrial sand mines, hazardous and non-hazardous landfills, steam electric coal piles, airport urea deicing) for the Part 8 limits, by grab sample.

  • Only if: your discharge is subject to federal effluent limitation guidelines (ELGs).
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 6.2.3.1. Check your copy of the permit.

Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 6.2.3.1, page 42
"Beginning in the first full quarter following your date of discharge authorization, you must monitor once per year at each storm water discharge point containing the discharges identified in Table 6-2"
Open the permit at this section

Annual monitoring of discharges to impaired waters without a TMDL

Once each year of your coverage, counted from when it began.

A facility discharging to an impaired water without an EPA-approved or established TMDL samples each outfall (except substantially identical ones) once a year for every pollutant the water is impaired for that has a standard method, starting in the first full quarter after authorization. Monitoring stops after one year if the pollutant is not detected above natural background and that is documented, or after a notice to NDEE that it is absent or solely natural background; while detected it continues every year.

  • Only if: your stormwater reaches an impaired water body.
  • Does not apply if: a TMDL applies to your discharge; the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 6.2.4.2. Check your copy of the permit.

Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 6.2.4.2, page 43
"You must monitor once per year at each outfall (except substantially identical outfalls) discharging storm water to impaired waters without an EPA-approved or established TMDL."
Open the permit at this section

Benchmark monitoring each quarter in coverage years 1 and 4

By the end of each calendar quarter, starting with the first full calendar quarter after your coverage begins. Only in coverage years 1 and 4, counted from when your coverage began.

Facilities in a subsector with benchmarks sample each outfall (or one of each group of substantially identical outfalls) once in each calendar quarter of their first and fourth years of coverage, starting with the first full quarter of coverage, for the Part 8 benchmarks of every sector at the site. A parameter whose annual average does not exceed its benchmark stops for the next eight quarters (or for good after year four); one that exceeds follows AIM.

  • Only if: your permit subsector is A1, A2, A3, A4, B1, C1, C2, C3, C4, D1, E1, E2, F1, F2, F3, F4, G1, G2, H1, J1, J2, K1, L1, M1, N1, Q1, S1, U1, U2, Y1, AA1, AA2.
  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 6.2.2.2, page 40
"Benchmark monitoring of storm water discharges is required quarterly, as identified in Part 6.1.7, in the first and fourth year of permit coverage"
Open the permit at this section

Hardness-dependent benchmarks: keep a receiving water hardness value with the first benchmark report

No set date. With the first benchmark report (6.2.2.1).

A facility whose benchmarks include hardness-dependent metals (cadmium, copper, lead, nickel, silver, zinc) establishes a hardness value representative of the receiving water by the Appendix E procedure and keeps it with its first benchmark report, then uses the Table 8.2-1 value for that hardness range.

  • Only if: your permit subsector is A1, A2, C1, C3, C4, F1, F2, F3, F4, G2, K1, M1, N1, Q1, Y1, AA1, AA2.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 6.2.2.1, page 40
"you are required to retain with your first benchmark report a hardness value, established consistent with the procedures in Appendix E, that is representative of your receiving water."
Open the permit at this section

PAH indicator monitoring twice a year in coverage years 1 and 4

Once each year of your coverage, counted from when it began, 2 times.

Sector A facilities with creosote, and Sectors C (SIC 2911), D, F, H, I, M, O, P (SIC 4011, 4013, 5171), Q (SIC 4491), R and S, sample twice a year for the 16 priority PAHs in the first and fourth years of coverage (report only), by EPA Method 625.1, or 610 or Standard Method 6440B.

  • Only if: your permit sector is D, F, H, I, M, O, R, S, or your SIC code starts with 2911, 4011, 4013, 5171, 4491, or the facility is a Sector A facility that makes, uses or stores creosote or creosote-treated wood exposed to precipitation.
  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 6.2.1.1.b.ii, page 39
"You must conduct indicator monitoring of storm water discharges for PAHs biannually (i.e., sample twice per year) in the first and fourth years of permit coverage."
Open the permit at this section

Sector AD: get the Director's written permission before the NOI

No set date. Before the NOI is submitted (8.AD.1.1); no number of days.

A facility designated by the Director, or with industrial storm water that fits no Sector A to AC description, obtains the Director's written permission to use the permit, or NDEE's notice that this permit applies, before submitting an NOI.

  • Only if: your permit sector is AD.
  • You file it in the agency's system (NDEE website electronic submission (Part 7.1); paper copies only with a waiver, by mail to the Part 7.5.1 address).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.AD.1.1, page 125
"you must obtain the Director’s written permission to use this permit prior to submitting an NOI or have been notified by NDEE that permit authorization is required and that this permit is applicable."
Open the permit at this section

Sector E: sweep or vacuum dust areas at least once a week

Within 7 days after the last cleaning.

Glass, clay, cement, concrete and gypsum product facilities sweep, vacuum or otherwise clean paved areas exposed to storm water at the frequency in the SWPPP, and at least once a week where cement, aggregate, kiln dust, fly ash or settled dust is handled or processed and may be discharged; fine granular solids are stored enclosed or covered where practicable.

  • Only if: your permit sector is E; cement, aggregate, kiln dust, fly ash or settled dust is handled or processed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.E.2.1, page 55
"it must be performed at least once a week in areas where cement, aggregate, kiln dust, fly ash, or settled dust are being handled or processed and may be discharged in storm water."
Open the permit at this section

Sector G active and temporarily inactive mines: train employees at least once a year

Within 1 year after the last training.

Active and temporarily inactive metal mining sites conduct employee training at least once a year and record it in the SWPPP.

  • Only if: your permit sector is G.
  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 8.G.5.1. Check your copy of the permit.

Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.G.5.1, page 63
"Conduct employee training at least annually at active and temporarily inactive sites."
Open the permit at this section

Sector G2 waste rock and overburden piles: benchmark monitoring in the first year

Once each year of your coverage, counted from when it began. Only in coverage years 1, counted from when your coverage began.

Active metal mines with discharges from waste rock and overburden piles sample once in the first year for the Table 8.G-2 parameters and the Table 8.G-3 parameters for the ore mined, then twice a year in later years for any parameter whose benchmark was exceeded. Radium and uranium are sampled each quarter for the first four full quarters.

  • Only if: your permit subsector is G2; the site has discharges from waste rock or overburden piles at an active metal mine.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 8.G.8.2. Check your copy of the permit.

Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.G.8.2, page 65
"For discharges from waste rock and overburden piles, perform benchmark monitoring once in the first year for the parameters listed in Table 8.G-2"
Open the permit at this section

Sector I: inspect erosion and sediment controls every 7 days

Within 7 days after the last inspection.

Oil and gas extraction facilities inspect all erosion and sedimentation control measures either every 7 days, or once every 14 calendar days and within 24 hours of a storm of 0.25 inches or more. The pack dates every 7 days.

  • Only if: your permit sector is I.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.I.5, page 75
"All erosion and sedimentation control measures must be inspected either: every 7 days; or once every 14 calendar days and within 24 hours of a storm event of 0.25 inches or greater."
Open the permit at this section

Sector I: start vegetative practices within 14 days of the last activity in an area

Within 14 days after the last activity in a disturbed area.

Begin appropriate vegetative practices (seeding, mulching, sod, buffer strips, tree protection) on all disturbed areas within 14 days after the last activity in that area.

  • Only if: your permit sector is I.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.I.3.1, page 74
"Begin implementing appropriate vegetative practices on all disturbed areas within 14 days following the last activity in that area."
Open the permit at this section

Sector J active and temporarily inactive mines: train employees at least once a year

Within 1 year after the last training.

Active and temporarily inactive non-metallic mineral mining sites conduct employee training at least once a year and record it with the SWPPP.

  • Only if: your permit sector is J.
  • Does not apply if: the facility is inactive and unstaffed.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 8.J.5.1. Check your copy of the permit.

Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.J.5.1, page 79
"Conduct employee training at least annually at active and temporarily inactive sites."
Open the permit at this section

Sector L operating landfills and land application sites: inspect every 7 days

Within 7 days after the last inspection.

Except in semi-arid climates, inspect operating landfills, open dumps and land application sites at least once every 7 days, focusing on areas not yet finally stabilized, active application areas, exposed storage, controls, leachate systems and vehicle entrances. Stabilized sites, completed land application areas and semi-arid sites inspect at least monthly.

  • Only if: your permit sector is L; the landfill, open dump or land application site is operating.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.L.7.1, page 87
"Except in semi-arid climates, inspect operating landfills, open dumps, and land application sites at least once every 7 days."
Open the permit at this section

Sector M: inspect arriving vehicles for leaks and drain their fluids

No set date. Immediately, or as soon as practicable, on arrival (8.M.4, 8.M.2.1).

Automobile salvage yards inspect vehicles arriving at the site for leaks immediately, or as soon as practicable, and drain vehicles to be dismantled of all fluids on arrival (or as soon as practicable).

  • Only if: your permit sector is M.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.M.4, page 90
"Immediately (or as soon thereafter as practicable) inspect vehicles arriving at the site for leaks."
Open the permit at this section

Sector P: train personnel at least once a year

Within 1 year after the last training.

Land transportation and warehousing facilities train personnel at least once a year on used oil and spent solvent management, fueling, good housekeeping, painting and used battery management, as applicable.

  • Only if: your permit sector is P.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.

Inferred from section 8.P.3.2. Check your copy of the permit.

Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.P.3.2, page 101
"Train personnel at least once a year and address the following activities, as applicable"
Open the permit at this section

Sector S primary airports: certify each year that no urea pavement deicers are used

Within 1 year after the last certification.

A primary airport with 1,000 or more annual non-propeller aircraft departures that discharges from airfield pavement deicing either certifies each year, kept with the SWPPP, that it does not use pavement deicers containing urea, or meets the Table 8.S-2 ammonia limit.

  • Only if: your permit sector is S; the airport is a "primary airport" with 1,000 or more annual non-propeller aircraft departures that discharges from airfield pavement deicing.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.

Inferred from section 8.S.7.1. Check your copy of the permit.

Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.S.7.1, page 109
"certify annually and maintain with your SWPPP that you do not use pavement deicers containing urea, or meet the effluent limitation in Table 8.S-2."
Open the permit at this section

Sectors G, H and J exploration and construction: inspect every 14 days and within 24 hours after a half-inch storm

Within 14 days after the last inspection.

While clearing, grading or excavation for exploration or construction is under way before active mining, inspect disturbed areas, material storage areas, erosion and sediment controls, discharge locations and vehicle exits at least once every 14 calendar days and within 24 hours after the end of a storm of 0.5 inches or more, with a report of the Part 4.1 information for each.

Further steps with their own deadlines:

  • Inspect within 24 hours after a storm of 0.5 inches or more. Within 24 hours after a storm of 0.5 inches or more ends. Section 8.G.4.2.1, page 62
    "within 24 hours of the end of a storm event of 0.5 inches or greater."
  • Only if: your permit sector is G, H, J; clearing, grading or excavation for exploration or construction is under way before active mining.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
  • The permit says this is done by qualified personnel, as the permit defines them.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.G.4.2.1, page 62
"Inspections must be conducted at least once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater."
Open the permit at this section

Sectors G, H and J exploration and construction: stabilize within 14 days after work stops

Within 14 days after clearing, grading or excavation stops in part of the site.

Start stabilizing any part of the site where clearing, grading or excavation has temporarily or permanently stopped immediately, and in no case more than 14 days after work there stopped; where winter, semi-arid or drought conditions prevent it, start as soon as practicable and use interim measures.

  • Only if: your permit sector is G, H, J; clearing, grading or excavation for exploration or construction is under way before active mining.
  • Nothing is filed; keep the record at the facility.
  • Keep the records 3 years.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 8.G.4.3.2, page 62
"but in no case more than 14 days after the clearing, grading and/or excavation activities in that portion of the site have temporarily ceased."
Open the permit at this section

What does no-exposure certification require?

Conditional exclusion for no exposure (NDEE Title 119, Chapter 10, 007.04D): a No Exposure Certification submitted electronically, renewed every five years and when the permit is reissued (Part 1.5).

Every few years 1 duty

Renew the No Exposure Certification every five years and when the permit is reissued

Within 5 years after your last No Exposure Certification.

A facility with no exposure submits a complete and accurate No Exposure Certification (NEC) electronically through NDEE's website, and submits a new one once every five years and upon reissuance or replacement of this permit, keeping the condition of no exposure.

Further steps with their own deadlines:

  • Submit a new NEC when the permit is reissued or replaced. Within 0 days after the reissued permit takes effect. Section 1.5, page 10
    "or upon reissuance or replacement of this permit"
  • You file it in the agency's system (NDEE Industrial Storm Water online application (ecmp.nebraska.gov)).
  • Keep the records 3 years.
  • Signed or certified by a responsible official or duly authorized representative.
Source: General NPDES Permit NER920000, Industrial Storm Water General Permit, Parts 1 to 9, 126 pages, section 1.5, page 10
"You must submit a NEC to the Department once every five years, or upon reissuance or replacement of this permit, and maintain a condition of No Exposure."
Open the permit at this section

Get your own dates

Choose your coverage and answer a few questions. You get each duty's next date and a calendar file.

Nebraska Industrial Storm Water General Permit NER920000 (ISW-GP) duties, topic by topic

How the Nebraska Industrial Storm Water General Permit NER920000 (ISW-GP) compares with the other checked permits on each kind of duty, in the permit's own words with the section for each: